03- Volume 3-Technical Specifications.pdf

PDF 21 MB Posted

Attached to
Eisenhower Lock Visitors' Center Construction Federal contract opportunity
Solicitation number
6923G522R0578
Issued by
Department of Transportation Saint Lawrence Seaway Development Corporation

About this file

This document outlines a federal contract opportunity for construction of the Eisenhower Lock Visitors' Center in Massena, New York. The project is a 100% small business set-aside solicited under NAICS code 236220 with a size standard of $39.5 million. Offerors must be registered in SAM and submit a bid bond with their proposals, with performance and payment bonds due within ten days of award. A non-mandatory site visit will be held on May 10th, with requests for information due May 16th and proposals due May 30th. The soliciting agency is the Department of Transportation Saint Lawrence Seaway Development Corporation.

View the file

Other files for this federal contract opportunity

Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Great Lakes St. Lawrence Seaway Development Corporation 180 Andrews Street Massena, NY 13662

Project & Location:

Visitors’ Center Eisenhower Lock Massena, NY 13662

Architect/Engineer Aubertine and Currier Architects, Engineers & Land Surveyors, PLLC 522 Bradley Street Watertown, NY 13601 A&C Project #: 2011-087.001

Mechanical/Electrical Engineer Jade Stone Engineering, PLLC 444 Vanduzee Street Watertown, New York 13601

Fire Protection Engineer Ran Fire Protection Engineering 1062 Central Avenue Albany, NY 12205

Exhibit Designers Hadley Exhibits Inc.

1700 Elmwood Avenue Buffalo, NY 14207

VOLUME 3

Technical Specifications for:

MARCH 2022—100% FOR CONSTRUCTION

This page intentionally left blank for duplicate printing

TABLE OF CONTENTS

EISENHOWER LOCK VISITORS’ CENTER

Great Lakes St. Lawrence Seaway Development Corporation Massena, New York

Table of Contents

VOLUME 1

Division Section Title

DIVISION 1 - GENERAL REQUIREMENTS

011000 Summary 011400 Work Restrictions 013000 Administrative Requirements 014000 Quality Requirements 014200 References 014533 Special Inspections & Structural Testing

014533.1 SUP Statement of Special Inspections

015000 Temporary Facilities and Controls 016000 Product Requirements 016116 Volatile Organic Compound (VOC) Content Restrictions 017300 Execution and Surveying 017419 Construction Waste Management and Disposal 017700 Closeout Procedures 017823 Operation and Maintenance Data 017839 Project Record Documents

DIVISION 2 – EXISTING CONDITIONS

020000 Limited Hazardous Material Survey 021000 Subsurface Investigation and Geotechnical Evaluation Services 024116 Structure Demolition

DIVISION 3 - CONCRETE

033000 Cast in Place Concrete

DIVISION 4 - MASONRY

042000 Unit Masonry

DIVISION 5- METALS

051200 Structural Steel Framing 052100 Steel Joist Framing 053100 Steel Decking 054000 Cold-Formed Metal Framing 054400 Cold-Formed Metal Trusses 055000 Metal Fabrications 055213 Pipe and Tube Railings

DIVISION 6 – WOOD, PLASTICS AND COMPOSITES

061000 Rough Carpentry

DIVISION 7 – THERMAL AND MOISTURE

072100 Thermal Insulation 072500 Weather Barriers 074113 Metal Roof Panels 074213 Metal Wall Panels 075000 EPDM Roof Membrane 079200 Joint Sealants

DIVISION 8 - DOORS AND WINDOWS

081113 Hollow Metal Doors and Frames 083000 Specialty Doors and Frames 084113 Aluminum-Framed Entrances and Storefront 087100 Door Hardware

DIVISION 9 – FINISHES

092600 Gypsum Board Assemblies 093013 Ceramic Tiling 095110 Acoustical Panel Ceilings 099120 Painting

DIVISION 10 – SPECIALTIES

102113 Toilet Compartments 102800 Toilet, Bath and Laundry Accessories 105200 Fire Extinguishers, Cabinets and Accessories

DIVISION 12 – FURNISHINGS

123040 Plastic Laminate-Faced Casework

VOLUME 2

DIVISION 14 – CONVEYING EQUIPMENT

142100 Electric Traction Passenger Elevations

DIVISION 21 – FIRE SUPPRESSION

210524 Backflow Preventers 210529 Pipe Hangers and Supports 211300 Sprinkler Piping 211313 Sprinkler Systems

DIVISION 22 – PLUMBING

220510 Basic Plumbing Requirements 220515 Plumbing Firestopping 220553 Plumbing Identification 220719 Plumbing Piping Insulation 221005 Plumbing Piping 221006 Plumbing Piping Specialties 224000 Plumbing Fixtures

DIVISION 23 – HEATING VENTILATING & AIR CONDITIONING

230510 Base Mechanical Requirements 230515 Mechanical Firestopping 230553 Identification for HVAC Piping and Equipment 230593 Testing, Adjusting and Balancing of HVAC 230713 Duct Insulation 230719 HVAC Piping Insulation 232300 Refrigerant Piping 233100 HVAC Ducts and Casings 233300 Air Duct Accessories 233416 Centrifugal HVAC Fans 233700 Air Outlets and Inlets 237413 Packaged Roof-top Units 238101 Terminal Heat Transfer Units 238129 Variable Refrigerant Flow HVAC Systems

DIVISION 26 – ELECTRICAL

260513 Medium-Voltage Cables

260519 Low-Voltage Electrical Power Conductors and Cables 260526 Grounding and Bonding For Electrical Systems 260529 Hangers and Supports For Electrical Systems

260533.13 Conduit For Electrical Systems

260533.16 Boxes For Electrical Systems

260553 Identification for Electrical Systems 260573 Power System Studies 260583 Wiring Connections 260923 Automatic Lighting Controls 261200 Medium-Voltage Transformers 262416 Panelboards 262726 Wiring Devices 262813 Fuses

