This is a preliminary bid tabulation document for an Invitation to Bid (ITB) issued by the Oregon Department of Transportation (ODOT) for a roof replacement project at the Prineville Maintenance Station. The project scope involves complete removal and installation of a new standing seam metal roofing system with concealed fasteners and mechanically locked seams installed over the existing roof on a sub-purlin system. The base bid is a single lump sum item covering all labor, materials, equipment, and supervision necessary to complete the work in accordance with project plans, specifications, and applicable building codes, with work to include installation of new flashing systems at all roof penetrations and compliance with project schedules, safety regulations, and quality control protocols. The base bid does not include snow guards. An additive alternate (Alternate Addition 1) provides for the supply and installation of snow guards as a separate lump sum item. The bid closing occurred on February 25, 2026, at 10:30 AM, with nineteen bidders submitting proposals. The tabulation lists all submitted bids, with base bid prices ranging from $75,000.00 (Excel NW LLC, lowest) to $190,740.00 (highest), and snow guard alternate prices ranging from $2,000.00 to $17,936.60, with one bidder (Buck Canyon Construction LLC) submitting no bid for the alternate. The document explicitly notes that the bid tabulation is preliminary and not an indicator of award.
The pricing structure is based on lump sum bids for both the base scope and the optional snow guard alternate. No incumbent vendor information is provided. The document indicates that available funding may be limited and insufficient to construct the entire scope, which is why the additive alternate structure has been implemented to maximize work completion within budgetary constraints. Award will be made to the responsible bidder submitting the lowest responsive bid. Substantial completion is required by July 1, 2026, with final completion required by July 15, 2026. The contractor must maintain performance and payment bonds equal to the contract price and commercial general liability insurance with combined single limits of $2,000,000 per occurrence and $4,000,000 annual aggregate. Liquidated damages of $300.00 per calendar day will be assessed for each day beyond the substantial completion date. Work shall be performed weekdays between 6:00 AM and 6:00 PM, excluding weekends and state holidays unless otherwise approved.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00015787 Intent To Award.xlsx | XLSX spreadsheet | |
| 00015787 Attachment A Plans.pdf | ||
| 00015787 Addendum3.docx | DOCX document | |
| Prebid Sign in Sheet.pdf | ||
| 00015787 Addendum2.docx | DOCX document | |
| 00015787 Addendum4.docx | DOCX document | |
| 00015787 Attachment D Description of Base Bid and Add Alternates~1.docx | DOCX document | |
| Approved Alternate Drexel Metals DMC 200S~1.pdf | ||
| 00015787 Addendum1.docx | DOCX document | |
| 00015787 Attachment C Statement of Work.pdf | ||
| Approved Alternate Bryer Company TBC Superseam~1.pdf | ||
| 00015787 Attachment A Plans REVISED.pdf | ||
| Pre-bid Agenda.docx | DOCX document | |
| 00015787 Attachment B Specifications.pdf | ||
| 00015787 Invitation To Bid.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Date Issued: | 2/25/26 | ||||||||||||||||||||
| ITB No. | S-73000-00015787 | BIDDER | |||||||||||||||||||
| NAME: | Excel NW LLC | Masters Roofing LLC | Innovative Exteriors | All In One Roofing LLC | Bateson Built Construction | Buck Canyon Construction LLC | CRN Construction LLC | All American Roofing & Building LLC | Safecover Roofing LLC | GB&A Construction LLC | C & C Construction Services Inc | AM-1 Roofing | Legendary Solutions LLC | T.T & L Sheet Metal | A Plus Construction LLC | Castle Construction Inc | RCI Architectural Sheet Metal | R. Swigart Company Inc | REV Construction LLC | ||
| Bid Closing: | 02/25/2026 @ 10:30 AM | ||||||||||||||||||||
| Description: | ODOT Prineville MS Reroof Project | ||||||||||||||||||||
| This bid tabulation is not an indicator of award. It is only a tabulation of the bids submitted for consideration. |
| Bid Item # | Description | Est | |
| QTY | UNIT | UNIT | |
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL |
PRICE
| 1 | Base Bid: Provide all labor, materials, equipment and supervision to install a new roof system on the ODOT Maintenance Station in Prineville Oregon. Work includes installation of new roofing system per specified standards to ensure compliance with plans specs and all applicable building codes. New roof will get installed on a sub-perlin system over the exisitng roof. All roof penetrations to get new flashing systems. All work shall be completed in accordance with the project schedule, safety regulations, and quality control protocols. Base bid does not include snow gaurds | 1 | Lump Sum | $ 75,000.00 | $ 75,000.00 | $ 76,000.00 | $ 76,000.00 | $ 96,950.00 | $ 96,950.00 | $ 95,100.00 | $ 95,100.00 | $ 113,066.00 | $ 113,066.00 | $ 107,999.00 | $ 107,999.00 | $ 105,273.00 | $ 105,273.00 | $ 124,372.00 | $ 124,372.00 | $ 119,500.00 | $ 119,500.00 | $ 120,324.20 | $ 120,324.20 | $ 119,500.00 | $ 119,500.00 | $ 128,673.00 | $ 128,673.00 | $ 140,000.00 | $ 140,000.00 | $ 142,500.00 | $ 142,500.00 | $ 146,755.00 | $ 146,755.00 | $ 169,394.50 | $ 169,394.50 | $ 177,831.24 | $ 177,831.24 | $ 190,727.00 | $ 190,727.00 | $ 190,740.00 | $ 190,740.00 |
| 2 | Alternate Addition 1: Supply and Install Snow Guards as shown in the project documents. | 1 | Lump Sum | $ 2,000.00 | $ 2,000.00 | $ 3,000.00 | $ 3,000.00 | $ 9,995.00 | $ 9,995.00 | $ 12,900.00 | $ 12,900.00 | No Bid | $ 8,700.00 | $ 8,700.00 | $ 15,412.00 | $ 15,412.00 | $ 4,968.00 | $ 4,968.00 | $ 14,500.00 | $ 14,500.00 | $ 15,158.50 | $ 15,158.50 | $ 17,800.00 | $ 17,800.00 | $ 10,376.00 | $ 10,376.00 | $ 7,000.00 | $ 7,000.00 | $ 12,500.00 | $ 12,500.00 | $ 16,600.00 | $ 16,600.00 | $ 17,936.60 | $ 17,936.60 | $ 13,221.77 | $ 13,221.77 | $ 6,655.00 | $ 6,655.00 | $ 11,760.00 | $ 11,760.00 | |
| TOTAL | $ 77,000.00 | $ 79,000.00 | $ 106,945.00 | $ 108,000.00 | $ 113,066.00 | $ 116,699.00 | $ 120,685.00 | $ 129,340.00 | $ 134,000.00 | $ 135,482.70 | $ 137,300.00 | $ 139,049.00 | $ 147,000.00 | $ 155,000.00 | $ 163,355.00 | $ 187,331.10 | $ 191,053.01 | $ 197,382.00 | $ 202,500.00 |