08- Visitors Center Exhibits Specifications.pdf

PDF 377 KB Posted

Attached to
Eisenhower Lock Visitors' Center Construction Federal contract opportunity
Solicitation number
6923G522R0578
Issued by
Department of Transportation Saint Lawrence Seaway Development Corporation

About this file

This document provides details for a federal construction solicitation for the Eisenhower Lock Visitors' Center project located in Massena, New York. The solicitation seeks proposals for construction services with a total estimated value between $5 million and $10 million. The acquisition is set aside for small businesses with a NAICS code of 236220 for commercial and institutional building construction. Offerors must be registered in SAM.gov and attend an optional site visit on May 10, 2022. Questions are due by May 16 and proposals are due by May 30, with performance and payment bonds required within 10 days of award. The soliciting agency is the Department of Transportation Saint Lawrence Seaway Development Corporation.

View the file

Other files for this federal contract opportunity

Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EISENHOWER LOCK VISITORS' CENTER March 2022 Great Lakes St. Lawrence Seaway Development Corporation Massena, New York

EXHIBIT DOCUMENTS 34100 - 1

SECTION 34100

SUMMARY OF WORK AND SPECIAL REQUIREMENTS

PART 1 - GENERAL

1.01 PROJECT IDENTIFICATION:

A. Name of the Project is: Eisenhower Lock Visitor Center

Route 37, Massena, NY 13662

1.02 SUMMARY OF WORK:

Work of this Contract includes the coordination and production of the entire work indicated by the Bid Documents. Work of the Contract may be unavoidably affected or influenced by governing regulations, and other forces outside the Contract Documents. Briefly, without limitation the Work can be summarized as fol-lows:

A. The design indicated in the attached bid package is at 100% Construction Documentation. It is the Contrac-tor's responsibility to thoroughly review the Exhibit, Architectural, and Graphics packages, as well as this Specifications Book and Appendices, in an effort to fully understand the design intent, work provided by others and complete installation requirements. Notify the Owner, and/or Exhibit Designer if further clarifi-cation is requested. If no notification is given, it is assumed the contractor understands these requirements and assumes full responsibility for providing environments, exhibits and graphics produced within these specifications and guidelines. This may include additional steps or processes related to submittals, approv-als, verification of field dimensions and other special conditions. Approval lines should be included on shop drawings and other submittals for key Owner offices.

B. The project is the fabrication and installation of new exhibits in architecture by others and includes coordi-nation with the architect and general contractor. Work includes fabrication of exhibit components, finishes, lighting, audio/visual, computer and mechanical interactive components, media production, artifact mount-ing, graphic production, and custom furniture. Exhibition components include but are not limited to:

1. Coordination with Architectural Space Preparation, and facility construction.

2. Coordination with Owner-provided objects, including models and model map table.

3. Cases: Cases include but are not limited to: Wall Cases, Vitrines and other custom artifact and object mounting and display components.

4. Artifact Mounting: See Section 34600 for more information.

5. Lighting: Exhibit lighting for this contract includes but is not limited to: case interior lighting, low-volt-age lighting coordinated with interactive elements, and other lighting as specified.

6. Graphics: See the Graphics Specification Package, Graphic Schedule and Section 34550 for more infor-mation. Graphics include but are not limited to: Digitally produced graphics, Photo processing, Specialty graphics, all graphic substrates and connectors.

7. Installation and Coordination of Audio, Video, Database and Multimedia Interactives and Presentations.

The Fabricator will provide all AV equipment and integration, unless otherwise specified. Verify all hardware models and dimensions; clearly indicate access and mounting details on shop drawings. See Section 34700 and Eisenhower Lock Visitor Center Media/Interactive and AV Schedules pages AV5, AV6 and AV7 for more information.

8. Mechanical Interactive Units, including those that interface with AV components. See Drawings and Eisenhower Lock Visitor Center Media/Interactive and AV Schedules pages AV3 and AV4 for more information.

9. All Media and computerized interactives see Section 34700 for more information.

C. Work Included: Without limitation, the Project requires all Work necessary for the proper performance and completion of the entire exhibition including: professional services to furnish all labor, materials, EISENHOWER LOCK VISITORS' CENTER March 2022

EXHIBIT DOCUMENTS 34100 - 2

equipment, artistic talent and expertise and all other manner of things necessary to design, provide, fabri-cate, manufacture and assemble, deliver and install the Work at the Project location, in a complete and properly artistic, usable and workmanlike manner including all goods, materials, and finishes described in the Bid Documents.

D. Every effort has been made to indicate all work necessary to complete the project as identified. All bidders shall carefully examine the premises and available architectural documents during the bid period and satisfy themselves as to the extent, nature, and location of the work, general and local conditions; particularly those bearing on transportation, disposal, handling and storage of materials, availability of labor, water, electric power, access routes, uncertainties of the weather, type of equipment and facilities needed for the success-ful execution of the Work.

E. It is the intention of the Specifications and Drawings to call for finished work, tested, and ready for oper-tion.

1. Any apparatus, material or Work described in either the Drawings or the Specifications and any inci-dental accessories necessary to make the Work complete in all respects and ready for operation (even though not particularly specified) shall be furnished, delivered, and installed by the Contractor without additional expense to the Owner.