262816.16 Enclosed Switches

263213 Engine Generators 263600 Transfer Switches 265100 Interior Lighting

DIVISION 27- COMMUNICATIONS

271000 Structured Cabling

275129.13 Two-Way Communication Systems

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

284600 Fire Detection and Alarm

VOLUME 3

DIVISION 31 – EARTHWORK

311000 Site Clearing 312200 Grading 312316 Excavation

312316.26 Rock Removal

312319 Dewatering and Drainage 312323 Fill 315000 Excavation Support and Protection

DIVISION 32 – EXTERIOR IMPROVEMENTS

321216 Asphalt Paving 321313 Concrete Paving 321373 Concrete Paving Joint Sealants 323113 Chain Link Fences and Gates 323119 Decorative Metal Fences and Gates 323300 Site Furnishings 329219 Seeding

DIVISION 33 – UTILITIES

331416 Site Water Utility Distribution 333113 Facility Sanitary Sewers 334211 Stormwater Gravity Piping 334211 Stormwater Drains

DIVISION 34 – EXHIBIT DOCUMENTS

34100 Summary of Work and Special Requirements 34150 Submittals and Prototypes 34200 Project Coordination 34250 Project Meetings 34300 Submittal Procedures 34350 Work Restrictions 34400 Architectural Woodwork

34450 Metal Fabrication and Finishing 34500 Wall Coverings and Murals 34550 Graphics 34600 Artifacts, Models and Objects 34650 Electrical Wiring 34700 Audio Visual and Interactive Systems 34750 Closeout Procedures 34800 Closeout Submittals Design Development Package

EISENHOWER LOCK VISITORS' CENTER March 2022

Massena, New York

Site Clearing 311000 - 1

SECTION 311000 - SITE CLEARING

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Clearing and protection of vegetation.

B. Removal of existing debris.

C. Protecting existing grass to remain.

D. Removing existing grass.

E. Clearing and Grubbing.

F. Tree Removal.

G. Stripping and stockpiling topsoil.

H. Removing above- and below-grade site improvements.

I. Disconnecting, capping or sealing and removing site utilities or abandoning site utilities in place.

J. Temporary erosion and sedimentation control.

1.2 RELATED REQUIREMENTS

A. Section 312200 - Grading: Fill material for filling holes, pits, and excavations generated as a result of removal operations.

1.3 DEFINITIONS

A. Subsoil: Soil beneath the level of subgrade; soil beneath the topsoil layers of a naturally occurring soil profile, typified by less than 1 percent organic matter and few soil organisms.

B. Surface Soil: Soil that is present at the top layer of the existing soil profile. In undisturbed areas, surface soil is typically called "topsoil," but in disturbed areas such as urban environments, the surface soil can be subsoil.

C. Topsoil: Top layer of the soil profile consisting of existing native surface topsoil or existing in-place surface soil; the zone where plant roots grow.

D. Vegetation: Trees, shrubs, groundcovers, grass, and other plants.

E. Tree-Protection Zone: Area surrounding individual trees or groups of trees to be protected during construction and indicated on Drawings.

Massena, New York

Site Clearing 311000 - 2

1.4 MATERIAL OWNERSHIP

A. Except for materials indicated to be stockpiled or otherwise remain Owner's property, cleared materials shall become Contractor's property and shall be removed from Project site.

1.5 PROJECT CONDITIONS

A. Traffic: Minimize interference with adjoining roads, streets, walks, and other adjacent occupied or used facilities during site-clearing operations.

1. Do not close or obstruct streets, walks, or other adjacent occupied or used facilities without permission from Owner and authorities having jurisdiction.

2. Provide alternate routes around closed or obstructed trafficways if required by Owner or authorities having jurisdiction.

B. Salvageable Improvements: Carefully remove items indicated to be salvaged and store on Owner's premises.

C. Utility Locator Service: Notify Dig Safely NY to obtain an excavation permit for area where Project is located before site clearing.

D. Do not commence site clearing operations until temporary erosion- and sedimentation-control and plant-protection measures are in place.

E. The following practices are prohibited within protection zones:

1. Storage of construction materials, debris, or excavated material.

2. Parking vehicles or equipment.

3. Foot traffic.

4. Erection of sheds or structures.

5. Impoundment of water.

6. Excavation or other digging unless otherwise indicated.

7. Attachment of signs to or wrapping materials around trees or plants unless otherwise indicated.

F. Do not direct vehicle or equipment exhaust towards protection zones.

G. Prohibit heat sources, flames, ignition sources, and smoking within or near protection zones.

1.6 SUBMITTALS

A. See Section 013000 - Administrative Requirements, for submittal procedures.

Massena, New York

Site Clearing 311000 - 3

B. Site Plan: Showing:

1. Areas for temporary construction and field offices.

PART 2 PRODUCTS

2.1 MATERIALS

A. Fill Material: As specified in Section 312323 - Fill

PART 3 EXECUTION

3.1 PREPARATION

A. Protect and maintain benchmarks and survey control points from disturbance during construction.

B. The Contractor shall be solely responsible for locating all underground utilities prior to the commencement of work. Locations of existing utilities on the site plan are not warranted to show all existing utilities under or above ground. Existing utilities indicated on the site plan are shown only for the convenience of the owner’s representatives. It shall be expressly understood that the owner will not in any way be held responsible for conclusions or interpretations drawn there from by contractor. The Contractor shall therefore be held solely liable for any damage that occurs on or off site in this respect.

C. Locate and clearly flag trees and vegetation to remain or to be relocated. Protect existing trees, group of trees, and other vegetation designated by the Engineer or shown on the drawings to remain in place against unnecessary cutting, breaking, or skinning of roots, skinning and bruising of bark, smothering of trees by stockpiling construction materials or excavated materials within the drip line, excess foot or vehicular traffic, or parking of vehicles within the drip line.

