099000_Appendix_B__Quality_Control_Inspection_PCS.pdf
PDF 70 KB Posted
- Attached to
- Reroof Buildings 3, 6, 19 and 28
- Solicitation number
- 25-CR-054
- Issued by
- Pinellas County, Florida
About this file
This document is a Quality Control Inspection Report form issued by Pinellas County Schools for the Northeast High School Roof Replacement project, specifically targeting Buildings 3, 6, 19, and 28. The form is designed to document quality control procedures, inspections, and compliance for painting and coating work, with a project number of 9505 / WDA 2412-02 and was issued on 3/27/17. The form includes sections for recording project details, procedures reviewed, specific locations, applicable paragraphs, pass/fail assessments, and a quality control checklist with options to verify contractor quality control presence, specification accessibility, material appropriateness, and resolution of prior non-conformance issues.
The form provides a structured template for systematically documenting and evaluating construction quality control processes, with space for inspectors to note specific details about the roof replacement project. While the form is blank in this instance, it is designed to enable comprehensive tracking of procedural compliance, material usage, and potential recommendations or comments during the project's implementation. The quality control checklist allows for quick visual confirmation of key project management elements, ensuring that contractors adhere to specified standards and address any previous quality concerns.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pinellas County Schools 09 90 00 Painting and Coating - Appendix B Facility Name: Northeast HS Roof Replacement - Buildings 3, 6, 19, & 28
PCS Project No.: 9505 / WDA 2412-02 Quality Control Inspection Report
Issued by PCS: 3/27/17
Project Name: Date and Time:
General Contractor:
Inspector Name:
Subcontractor: Contractor QC:
Weather Conditions:
Building No:
PROCEDURE(S) REVIEWED INCLUDING
SPECIFIC LOCATIONS
APPLICABLE PCSB
9F PARAGRAPH
PASS / FAIL PER
REQUIREMENTS
COMMENTS AND/OR
RECOMMENDATIONS
QUALITY CONTROL CHECKLIST:
(Circle One)
Was Contractor’s QC present during operations: Yes No
Was the specification accessible to the Contractor: Yes No
Were the proper materials being used: Yes No
Have prior non-conformance issues been rectified: Yes No
File details come from the government source that posted it. Updated .