2. Minor details not usually shown or specified but necessary for proper installation and operation are in-cluded in the Work as if specified herein or shown on the Drawings.

F. Warranties and Guarantees: The Contractor shall warrant that the work performed under this contract con-forms to the contract requirements and is free of any defect in equipment, materials, design furnished, or workmanship performed by the Contractor or any subcontractor or supplier at any tier. Unless otherwise stated in the technical sections of the Specifications, the warranty of the Work shall continue for a period of one (1) year from the date of Final Completion status. If the Owner takes partial occupancy before Final Completion, then the warranty for that portion shall be in effect for a period of one (1) year beginning on the date of Substantial Completion for that portion of the Work. These Warranties are in addition to and concurrent with, warranties provided by manufacturers.

G. Operation and Maintenance Manuals: Prior to requesting Substantial Completion Inspection, the Contractor shall submit to the Owner three (3) sets of manuals for all systems and equipment, as specified in the tech-nical sections of this specification. The manuals shall be bound in letter-sized, three-ring, loose-leaf binders with durable plastic covers. They shall be organized into suitable volumes of manageable size using the di-visions of the Specifications as a guide. Each manual shall have table of contents and shall be assembled to conform to the table of contents with tab sheets locating each subject. The instructions shall be legible and easy to read. Where oversize drawings are necessary, they shall be folded to be not greater than letter-size.

The words "Operation and Maintenance Manual", the name and location of the project, project number, contract number, date, and the name of the general contractor, shall appear on the cover. Manuals shall in-clude, as a minimum, the following data:

1. Detailed description of each system and each of its components, including layout showing piping, valves, controls and other components, and including diagrams and illustrations where applicable.

2. Wiring and control diagrams with data to explain detailed operation and control of each component.

3. Control sequence describing start-up, operation, and shutdown.

4. Procedures for starting, operating, and shutdown of exhibits and AV equipment.

5. Installation and access instructions and sequences.

6. Maintenance and overhaul instructions.

7. Lubricating schedule, including type, grade, temperature range and frequency.

8. Emergency instructions and safety precautions.

9. Approved product data, shop drawings, and system as-built drawings or schematics.

10. Copies of approved certifications and laboratory test reports (where applicable).

11. Copies of warranties (originals to be provided as required by “Warranties and Guarantees").

EISENHOWER LOCK VISITORS' CENTER March 2022

EXHIBIT DOCUMENTS 34100 - 3

12. Parts list, including source of supply, recommended spare parts, and service organization convenient to the Owner.

13. Name, address, and telephone number of each subcontractor who installed equipment and systems, lo-cal representative for each type of equipment and each system.

14. Paint formulas, As-Built finish schedule, and information on specialty finishes or theming to allow the Owner staff to replace or acquire installed finishes that may become damaged by visitors.

15.Other pertinent data applicable to the operation and maintenance of particular systems or equipment and/or other data as specified Divisions 2 through 16 of the Specifications.

1.03 SPECIAL REQUIREMENTS

A. Compliance with life safety and disability codes and regulations: It is the responsibility of the Exhibit Fabri-cator to investigate and ensure they fully comply with all Federal, state or municipal codes and other local laws, ordinances, rules and regulations that will be in effect at the job site during the installation and com-missioning period. All such rules, regulations and ordinances will be deemed to apply to the Contract throughout and are to be included in the Contract as though written out in full. See Section 34650 Regula-tory Requirements for more information.

B. Coordination of Trades:

1. The Contractor shall coordinate work with the General Contractor so that interference between me-chanical, electrical, architectural, and structural work, including existing services, will be avoided.

2. Where work by separate entities requires off-site fabrication of products and accurate interfacing of materials to produce the required results, the Contractor shall prepare coordination drawings to indicate how work shown on separate shop drawings will be interfaced, intermeshed, and sequenced for instal-lation. Coordination drawings shall be submitted in accordance with the requirements Section 34150 Submittals and Prototypes and as specifically indicated in each material’s section.

a. Work installed prior to approval of coordination drawings shall be at the Contractor's risk. Sub-sequent relocations required to avoid interferences shall be made without additional expense to the Owner. If interference develops, the Owner will decide which work shall be relocated, regardless of which was installed first.

3. Installation of equipment and systems shall allow the maximum practical space for operation, repair, removal, and testing, within the limits indicated on the Contract Documents. Pipes, conduit, ducts, and other system components shall be installed as close as possible to ceiling slabs, walls, and columns to minimize space used while accommodating function and maintenance.

4. The Contractor shall be responsible for the cost of hoisting all tools, equipment, and materials to ex-hibit levels as necessary. The Contractor shall coordinate/cooperate fully with the core and shell Con-tractor as long as the core and shell contractor are responsible for the site.

5. The Contractor must maintain a good working relationship with the core and shell contractor and his sub-contractors, local labor organizations, and regulatory agencies at all times. Close coordination, open communication, and courtesy and respect regarding treatment of staff and materials is expected.

C. Engineering:

1. All engineering services and testing / prototyping of structural integrity and stability of the exhibit components, including support and loads on freestanding items are the responsibility of the Exhibit Fabricator. All individual freestanding units are to withstand 100 pounds of lateral force, without tip-ping, at a five-foot height from the finished floor.

