The document is a comprehensive Nuclear Moisture Survey Report prepared by NOVA Engineering & Environmental for Williamson Design Associates, Inc., focusing on roof testing services at Northeast Pinellas High School in St. Petersburg, Florida. The report details nuclear moisture surveys, field uplift resistance testing, and fastener withdrawal resistance testing conducted on four buildings (Buildings 3, 6, 19, and 28) across multiple roof sections. The investigation was performed from November 18-24, 2024, utilizing specialized equipment including a Troxler Model 3216 Nuclear Moisture Gauge and a Digital Extractor pull tester, with testing methods following Florida Building Code Testing Application Standards (TAS 124-20 and TAS 126).
The report provides detailed technical analysis of roof system compositions, moisture content, and structural integrity across different roof areas. Key findings include varying moisture levels in lightweight insulated concrete (LWIC), polyisocyanurate insulation, and modified bitumen membranes, with some areas showing elevated moisture percentages. The testing covered approximately 74,622 square feet across multiple roof sections, with specific attention to core sample extractions, gravimetric analysis, and nuclear moisture survey measurements. While the report does not directly relate to a procurement process, it serves as a critical diagnostic tool for assessing the current condition of the school's roofing systems, potentially informing future maintenance, repair, or replacement decisions.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P R O F E S S I O N A L | P R A C T I C A L | P R O V E N
6 5 0 N o r t h l a k e B o u l e v a r d | S u i t e 4 3 0 | A l t a m o n t e S p r i n g s , F L 3 2 7 0 1 t . 4 0 7 . 9 0 2 . 2 6 6 0 | u s a N O V A . c o m
December 18, 2024
Williamson Design Associates, Inc.
2605 Enterprise Drive Suite 200
Clearwater, Florida 33759
Attention: Mr. Brian Lapointe brianl@wda.biz
727-725-0951
Subject: Report for Roof Consulting and Testing Services
Northeast Pinellas High School
5500 16th Street North
St. Petersburg, FL 33703
NOVA Project No.: 10109-0524065
Dear Mr. Lapointe:
NOVA Engineering and Environmental, LLC (NOVA) appreciates the opportunity to submit the following report to Williamson Design Associates, Inc. for the completed Roof Consulting and
Testing Services. This work was performed in general accordance with NOVA’s Proposal Number
009-0524065-Rev.2, dated May 2, 2024, and the AIA Contract between WDA and NOVA, dated
July 16, 2024, and signed on August 15, 2024. Included in this report is an outline of the project understanding, the scope of services performed, and results of the roof testing services as well as photographic documentation, observed and marked-up roof drawings indicating test locations and results.
PROJECT INFORMATION
NOVA performed Field Uplift Resistance Testing (FBC TAS 124-20) Bonded Method, Field
Withdrawal Resistance of Fasteners (ANSI/SPRI FX-1) and a Nuclear Roof Moisture Survey (FBC
TAS-126) testing at Northeast Pinellas High School from November 18, 2024, through November
24, 2024. The Northeast Pinellas High School, a facility located at 5500 16th Street North in St.
Petersburg, Florida, consists of four (4) buildings throughout the campus where testing was performed. The roof sections which were the subject of our testing are as follows:
A. Building 3 is composed of two independent roof sections, covering a total area of approximately 18,300 square feet and was constructed in 2002. Each roof section consists of approximately:
• Building 3 Roof Section A – 11,400 sq. ft.
• Building 3 Roof Section B – 6,900 sq. ft.
B. Building 6 consists of seven independent roof sections, covering an area of approximately
28,536 square feet and was constructed in 1977. Each roof section consists of approximately:
mailto:brianl@wda.biz jmcadams Snapshot
Northeast Pinellas High School – Roof Testing Services December 18, 2024
Williamson Design Associates, Inc. NOVA Project Number 10109-0524065
Page | 2
• Building 6 Roof Section A – 1064 sq. ft.
• Building 6 Roof Section B – 1,100 sq. ft.
• Building 6 Roof Section C – 7,381 sq. ft.
• Building 6 Roof Section D – 4,400 sq. ft.
• Building 6 Roof Section E – 1,233 sq. ft.
• Building 6 Roof Section Y – 2,769 sq. ft.
• Building 6 Roof Section Z – 10,589 sq. ft.
C. Building 19 consists of three independent roof sections covering an area of approximately
23,688 square feet and was constructed in 2002. Each roof section consists of approximately:
• Building 19 Roof Section A – 13,519 sq. ft.
• Building 19 Roof Section B – 2,367 sq. ft.
• Building 19 Roof Section C – 7,802 sq. ft.
D. Building 28 consists of three independent roof sections covering an area of approximately
13,597 square feet and was constructed in 1992. Each roof section consists of approximately:
• Building 28 Roof Section A – 9,685 sq. ft.
• Building 28 Roof Section B – 3,238 sq. ft
• Building 28 Roof Section C – 674 sq. ft.
It was reported that the actual roof construction was unknown at the time of the mobilization and was later determined on-site in which core extractions were performed, defining the scope of work.
Building 6 Roof Sections Y and Z and Building 28 Roof Sections A-C were determined on-site to consist of a low-sloped modified bitumen built-up roof (BUR) over tapered polyisocyanurate insulation with a perlite coverboard mechanically secured to a structural metal decking, requiring complete removal down to the deck. NOVA performed roof system construction composition verifications and Field Withdrawal Resistance of Fasteners (ANSI/SPRI FX-1) testing associated with Building 6 (Y and Z) and Building 28 (A-C) roof sections, based on the construction of the roof systems bonded pull tests and nuclear roof moisture assessments were excluded. The remaining roof sections, where testing was performed, were generally comprised of a low-sloped modified bitumen built-up roof (BUR) system with a granulated cap sheet covering lightweight insulated concrete (LWIC) with holey board expanded polystyrene (EPS) insulation with concrete slurry installed over structural metal decking. Building 6 Roof sections Z and Y were the only sections observed with a second roof system combining both LWIC and polyisocyanurate insulation systems beneath the modified bitumen built-up membrane. The general composition of the roof systems observed was as follows:
Section
Roof Areas
Membrane
Thickness
LWIC w/ EPS
Thickness
Polystyrene
Insulation Thickness
Perlite
Coverboard
Polyisocyanurate
Insulation Thickness
3 (A & B) ~0.50” ~3 ½” ~1” - ~5 ½“ NA NA
6 (A-E) ~0.50” ~3 ½” ~1” - ~5 ½“ NA NA
6 (Y & Z) ~0.50 - ~1” ~3 ½” ~1” - ~4 ½” ~ ½” - ~1” ~1” - ~ 8 ½”
19 (A-C) ~0.50” ~3 ½” ~1” - ~5 ½ “ NA NA
28 (A-C) ~0.50” NA NA ~ ½” - ~1” ~2 - ~5 ½”
Williamson Design Associates, Inc. NOVA Project Number 10109-0524065
Page | 3
SCOPE OF SERVICES
1. Nuclear Roof Moisture Survey
NOVA performed a nuclear roof moisture survey in general accordance with Florida Building
Code Testing Application Standard (TAS) 126 Standard Procedures for Roof Moisture Surveys to identify areas of suspected moisture intrusion throughout the roof systems utilizing a Troxler
Model 3216 Nuclear Moisture Gauge. TAS 126 protocol covers the procedure for non-destructive testing for the presence of moisture and the subsequent destructive testing to confirm moisture content in Roof System Assemblies, including insulation utilizing an infrared camera to detect the temperature of areas within the roof system, nuclear thermography or impedance testing. The weather conditions were, on average, in the low-80s with the maximum high temperature of 83°F and mostly sunny.