D. Protect existing site improvements to remain from damage during construction.

1. Restore damaged improvements to their original condition, as acceptable to Owner.

3.2 TEMPORARY EROSION AND SEDIMENTATION CONTROL

A. Provide temporary erosion and sedimentation control measures to prevent soil erosion and discharge of soil-bearing water runoff or airborne dust to adjacent properties and walkways, according to a sediment and erosion control plan. Utilize erosion and sediment control measures installed in accordance with NYS DEC Standards and Specifications for Erosion and Sediment Control dated November 2016.

B. The operator shall initiate stabilization measures as soon as practicable in portions of the site where construction activities have temporarily or permanently ceased, but in no case more then 7 days after the construction activity in that portion of the site have temporarily or permanently ceased. This requirement does not apply in the following instances:

Massena, New York

Site Clearing 311000 - 4

1. Where the initiation of stabilization measures by the 7th day after construction activity temporarily or permanently ceased is precluded by snow cover or frozen ground conditions, stabilization measures shall be initiated as soon as practicable;

2. General:

a. The Contractor shall take sufficient precautions during construction to minimize the run-off of polluting substances such as silt, clay, fuels, oils, bitumens, calcium chloride, or other polluting materials harmful to humans, fish, or other life, into the water supplies and surface waters. Special precautions shall be taken in the use of construction equipment to prevent operations which promote erosion.

b. Measures of control of erosion must be adequate to assure that turbidity in the receiving water will not be increased more than the limit set by the State or other controlling body.

c. Topsoiling and seeding or mulching of cross country areas shall take place as soon as practicable but shall not be contrary to the requirements specified.

d. Burning of combustible cleared and grubbed materials and debris will not be permitted on the project site.

3. With regard to erosion and siltation control, the sequence of activities will generally take place as follows:

a. Prior to grubbing or topsoil stripping, place all stone check dams, silt fence and construction fence required.

b. Throughout excavation, filling and grading operations, the Contractor shall take other necessary precautions, including installation of temporary drainage swales, siltation sumps, filtration dams, stone check dams, siltation fences and temporary pipe to direct and control drainage from disturbed areas on the site so that erosion and siltation is minimal. In addition, no erosion or discharge of silt or larger particles from erosion control measures, surface runoff, or construction dewatering shall occur onto adjacent properties, or into sewers or drains.

c. Construction of dewatering sumps and connecting dewatering trenches as necessary for construction operations. These sumps and trenches shall be of size, configuration and elevation as necessary to draw groundwater below the excavation subgrade levels. Water from dewatering operations shall be discharged into silt sumps and through filtration dams to insure that no silt laden water or larger particles shall be discharged into wetland areas to remain undisturbed, or onto adjacent properties.

Special siltation control details may have to be submitted to the Engineer for approval.

d. Damaged or loose siltation fence shall be replaced as necessary to maintain their function of controlling erosion siltation. Damaged or broken down stone check dams

Massena, New York

Site Clearing 311000 - 5 and filtration dams shall be replaced immediately.

e. Remove any accumulation of silt or soil build-up behind stone check dams and filtration dams, as it occurs. Remove accumulations of silt and soil build-up from the siltation sumps and silt trap, if any, when it is approximately the capacity has been reduced by 50%.

f. Remove all erosion control measures, including silt fence, siltation sumps and stone check dams only when construction is completed, upland surfaces are stabilized and the piped drainage system is fully operational.

4. If the Contractor anticipates deviations from the above procedures, he shall notify the Engineer or his designated representative as soon as possible. No substantial deviations from the above sequence of activities shall take place without the Engineer's approval.

3.3 TREE PROTECTION

A. Erect and maintain temporary fencing around tree protection zones before starting site clearing.

Remove fence when construction is complete.

B. Do not excavate within tree protection zones, unless otherwise indicated.

C. Repair or replace trees and vegetation indicated to remain that are damaged by construction operations, in a manner approved by Engineer.

3.4 EXISTING UTILITIES

A. Locate, identify, disconnect, and seal or cap utilities indicated to be removed or abandoned in place.

1. Arrange with utility companies to shut off indicated utilities.

2. Owner will arrange to shut off indicated utilities when requested by Contractor.

B. Locate, identify, and disconnect utilities indicated to be abandoned in place.

C. Interrupting Existing Utilities: Do not interrupt utilities serving facilities occupied by Owner or others, unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:

1. Notify Owner not less than two days in advance of proposed utility interruptions.

2. Do not proceed with utility interruptions without Owner written permission.

D. Excavate for and remove underground utilities indicated to be removed.

E. Removal of underground utilities is included in earthwork Section 312316 “Excavation”.

Massena, New York

Site Clearing 311000 - 6

3.5 CLEARING AND GRUBBING

A. Remove shrubs, grass, weeds and other vegetation, improvements or obstructions that interfere with the installation of new construction. Also remove such items elsewhere in the site or premises as specifically indicated by the Engineer. Removal includes new and old stumps and their roots and any existing above-ground improvements.

B. Clearing of trees shall consist of the felling, trimming, and cutting of trees into sections and the satisfactory disposal of the trees and other vegitation designated for removal, including downed timber, snags, brush, and rubish occuring within the areas to be cleared. Trees designated to be left standing within the cleared areas shall be trimmed of dead branches 1-1/2 inches or more in diameter and shall be trimmed of all branches to the heights indicated or directed. Limbs and branches to be trimmed shall be neatly cut close to the bole of the tree or main branches. Cuts more than 1-1/2 inches in diameter shall be painted with an approved tree-wound paint.

C. All tree stumps and roots within the limits of work shall be removed.

D. Conduct clearing operations to prevent falling trees from damaging standing trees or adjacent structures.

E. Clear areas required for access to site and execution of Work.

F. Remove roots to a depth of 18 inches.

G. Clear the project site of shrubs and other vegetation except for those indicated to be left standing.

H. Completely remove stumps, roots, organic materials and other debris in all excavations, I. embankment, and slope areas in which earthwork and grading operations will occur. Remove only trees as shown on the Contract Drawings.