2. Audio Visual Components and Interactives must survive use and abuse by visitors without failure and without danger to the visitor. For example: exposed wiring and equipment controls must be aestheti-cally covered in a way that complements the exhibit design, will block visitor access yet allow for staff access; knobs and other devices are to be of sufficient quality, and installed in the proper manner, to anticipate a number and age range of participants.

EISENHOWER LOCK VISITORS' CENTER March 2022

EXHIBIT DOCUMENTS 34100 - 4

3. If the Exhibit installation requires any modification to, or isolation from, the architectural structure, the Exhibit Fabricator is required to obtain written approval of any, and all, impact on structural transfer, loading or special requirements with the Project Engineer. Provide shop drawings for the Project Engi-neer review and approval as required.

4. All engineering services and testing / prototyping of artifact and object security, environmental and conservation standards are the contractual responsibility of the Exhibit Fabricator. Including but not limited to:

a. Light and UV levels within the exhibit cases (by Exhibit Contractor) shall be prototyped and tested as indicated by owner and/or Design Drawings.

b. Heat gain, RH and temperature fluctuation from ambient room environment to case interiors.

The Exhibit Fabricator case shop drawings and detailing may include special housings, filters, desiccant trays, seals or specialty lighting where required and may vary from case to case based on the Owner's artifact requirements and actual facility condition.

c. Coordinate with the Owner and Architect for all security systems related to the cases, artifacts or objects including but not limited to: cameras, glass break alarms, motion sensors or facility security system.

D. Artifact Conservation:

1. The ambient facility environment is anticipated to fall within the following guidelines:

a. Temperature: 70 (+/- 5) degrees Fahrenheit

b. Relative Humidity: 45 (+/- 5) %

2. As indicated in the Drawings and by the Owners artifact requirements, it is the Exhibit Fabricator's re-sponsibility to provide cases to maintain the temperature and humidity ranges within the ambient facil-ity environment guidelines listed above. Conservation requirements may vary from case to case based on the Owner's artifact requirements and actual facility condition. Provide the Owner with clear infor-mation on case performance related to light levels, temperature and humidity controls. Provide the Owner with estimated costs for conservation upgrades to cases as requested.

3. The Contractor shall take care to minimize fluctuations in air conditions and quality, particularly in ar-eas containing artifacts and storage collections. Humidity and temperature-controlled areas require con-sistency of utility operation.

4. Lighting: In general, facility lighting shall focus on graphics and the exhibit path, not the cases or mon-itors.

E. The Contractor shall provide for quality control, inspections, testing, and re-testing as necessary for all work, including that of subcontractors, to assure compliance with the contract documents.

1.04 OWNER FURNISHED AND INSTALLED WITH CONTRACTOR ASSISTANCE ITEMS

A. Items Furnished and Installed by the Owner with assistance by the Contractor: Briefly, without limitation, the work of the Contract includes coordination with the following items furnished by the Owner:

1. The Owner will provide all original artifacts and objects. Confirm any discrepancies, overlap or ques-tions about the scope of work for artifacts, props, or recreations with the Owner.

2. Photographs for Reproduction—scans supplied by Owner.

3. Final Digital Artwork—provided by Owner.

4. Original illustrations for Final Artwork by Owner.

B. Procedure for Owner Furnished and Contractor Installed Items: Items indicated to be furnished by the Owner and installed by the Contractor, it is the Contractor’s responsibility to pick up from Owner’s loca-tion the Map Table, Models and all Artifacts during normal working hours following reasonable and timely advance notice to the Owner by the Contractor.

1. Contractor's Responsibilities: Receive, tailgate load, and thoroughly inspect all Owner furnished items immediately before removing from the site, or to Contractor’s facility. Immediately notify the Owner in

EISENHOWER LOCK VISITORS' CENTER March 2022

EXHIBIT DOCUMENTS 34100 - 5

writing of all damaged or imperfect items and follow their instructions for repair or replacement. The Contractor shall note all conditions that would prohibit the proper installation or operation of the items.

Immediately transport all undamaged Owner furnished items to their final locations, unpack, and per-form all needed assembly, installation and connection of services as required for proper operation and completion. Correct all damage and imperfections that become apparent, during the course of work, at no additional cost to the Owner, unless the damage or imperfection was included in the Contractor's original written notification to the Owner.

C. The Contractor shall be responsible for proper storage and protection of items received, including all ex-penses incidental thereto.

1.05 SPECIAL PROCEDURES

A. Do not install exhibit items or equipment into non-conditioned spaces as indicated by individual specifica-tion sections. Interference with the exhibit schedule due to delays caused by the General or Space Prepara-tion Contractor shall be brought to the attention of the Owner immediately.

B. Owner Requirements: It is the responsibility of the Contractor to maintain convenient access and egress to fabrication and installation facilities in coordination with Owner Project Manager. The Contractor shall be responsible for public safety at the fabrication and installation sites.

C. The Contractor shall maintain security of the fabrication and installation site. Contractor should coordinate installation site security with the Owner and abide by all Owner security requirements as well as coordinate with the Owner’s Project Manager.

D. Schedules and Work Plans: Submit detailed Work plans and obtain the Owner's written approval prior to proceeding with any Work. Schedules and Work Plans will be required to be revised as necessary and up-dated monthly throughout the Work of the Project.

