099000_Appendix_B__Quality_Control_Inspection_PCS.pdf
PDF 70 KB Posted
- Attached to
- Reroof Buildings 3, 6, 19 and 28
- Solicitation number
- 25-CR-054
- Issued by
- Pinellas County, Florida
About this file
This document is a Quality Control Inspection Report issued by Pinellas County Schools (PCS) on 3/27/17 for a roof replacement project at Northeast High School, specifically targeting Buildings 3, 6, 19, and 28. The form is a blank template designed to document quality control procedures, inspections, and compliance checks during the roofing project, with columns for reviewing specific procedures, applicable paragraphs, pass/fail status, and comments or recommendations. The form includes a quality control checklist with yes/no questions about contractor quality control presence, specification accessibility, material usage, and prior non-conformance issue resolution.
While the specific form is blank and not filled out, it is part of a comprehensive roof replacement project with a project number of 9505/WDA 2412-02. The document serves as a standardized tool for ensuring quality control and adherence to specified standards during the roofing renovation process, allowing inspectors to systematically document and track project compliance with Pinellas County Schools' requirements and construction standards.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pinellas County Schools 09 90 00 Painting and Coating - Appendix B Facility Name: Northeast HS Roof Replacement - Buildings 3, 6, 19, & 28
PCS Project No.: 9505 / WDA 2412-02 Quality Control Inspection Report
Issued by PCS: 3/27/17
Project Name: Date and Time:
General Contractor:
Inspector Name:
Subcontractor: Contractor QC:
Weather Conditions:
Building No:
PROCEDURE(S) REVIEWED INCLUDING
SPECIFIC LOCATIONS
APPLICABLE PCSB
9F PARAGRAPH
PASS / FAIL PER
REQUIREMENTS
COMMENTS AND/OR
RECOMMENDATIONS
QUALITY CONTROL CHECKLIST:
(Circle One)
Was Contractor’s QC present during operations: Yes No
Was the specification accessible to the Contractor: Yes No
Were the proper materials being used: Yes No
Have prior non-conformance issues been rectified: Yes No
File details come from the government source that posted it. Updated .