J. Fill depressions caused by clearing and grubbing operations with satisfactory soil material unless further excavation or earthwork is indicated.

1. Place fill material in horizontal layers not exceeding a loose depth of 8 inches (200 mm), and compact each layer to a density equal to adjacent original ground. Coordinate with Section 312200 "Grading" and 312323 "Fill".

3.6 TOPSOIL STRIPPING

A. Prior to beginning earthwork excavation within the project site, strip all topsoil to its normal depth.

B. Strip topsoil to whatever depths are encountered in a manner to prevent intermingling with underlying subsoil or other waste materials.

C. Where trees are indicated to be left standing, stop topsoil stripping a sufficient distance from these trees to prevent damage to the main root system.

Massena, New York

Site Clearing 311000 - 7

D. Stockpile topsoil materials away from edge of excavations without intermixing with subsoil.

Grade and shape stockpiles to drain surface water. Cover to prevent windblown dust.

3.7 SITE IMPROVEMENTS

A. Remove existing above- and below-grade improvements as indicated and necessary to facilitate new construction.

B. Remove slabs, paving, curbs, gutters, and aggregate base as indicated.

1. Unless existing full-depth joints coincide with line of demolition, neatly saw-cut along line of existing pavement to remain before removing adjacent existing pavement. Saw-cut faces vertically.

2. Paint cut ends of steel reinforcement in concrete to remain with two coats of antirust coating, following coating manufacturer's written instructions. Keep paint off surfaces that will remain exposed.

3.8 DISPOSAL OF SURPLUS AND WASTE MATERIALS

A. Remove surplus soil material, unsuitable topsoil, obstructions, demolished materials, and waste materials including trash and debris, and legally dispose of them off Owner's property.

B. Burning tree, shrub, and other vegetation waste is not permitted on Owner’sproperty.

C. Separate recyclable materials produced during site clearing from other nonrecyclable materials.

Store or stockpile without intermixing with other materials, and transport them to recycling facilities. Do not interfere with other Project work.

3.9 SITE CLEARING

A. Minimize production of dust due to clearing operations; do not use water if that will result in ice, flooding, sedimentation of public waterways or storm sewers, or other pollution.

3.10 EXISTING UTILITIES AND BUILT ELEMENTS

A. Coordinate work with utility companies; notify before starting work and comply with their requirements; obtain required permits.

B. Protect existing utilities to remain from damage.

C. Do not disrupt public utilities without permit from authority having jurisdiction.

D. Protect existing structures and other elements that are not to be removed.

3.11 VEGETATION

A. Scope: Remove trees, shrubs, brush, and stumps in areas to be covered by building structure, paving, lawns, and landscape areas.

Massena, New York

Site Clearing 311000 - 8

B. Do not remove or damage vegetation beyond the limits indicated on drawings.

1. 40 feet outside the building perimeter.

2. 10 feet each side of surface walkways, patios, surface parking, and utility lines less than 12 inches in diameter.

C. Vegetation Removed: Do not burn, bury, landfill, or leave on site, except as indicated.

1. Chip, grind, crush, or shred vegetation for mulching, composting, or other purposes.

2. Trees: Sell if marketable; if not, treat as specified for other vegetation removed; remove stumps and roots to depth of 18 inches.

3. Existing Stumps: Treat as specified for other vegetation removed; remove stumps and roots to depth of 18 inches.

4. Sod: Re-use on site if possible; otherwise sell if marketable, and if not, treat as specified for other vegetation removed.

5. Fill holes left by removal of stumps and roots, using suitable fill material, with top surface neat in appearance and smooth enough not to constitute a hazard to pedestrians.

D. Dead Wood: Remove all dead trees (standing or down), limbs, and dry brush on entire site;

treat as specified for vegetation removed.

E. Restoration: If vegetation outside removal limits or within specified protective fences is damaged or destroyed due to subsequent construction operations, replace at no cost to Owner.

3.12 DEBRIS

A. Remove debris, junk, and trash from site.

B. Leave site in clean condition, ready for subsequent work.

C. Clean up spillage and wind-blown debris from public and private lands.

END OF SECTION 311000

Massena, New York

Grading 312200 - 1

SECTION 312200 - GRADING

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Removal and storage of topsoil.

B. Rough grading for site structures sucha s walks, roads, drives, and landscape areas.

C. Replacement of topsoil and finish grading .

1.2 RELATED REQUIREMENTS

A. Section 312316 - Excavation.

B. Section 312323 - Fill: Filling and compaction.

C. Section 329219 - Seeding: Finish ground cover.

1.3 SUBMITTALS

A. Project Record Documents: Accurately record actual locations of utilities remaining by horizontal dimensions, elevations or inverts, and slope gradients.

1.4 QUALITY ASSURANCE

A. Perform Work in accordance with NYSDOT and Great Lakes Seaway Development Corporation standards.

PART 2 PRODUCTS

2.1 MATERIALS

A. Topsoil: See Section 312323.

B. Other Fill Materials: See Section 312323.

PART 3 EXECUTION

3.1 EXAMINATION

A. Verify that survey bench mark and intended elevations for the Work are as indicated.

B. Verify the absence of standing or ponding water.

3.2 PREPARATION

A. Identify required lines, levels, contours, and datum.

B. Stake and flag locations of known utilities.

Massena, New York

Grading 312200 - 2

C. Locate, identify, and protect from damage above- and below-grade utilities to remain.

D. Notify utility company prior to the removal or relocation of utilities.

E. Provide temporary means and methods to remove all standing or ponding water from areas prior to grading.

F. Protect site features to remain, including but not limited to bench marks, survey control points, existing structures, fences, sidewalks, paving, and curbs, from damage by grading equipment and vehicular traffic.

G. Protect trees to remain by providing substantial fencing around entire tree at the outer tips of its branches; no grading is to be performed inside this line.