E. No Damages for Delay: Only delays of the Contractor, which are caused solely by Owner, are compensable to the Contractor and shall be compensable by time extension only. The Contractor shall not be entitled to, and Owner shall not pay damages for any such delays.

F. Notes on Installation: The Contractor shall perform installation work within occupied spaces at times ac-cepted by the Owner and facility manager in writing.

1. The Contractor shall regularly clean up the work areas and shall at all times maintain the project in as neat and orderly a manner as is consistent with normal operations. The Contractor shall remove debris resulting from construction operations from the site daily. The Contractor shall keep all access, haul routes, and site areas free of dirt, debris, and other materials resulting from construction activities.

2. Traffic, Parking, Delivery, and Material Storage: The Contractor shall make special efforts to coordi-nate all work with the Owner and facility manager. Locate vehicles only where directed and permitted.

Use building entrances and travel paths directed by the Owner and facility manager. Store and stockpile materials and debris only where permitted by the facility manager.

3. Advance Notice Required: The Contractor shall not interrupt services, utilities, or facilities serving oc-cupied or used spaces, except when having given ten days prior written notice to the Owner and having obtained the Owner's and facility manager's written approval.

4. Work in Occupied Areas: After starting work in any occupied area, prosecute that work to its comple-tion as soon as possible with full crews of workmen. At the Owner’s direction, schedule work in occu-pied areas outside of normal work and business hours.

5. Avoiding Nuisance: The Contractor shall take special care and make special efforts to avoid creating any nuisance that could interfere with normal business, and to avoid disturbing visitors who are in the building facility during the Installation of this Project.

EISENHOWER LOCK VISITORS' CENTER March 2022

EXHIBIT DOCUMENTS 34100 - 6

6. Noise Control:

a. The Contractor shall comply with OSHA Standard 1926.52 and 1910.95 and all other regula-tions relative to safety noise control.

b. Activities that generate excessive noise or vibration and interrupt museum functions or create public disturbances may be required to be performed during off-hours at the discretion of the Owner.

7. Dust and Dirt Control: The Contractor shall take all needed precautions and provide all needed tempo-rary barriers to contain dust and dirt with effective dust barriers, temporary partitions and other meth-ods acceptable to the Owner and facility manager. Protect furnishings, equipment, and floors with drop cloths. Remove all temporary protections immediately upon completion of installation. Comply with requirements of federal, state and local authorities having jurisdiction for flammable materials, flame spread of temporary construction conditions.

a. The Contractor will execute the Work by methods that minimize dust raised by construction operations. The Contractor will provide positive means to prevent objectionable odors and air-borne dust from dispersing into the atmosphere and from being drawn into existing air-intake louvers and ductwork.

b. Dust barriers shall be erected where necessary to protect adjacent areas from dust infiltration as required by the Owner. Dust barriers shall be rigid and visually opaque and shall seal the work area by affixing to the structure on all sides (i.e. ceiling, walls, and floor).

8. Storage: Confine storage of materials, equipment and apparatus and operations of workmen to limits as required by Owner, and do not unreasonably encumber the premises in any way. The Contractor shall provide adequate storage and protection of materials and equipment delivered to the site to prevent theft, weather damage, or other physical damage.

9. Housekeeping and Protection of Existing Conditions: Maintain the premises in a safe, orderly condition at all times. Protect all existing construction, furnishings, equipment and other items to maintain their original, pre-construction conditions.

10. The Contractor shall use construction means, which deter or prevent the introduction of pests into the project site or premises.

11. Contractor must coordinate and schedule deliveries with Owner’s staff. With renovation work ongoing during installation, access to the loading dock is likely to be limited and require careful scheduling.

G. Circulation Routes and Egress: Do not obstruct any circulation routes, corridors, traffic ways, and exit ways in any manner at any time. Keep means of life safety egress clear at all times.

H. The Contractor shall establish a temporary workspace at the project site, in coordination with Owner staff and the Owner’s Project Manager. The Contractor shall provide information about proposed locations of any temporary workspace, staging and storage areas and designation of size, color and materials to the Owner for approval at least five working days prior to mobilization.

1. The Contractor may provide his own locking device on the door to the temporary workspace. The Con-tractor shall be solely responsible for the safekeeping and security of the construction facilities, materi-als, and equipment.

2. Upon completion of the Work, the temporary workspace shall be removed, and the area returned to its original pre-contract condition.

1.06 DESIGN RESPONSIBILITY/COMMUNICATION

A. The general design requirements shown by the Drawings and details are intended to establish basic dimen-sions of units or modules, accessibility, profiles and sight lines of members. Within these limitations, the Contractor is responsible for fabrication of the entire system, and to make whatever modifications of, and additions to the details as may be required. All modifications are dependent upon written approval of the Owner and Exhibit Designer. Maintain the visual design concept and operational features as shown, includ-ing members’ sizes, profiles and alignment of components as accurately as possible. The Contractor shall

EISENHOWER LOCK VISITORS' CENTER March 2022

EXHIBIT DOCUMENTS 34100 - 7

supplement the general design shown with detailed shop drawings for approval. The shop drawings shall include major aspects of the system proposed, such as sections, shapes and connections of components and joints, power and communications requirements, illustration of how temperature movement and other envi-ronmental or conservation issues are handled, venting, anchorage and structural integrity and stability. See attached Specification Sections for further descriptions of required submittals.

