This is a Statement of Work document issued by the Oregon Department of Transportation for the Prineville Maintenance Station Reroof Project. The project involves replacing the existing roof with a standing seam system featuring concealed fasteners and mechanically locked seams, installed over existing roofing on a sub-purlin system as specified by the Over Ezee system. The facility is located at 3571 NE 3rd Street, Prineville, Oregon. The ODOT Project Manager is Jesse Powning, who can be reached at Jesse.powning@odot.oregon.gov or (541) 554-4775. The project addresses persistent roof leaks caused by ice dam formation during snow and freezing conditions that have saturated building insulation, created mold growth risks, reduced energy efficiency, and raised structural integrity concerns regarding potential steel frame corrosion. Contractors are required to conduct a pre-bid site visit to examine existing conditions and submit any clarification requests in writing prior to installation. Substantial completion is required by July 1, 2026, with final completion by July 15, 2026. Work shall be performed weekdays between 6 a.m. and 6 p.m., excluding weekends and state holidays unless otherwise approved. The contractor must contact the ODOT Project Manager at least 10 business days prior to commencing work.
The contractor is responsible for supplying all materials and equipment, including roofing materials, trim, fasteners, and the sub-purlin system, along with all minor components necessary for a complete and functional project. BOLI prevailing wage rates apply, and contractors must provide weekly certified payroll reports for the general contractor and all subcontractors as a prerequisite for progress payment approval. ODOT will obtain all required permits. The contractor must maintain site cleanliness, provide daily end-of-day broom cleanup, stack materials in approved locations, manage material storage and debris removal including dumpsters, protect materials from weather damage, and notify ODOT of major deliveries at least two days in advance. A one-year installation warranty on all workmanship and applicable equipment warranties are required. At final completion, the contractor must provide digital copies of all operations and maintenance information, equipment details, signed certification of full payment to subcontractors and suppliers, record drawings marked with as-built utility locations, and instruction to ODOT personnel on operation and maintenance of all products and systems.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00015787 Intent To Award.xlsx | XLSX spreadsheet | |
| 00015787 Attachment A Plans.pdf | ||
| 00015787 Addendum3.docx | DOCX document | |
| Prebid Sign in Sheet.pdf | ||
| 00015787 Addendum2.docx | DOCX document | |
| 00015787 Addendum4.docx | DOCX document | |
| 00015787 Attachment D Description of Base Bid and Add Alternates~1.docx | DOCX document | |
| Approved Alternate Drexel Metals DMC 200S~1.pdf | ||
| 00015787 Addendum1.docx | DOCX document | |
| 00015787 Preliminary Results.xlsx | XLSX spreadsheet | |
| Approved Alternate Bryer Company TBC Superseam~1.pdf | ||
| 00015787 Attachment A Plans REVISED.pdf | ||
| Pre-bid Agenda.docx | DOCX document | |
| 00015787 Attachment B Specifications.pdf | ||
| 00015787 Invitation To Bid.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT C - STATEMENT OF WORK
PROJECT OVERVIEW
1/13/2025
Oregon Department of Transportation Prineville MS Reroof Project
Project Location:
Prineville MS 3571 NE 3rd St.
Prineville, OR 97754
ODOT Contact:
The ODOT Project Manager for this project is Jesse Powning.
E-mail: Jesse.powning@odot.oregon.gov Cell: (541)554-4775 Address: 63055 N Hwy 97 Bldg L, Bend OR 97703
The ODOT Project Manager may designate an additional ODOT contact person or engineer to support with inspections or questions in the field.
Project Background
The Prineville MS has experienced roof leaks during snow and freezing conditions. Primarily due to ice dam formation. This new roof system will eliminate the leaks and help reduce the large ice formations that build up at the eves. In the past, the leaks saturated portions of the building’s insulation, creating a risk of mold growth and reduced energy efficiency. In addition, moisture infiltration has raised concerns about potential corrosion of the steel frame, which could compromise structural integrity over time.
Addressing these issues through roof replacement is critical to maintaining the facility’s safety and extending its service life.
Project Description:
To replace the roof on the Prineville Maintenance Station. The new roof will be standing seam with concealed fasteners and mechanically locked seams. It will be installed over the existing roofing on a sub-purlin system (See attached Over Ezee spec sheet).
Detailed Project Specifications:
See attached drawings and specifications for details.
General Construction Notes:
The contractor shall make a site visit and examine existing conditions prior to providing a bid.
Any discrepancies shall be brought to the attention of ODOT through a request for clarification as set forth in the bid documents.
Clarifications shall be requested in writing prior to any installation. Incorrect installations shall be corrected at no additional cost to ODOT.
All work shown is to be by the contractor unless specifically noted as being by ODOT or by others. All materials shown are to be provided by the contractor unless specifically noted as existing or provided by ODOT.
Drawings are schematic in nature, major components and equipment are shown on the drawings. The contractor shall supply and install all minor components and materials necessary to provide a complete and functional project whether all such components are noted in the drawings and specifications.
Plans and specifications call out specific makes and models of equipment in some locations.