H. Protect plants, lawns, rock outcroppings, and other features to remain as a portion of final landscaping.

3.3 ROUGH GRADING

A. Remove topsoil from areas to be further excavated, re-landscaped, or re-graded, without mixing with foreign materials.

B. Do not remove topsoil when wet.

C. Remove subsoil from areas to be further excavated, re-landscaped, or re-graded.

D. Do not remove wet subsoil , unless it is subsequently processed to obtain optimum moisture content.

E. When excavating through roots, perform work by hand and cut roots with sharp axe.

F. See Section 312323 for filling procedures.

G. Benching Slopes: Horizontally bench existing slopes greater than 1:3 to key fill material to slope for firm bearing.

H. Stability: Replace damaged or displaced subsoil to same requirements as for specified fill.

I. Remove and replace soils deemed unsuitable by classification and which are excessively moist due to lack surface water control.

3.4 SOIL REMOVAL AND STOCKPILING

A. Stockpile topsoil to be re-used on site; remove remainder from site.

B. Stockpile excavated subsoil on-site to be reused.

C. Remove excess soil from site.

D. Stockpile subsoil to be re-used on site; remove remainder from site.

Massena, New York

Grading 312200 - 3

E. Stockpiles: Use areas designated on site; protect from erosion.

3.5 FINISH GRADING

A. Before Finish Grading:

1. Verify building and trench backfilling have been inspected.

2. Verify subgrade has been contoured and compacted.

B. Remove debris, roots, branches, stones, in excess of 1/2 inch in size. Remove soil contaminated with petroleum products.

C. Where topsoil is to be placed, scarify surface to depth of 3 inches.

D. In areas where vehicles or equipment have compacted soil, scarify surface to depth of 6 inches .

E. Place topsoil in areas where seeding is indicated.

F. Place topsoil where required to level finish grade.

G. Place topsoil to thickness as indicated.

H. Place topsoil during dry weather.

I. Remove roots, weeds, rocks, and foreign material while spreading.

J. Near buildings , walks, and pavements spread topsoil manually to prevent damage.

K. Fine grade topsoil to eliminate uneven areas and low spots. Maintain profiles and contour of subgrade.

L. Lightly compact placed topsoil.

M. Maintain stability of topsoil during inclement weather. Replace topsoil in areas where surface water has eroded thickness below specifications.

3.6 TOLERANCES

A. Top Surface of Subgrade: Plus or minus 0.10 foot (1-3/16 inches) from required elevation.

B. Top Surface of Finish Grade: Plus or minus 0.04 foot (1/2 inch).

3.7 REPAIR AND RESTORATION

A. Existing Facilities, Utilities, and Site Features to Remain: If damaged due to this work, repair or replace to original condition.

B. Trees to Remain: If damaged due to this work, trim broken branches and repair bark wounds; if root damage has occurred, obtain instructions from Architect as to remedy.

Massena, New York

Grading 312200 - 4

C. Other Existing Vegetation to Remain: If damaged due to this work, replace with vegetation of equivalent species and size.

3.8 FIELD QUALITY CONTROL

A. See Section 312323 for compaction density testing.

3.9 PROTECTION

A. Protecting Graded Areas: Protect newly graded areas from traffic, freezing, and erosion. Keep free of trash and debris.

B. Repair and reestablish grades to specified tolerances where completed or partially completed surfaces become eroded, rutted, settled, or where they lose compaction due to subsequent construction operations or weather conditions.

C. Where settling occurs before Project correction period elapses, remove finished surfacing, backfill with additional soil material, compact, and reconstruct surfacing.

1. Restore appearance, quality, and condition of finished surfacing to match adjacent work, and eliminate evidence of restoration to greatest extent possible.

3.10 CLEANING

A. Remove unused stockpiled topsoil and subsoil. Grade stockpile area to prevent standing water.

B. Leave site clean and raked, ready to receive landscaping.

END OF SECTION 312200

Massena, New York

Rock Removal 312316.26 - 1

SECTION 312316.26 - ROCK REMOVAL

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Removal of identified and discovered rock during excavation.

1.2 RELATED REQUIREMENTS

A. Section 312323 - Fill: Fill materials.

B. Section 31 2316 - Excavation

1.3 DEFINITIONS

A. Rock: Rock material in beds, ledges, unstratified masses, conglomerate deposits, and boulders of rock material that exceed 1 cu. yd. (0.76 cu. m) for bulk excavation or 3/4 cu. yd. (0.57 cu.

m) for footing, trench, and pit excavation that cannot be removed by rock-excavating equipment equivalent to the following in size and performance ratings, without systematic drilling, ram hammering, ripping, or blasting, when permitted:

1. Equipment for Footing, Trench, and Pit Excavation: Late-model, track-mounted hydraulic excavator; equipped with a 42-inch- (1065-mm-) maximum-width, short-tip-radius rock bucket; rated at not less than 138-hp (103-kW) flywheel power with bucket-curling force of not less than 28,700 lbf (128 kN) and stick-crowd force of not less than 18,400 lbf (82 kN) with extra-long reach boom.

2. Equipment for Bulk Excavation: Late-model, track-mounted loader; rated at not less than 230-hp (172-kW) flywheel power and developing a minimum of 47,992-lbf (213.3-kN) breakout force with a general-purpose bare bucket.

B. Rock: Rock material in beds, ledges, unstratified masses, conglomerate deposits, and boulders of rock material 3/4 cu. yd. (0.57 cu. m) or more in volume that exceed a standard penetration resistance of 100 blows/2 inches (97 blows/50 mm) when tested by a geotechnical testing agency, according to ASTM D 1586

1.4 REGULATORY REQUIREMENTS

A. Rock removal by mechanical and/or saw cutting shall conform to applicable State and/or Local regulatory requirements.

1.5 REFERENCE STANDARDS

A. NFPA 495 - Explosive Materials Code 2018.

1.6 SUBMITTALS

A. See Section 013000 - Administrative Requirements, for submittal procedures.

Massena, New York

Rock Removal 312316.26 - 2

B. Shop Drawings: Indicate the proposed method of blasting, delay pattern, explosive types, type of blasting mat or cover, and intended rock removal method.