B. Progress Meetings: The Contract shall initiate, participate and provide the agenda for regular progress meetings with representatives of the Contractor, Owner, Exhibit Designer, Architect/Engineer (as required), major exhibit subcontractors, other critical exhibit subcontractors and suppliers. The purpose of these meet-ings is to expedite the Work, coordinate and schedule the Work, and coordinate the Work with the Owner's activities. Progress meetings shall be held biweekly unless otherwise directed by the Owner. The Contractor shall insure that all required subcontractors and suppliers attend the Exhibit Progress Meetings and the Owner will ensure that all necessary Owner personnel attend.

1. Special-Topic Meetings: At the discretion of the Owner, separate meetings may be scheduled to ad-dress issues of quality assurance, coordination with other contractors on the premises, coordination with other agencies, scheduling of the work, application for payments, etc. The Contractor's staff and Subcontractors or Suppliers whose presence is necessary or requested by the Owner shall attend.

2. Meeting Minutes: The Contractor shall promptly prepare minutes of each meeting and send copies to the Owner and Exhibit Designer within five working days.

3. Monthly Progress Reports: The Fabricator should submit in writing a monthly report (due no later t than the 3rd day of each month) along with their invoice, providing a progress update on all aspects of the fabrication and installation process, including any early concerns related to schedule or cost I pact.

C. Provide the Owner and Exhibit Designer with Progress Photos, Daily Reports, Test Results, Material Safety

Data Sheets, Schedules, Work Plans and all other construction and installation administrative documents as requested.

END OF SECTION 34100

EISENHOWER LOCK VISITORS' CENTER March 2022

EXHIBIT DOCUMENTS 34150 - 8

SECTION 34150

SUBMITTALS AND PROTOTYPES

1.01 SUMMARY

A. Coordination with the Owner and consultants, Exhibit Designers and sub-consultants, General or Space

Preparation Contractors, and other consultants designated by the Owner applies to Work of this section.

B. Individual submittal requirements are further specified in applicable Sections for each unit of Work.

1.02 DESCRIPTIONS OF REQUIREMENTS

A. The submittals required on this Project include: Shop Drawings, Product Data, Material and Graphic Sam-ples, Prototypes, Mock-ups, Graphic Layouts and techniques, and miscellaneous work-related submittals.

B. All mechanical or computer Interactives, AV systems and programs, and typical exhibit components re-quire a working prototype and/or mock-up for approval. Exhibit components housing mechanical interac-tive or AV / Computer Systems must be coordinated with approved, final interactive design, as approved by Owner and Exhibit Designer. See Section 34700 for more information.

C. Contractor Responsibility for Submittals: The Contractor shall provide all required submittals, by specifica-tion section or by Exhibit Area, whichever is the most convenient and productive to completing the review process. The Contractor shall clearly indicate on the submittal that it has been reviewed by the Contractor and found to meet the project requirements. Any items submitted as substitutions shall be clearly identified as such on the submittal and the transmittal document. If shop drawings show variations from the contract documents because of standard shop practices or for other reasons, the Contractor shall provide a separate, written description of variations along with the submittal.

1. The Contractor is to determine and verify all field measurements, required material quantities, method of assembly or erection, installation requirements, and proper connection to adjoining materials in-stalled by others.

2. The Contractor is to thoroughly review each Section for Approval and Re-Submittal Procedures. No items may be installed that do not have a written Approval or Approved as Noted with the appropriate corrections made. Work that is installed without all required submittals (shop drawing, finish samples, etc) and approvals will not be accepted.

D. Do not submit Shop Drawings or Product Data (including AV or lighting cut sheets) or allow its use in the

Project, until the Contractor has confirmed its compliance with the Drawings and Specifications and re-ceived written Approval from the Owner and Exhibit Designer. Incomplete submittals or submittals not in compliance with Drawings and Specifications may be returned “without action” and/or the work, even if installed and completed, may not be accepted.

E. Commence work on items requiring submittals only after all related submittals are reviewed and approved by the Owner and Exhibit Designer. All Work shall conform to approved submittals.

F. A critical path schedule, also referred to as a work plan, shall be prepared by the Contractor and submitted in reproducible form, See Section 34300 for more information. In addition to the start and completion of various design and construction stages, the schedule shall also show percentages of work to be completed at any given time, as well as significant dates which will serve as check points to determine compliance with approved Schedule and help to coordinate with other contractors and consultants on the Project.

EISENHOWER LOCK VISITORS' CENTER March 2022

EXHIBIT DOCUMENTS 34150 - 9

1.03 SUBMITTAL DEFINITIONS AND REQUIREMENTS

A. Submittals are required for submission to the Owner and Exhibit Designer for review and approval prior to incorporation into the work.

1. Shop Drawings: Shop Drawings are required for each exhibit component and include detailed draw-ings, hardware and finish schedules, diagrams, and illustrations prepared specifically for this project by the Contractor, or any subcontractor, manufacturer, supplier, or distributor to illustrate fabrication and/or installation of a portion of the Work. Shop Drawing submittals shall include attached cutsheets, specially prepared technical data sheets, templates, patterns, reports, calculations, instructions, meas-urements and similar information not in standard printed form for general application to several pro-jects.