A Nuclear Moisture Survey is the technique of utilizing a radioactive isotope to emit high-speed neutrons aimed downward at the roof from the roof surface from a radiation source within the scanning meter. Neutrons that encounter hydrogen atoms (water) are slowed down, a portion of which “bounce back” to be counted by detectors within the scanning meter measuring the rate of thermalization of the neutrons identifying areas of wet roof system components. Since water contains significant hydrogen atoms, areas of moisture within the roofing record higher levels of slowed neutrons at a depth of 7 inches. This test method is suggested for roof systems such as the subject roof area of this project and provides quantitative data on the amounts of moisture within the roof system.
NOVA performed the nuclear scanning on a 5’ x 5’ grid pattern over the entire roof surface.
Varying types and thicknesses of the membranes and other roofing components also contain varying quantities of hydrogen atoms, and therefore, higher levels can be detected in different areas. Ponded water will result in increased readings; however, the quantity of water below the scanning meter in these areas is generally constant. For this reason, areas of ponded water can be tested and compared separately.
Subsequent to non-destructive testing, core samples with a minimum of 2-inch diameter were taken from 1) those areas determined to be “dry” and 2) those areas found to have varying levels of moisture present and placed immediately into separate watertight containers then tested for gravimetric analysis. The roofing contractor performed the permanent roof repair procedures at extracted core locations.
1.1 Gravimetric Analysis
NOVA performed gravimetric analysis (moisture by weight testing) in compliance with ASTM
Test Method D1864. The different components of each core sample were tested separately.
Each component was cleaned of debris and weighed immediately after removal from a watertight container. “Wet” weights were recorded with their respective labeling. Each component of individual core samples was chamber-dried for 24 hours at 230°F (114°C) and reweighed with the results recorded. After the second weight measurement, the samples were subsequently replaced in the drying chamber for one additional hour. At the completion of the extra drying time, the samples were reweighed and recorded.
This process was repeated until no additional weight loss was recorded. The moisture by weight is determined for each test component utilizing the following equation below:
Williamson Design Associates, Inc. NOVA Project Number 10109-0524065
Page | 4
% 𝑀𝑜𝑖𝑠𝑡𝑢𝑟𝑒 𝑏𝑦 𝐷𝑟𝑦 𝑊𝑒𝑖𝑔ℎ𝑡 = 𝑊𝑒𝑖𝑔ℎ𝑡(𝑤𝑒𝑡) − 𝑊𝑒𝑖𝑔ℎ𝑡(𝑑𝑟𝑦)
𝑊𝑒𝑖𝑔ℎ𝑡(𝑑𝑟𝑦) × 100%
Core samples were obtained at each roof area in conjunction with the reading measured by the gauge as part of the nuclear roof moisture survey with the purpose of further investigating, qualifying, and quantifying the presence of subsurface moisture content. Gravimetric analysis results for extracted cores and roof composition thicknesses are reported in the tables shown below:
Building 3
Building Section Core # Nuclear
Reading
Membrane
% Moisture
LWIC %
Moisture
Polystyrene
Insulation %
Moisture
3 A D.24 9 0.3 3.2 1.0
3 A Q.24 9 1.3 3.5 1.0
3 A AC.5 12 0.3 3.3 1.7
3 A M.9 13 0.3 4.1 1.1
3 A L.13 31 3.9 25.2 37.2
3 A AD.9 31 0.2 2.6 1.5
3 B X.20 9 0.4 2.3 1.4
3 B T.2 10 0.3 2.9 0.0
3 B Q.11 12 0.2 2.9 1.0
3 B R.31 13 0.3 5.3 1.6
3 B X.22 24 0.2 5.3 3.3
3 B Z.19 28 0.1 2.8 1.7
Williamson Design Associates, Inc. NOVA Project Number 10109-0524065
Page | 5
Building 6
Reading
Membrane
% Moisture
LWIC %
Moisture
Polystyrene
Insulation %
Moisture
6 A B.9 9 0.2 3.4 1.7
6 A A.4 10 0.0 3.8 0.0
6 A D.3 18 0.4 3.4 0.0
6 A C.7 19 0.0 4.5 0.0
6 A A.1 34 0.8 4.5 0.0
6 A B.5 35 6.6 14.8 0.0
6 B B.9 9 0.3 4.2 2.2
6 B B.10 10 0.2 3.4 0.0
6 B B.6 15 0.2 3.6 8.7
6 B E.5 15 0.6 6.0 0.0
6 B D.4 24 0.6 4.8 0.0
6 B A.1 36 1.7 6.0 3.9
6 C I.14 8 0.5 3.1 1.6
6 C H.6 9 0.3 2.6 1.5
6 C F.18 13 0.0 3.3 0.0
6 C K.10 13 0.0 6.6 0.0
6 C A.19 33 0.0 4.6 0.0
6 C K.21 39 5.0 20.7 6.4
6 D B.4 9 0.0 2.9 0.0
6 D F.3 10 0.0 1.5 0.0
6 D H.4 15 0.0 2.5 0.0
6 D C.21 15 0.2 3.8 0.0
6 D A.2 30 0.0 1.9 0.0
6 D A.5 41 0.0 2.8 0.0
6 E H.2 9 0.0 2.3 0.0
6 E B.4 9 0.0 1.6 1.2
6 E F.7 16 0.3 3.5 1.8
6 E D.5 17 0.0 4.3 0.0
6 E I.5 28 5.6 17.2 0.0
6 E I.6 37 2.0 21.2 0.0
Williamson Design Associates, Inc. NOVA Project Number 10109-0524065
Page | 6
Building 19
Reading
Membrane
% Moisture
LWIC %
Moisture
Polystyrene
Insulation %
Moisture
19 A A.21 9 0.0 3.4 0.0
19 A F.3 10 0.0 2.8 0.0
19 A K.25 16 0.2 3.9 0.0
19 A N.3 17 0.2 4.2 1.0
19 A U.10 39 0.3 6.0 0.0
19 A D.22 49 2.3 12..4 3.3
19 B H.7 10 0.0 4.2 0.0
19 B E.5 11 0.6 8.9 4.5
19 B B.5 16 0.4 6.7 1.5
19 B E.2 18 0.5 11.0 1.5
19 B D.6 31 1.1 19.6 9.0
19 B F.9 33 0.7 10.0 6.9
19 C S.21 11 0.3 4.2 0.0
19 C T.15 12 0.0 4.0 0.0
19 C C.27 19 0.4 5.2 0.0
19 C I.21 19 0.3 8.2 1.6
19 C L.19 52 0.3 13.1 1.8
19 C K.19 53 0.1 9.5 9.5
NOTE: Building 6 (Y and Z) and Building 28 (A-C) roof sections nuclear roof moisture assessments with extracted cores were excluded based on roof construction composition.
1.2 Analysis of Nuclear Roof Moisture Survey with Gravimetric Analysis
The laboratory-determined total moisture content of each core sample extracted, was plotted, and compared to each core location nuclear measurement. A best-fit linear regression curve and corresponding line slope equation were developed. The line slope equation describes the average moisture percentage by dry weight of the roof assembly.
Due to the difference in time of installation and unknown factors affecting the installation process, each roof section was evaluated separately.
A representative moisture mapping roof diagram showing locations of nuclear gauge readings as well as core locations extracted is presented as Appendix D to this report. The raw results of the nuclear roof moisture survey scans per section were also arranged into histograms depicting the frequency and statistical distribution of the measurements and are presented in Appendix D of this report.