C. Pre-excavation Photographs or Videotape: Show existing conditions of adjoining construction and site improvements, including finish surfaces that might be misconstrued as damage caused by mechanical rock removal and/or blasting operations. Submit before earth moving begins.

D. Pre-Blast Investigation and Report: Thorough engineer's investigation and documentation of all structures within 250' of the project's planned blasting area. Report shall document size and location of all visible preconstruction structural damage, cracks, general condition, etc. of adjacent structures.

1.7 QUALITY ASSURANCE

A. Explosives Agency: Company specializing in explosives for disintegration of rock, with five years documented experience.

B. Blasting: Comply with applicable requirements in NFPA 495, "Explosive Materials Code," and prepare a blasting plan reporting the following:

1. Types of explosive and sizes of charge to be used in each area of rock removal, types of blasting mats, sequence of blasting operations, and procedures that will prevent damage to site improvements and structures on Project site and adjacent properties.

2. Seismographic monitoring during blasting operations.

C. Seismic Survey Agency: An independent testing agency, acceptable to authorities having jurisdiction, experienced in seismic surveys and blasting procedures to perform the following services:

1. Report types of explosive and sizes of charge to be used in each area of rock removal, types of blasting mats, sequence of blasting operations, and procedures that will prevent damage to site improvements and structures on Project site and adjacent properties.

D. Pre-Blast Investigation and Report: Contractor shall provide Pre-Blast Investigation and Report documenting condition of all existing structures within 250' of the project blast area.

Investigation and Report shall be conducted by a 3rd Party independent professional engineering firm. At a minimum, report shall include photograph and video documentation of conditions, including measurements of any existing cracks, damages, or suspect structural conditions. Documentation shall be provided in video narrative and/or tabular database/spreadsheet/report format.

PART 2 PRODUCTS

2.1 MATERIALS

A. Explosives: Type recommended by explosive firm following seismic survey and required by authorities having jurisdiction.

Massena, New York

Rock Removal 312316.26 - 3

B. Delay Device: Type recommended by explosives firm.

C. Blast Mat Materials: Type recommended by explosives firm.

PART 3 EXECUTION

3.1 EXAMINATION

A. Verify site conditions and note subsurface irregularities affecting work of this section.

3.2 PREPARATION

A. Identify required lines, levels, contours, and datum.

B. Have required seismographs and safety features in place and operational before blasting operations begin.

3.3 ROCK REMOVAL

A. Excavate and remove rock by either mechanical or explosive methods.

B. Mechanical Methods: Drill holes and utilize expansive tools to fracture rock.

C. Rock Saw/Trencher.

D. Hydro-Ram or Jack Hammer.

E. If rock is uncovered requiring the explosives method for rock disintegration, notify the Architect.

F. Use of Explosives: Obtain permits from authorities having jurisdiction before explosives are brought to site or drilling is started.

1. Comply with NFPA 495 and applicable state and local codes.

2. Prior to blasting, obtain a seismographic survey to determine maximum charges that can be used at each location in area of excavation without damaging adjacent properties or other work.

3. Prior to executing seismographic survey, advise owners of adjacent buildings and structures in writing; explain planned survey and blasting operations.

4. Prior to blasting, document conditions of buildings near locations of intended blasting and photograph existing conditions identifying existing irregularities.

5. Schedule work to avoid working hours of occupied buildings nearby.

6. Perform blasting without damaging adjacent structures, property, or site improvements.

Massena, New York

Rock Removal 312316.26 - 4

7. Perform blasting without weakening the bearing capacity of rock subgrade and with the least-practicable disturbance to rock to remain

G. Form level bearing at bottom of excavations.

H. Remove shaled layers to provide sound and unshattered base for footings.

I. In utility trenches, excavate to 6 inches below invert elevation of pipe and the greater of 24 inches wider than pipe diameter or 42 inches

J. Remove excavated materials from site.

K. Correct unauthorized rock removal in accordance with backfilling and compacting requirements of Section 312323.

L. Correct unauthorized rock removal to directions of Architect.

3.4 FIELD QUALITY CONTROL

A. Record top of rock elevations and provide them to the owners representative.

B. Confirm, in writing, that the Owners Representative is in agreement with the measurements for quantity of rock before any rock removal operations commence.

END OF SECTION 312316.26

Massena, New York

Excavation 312316 - 1

SECTION 312316 - EXCAVATION

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Excavating for building volume below grade, footings, slabs-on-grade, paving, site structures, and utilities within the building .

B. Trenching for utilities outside the building to utility main connections.

C. Temporary excavation support and protection systems.

1.2 RELATED REQUIREMENTS

A. Section 311000 - Site Clearing: Vegetation and existing debris removal.

B. Section 312200 - Grading: Soil removal from surface of site and grading.

C. Section 312323 - Fill: Fill materials, backfilling, and compacting.

1.3 REFERENCE STANDARDS

A. 29 CFR 1926 - Safety and Health Regulations for Construction Current Edition.

1.4 SUBMITTALS

A. See Section 013000 - Administrative Requirements, for submittal procedures.

B. Field Quality Control Submittals: Document visual inspection of load-bearing excavated surfaces.

1.5 PROJECT CONDITIONS

A. Existing Utilities: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted in writing by Engineer and then only after arranging to provide temporary utility services according to requirements indicated.

B. Traffic: Minimize interference with adjoining roads, streets, walks, and other adjacent occupied or used facilities during earth-moving operations.

1. Do not close or obstruct streets, walks, or other adjacent occupied or used facilities without permission from Owner and authorities having jurisdiction.

2. Provide alternate routes around closed or obstructed traffic ways if required by Owner or authorities having jurisdiction.

C. Utility Locator Service: Notify Dig Safely NY to obtain an excavation permit for area where Project is located before beginning earth-moving operations.