2. Product Data: Product Data requirements are listed with each material section and are to be provided to the Owner in the form of an Operations and Maintenance Manual at the completion of the Project and as required with the Shop Drawings. Product data includes standard printed information on materials, products and systems not specially prepared for this Project. Product Data may include information in-dicating the range of standard products for selection to be used in the finished Work. Product Data in-cludes illustrations, standard schedules, performance charts, instructions, brochures, diagrams, manu-facturer's descriptive literature, and catalog information illustrating a material, product, or system to be installed on this project.

a. Material Safety Data Sheets (MSDS): Submit MSDS sheets as indicated in individual sections or as recommended by the manufacturers. MSDS include instructions, warnings, and recommended and re-quired handling and use procedures for individual hazardous materials published by the product manu-facturer.

3. Samples: Samples are physical examples of materials, equipment, assemblies, or workmanship estab-lishing standards for evaluating finished Work and may include both fabricated and un-fabricated ex-amples of materials, finishes, products and techniques. Samples may be both complete units and smaller portions of units of work; either for limited visual inspection or, where indicated, for more de-tailed testing and analysis. See individual material specifications for sample requirements.

a. Color/Texture Selection Sample: Samples of an available range of textures and/or colors of a material formed of the actual finish material over a substrate identical to that which will be used in the field.

b. Color Charts: Pre-printed brochures showing the color range of a material, color charts may be submit-ted only as specifically indicated, color charts are not acceptable in lieu of samples required in subse-quent sections.

c. Sample installations / Mock-ups: where the finished exhibits, graphic, AV or lighting have significant overlap or interrelationships, a sample installation or mock-up may be required either at the project site, or in the Contractor’s facility, to confirm the methods of construction in addition to shop drawings or other submittals.

d. Visual Matching: Where matching with an established sample for color, pattern, and/or texture, the Ex-hibit Designer shall determine whether a proposed product matches the sample.

4. Prototypes: Prototypes are required for select exhibit components, case interior and working AV or In-teractive systems. Prototypes will be used to verify aesthetics and conformance to the Specifications including: light levels, accessibility, heat gain, stability and other requirements. Produce one working prototype for approval prior to fabrication of subsequent units, retain approved prototype at fabrication facility to use as a standard for judging subsequent work. Approved prototypes and mock-ups may be-come part of the finished Work. Prototypes do not relieve Fabricator of system Shop Drawings or other submittals.

5. Schedules: A detailed tabulation of components, items, or parts to be furnished for use on this project.

6. Miscellaneous submittals related directly to the Work include warranties, maintenance agreements, software ownership, workmanship bonds, project photographs, survey data and reports, physical work records, quality testing and certifying reports, copies of industry standards, record drawings, field measurement data, operating and maintenance materials, overrun stock, and similar information, EISENHOWER LOCK VISITORS' CENTER March 2022

EXHIBIT DOCUMENTS 34150 - 10

devices and materials applicable to the work and not processed as shop drawings, product data or sam-ples. Verify requirements with Owner and Exhibit Designer.

7. See Section 34550 and Graphics Panel Schedule for additional graphic submittal definitions and re-quirements.

1.04 GENERAL SUBMITTAL REQUIREMENTS

A. Coordination and Sequencing: Coordinate preparation and processing of submittals with performance of the work so that Work will not be delayed by submittals. Coordinate and sequence different categories of sub-mittals for same work, and for interfacing units of Work, so that one is not delayed for coordination with another.

B. Scheduling: In administrative submittals (listing of products, manufacturers suppliers and subcontractors, and in job progress schedule) show principal work-related submittals and time schedules for coordination of submittal activity with related work in each instance.

C. Preparation of Submittals: Provide permanent marking on each submittal to identify Project, Date, Contrac-tor, Subcontractor, submittal name and similar information to distinguish it from other submittals. Show Contractor’s executed review and approval marking and provide space for Owner, Owner Representative’s, Architect's, Designer's or Engineer’s “Action” marking. Package each submittal appropriately for transmit-tal and handling. Submittals that are received from sources other than through the Contractor’s office will be returned “without action”.

D. Except as otherwise indicated in individual work sections, comply with requirements specified herein for each category of submittal.

E. Field Conditions: All Work has the general requirement of field measurements, coordination with existing work by others, quantitative records of actual work, and similar data specified in individual work sections.

1.05 DETAILED SUBMITTAL REQUIREMENTS

A. Mock-up and Prototype Requirements: In addition to requirements listed above:

1. Each typical component type and all interactives and AV systems must have prototype working system for approval of the Owner and Exhibit Designer.

B. Shop Drawings: Provide newly prepared information, on reproducible sheets, with graphic information at an accurate scale. Clearly indicate the name of preparer (firm name). Show dimensions and note those that are based on field measurement. Identify materials, colors and products in the Work shown. Shop Drawings must show connection to and coordination with Work by others as applicable. Indicate compliance with standards, and special coordination requirements. Do not allow Shop Drawing or Specialty Set-Up Drawing copies without appropriate final “Action” markings to be used or distributed on this Project. Even if in-stalled and completed, work produced by shop drawings without action markings may be rejected; contrac-tor is obligated to provide the item as specified at no additional cost to the Owner. Identify verified field dimensions or other special concerns on shop drawings whenever possible.