Williamson Design Associates, Inc. NOVA Project Number 10109-0524065
Page | 7
1.3 Moisture Evaluation Criteria
Devaluation of material structural performance associated with these geographic locations are generally the result of organic or inorganic material deterioration of physical properties or dissolving of adhesives/binders of the material makeup. In general, NOVA believes that a moisture concentration level lower than levels traditionally shown to impact thermal resistance factors and typically considered during the interpretation of roof moisture survey results can negatively affect material and system performance. Considering the subject roof system construction, condition and geographic location, Florida Building Code
1521.12 states:
“Moisture content of the existing roofing assembly to be covered by a new roofing system shall not exceed 5 percent by weight in the roofing membrane and 8 percent by weight in commercially manufactured rigid board insulation as verified by moisture survey performed in accordance with TAS 126”.
Florida Building Code 1521.12 further states that “testing for moisture content shall not be required for existing lightweight insulating concrete, gypsum, and cementitious fiber roof decks. On Lightweight insulating concrete, gypsum, and cementitious wood fiber roof decks field fastener withdrawal resistance testing, in compliance with TAS 105 shall be carried out to confirm compliance with wind load requirements.”
When evaluating and determining the roof substrate moisture content to be “dry or “wet” the FBC criteria was utilized. Other criteria or standards may be applied that change the moisture classification.
NOVA’s methodology and approach to determined roof component moisture percentage from gravimetric analysis results is as follows.
• Cores samples are taken from applicable roof sections.
• Gravimetric Analysis, as described in the above section, is performed on each core sample to determine the moisture content of each material component from the roof core.
• From testing, if at least one of the material components within a roof core is determined “wet”, that core and corresponding nuclear measurement numerical reading is considered “wet”.
• If a “wet” core is determined on a roof section, that corresponding nuclear measurement numerical reading and all nuclear measurement numerical readings higher than that reading are assumed and deemed to be “wet”, with one clarifying exception. This methodology and approach, NOVA references as a corresponding wet continuation.
• The exception to corresponding wet continuation is if a taken core sample has a numerical reading higher than a tested “wet” core, and that numerical reading higher core had all material components that tested “dry”. If this occurs, then the specific numerical reading higher core only will be considered “dry”.
Note that based on field conditions in relation with gravimetric analysis results, if applicable, NOVA conclusions may warrant deviation from the above methodology and approach.
Williamson Design Associates, Inc. NOVA Project Number 10109-0524065
Page | 8
1.4 Results
The table below summarizes the results based on the gravimetric analysis of the extracted core samples, as well as the statistical interpretation of the nuclear measurements. Refer to
Appendix D – Nuclear Roof Moisture Survey Figure.
2. Field Uplift Resistance Testing (FBC TAS 124) – Bonded Method
NOVA performed bonded uplift resistance testing – bonded method in general accordance with
FBC TAS 124. NOVA was directed by WDA to test to failure rather than a specified pass or fail criteria. McEnany Roofing contractor prepared the test areas of the roofs by cutting and removing the roof system components to expose the LWIC assemblies. The roofing contractor also provided low-rising polyurethane foam adhesive (OlyBond500 SpotShot) and 2” polyisocyanurate insulation board samples, which were utilized in the testing.
NOVA fabricated 2ft2 load transfer device panels for each of the test areas consisting of three
½” pieces of plywood secured together with wood screws and Liquid Nails adhesive with a ½” galvanized eyebolt placed in the center of the boards. The insulation board was adhered to the load transfer device panels with the OlyBond 500 adhesive applied in ribbons spaced at
6” O.C., and then adhered to the LWIC in the same manner. The test specimens were allowed to be cured for at least two hours, as required by the adhesive manufacturer.
A Digital Extractor (Roofing and Construction Pull Tester Model DFG2W200), manufactured by
Com Ten Industries and most recently calibrated on May 06, 2024, was utilized to perform the bonded pull testing. The test procedure and apparatus consisted of an aluminum tripod with block and tackle in conjunction with a calibrated load cell for applying and measuring the load applied to the roof system during the bonded pull tests. Each load transfer panel is weighed prior to testing for calculation purposes. Each load transfer panel weighs 15 lbs.
For each test, an initial load of 40 lbs. plus the weight of the load transfer panel (55 lbs.) was applied and held for a one (1) minute duration. The load of 40 lbs. plus the weight of the load transfer device was calculated to be 10 pounds per square foot (PSF) of applied pressure. When no load loss was detected after the initial one-minute duration, the applied load was increased an additional 10 PSF and held for one-minute (per cycle) increments. This procedure continued until failure occurred.
Roof Section readings
Wet Per
Section
Nuclear readings
Total Per
Section
Roof Area
Total Sq.Ft.
Wet Area
Sq.Ft.
Dry Area
Sq.Ft.
Wet Area
Dry Area
3-A 1 432 11,300 26.16 11,273.84 0.23 99.77
3-B 0 264 7,000 - 7,000.00 - 100.00
6-A 1 28 1,064 38.00 1,026.00 3.60 96.40
6-B 24 50 1,100 528.00 572.00 48.00 52.00
6-C 1 312 7,381 23.70 7,357.30 0.32 99.68
6-D 0 174 4,400 - 4,400.00 - 100.00
6-E 3 49 1,233 25.20 1,207.80 2.04 97.96
19-A 1 524 13,519 25.80 13,493.20 0.19 99.81
19-B 85 89 2,367 2,260.60 106.40 95.50 4.50
19-C 221 310 7,802 5,562.10 2,239.90 40.27 59.73
Williamson Design Associates, Inc. NOVA Project Number 10109-0524065
Page | 9
2.1. Test Results
Test specimens were pulled to failure at the client’s request. While TAS 124-20 generally requires 4 bonded pull tests for any roof area between 5,001 to 10,000, NOVA was requested by a WDA representative to only perform a maximum of three tests per roof section. Due to the favorable test results achieved throughout the roof sections, NOVA personnel were directed by the WDA representative to proceed with one test location on roof areas 6 A-E and 19 A-C, which is a deviation from our proposal and the FBC TAS 124-
20. Refer to Appendix E – Bonded Uplift and Fastener Withdrawal Resistance Testing
Figures. Test results for the tests performed are depicted in the table below:
Test
Location # Building
Roof
Section
(Field, Corner, Perimeter)
Failure
PSF
Failure Location
1 3 A
(Perimeter)
373 Target bolt failure
2 3 A
(Corner)
435 Test called before failure due to maximum limit reached for the pull tester.
3 3 A (Field) 429 Target bolt failure
4 3 B (Field) 435 Test called before failure due to maximum limit reached for the pull tester.
5 3 B
(Perimeter)
435 Test called before failure due to maximum limit reached for the pull tester.
6 3 B
(Corner)
435 Test called before failure due to maximum limit reached for the pull tester.
7 6 A (Field) 423 Target bolt failure
8 6 B
(Perimeter)
435 Test called before failure due to maximum limit reached for the pull tester.
9 6 C (Field) 328 Target to insulation adhesion separation
10 6 D
(Corner)
408 Target to insulation adhesion separation
11 6 E (Field) 408 Target to insulation adhesion separation
12 19 A (Field) 435 Test called before failure due to maximum limit reached for the pull tester.
13 19 B
(Perimeter)
435 Test called before failure due to maximum limit reached for the pull tester.
14 19 C
(Perimeter)
435 Test called before failure due to maximum limit reached for the pull tester.
Note: Related photos of failures show the total pounds for the full load transfer device panels, which are 4 square feet. Subtracting 15 lbs. from the weight of the load transfer device panel and dividing it by 4 square feet gives you the failure PSF shown in the chart. NOTE: Building 6 (Y and Z) and Building
28 (A-C) roof sections bonded pull tests were excluded based on roof construction composition.