Massena, New York

Excavation 312316 - 2

D. Improvements on Adjoining Property: Authority for performing earth moving indicated on property adjoining Owner's property will be obtained by Owner before award of Contract.

1. Do not proceed with work on adjoining property until directed by Engineer.

E. Do not commence earth-moving operations until temporary site fencing and erosion and sedimentation-control measures, specified in Section 31 1000 “Site Clearing”, are in place.

F. The following practices are prohibited within protection zones:

1. Storage of construction materials, debris, or excavated material.

2. Parking vehicles or equipment.

3. Foot traffic.

4. Erection of sheds or structures.

5. Impoundment of water.

6. Excavation or other digging unless otherwise indicated.

7. Attachment of signs to or wrapping materials around trees or plants unless otherwise indicated.

G. Do not direct vehicle or equipment exhaust towards protection zones.

H. Prohibit heat sources, flames, ignition sources, and smoking within or near protection zones.

1.6 DEFINITIONS

A. Backfill: Soil material or controlled low-strength material used to fill an excavation.

1. Initial Backfill: Backfill placed beside and over pipe in a trench, including haunches to support sides of pipe.

2. Final Backfill: Backfill placed over initial backfill to fill a trench.

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.

C. Bedding Course: Aggregate layer placed over the excavated subgrade in a trench before laying pipe.

D. Borrow Soil: Satisfactory soil imported from off-site for use as fill or backfill.

E. Drainage Course: Aggregate layer of graded stone utilized under and around structures to promote collection and drainage of groundwater.

F. Excavation: Removal of material encountered above subgrade elevations and to lines and dimensions indicated.

Massena, New York

Excavation 312316 - 3

1. Authorized Additional Excavation: Excavation below subgrade elevations or beyond indicated lines and dimensions as directed by Engineer. Authorized additional excavation and replacement material will be paid for according to Contract provisions for changes in the Work.

2. Unauthorized Excavation: Excavation below subgrade elevations or beyond indicated lines and dimensions without direction by Engineer. Unauthorized excavation, as well as remedial work directed by Engineer, shall be without additional compensation.

G. Fill: Soil materials used to raise existing grades.

H. Rock: Rock material in beds, ledges, unstratified masses, conglomerate deposits, and boulders of rock material that exceed 1 cu. yd. (0.76 cu. m) for bulk excavation or 3/4 cu. yd. (0.57 cu.

m) for footing, trench, and pit excavation that cannot be removed by rock-excavating equipment equivalent to the following in size and performance ratings, without systematic drilling, ram hammering, ripping, or blasting, when permitted:

1. Equipment for Footing, Trench, and Pit Excavation: Late-model, track-mounted hydraulic excavator; equipped with a 42-inch- (1065-mm-) maximum-width, short-tip-radius rock bucket; rated at not less than 138-hp (103-kW) flywheel power with bucket-curling force of not less than 28,700 lbf (128 kN) and stick-crowd force of not less than 18,400 lbf (82 kN) with extra-long reach boom.

2. Equipment for Bulk Excavation: Late-model, track-mounted loader; rated at not less than 230-hp (172-kW) flywheel power and developing a minimum of 47,992-lbf (213.3-kN) breakout force with a general-purpose bare bucket.

I. Structures: Buildings, footings, foundations, retaining walls, slabs, tanks, curbs, mechanical and electrical appurtenances, or other man-made stationary features constructed above or below the ground surface.

J. Subbase Course: Aggregate layer placed between the subgrade and base course for hot-mix asphalt pavement, or aggregate layer placed between the subgrade and a cement concrete pavement or a cement concrete or hot-mix asphalt walk.

K. Subgrade: Uppermost surface of an excavation or the top surface of a fill or backfill immediately below subbase, drainage fill, drainage course, or topsoil materials.

L. Tree Protection Zone: An area where construction activities are prohibited or restricted to prevent injury to preserved trees, especially during pre-construction and construction, and includes the Critical Root Zone and/or beyond.

M. Utilities: On-site underground pipes, conduits, ducts, and cables as well as underground services within buildings.

Massena, New York

Excavation 312316 - 4

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION

3.1 EXAMINATION

A. Verify that survey bench mark and intended elevations for the work are as indicated.

3.2 PREPARATION

A. Identify required lines, levels, contours, and datum locations.

B. See Section 311000 for clearing, grubbing, and removal of existing debris.

C. See Section 312200 for topsoil removal.

D. Locate, identify, and protect utilities that remain and protect from damage.

E. Protect bench marks, survey control points, existing structures, fences, sidewalks, paving, and curbs from excavating equipment and vehicular traffic.

F. Protect plants, lawns, rock outcroppings, and other features to remain.

G. Grade top perimeter of excavation to prevent surface water from draining into excavation.

Provide temporary means and methods, as required, to maintain surface water diversion until no longer needed, or as directed by Architect.

H. Grade top perimeter of excavation to prevent surface water from draining into excavation.

Provide temporary means and methods, as required, to maintain surface water diversion until no longer needed, or as directed by the Engineer.

3.3 TEMPORARY EXCAVATION SUPPORT AND PROTECTION

A. Excavation Safety: Comply with OSHA’s Excavation Standard, 29 CFR 1926, Subpart P.

1. Depending upon excavation depth, time that excavation is open, soil classification, configuration and slope of excavation sidewalls, design and provide an excavation support and protection system that meets the requirements of 29 CFR 1926, Subpart P:

a. Sloping and benching systems.

b. Support systems, shield systems, and other protective systems.

3.4 DEWATERING

A. Prevent surface water and ground water from entering excavations, from ponding on prepared subgrades, and from flooding Project site and surrounding area.

B. Protect subgrades from softening, undermining, washout, and damage by rain or water accumulation.

Massena, New York

Excavation 312316 - 5

1. Reroute surface water runoff away from excavated areas. Do not allow water to accumulate in excavations. Do not use excavated trenches as temporary drainage ditches.