1. Initial Submittal: One (1) 11” x 17” PDF set with area for “Approved”, “Approved as Noted”, and “Not

Approved/Resubmit” delivered to both the Owner and the Exhibit Designer. (Provide hard copies as well as a PDF set if drawings are not 11” x 17”.) Re-submittal is required until drawings are compliant with specifications and design indicated in drawings. Submittals will be responded to in a timely man-ner but may require coordination and feedback by others affected by this work. Do not begin produc-tion until “Approved” or “Approved as Noted” shop drawings are returned.

2. Final Submittal: One (1) PDF set showing final “action” marking and applicable notes. Contractor shall retain additional copies as noted:

EISENHOWER LOCK VISITORS' CENTER March 2022

EXHIBIT DOCUMENTS 34150 - 11

a. Maintain one (1) copy in an undisturbed condition for use in maintenance manuals and other closeout documents.

b. One (1) copy shall be carefully and neatly “marked-up” by the Contractor throughout the duration of the Work as a record document.

c. Final Shop Drawings, with noted changes or subsequent clarifications attached, to be availa-ble on the project site for use by others as requested.

d. Deliver final as-built drawings in live digital format to the Owner.

C. Product Data: Collect required data into one (1) submittal for each unit of work or system. Mark each copy to show which choices and options are applicable to this Project. Note clearly where a selection of color or type is required. Include manufacturer’s standard printed recommendations for application and use, compli-ance with standards, application of labels and seals, notation of verified field measurements, and special coordination requirements.

1. Maintain one (1) set of product data (for each submittal) at project site, available for reference by

Owner’s Field Observer, Owner, Facility Manager and others as requested.

D. Graphic Layouts Requirements: Layouts are to be provided for each item. Submit full-scale layouts of each sign or graphic showing the complete layout. Scale drawings are sufficient for items 24" x 24" and larger with text samples at full size attached. See Section 34550 Exhibit Graphics for more information.

E. Sample Requirements: Provide units identical with final conditions of proposed materials or products for the Work. Include “range” samples (not less than three (3) units) where unavoidable variations may be ex-pected. Describe or identify variations between units of each set. Provide manufacturers full range of sam-ples where selection is required; submit for selection as noted above. Prepare samples to match Owner or Exhibit Designer’s sample or photographs where so indicated. Include information with each sample to show generic description, source or product name and manufacturer, limitations, and compliance with in-dustry standards. Samples are submitted for review and confirmation of color, pattern, texture, and “kind” by Owner and Exhibit Designer. Neither Owner nor Exhibit Designer will “test” samples (except as other-wise indicated) for compliance with other requirements, which are the exclusive responsibility of Contrac-tor.

1.06 MISCELLANEOUS SUBMITTALS

A. Quality Control Set: Maintain returned final set of samples to the Owner, in suitable condition and available for quality control comparisons by Owner and others as requested.

B. Prototypes and Mock-ups: Process transmittal forms to provide a record of activity.

C. Inspection and Test Reports: Classify each as either Shop Drawing or Product Data, depending upon whether report is uniquely prepared for this project or a standard publication of workmanship control test-ing at point of production, and process accordingly.

D. Warranties: Verify requirements for warranties, product or workmanship bonds, maintenance agreements and software ownership with the Owner.

E. Standards: Except where specified integrally with “Product Data” submittal, submit a single copy of indus-try standards for Owner or Exhibit Designer's use. Where workmanship at project site and elsewhere is gov-erned by standard, furnish additional copies to fabricators, installers and others involved in performance or installation of the work.

F. Maintenance/Operating Manuals: See Section 34800, Article 1.03

EISENHOWER LOCK VISITORS' CENTER March 2022

EXHIBIT DOCUMENTS 34150 - 12

G. Materials and Tools: Refer to individual Specification Sections and coordinate with Owner for required quantities of spare parts, extra and overrun stock, maintenance tools and devices, keys and similar physical units to be submitted.

H. General Distributing: Provide additional distribution of submittals to subcontractors, suppliers, fabricators, installers, governing authorities and others as necessary for proper performance of the work.

I. Timing of Submittals: Provide submittals in a timely fashion to allow at least ten (10) business days, not in-cluding transmittal time, for the Owner, Exhibit Designer's, Consultant's or Engineer’s review and handling.

1.08 ACTION ON SUBMITTAL:

A. Action: Owner, Exhibit Designer, Consultant or Engineer will review each submittal, mark with “Action,” and where possible, return within ten (10) business days of receipt not including transmittal time. Where submittal must be held for coordination, Contractor will be so advised without delay.

B. Leave a 4" x 6" (100mm x 150mm) space on all submittals for each required “Action Stamp.”

END OF SECTION 34150

EISENHOWER LOCK VISITORS' CENTER March 2022

EXHIBIT DOCUMENTS 34200 - 13

SECTION 34200

PROJECT COORDINATION

PART 1 - GENERAL

1.01 GENERAL COORDINATION PROVISIONS

A. Carefully study and compare Contract Documents before proceeding with fabrication and installation of

Work. Promptly advise Exhibit Designer of any error, inconsistency, omission, or apparent discrepancy dis-covered.