Williamson Design Associates, Inc. NOVA Project Number 10109-0524065
Page | 10
3. Fastener Withdrawal Resistance Testing (ANSI/SPRI FX-1)
NOVA performed fastener withdrawal resistance testing in general accordance with
ANSI/SPRI FX-1 Field Test Procedure for Determining the Withdrawal Resistance of Roofing
Fasteners, as requested by the client. This procedure is utilized in the field to test the pullout resistance of all types of fasteners into the load-resisting material of the roofing substrate. Before testing, roofing material shall be removed (i.e., waterproofing membrane, existing insulation).
Fasteners were installed using the same methods and tools as per during actual construction.
Fasteners were pulled out perpendicular to the deck utilizing either a hydraulic or electronic load cell with a dated calibration certificate. Testing was performed at a minimum rate of ten (10) test locations for up to 50,000 sq. ft. and five (5) additional test locations for each additional 50,000
sq. ft. or portion thereof. Testing locations were performed at various areas of the roof, including corners, perimeter, and field, to provide a representative sampling of the roof area, with 50% of the tests in the corners and perimeter areas.
Testing was performed on each building and roof section stated in the project information section of this report at 136 locations (per client’s direction) throughout the roof sections noted above.
Per WDA request, fasteners were provided by McEnany Roofing and included HD #15, 8” and
14” deck fasteners and installed fasteners at test locations. A Digital Extractor (Roofing and
Construction Pull Tester), most recently calibrated on May 06, 2024, manufactured by ComTen
Industries, was utilized to perform the testing.
3.1. Test Results
Refer to Appendix E – Bonded Uplift and Fastener Withdrawal Resistance Testing Figures.
Building 6 section Y and Z checked for composition at varying heights (highest point, middle point to lowest point) then reutilized to perform a fastener withdrawal pull test. Fastener withdrawal resistance testing results are as follows:
NE Pinellas High School Fastener Pull Test
Building Location ID Sample Number
Plan Identifier
Initial Failure Load (lbf) Field, Perimeter or Corner
Building 3A
1 A.27 1018.9 F P C
2 I.1 637.9 F P C
3 AD.0 642.9 F P C
4 G.1 637.1 F P C
5 A.16 1241.1 F P C
6 D.24 516.7 F P C
7 L.13 289.1 F P C
8 M.9 689.4 F P C
9 AA.21 693.1 F P C
10 G.6 714.2 F P C
Building 3B
11 Z.23 773.8 F P C
12 AA.2 1318 F P C
13 P.10 724.6 F P C
14 AA.16 614.8 F P C
15 W.2 272.1 F P C
Williamson Design Associates, Inc. NOVA Project Number 10109-0524065
Page | 11
16 O.4 835.5 F P C
17 X.20 1013.4 F P C
18 Z.19 543 F P C
19 R.15 898.7 F P C
20 V.12 573.8 F P C
Building 6A
21 A.1 479.2 F P C
22 D.1 794.7 F P C
23 D.9 492.6 F P C
24 D.3 492.6 F P C
25 A.4 565.8 F P C
26 B.9 1001.5 F P C
27 B.5 794.9 F P C
28 C.7 432.6 F P C
29 B.4 525.4 F P C
30 C.1 529.3 F P C
Building 6B
31 E.1 332.2 F P C
32 A.1 1559.5 F P C
33 E.10 387.1 F P C
34 B.10 586.1 F P C
35 E.5 958.9 F P C
36 C.1 395.2 F P C
37 D.4 309.2 F P C
38 B.6 271.8 F P C
39 B.9 626.4 F P C
40 C.5 513.8 F P C
Building 6C
41 A.1 254.7 F P C
42 F.27 800.8 F P C
43 L.22 810.8 F P C
44 A.19 496.5 F P C
45 L.2 359.5 F P C
46 B.27 366 F P C
47 H.6 468.5 F P C
48 K.10 280.3 F P C
49 I.14 586.2 F P C
50 F.18 1543.5 F P C
Building 6D
51 D.37 1143.7 F P C
52 A.3 540.2 F P C
53 L.9 483.2 F P C
54 D.29 623.9 F P C
55 A.6 563.1 F P C
56 H.9 564.5 F P C
57 C.22 1059.1 F P C
58 B.5 1121.1 F P C
59 F.4 1014.1 F P C
60 H.4 336.7 F P C
Williamson Design Associates, Inc. NOVA Project Number 10109-0524065
Page | 12
Building 6E
61 A.4 588.1 F P C
62 A.7 323.4 F P C
63 G.3 1166.6 F P C
64 H.2 547.3 F P C
65 E.4 536.2 F P C
66 A.5 567.2 F P C
67 I.5 1140 F P C
68 I.6 598.8 F P C
69 F.7 451.5 F P C
70 D.5 536.6 F P C
Building 6Y
71 "high" 487.1 F P C
72 "med" 277.7 F P C
73 "low" 246.8 F P C
Building 6Z
74 "high" 575.1 F P C
75 "med" 277.6 F P C
76 "low" 616 F P C
Building 19A
77 W.3 390.6 F P C
78 W.10 657.1 F P C
79 W.25 340.2 F P C
80 K.25 392.3 F P C
81 L.13 309.2 F P C
82 D.22 586.7 F P C
83 C.7 542 F P C
84 A.21 604.7 F P C
85 F.3 657 F P C
86 N.3 551.4 F P C
Building 19B
87 H.12 337.8 F P C
88 B.9 288.8 F P C
89 B.12 607.1 F P C
90 E.12 290.4 F P C
91 H.1 499.2 F P C
92 H.7 387.2 F P C
93 F.9 528.1 F P C
94 E.5 355.9 F P C
95 E.2 482.4 F P C
96 D.6 731.7 F P C
Building 19C
97 Q.10 1053.7 F P C
98 P.17 329.2 F P C
99 G.15 333.4 F P C
100 G.22 336 F P C
101 R.1 867.1 F P C
102 D.22 1051.9 F P C
103 C.27 259.4 F P C
104 K.19 524.2 F P C
105 T.15 448.7 F P C
Williamson Design Associates, Inc. NOVA Project Number 10109-0524065
Page | 13
106 S.21 486.6 F P C
Building 28A
107 J.11 681.8 F P C
108 P.9 675.8 F P C
109 K.1 734.4 F P C
110 D.1 1338.4 F P C
111 B.10 654.7 F P C
112 A.20 707.5 F P C
113 A.34 733.5 F P C
114 I.34 1182 F P C
115 L.24 762.3 F P C
116 N.15 684.7 F P C
Building 28B
117 P.4 589.7 F P C
118 J.4 1166.9 F P C
119 G.1 611.4 F P C
120 F.6 713.6 F P C
121 D.3 684.1 F P C
122 A.1 507.7 F P C
123 A.4 723.3 F P C
124 B.8 728.7 F P C
125 M.6 1723.5 F P C
126 N.10 663.4 F P C
Building 28C
127 J.1 608 F P C
128 H.2 595 F P C
129 H.4 408.4 F P C
130 G.1 648.8 F P C
131 D.2 619.5 F P C
132 D.3 689.8 F P C
133 B.3 679.2 F P C
134 A.2 618.8 F P C
135 D.1 685.4 F P C
136 C.1 725.6 F P C
Williamson Design Associates, Inc. NOVA Project Number 10109-0524065
Page | 14
LIMITATIONS
These results and observations presented in this report are time-dependent, and, as such, conditions may have changed since the scope of services was performed. NOVA performed this
Scope of Services, which is limited to the specific focus outlined. No random testing can wholly eliminate uncertainty regarding the potential for other deficient areas in connection with a property. All opinions and recommendations are solely based on the conditions observed from the areas accessible during the site visits. NOVA’s assessment and recommendations represent our professional opinion only.
