2412-02_Northeast_HS_Roof_Replacement_-_Addendum_4_Summary_2025.06.03.pdf
PDF 109 KB Posted
- Attached to
- Reroof Buildings 3, 6, 19 and 28
- Solicitation number
- 25-CR-054
- Issued by
- Pinellas County, Florida
About this file
This document is Addendum #4 for the Northeast High School Roof Replacement project issued by the District School Board of Pinellas County, involving Buildings 3, 6, 19, and 28. The addendum, dated April 16, 2025, provides clarifications and revisions to architectural drawings and specifications, including updates to roofing details on various building sections, section tags, and flashing details. Key modifications include adjustments to section tags on Sheets A1.3, A5.2, and A5.4, with specific changes to roofing details between different roof areas on Building 19.
The addendum also includes updates to specification sections, notably Section 00 01 00 Special Conditions, which clarifies contingency usage (set at 10% of total bid amount), mandates JLA badges for all contractors/employees, and specifies contractor access requirements for roof work. Additional specification sections 09 24 00 and 09 90 00 provide product information for stucco repairs and painting related to the roof replacement. The document emphasizes that all work is subject to General and Special Conditions, and contractors must acknowledge the revisions on the Bid Form, incorporating the associated costs into the Base Bid.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
District School Board of Pinellas County
Northeast High School Roof Replacement – Buildings 3, 6, 19 & 28
PCS Project # 9505 / WDA Project # 2412-02
ADDENDUM #4 SUMMARY
DATE OF CONTRACT DOCUMENTS: April 16, 2025
ISSUED TO BID: May 15, 2025
BID DATE: -
The following changes, additions, modifications, deletions and clarifications to the Contract Documents dated as shown are herewith issued and shall be made under this Addendum #1 a part of the Bid Proposal submitted to the Owner.
CONTENTS:
CLARIFICATIONS / REVISIONS TO DRAWINGS
Sheet
No.
Revision Description Type of Change
ARCHITECTURAL
A1.3 - Section tag for detail between roof Areas J and K on Building 19 has been updated to reflect revised roofing detail between the two (2) roofs.
- Section tag for detail 5/A5.4 has been added for clarification of detail between lower roof areas and Area L.
A5.2 - Detail 1/A5.2 updated to reflect two-piece Reglet flashing detail.
- Detail 3/A5.2 clarified to reflect two-piece Reglet flashing detail and to clarify required stucco repairs for new flashing installation.
A5.4 - Detail 4/A5.4 has been added to clarify the roofing detail between
Areas J and K on Building 19.
- Detail 5/A5.4 has been added to clarify the roofing detail between the lower roof areas and the upper roof area on Building 19.
CLARIFICATIONS / REVISIONS TO SPECIFICATIONS
Specification
Section Revision Description Type of Change
ARCHITECTURAL
00 01 00 Clarifications and updates have been added to the bid specifications
Special Conditions Section 1.1 H including:
- Additional verbiage clarifying contingency usage on the project and the adjustment of the contingency value to 10% of the total bid amount.
- Clarification of the requirement that all contractors/employees are required to have JLA badges at all times anywhere on the campus.
- Clarification of the requirements for the contractor to provide their own access to the roof when work after hours is being conducted on the campus. The exiting internal roof hatches & ladders are not to be utilized during after hours work.
09 24 00 Portland cement plaster specification section to provide product information for stucco repairs associated with the roof replacement.
09 90 00 Painting specification section provided to provide painting product information for work related to any stucco repairs.
MISCELLANEOUS CLARIFICATIONS
N/A
INSTRUCTIONS
1. All work covered in this Revision Summary is subject to the General and Special Conditions.
2. This Revision Summary shall be acknowledged on the Bid Form and the cost of the work herein specified shall be included in the Base Bid and or as an alternate indicated.
3. If this Revision Summary lists additional acceptable manufacturers, manufacturers listed remain responsible for meeting the design and performance criteria of specifications and drawings, as shown.
End of Addendum #4 Revision Summary