Substitution requests shall be made during the bid process. ODOT shall at its sole discretion determine the acceptability of substitutions. No substitutions shall be installed without prior written approval from the ODOT Construction Project Manager.
All equipment and materials shall be installed in accordance with the manufacturer’s published installation instructions and recommendations.
Clean the entire work area at the conclusion of the project to the satisfaction of the ODOT Project Manager.
Submittals The Contractor shall provide the following submittals at a minimum to the ODOT Project Manager.
Submittals shall be approved by the ODOT Project Manager prior to the start of on-site construction.
As detailed in specifications and plans o New roofing materials - including trim and fasteners.
o Sub-purlin reroof system
Scheduling of Contract:
Substantial completion of the Work shall be no later than 7/1/2026. Final completion shall be no later than 7/15/2026.
After award of contract, the Contractor shall contact the ODOT Project Manager to schedule the
Work at least 10 business days prior to the start of any work/demolition.
The Work shall be accomplished on weekdays between the hours of 6 a.m. and 6 p.m. Work hours shall exclude weekends and State Holidays, unless specifically requested by the Contractor and approved by the ODOT Project Managers.
Any permits required for the Work will be obtained by ODOT. ODOT will provide copies to the contractor and ensure that all required permits are posted on site.
The Contractor shall submit to the ODOT Project Managers a list of the contact information for the Contractor’s project manager and site superintendent, as well as a list of all Subcontractors and their key representatives.
The Contractor shall coordinate the efforts of all Suppliers and Subcontractors and shall maintain orderly progress of the Work, prevent duplication of effort, and ensure proper sequence of operations.
Clean-Up/Conditions of Site:
The Contractor shall be responsible for keeping the ODOT Project Manager informed of all activity throughout the Work.
The Contractor shall clean up all worksite debris resulting from construction and remove all excess construction materials and scraps from the premises. The Contractor shall broom-clean their work area at the end of each workday and neatly stack materials and debris in an approved location. The contractor shall clean the entire work area at the conclusion of the project to the satisfaction of the ODOT Project Manager.
The Contractor shall protect materials subject to damage by temperature or other weather conditions.
The location for storage of materials, debris, or dumpster on the Premises shall be approved in advance by the ODOT Project Manager. Disposal facilities, bins, or dumpsters shall not be provided by ODOT.
The Contractor shall notify the ODOT Project Manager at least two (2) days in advance of any major deliveries.
Contractor shall immediately notify the ODOT Project Manager of any damage done by the Contractor to the Premises, grounds, or adjacent State properties. Damage done by the Contractor to the Premises or surrounding area shall be repaired to existing conditions as found prior to the commencement of the Work.
ODOT shall not be responsible for the security of the Contractor’s materials, tools, personal belongings, or equipment on the Premises.
It is the responsibility of the Contractor to ensure the Work is performed in accordance with Oregon OSHA rules and regulations.
The Contractor shall immediately bring to the attention of the ODOT Project Manager any conflicts or issues between existing utilities and the Work.
BOLI:
BOLI Prevailing Wage Rates apply to this project. Provide weekly Certified Payroll Reports for
General Contractor and all subcontractors as a prerequisite for progress payment approval.
Close Out:
All special inspections must be complete prior to Substantial Completion.
Inspection of the work by the ODOT Project Manager for establishment of Substantial
Completion shall be made within five (5) business days after receipt of the Contractor’s email request. At this time, the ODOT Project Manager and the Contractor shall develop a punch list document of any incomplete or deficient work.
Prior to Final Completion, the Contractor shall complete all items on the punch list.
The Contractor shall provide final inspection reports for all permits applicable to this Contract signed by authorities having jurisdiction The Contractor shall maintain one set of the approved drawings for recording as-built conditions. Mark (in red) the actual location of all underground utilities and any changes. At the time of Final Completion, the Contractor shall turn over the one marked-up set of record drawings to the ODOT Project Manager.
Prior to Final Completion, the Contractor shall provide one (1) digital copy via email of all operations, maintenance, and warranty information to the ODOT Project Manager.
Prior to Final Completion, provide ODOT Project Manager with information for all equipment provided by the project, including but not limited to: Manufacturer, model, serial number, consumables, installation date, purchase date.
Prior to Final Completion, and as prerequisite for final payment, provide ODOT Project Manager with signed certification that all subcontractors and suppliers have been paid in full and in compliance with all prompt payment requirements. All disputes with property owners have been resolved, all obligations on the project have been satisfied, all monetary claims and indebtedness have been paid, and, to the best of the Contractor's knowledge, there are no claims of any kind outstanding against the project.
Prior to Final Completion, the Contractor shall fully instruct ODOT’s operating and maintenance personnel in the operation, adjustment, and maintenance of products, equipment, and systems.
Inspection of the work by the ODOT Project Manager for establishment of Final Completion shall be made within five (5) business days after receipt of the Contractor’s email request.
Warranty:
Contractor shall provide a 1 year Installation warranty on all workmanship.
Contractor shall provide all warranties for equipment applicable to this Contract