Therefore, NOVA cannot, under any circumstances, make a statement of warranty or guarantee, expressed or implied, that deficient areas are limited to those that are discovered while we were performing the services on the Project.
NOVA was not contracted to provide investigative services to detect the presence of mold or other biological contaminates in or around the building. Client acknowledges that these contaminates are ubiquitous to the environment with amplification occurring when the building materials are impacted by moisture. As such, NOVA cannot and shall not be held responsible for the occurrence of contaminate amplification.
NOVA is not responsible for damage incurred due to this investigation, nor is NOVA the designer of record for this Project. NOVA is not responsible for damage to the structure or surrounding areas that may have resulted from the testing. The roofing contractor McEnany Roofing hired by the WDA, performed permanent roof repairs to the tested areas. NOVA takes no responsibility for leaks or results/effects of. NOVA is not responsible for voiding any roof warranties.
NOVA’s evaluation is not a code compliance survey, nor an As-Built Drawing investigation. NOVA’s recommendations should not be considered a design document. Any revisions made to the findings enumerated in this report should be brought to the attention of NOVA. If deviations from notated construction or conditions are encountered during remedial applications, NOVA requires notification.
Williamson Design Associates, Inc. NOVA Project Number 10109-0524065
Page | 15
CLOSURE OF SERVICES
We would like to thank you for contracting with NOVA Engineering & Environmental, LLC for your professional service needs, and we appreciate working with you on this exciting project. If you have any questions regarding the information provided in this report or if NOVA can be of further assistance to you on future projects, please don’t hesitate to contact us.
NOVA ENGINEERING & ENVIRONMENTAL, LLC
Jacob McAdams Brandon Mahanna, CABS, CIT, REWO, WBA-BDT
Engineering Technician Principal Project Manager
Facilities & Enclosure Services Facilities & Enclosure Services
Attachments: Appendix A – Photo Narrative - Bonded Uplift Testing
Appendix B – Photo Narrative – Fastener Withdrawal Resistance Testing
Appendix C – Photo Narrative – Nuclear Roof Moisture Survey
Appendix D – Nuclear Roof Moisture Survey Figures
Appendix E – Bonded Uplift & Fastener Withdrawal Resistance Testing Figures
APPENDIX A
PHOTO NARRATIVE - BONDED UPLIFT TESTING
Williamson Design Associates, Inc. NOVA Project Number 10109-0524065
Page | 16
PHOTO NARRATIVE – Bonded Uplift Testing
Photo 1: Typical adhesion test sample location preparation overview. The existing roof system assemblies were removed, and the LWIC surface was cleaned of loose dust and other contaminants.
Photo 2: Typical adhesion test sample location preparation overview. The 24” x 24” insulation target was installed over OlyBond 500 low-rising polyurethane foam adhesive. The insulation was
2” thick. The adhesive ribbon spacing was approximately 6”.
Williamson Design Associates, Inc. NOVA Project Number 10109-0524065
Page | 17
Photo 3: Typical adhesion test sample location preparation overview. The 24” x 24” insulation target was installed over OlyBond 500 low-rising polyurethane foam adhesive. The insulation was
2” thick. The adhesive ribbon spacing was approximately 6”.
Photo 4: Typical bonded adhesion test specimen setup directly before the test performance.
Williamson Design Associates, Inc. NOVA Project Number 10109-0524065
Page | 18
Photo 5: Typical bonded adhesion test specimen setup directly before the test performance.
Photo 6: Building 6, Roof Section D, target location 10. Overview prior to the test performance.
Williamson Design Associates, Inc. NOVA Project Number 10109-0524065
Page | 19
Photo 7: Building 6, Roof Section D, target location 10. Target to insulation adhesion separation.
Photo 8: Building 6, Roof Section D, target location 10. Overview of the test specimen directly after test performance completion.
Williamson Design Associates, Inc. NOVA Project Number 10109-0524065
Page | 20
Photo 9: Building 3, Roof Section A, target location 1. Overview prior to the test performance.
Photo 10: Building 3, Roof Section A, target location 1. Target bolt separating from the wooden specimen directly after the test performance completion.
Williamson Design Associates, Inc. NOVA Project Number 10109-0524065
Page | 21
Photo 11: Building 19, Roof Section B, target location 13. Overview prior to the test performance.
Photo 12: Building 19, Roof Section B, target location 13. Overview of the pull tester reaching its threshold capacity of about 1800 during the testing performance.
Williamson Design Associates, Inc. NOVA Project Number 10109-0524065
Page | 22
Photo 13: Building 19, Roof Section B, target location 13. Overview of the test specimen directly after test performance completion.
Photo 14: Building 6, Roof Section B, target location 8. Overview prior to the test performance.
Williamson Design Associates, Inc. NOVA Project Number 10109-0524065
Page | 23
Photo 15: Building 6, Roof Section B, target location 8. Overview of the pull tester reaching its threshold capacity of about 1800 during the testing performance.
Photo 16: Building 6, Roof Section B, target location 8. Overview of the test specimen directly after test performance completion.
APPENDIX B
PHOTO NARRATIVE - FASTENER WITHDRAWAL
RESISTANCE TESTING
Williamson Design Associates, Inc. NOVA Project Number 10109-0524065
Page | 24
PHOTO NARRATIVE – Fastener Withdrawal Resistance Testing
Photo 17: Prior to performing each pull test, the fastener pull test device was set to zero.
Photo 18: Complete roof composition down to the metal deck was removed and documented to determine the scope of work prior to testing performance.
Williamson Design Associates, Inc. NOVA Project Number 10109-0524065
Page | 25
Photo 19: Complete roof composition down to the metal deck was removed prior to each fastener pull test.
Photo 20: Complete roof composition down to the metal deck was removed prior to each fastener pull test.
Williamson Design Associates, Inc. NOVA Project Number 10109-0524065
Page | 26
Photo 21: Overview of a typical fastener pull test (Perimeter). Located on Building 6-Z.
Photo 22: Perimeter fastener pull test results along Building 6-Z reading 616.0 lbf.
Williamson Design Associates, Inc. NOVA Project Number 10109-0524065
Page | 27
Photo 23: Overview of a typical fastener pull test (Field). Located on Building 3B.
Photo 24: Typical field fastener pull test results along Building 3B reading 898.7 lbf.
Williamson Design Associates, Inc. NOVA Project Number 10109-0524065
Page | 28
Photo 25: Overview of a typical fastener pull test (Perimeter). Located on Building 6A.
Photo 26: Typical perimeter fastener pull test results along Building 6A reading 565.8 lbf.
Williamson Design Associates, Inc. NOVA Project Number 10109-0524065
Page | 29
Photo 27: Overview of a typical fastener pull test (Perimeter). Located on Building 3A.
Photo 28: Typical perimeter fastener pull test results along Building 3A reading 1241.1 lbf.
Williamson Design Associates, Inc. NOVA Project Number 10109-0524065
Page | 30
Photo 29: Overview of a typical fastener pull test (Field). Located on Building 3A.
Photo 30: Typical field fastener pull test results along Building 3A reading 1013.4 lbf.
Williamson Design Associates, Inc. NOVA Project Number 10109-0524065
Page | 31
Photo 31: Overview of a typical fastener pull test (Field). Located on Building 6A.