3.5 EXCAVATING

A. Excavate to accommodate new structures and construction operations.

1. Excavate to the specified elevations.

2. Excavate to the length and width required to safely install, adjust, and remove any forms, bracing, or supports necessary for the installation of the work.

3. Cut utility trenches wide enough to allow inspection of installed utilities.

4. See details for required excavation clearances for pipes in utility trenches.

5. Hand trim excavations. Remove loose matter.

B. Notify Architect of unexpected subsurface conditions and discontinue affected Work in area until notified to resume work.

C. Slope banks of excavations deeper than 3 feet to angle of repose or less until shored.

D. Do not interfere with 45 degree bearing splay of foundations.

E. Cut utility trenches wide enough to allow inspection of installed utilities.

F. Hand trim excavations. Remove loose matter.

G. Remove lumped subsoil, boulders, and rock up to 3/4 cubic yard measured by volume.

H. Correct areas that are over-excavated and load-bearing surfaces that are disturbed; see Section 312323.

I. Provide temporary means and methods, as required, to remove all water from excavations until directed by Architect. Remove and replace soils deemed suitable by classification and which are excessively moist due to lack of dewatering or surface water control.

J. Determine the prevailing groundwater level prior to excavation. If the proposed excavation extends less than 1 foot (305 mm) into the prevailing groundwater, control groundwater intrusion with perimeter drains routed to sump pumps, or as directed by the Engineer. If the proposed excavation extends more than 1 foot (305 mm) into the excavation, control groundwater intrusion with a comprehensive dewatering procedures, or as directed by the Engineer.

K. Remove excavated material that is unsuitable for re-use from site.

L. Remove excess excavated material from site.

Massena, New York

Excavation 312316 - 6

3.6 SUBGRADE PREPARATION

A. See Section 312323 for subgrade preparation at general excavations.

3.7 FILLING AND BACKFILLING

A. Do not fill or backfill until all debris, water, unsatisfactory soil materials, obstructions, and deleterious materials have been removed from excavation.

B. Install underground warning tape at buried utilities .

C. See Section 312323 for fill, backfill, and compaction requirements at general excavations.

D. See Section 312316.13 for fill, backfill, and compaction requirements at utility trenches.

E. See Section 312200 for rough and final grading and topsoil replacement requirements.

3.8 REPAIR

A. Correct areas that are over-excavated and load-bearing surfaces that are disturbed; see Section 312323.

3.9 EXCAVATION FOR WALKS AND PAVEMENTS

A. Excavate surfaces under walks and pavements to indicated lines, cross sections, elevations, and subgrades.

3.10 EXCAVATION FOR UTILITY TRENCHES

A. Excavate trenches to indicated gradients, lines, depths, and elevations.

B. Excavate trenches to uniform widths to provide the following clearance on each side of pipe or conduit. Excavate trench walls vertically from trench bottom to 12 inches (300 mm) higher than top of pipe or conduit, unless otherwise indicated.

1. Clearance: 6 inches (150 mm) each side of pipe or conduit.

C. Trench Bottoms: Excavate and shape trench bottoms to provide uniform bearing and support of pipes and conduit. Shape subgrade to provide continuous support for bells, joints, and barrels of pipes and for joints, fittings, and bodies of conduits. Remove projecting stones and sharp objects along trench subgrade.

1. Excavate trenches 6 inches (150 mm) deeper than elevation required.

3.11 UNAUTHORIZED EXCAVATION

A. Fill unauthorized excavation under foundations or wall footings by extending bottom elevation of concrete foundation or footing to excavation bottom, without altering top elevation. Lean concrete fill, with 28-day compressive strength of 2500 psi (17.2 MPa), may be used when approved by Engineer.

Massena, New York

Excavation 312316 - 7

1. Fill unauthorized excavations under other construction or utility pipe as directed by Engineer.

3.12 STORAGE OF SOIL MATERIALS

A. Stockpile borrow soil materials and excavated satisfactory soil materials without intermixing.

Place, grade, and shape stockpiles to drain surface water. Cover or stabilize to prevent windblown dust.

1. Stockpile soil materials away from edge of excavations. Do not store within drip line of remaining trees.

3.13 FIELD QUALITY CONTROL

A. See Section 014000 - Quality Requirements, for general requirements for field inspection and testing.

B. Provide for visual inspection of load-bearing excavated surfaces by Architect before placement of foundations.

3.14 CLEANING

A. Stockpile excavated material to be re-used in area designated on site in accordance with Section 312200.

B. Remove excavated material that is unsuitable for re-use from site.

3.15 PROTECTION

A. Divert surface flow from rains or water discharges from the excavation.

B. Prevent displacement of banks and keep loose soil from falling into excavation; maintain soil stability.

C. Protect open excavations from rainfall, runoff, freezing groundwater, or excessive drying so as to maintain foundation subgrade in satisfactory, undisturbed condition.

D. Protect bottom of excavations and soil adjacent to and beneath foundation from freezing.

E. Keep excavations free of standing water and completely free of water during concrete placement.

END OF SECTION 312316

This page intentionally left blank

Massena, New York

Dewatering and Drainage 312319 - 1

SECTION 312319 - DEWATERING AND DRAINAGE

PART 1 GENERAL

1.1 SUMMARY

A. Section includes construction dewatering.

1.2 RELATED REQUIREMENTS:

A. Section 31 2200 “Grading”, Section 31 2323 “Fill”, and Section 31 2316 “Excavation” for excavating, backfilling, site grading, and controlling surface runoff and ponding.

1.3 SCOPE OF WORK

A. The Contractor shall prevent surface water and subsurface or groundwater from flowing into excavations or earthwork areas which would cause flooding of the project site and surrounding area, or softening or loosening of the soil at excavation or earthwork subgrade.

B. The Contractor shall provide adequate and satisfactory dewatering and drainage of excavations and furnish all materials and equipment and do all incidental work required in conjunction with the furnishing, installing, and maintaining of same to permit proper installation of the structures, pipe and appurtenances.