B. Carefully study and compare Contract Documents with base building construction drawings and conduct periodic site surveys to verify field conditions and coordination of exhibit environment with base building environment.

C. Requests for information (RFI): Allot time in construction scheduling for liaison with Exhibit Designer;

establish procedures for handling queries and clarifications, using an RFI form. RFI form should include RFI number, date submitted, date response is due, drawing or spec reference, and space for responder’s name, date and response.

1. If Contractor disagrees with Exhibit Designer’s response to Contractor’s RFI, Contractor shall notify

Exhibit Designer within seven days of receipt of response. Lack of such notification shall be under-stood to mean that Contractor agrees with response.

D. Coordination Meetings: In addition to meetings specified in Section 34250, hold coordination meetings and conferences with personnel and subcontractors to ensure coordination of Work.

E. Coordination: Coordinate scheduling, submittals, and Work of various Specification sections to avoid con-flicts and ensure efficient and orderly sequence of installation of interdependent construction elements.

1. Coordinate Work of various Specification sections having interdependent responsibilities for installa-tion, connection, and operation.

2. Verify that characteristics of operating equipment are compatible with building utilities and services.

3. Prepare coordination drawings as required. See requirements elsewhere in this Section.

4. Conduct pre-installation conferences as required. See Section 34250.

F. Except as otherwise indicated, conceal pipes, ducts, conduit and wiring in construction. Coordinate loca-tions of fixtures and outlets with finish elements.

G. Make provision to accommodate items scheduled for later installation.

1.02 COORDINATION DRAWINGS AND LAYOUTS

A. Coordination Drawings: Prepare as required to coordinate all portions of Work. Include discussion of coor-dination drawings at complementary pre-installation conferences. See Section 34250.

1. Coordination drawings show relationship and integration of different construction elements that require careful coordination during fabrication or installation to fit in space provided or to function as intended.

2. Prior to fabricating or installing work, prepare composite coordination drawings at appropriate scale;

detail major elements, components, and systems of architectural, structural, mechanical, and electrical such as equipment, components, and materials in relationship with each other, installations, and build-ing components. Include dimensions.

3. Indicate locations where space is limited for installation and access and where sequencing and coordi-nation of installations are of importance to efficient flow of Work.

EISENHOWER LOCK VISITORS' CENTER March 2022

EXHIBIT DOCUMENTS 34200 - 14

4. Indicate scheduling, sequencing, movement, and positioning of large equipment into building during construction.

5. Assembly Penetrations: Prepare drawings as required to indicate penetrations in floors, walls, and ceil-ings and their relationship to assembly construction, other penetrations and installations. Identify where additional bracing and offsets are required to comply with Contract Documents.

6. Ceilings: Prepare reflected ceiling plans and other drawings as required to coordinate and integrate in-stallations, air outlets and inlets, light fixtures, communications systems components, sprinklers, other ceiling-mounted devices, components located above suspended ceilings, and suspended ceiling support components.

7. Show interrelationship of components to be shown on separate Shop Drawings.

8. Indicate required installation sequences to minimize cutting and patching.

9. Make coordination documents available in field office for review by Exhibit Designer and Owner dur-ing entire period of construction.

10. In addition, prepare coordination drawings required below and in individual Specification sections.

B. Structural Systems: Where applicable include, but do not necessarily limit to following:

1. Structural frame showing interface with exterior cladding.

2. Location of openings in relation to structure.

3. Show attachments to decking, structural elements, and other systems.

C. Mechanical Systems: Where applicable include, but do not necessarily limit to following:

1. Proposed locations of piping, ductwork, equipment, and materials.

2. Proposed locations for access panels and doors.

3. Clearances for installing and maintaining insulation.

4. Clearances for servicing and maintaining equipment, including tube removal, filter removal, and space for equipment disassembly required for periodic maintenance. Show access locations.

5. Equipment connections and support details.

6. Exterior wall and foundation penetrations.

7. Fire-rated wall and floor penetrations.

8. Sizes and location of required concrete pads and bases.

9. Valve stem movement.

D. Electrical Systems: Include, but do not necessarily limit to following:

1. Proposed locations of major raceway systems, equipment, and materials.

2. Clearances for servicing equipment, including space for equipment disassembly required for periodic maintenance. Show access locations.

3. Exterior wall and foundation penetrations (where applicable).

4. Fire-rated wall and floor penetrations.

5. Equipment connections and support details.

6. Sizes and location of required concrete pads and bases.

E. Coordination: Coordinate in field with affected trades for proper relationship to Work based on Project con-ditions.

1. Notify Exhibit Designer of conflicts and other coordination issues requiring resolution prior to com-mencing construction in each affected area.

F. Submittal: Coordination drawings are Informational Submittals. See Section 34300. Submit coordination drawings to Exhibit Designer for information only to document proper coordination of all portions of Work and that coordination issues have been identified and resolved prior to commencing construction in each affected area.

EISENHOWER LOCK VISITORS' CENTER March 2022

EXHIBIT DOCUMENTS 34200 - 15

1.03 COORDINATION OF SPACE

A. General: Coordinate use of Project space and sequence of installation of plumbing, fire protection, mechan-ical and electrical Work. Follow routings shown for pipes, ducts, and conduits as closely as practicable, with due allowance for available physical space; make runs parallel with building lines.