Photo 32: Typical field fastener pull test results along Building 6A reading 794.9 lbf.
Williamson Design Associates, Inc. NOVA Project Number 10109-0524065
Page | 32
Photo 33: Overview of a typical fastener pull test (Field). Located on Building 6Z
Photo 34: Typical field fastener pull test results along Building 6Z reading 575.1 lbf
Williamson Design Associates, Inc. NOVA Project Number 10109-0524065
Page | 33
Photo 35: Overview of a typical fastener pull test (Corner). Located on Building 28C.
Photo 36: Typical corner fastener pull test results along Building 28C reading 608.0 lbf
Williamson Design Associates, Inc. NOVA Project Number 10109-0524065
Page | 34
Photo 37: Overview of a typical fastener pull test (Field). Located on Building 28C.
Photo 38: Typical field fastener pull test results along Building 28C reading 595.0 lbf
Williamson Design Associates, Inc. NOVA Project Number 10109-0524065
Page | 35
Photo 39: Overview of a typical fastener pull test (Perimeter). Located on Building 28C.
Photo 40: Typical perimeter fastener pull test results along Building 28C reading 685.4 lbf
Williamson Design Associates, Inc. NOVA Project Number 10109-0524065
Page | 36
Photo 41: Overview of a typical fastener pull test (Perimeter). Located on Building 28A
Photo 42: Typical perimeter fastener pull test results along Building 28A reading 713.6 lbf
Williamson Design Associates, Inc. NOVA Project Number 10109-0524065
Page | 37
Photo 43: Overview of a typical fastener pull test (Field). Located on Building 28B.
Photo 44: Typical field fastener pull test results along Building 28B reading 589.7 lbf
Williamson Design Associates, Inc. NOVA Project Number 10109-0524065
Page | 38
Photo 45: Overview of a typical fastener pull test (Corner). Located on Building 28B.
Photo 46: Typical corner fastener pull test results along Building 28B reading 507.7 lbf
Williamson Design Associates, Inc. NOVA Project Number 10109-0524065
Page | 39
Photo 47: Overview of a typical fastener pull test (Field). Located on Building 19C.
Photo 48: Typical field fastener pull test results along Building 19C reading 329.2 lbf
Williamson Design Associates, Inc. NOVA Project Number 10109-0524065
Page | 40
Photo 49: Overview of a typical fastener pull test (Corner). Located on Building 19B.
Photo 50: Typical corner fastener pull test results along Building -- reading 607.1 lbf
APPENDIX C
PHOTO NARRATIVE - NUCLEAR MOISTURE SURVEY
Williamson Design Associates, Inc. NOVA Project Number 10109-0524065
Page | 41
PHOTO NARRATIVE – Nuclear Moisture Survey
Photo 51: Nuclear moisture survey 5’ x 5’ grit preparation. Typical throughout the project. Grit lines were established from most southeast corner as A1.
Photo 52: Moisture survey equipment placement during the test performance. Typical condition.
Williamson Design Associates, Inc. NOVA Project Number 10109-0524065
Page | 42
Photo 53: Moisture survey equipment placement during the test performance. Typical condition.
Photo 54: Moisture survey equipment was placed during the test performance, and readings were displayed in a typical condition.
Williamson Design Associates, Inc. NOVA Project Number 10109-0524065
Page | 43
Photo 55: Core sample removal in progress conditions. Typical for sample procedures throughout the project. .
Photo 56: Roof core sample overview after the sample collection completion. Typical condition.
Williamson Design Associates, Inc. NOVA Project Number 10109-0524065
Page | 44
Photo 57: Roof assembly typical composition overview.
Photo 58: Roof assembly typical composition overview.
Williamson Design Associates, Inc. NOVA Project Number 10109-0524065
Page | 45
Photo 59: Concrete layer typical thickness.
Photo 60: Roof assembly typical membrane composition and thickness.
Williamson Design Associates, Inc. NOVA Project Number 10109-0524065
Page | 46
Photo 61: Roof assembly typical polyisocyanurate insulation composition and thickness.
Photo 62: Roof assembly typical perlite coverboard composition and thickness.
Williamson Design Associates, Inc. NOVA Project Number 10109-0524065
Page | 47
Photo 63: Evidence of elevated moisture observed in the light weight insulated concrete (LWIC).
Photo 64: Evidence of elevated moisture observed in the polyisocyanurate insulation.
APPENDIX D
NUCLEAR ROOF MOISTURE SURVEY FIGURES
SITE LOCATION:
CLIENT: DRAWING INDEX:
0.0 Project Information
1.0 Overall Site Plan
3A Nuclear Survey Results Roof Area 3A 3B Nuclear Survey Results Roof Area 3B
6A Nuclear Survey Results Roof Area 6A 6B Nuclear Survey Results Roof Area 6B 6C Nuclear Survey Results Roof Area 6C 6D Nuclear Survey Results Roof Area 6D 6E Nuclear Survey Results Roof Area 6E
19A Nuclear Survey Results Roof Area 19A 19B Nuclear Survey Results Roof Area 19B 19C Nuclear Survey Results Roof Area 19C
Pinellas Northeast High School - Nuclear Survey Moisture Results
DESIGN:
NOVA Engineering & Environmental 650 Northlake Boulevard, Suite 430 Altamonte Springs, Florida 32701
5500 16th Street North St. Petersburg, Florida 33703
WDA
2605 Enterprise Road East Suite 200 Clearwater, Florida 33759
0.0Project Information
Client:
WDA
2605 Enterprise Road, East Suite 200 Clearwater, Florida 33759
650 Northlake Blvd, Suite 430 Altamonte Springs, FL 32701 office: (407) 902-2660 www.usanova.com
5500 16th Street North, St. Petersburg, Florida 33703
Sheet:Pinellas Northeast High School - Nuclear Survey NOVA Project No.: 10109-0524065 Date: 12/13/2024
SITE PLAN:
5500 16th Street North St. Petersburg, FL
N
BUILDING 6 BUILDING 3
BUILDING 19
54th Ave N th
S tre et N
BUILDING
NOT IN
SCOPE
BUILDING 19
19-C
ROOF AREA
19-B
19-A
ROOF AREA
BUILDING
NOT IN
SCOPE
BUILDING
NOT IN
SCOPE
BUILDING
NOT IN
SCOPE
BUILDING
NOT IN
SCOPE
BUILDING
NOT IN
SCOPE
BUILDING
NOT IN
SCOPE
BUILDING
NOT IN
SCOPE
BUILDING
NOT IN
SCOPE
BUILDING
NOT IN
SCOPE
BUILDING 6
ROOF AREA
6-Z
(NOT IN SCOPE)
6-C
ROOF AREA
ROOF AREA
6-Y
(NOT IN
SCOPE)
6-D
ROOF AREA 6-E
6-B 6-A
BUILDING 3
3-B
ROOF AREA 3-A
ROOF AREA
Client:
WDA
2605 Enterprise Road, East Suite 200 Clearwater, Florida 33759
650 Northlake Blvd, Suite 430 Altamonte Springs, FL 32701 office: (407) 902-2660 www.usanova.com
5500 16th Street North, St. Petersburg, Florida 33703
Sheet:Pinellas Northeast High School - Nuclear Survey NOVA Project No.: 10109-0524065 Date: 12/13/2024
SCALE: NTS
OVERALL BUILDING SITE PLAN
1.0Overall Site Plan
N
ROOF AREA
28-A (NOT
IN SCOPE)
ROOF AREA
28-B (NOT
IN SCOPE)
ROOF AREA
28-C (NOT
IN SCOPE)
LEGEND
# NUCLEAR GAUGE READING VALUE
CORE LOCATION
HATCH INDICATES MOISTURE MEASURED
IN SUBSTRATE
19 18
23 16 9 11 17 15 15 10 18 19 19 17
CORE D24 CORE Q24
CORE L13
CORE M9
CORE AC5
CORE AD9
CORE Q11
CORE R31
CORE X22
CORE X20
CORE Z19
CORE T2
Histogram - Survey Quantity Results per Roof Area
SCALE: NTS
SURVEY VALUES - ROOF AREA 3A1
ROOF AREA 3B
3ANuclear Survey Results Roof Area 3A
Client:
WDA
2605 Enterprise Road, East Suite 200 Clearwater, Florida 33759
650 Northlake Blvd, Suite 430 Altamonte Springs, FL 32701 office: (407) 902-2660 www.usanova.com
5500 16th Street North, St. Petersburg, Florida 33703
Sheet:Pinellas Northeast High School - Nuclear Survey NOVA Project No.: 10109-0524065 Date: 12/13/2024
3 Gravimetrics Results
CORE LOCATION
HATCH INDICATES MOISTURE MEASURED
IN SUBSTRATE
19 18
23 16 9 11 17 15 15 10 18 19 19 17
CORE Q24
CORE L13
CORE AC5
CORE AD9
CORE Q11
CORE R31
CORE X22
CORE X20
CORE Z19
CORE T2
Histogram - Survey Quantity Results per Roof AreaSCALE: NTS
SURVEY VALUES - ROOF AREA 3B1
ROOF AREA 3A
3BNuclear Survey Results Roof Area 3B
Client:
WDA
2605 Enterprise Road, East Suite 200 Clearwater, Florida 33759
650 Northlake Blvd, Suite 430 Altamonte Springs, FL 32701 office: (407) 902-2660 www.usanova.com
5500 16th Street North, St. Petersburg, Florida 33703
Sheet:Pinellas Northeast High School - Nuclear Survey NOVA Project No.: 10109-0524065 Date: 12/13/2024
ROOF AREA 3A 3 Gravimetrics Results
C
LEGEND
# NUCLEAR GAUGE READING VALUE
CORE LOCATION
HATCH INDICATES MOISTURE MEASURED
IN SUBSTRATE
Histogram - Survey Quantity Results per Roof Area
SCALE: NTS
SURVEY VALUES - ROOF AREA 6A1 2
6ANuclear Survey Results Roof Area 6A
Client:
WDA
2605 Enterprise Road, East Suite 200 Clearwater, Florida 33759
650 Northlake Blvd, Suite 430 Altamonte Springs, FL 32701 office: (407) 902-2660 www.usanova.com
5500 16th Street North, St. Petersburg, Florida 33703
Sheet:Pinellas Northeast High School - Nuclear Survey NOVA Project No.: 10109-0524065 Date: 12/13/2024
N
BUILDING 6 KEY PLAN
14 29 29 33
34 20 28 28
CORE A1
CORE D3
CORE A4
CORE B5
CORE C7
CORE B9
6-C
6-D6-E
6-B6-A
ROOF AREA
6-Y
(NOT IN
SCOPE)
ROOF AREA
6-Z
(NOT IN SCOPE)
CORE A1
CORE D
CORE E5
ORE B6
CORE B9
CORE B10
LEGEND
# NUCLEAR GAUGE READING VALUE
CORE LOCATION
HATCH INDICATES MOISTURE MEASURED
IN SUBSTRATE
Histogram - Survey Quantity Results per Roof Area
SCALE: NTS
SURVEY VALUES - ROOF AREA 6B1 2
6BNuclear Survey Results Roof Area 6B
Client:
WDA
2605 Enterprise Road, East Suite 200 Clearwater, Florida 33759
650 Northlake Blvd, Suite 430 Altamonte Springs, FL 32701 office: (407) 902-2660 www.usanova.com
5500 16th Street North, St. Petersburg, Florida 33703
Sheet:Pinellas Northeast High School - Nuclear Survey NOVA Project No.: 10109-0524065 Date: 12/13/2024
N
BUILDING 6 KEY PLAN
6-C
6-D6-E
6-B6-A
ROOF AREA
6-Y
(NOT IN
SCOPE)
ROOF AREA
6-Z
(NOT IN SCOPE)
3 Gravimetrics Results24
CORE D4
CORE LOCATION
HATCH INDICATES MOISTURE MEASURED
IN SUBSTRATE
CORE A19
CORE F18
CORE K21
CORE I14
CORE K10
CORE H6
25 12 10 21 12
CORE C21
6-C
6-D6-E
6-B6-A
Histogram - Survey Quantity Results per Roof AreaSCALE: NTS
SURVEY VALUES - ROOF AREA 6C1 2
6CNuclear Survey Results Roof Area 6C
Client:
WDA
2605 Enterprise Road, East Suite 200 Clearwater, Florida 33759
650 Northlake Blvd, Suite 430 Altamonte Springs, FL 32701 office: (407) 902-2660 www.usanova.com
5500 16th Street North, St. Petersburg, Florida 33703
Sheet:Pinellas Northeast High School - Nuclear Survey NOVA Project No.: 10109-0524065 Date: 12/13/2024
N
ROOF AREA
6-Y
(NOT IN
SCOPE)
ROOF AREA
6-Z
(NOT IN SCOPE)
BUILDING 6 KEY PLAN
ROOF AREA 6D
CORE A2
CORE B4
CORE A5
CORE F3
CORE H4
CORE H2
CORE I6
CORE A19
CORE D3
CORE C21
CORE B5
CORE B9
LEGEND
# NUCLEAR GAUGE READING VALUE
CORE LOCATION
HATCH INDICATES MOISTURE MEASURED
IN SUBSTRATE
6-C
6-D6-E
6-B6-A
Histogram - Survey Quantity Results per Roof AreaSCALE: NTS
SURVEY VALUES - ROOF AREA 6D1
ROOF AREA 6C
6DNuclear Survey Results Roof Area 6D
Client:
WDA
2605 Enterprise Road, East Suite 200 Clearwater, Florida 33759
650 Northlake Blvd, Suite 430 Altamonte Springs, FL 32701 office: (407) 902-2660 www.usanova.com
5500 16th Street North, St. Petersburg, Florida 33703
Sheet:Pinellas Northeast High School - Nuclear Survey NOVA Project No.: 10109-0524065 Date: 12/13/2024
N
MATCHLINE
MATCHLINE
ROOF AREA
6-Y
(NOT IN
SCOPE)
ROOF AREA
6-Z
(NOT IN SCOPE)
BUILDING 6 KEY PLAN
ROOF AREA 6E
ROOF
AREA 6B
ROOF AREA 6C
ROOF AREA 6E
CORE A2
CORE B4
CORE A5
CORE H2
CORE I5
CORE I6CORE F7
CORE D5
CORE B4
LEGEND
# NUCLEAR GAUGE READING VALUE
CORE LOCATION
HATCH INDICATES MOISTURE MEASURED
IN SUBSTRATE
Histogram - Survey Quantity Results per Roof Area
SCALE: NTS
SURVEY VALUES - ROOF AREA 6E1 2
6ENuclear Survey Results Roof Area 6E
Client:
WDA
2605 Enterprise Road, East Suite 200 Clearwater, Florida 33759
650 Northlake Blvd, Suite 430 Altamonte Springs, FL 32701 office: (407) 902-2660 www.usanova.com
5500 16th Street North, St. Petersburg, Florida 33703
Sheet:Pinellas Northeast High School - Nuclear Survey NOVA Project No.: 10109-0524065 Date: 12/13/2024
N
ROOF AREA 6D
ROOF AREA 6Z
(NOT IN SCOPE)
6-C
6-D6-E
6-B6-A
ROOF AREA
6-Y
(NOT IN
SCOPE)
ROOF AREA
6-Z
(NOT IN SCOPE)
BUILDING 6 KEY PLAN
CORE LOCATION
HATCH INDICATES MOISTURE MEASURED
IN SUBSTRATE13
X
X
CORE A21
CORE D22
CORE F3 CORE N3
CORE U10
CORE K25
20 24 17 23 22 25 19 20
281921232518271518141518171827 CORE I12CORE E2 Histogram - Survey Quantity
Results per Roof AreaSCALE: NTS
SURVEY VALUES - ROOF AREA 19A1 2
19ANuclear Survey Results Roof Area 19A
Client:
WDA
2605 Enterprise Road, East Suite 200 Clearwater, Florida 33759
650 Northlake Blvd, Suite 430 Altamonte Springs, FL 32701 office: (407) 902-2660 www.usanova.com
5500 16th Street North, St. Petersburg, Florida 33703
Sheet:Pinellas Northeast High School - Nuclear Survey NOVA Project No.: 10109-0524065 Date: 12/13/2024
N
ROOF AREA 19C
ROOF AREA 19B
CORE LOCATION
HATCH INDICATES MOISTURE MEASURED
IN SUBSTRATE
16 13 29 23 14 16 16 16222113
17251816
CORE B5 CORE E5
CORE D6
CORE F9
CORE E2
CORE H7
Histogram - Survey Quantity Results per Roof AreaSCALE: NTS
SURVEY VALUES - ROOF AREA 19B1 2
19BNuclear Survey Results Roof Area 19B
Client:
WDA
2605 Enterprise Road, East Suite 200 Clearwater, Florida 33759
650 Northlake Blvd, Suite 430 Altamonte Springs, FL 32701 office: (407) 902-2660 www.usanova.com
5500 16th Street North, St. Petersburg, Florida 33703
Sheet:Pinellas Northeast High School - Nuclear Survey NOVA Project No.: 10109-0524065 Date: 12/13/2024
N
ROOF AREA 19C
ROOF AREA 19A
CORE LOCATION
HATCH INDICATES MOISTURE MEASURED
IN SUBSTRATE
X
X
CORE K25
CORE I12
CORE K19
CORE L19
CORE S21
CORE T15
CORE E5
CORE E2
CORE H7
Histogram - Survey Quantity Results per Roof AreaSCALE: NTS
SURVEY VALUES - ROOF AREA 19C1 2
19CNuclear Survey Results Roof Area 19C
Client:
WDA
2605 Enterprise Road, East Suite 200 Clearwater, Florida 33759
650 Northlake Blvd, Suite 430 Altamonte Springs, FL 32701 office: (407) 902-2660 www.usanova.com
5500 16th Street North, St. Petersburg, Florida 33703
Sheet:Pinellas Northeast High School - Nuclear Survey NOVA Project No.: 10109-0524065 Date: 12/13/2024
N
ROOF
AREA 19B
ROOF
AREA 19A
3 Gravimetrics Results
CORE C27
NUCLEAR ROOF MOISTURE SURVEY FIGURESBONDED UPLIFT AND FASTENER WITHDRAWAL
RESISTANCE TESTING FIGURES
APPENDIX E
Client:
William Design Associates Inc, 2605 Enterprise Road East, Suite 200 Clearwater, FL 33759
650 Northlake Blvd, Suite 430 Altamonte Springs, FL 32701 office: (407) 902-2660 www.usanova.com
Sheet:
NOVA Project No.: Date:
SCALE: NTS1 BONDED / FASTENER TEST LOCATIONSCATI
FASTENER PULL TEST LOCATION
BONDED PULL TEST LOCATION
LEGEND
LEGEND
# NUCLEAR GAUGE READING VALUE
CORE LOCATION
SCALE: NTS
SURVEY VALUES - ROOF AREA 3A1
Pinellas Northeast High School - Fastener and Bonded Pull Test 5500 16th Street North St. Petersburg, FL 33703
10109-0524065 12/18/2024
Fastener / Bonded Results Roof Area 3A 1.0
SCALE: NTS2 Fastener Pull Test Results per Roof Area
SCALE: NTS
Bonded Pull Test Results per Roof Area3
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z AA AB AC AD
P
C
F
C
C
P
P
F
F
F
Roof Area 3B
2605 Enterprise Road East, Suite 200 Clearwater, FL 33759
650 Northlake Blvd, Suite 430 Altamonte Springs, FL 32701 office: (407) 902-2660 www.usanova.com
Sheet:
NOVA Project No.: Date:
SCALE: NTS
BONDED / FASTENER TEST LOCATIONS1
SCALE: NTS
Bonded Pull Test Results per Roof Area3
FASTENER PULL TEST LOCATION
BONDED PULL TEST LOCATION
LEGEND
LEGEND
# NUCLEAR GAUGE READING VALUE
CORE LOCATION
SCALE: NTS
SURVEY VALUES - ROOF AREA 1
C
F
P
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z AA AB AC AD
C
C
P
P
F
F
F
SCALE: NTS
Fastener Pull Test Results per Roof Area2
N
Pinellas Northeast High School - Fastener and Bonded Pull Test 5500 16th Street North St. Petersburg, FL 33703
10109-0524065 12/18/2024
Fastener / Bonded Results Roof Area 3B 1.1
Roof Area 3A
2605 Enterprise Road East, Suite 200 Clearwater, FL 33759
650 Northlake Blvd, Suite 430 Altamonte Springs, FL 32701 office: (407) 902-2660 www.usanova.com
Sheet:
NOVA Project No.: Date:
FASTENER PULL TEST LOCATION
BONDED PULL TEST LOCATION
LEGEND
SCALE: NTS
BONDED / FASTENER TEST LOCATIONS1
A B C D
C
P
F
C
C
P
P
F
F
F
N
SCALE: NTS
Fastener Pull Test Results per Roof Area2
SCALE: NTS
Bonded Pull Test Results per Roof Area3
Pinellas Northeast High School - Fastener and Bonded Pull Test 5500 16th Street North St. Petersburg, FL 33703
10109-0524065 12/18/2024
Fastener / Bonded Results Roof Area 6A 2.0
2605 Enterprise Road East, Suite 200 Clearwater, FL 33759
650 Northlake Blvd, Suite 430 Altamonte Springs, FL 32701 office: (407) 902-2660 www.usanova.com
Sheet:
NOVA Project No.: Date:
FASTENER PULL TEST LOCATION
BONDED PULL TEST LOCATION
LEGEND
SCALE: NTS
Fastener Pull Test Results per Roof Area2
SCALE: NTS
BONDED / FASTENER TEST LOCATIONS1
SCALE: NTS
Bonded Pull Test Results per Roof Area3
A B C D
C
P
F
E
C
C
P
P
F
F
F
Pinellas Northeast High School - Fastener and Bonded Pull Test 5500 16th Street North St. Petersburg, FL 33703
10109-0524065 12/18/2024
Fastener / Bonded Results Roof Area 6B 2.1
2605 Enterprise Road East, Suite 200 Clearwater, FL 33759
650 Northlake Blvd, Suite 430 Altamonte Springs, FL 32701 office: (407) 902-2660 www.usanova.com
Sheet:
NOVA Project No.: Date:
FASTENER PULL TEST LOCATION
BONDED PULL TEST LOCATION
LEGEND
SCALE: NTS
L
1610 13
CO
SCALE:…