RFSQ - Professional Architectural and/or Engineering Services for South Mayde Creek Bypass Channel and Stormwater Detention Basin for the Harris County Flood Control District

Closed State & local contract opportunity Posted

Solicitation number
26/0119
State
Texas
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from harriscountytx.bonfirehub.com. Updated .

About this opportunity

Harris County Flood Control District is requesting Statements of Qualifications from professional architectural and engineering firms for design, permitting, and construction-phase services on the South Mayde Creek Bypass Channel and Stormwater Detention Basin project (RFSQ due June 15, 2026, with a non-mandatory pre-submission conference on June 1, 2026). This is a federally funded project subject to BABA (Build America, Buy America) compliance, Davis-Bacon wage requirements where applicable, Section 3 Act requirements for HUD-funded work exceeding $200,000, and M/WBE utilization goals; specific M/WBE goal percentage is not stated in the solicitation documents provided.

The scope encompasses comprehensive hydrologic and hydraulic analysis, final engineering design with construction plans and specifications at 50% design, bid-ready, and final phases, topographic surveying and property boundary establishment, geotechnical investigations, environmental compliance documentation under NEPA and Clean Water Act (including U.S. Army Corps of Engineers Section 404 and 408 coordination), utility coordination, and full construction-phase support including a Resident Project Representative at an estimated average of twenty hours per week. The project is located in Harris County Precinct 4 within Addicks Reservoir and USACE property, extending from Greenhouse Road to Barker Cypress Road with two sedimentation basins upstream of Greenhouse Road. Firms must be licensed professional engineering firms currently registered in Texas with Errors and Omissions insurance and may use subcontractors with Harris County approval.

Evaluation criteria are firm experience and qualifications (30%), firm capacity and resources (30%), organization and project methodology (25%), and estimated schedule to complete (15%). Price is not an evaluation factor; final award follows qualifications review and is subject to negotiation of fair and reasonable rates. Harris County may conduct interviews with up to three shortlisted firms. The project completion timeline is anticipated at three years and six months. Statements of Qualifications must be limited to 20 pages and are due June 15, 2026, by 2:00 p.m. to the Harris County Purchasing Agent at 1111 Fannin Street, 12th Floor, Houston, Texas 77002. Written questions are due June 2, 2026, by 12:00 p.m. CST. Harris County minimum wage policy of $21.65 per hour applies to services contracts valued at $50,000 or more per year. Performance and payment bonds will be required based on contract value thresholds under Texas Government Code. All subcontractors and suppliers must comply with federal procurement standards under 2 CFR 200.

Opportunity text

Professional Architectural and/or Engineering Services for South Mayde Creek Bypass Channel and Stormwater Detention Basin for the Harris County Flood Control District

Files

File Type Posted
19-Attachment Z - Identify Need Statement.pdf PDF
17-Attachment CC - Preliminary Engineering Report.pdf PDF
21-Attachment EE - Final Build America, Buy America (BABA) Certification.pdf PDF
13-Harris County Minimum Wage FAQs as of December 2025 - Final.pdf PDF
9-Attachment F - Contractor Profile.pdf PDF
23-Federal Single Vendor RFQ General Requirements and Specifications.pdf PDF
16-Attachment BB - Project Boundary Map.pdf PDF
20-Attachment Y - General Scope of Basic Services – Appendix B.pdf PDF
10-Attachment A - RFQ and Addenda Acknowledgement.pdf PDF
15-Attachment X - General Scope of Basic Services – Appendix A.pdf PDF
22-Attachment DD - Texas Water Development Board Build America, Buy America Act Guidance.pdf PDF
6-Attachment Q - Standard Form 330 Architect - Engineer Qualifications.pdf PDF
3-Attachment E - References.pdf PDF
12-Attachment T – Non-HUB MWBE Utilization Plan Commitment Form.pdf PDF
11-Attachment W - Harris County Minimum Wage Policy and Certification.pdf PDF
5-Attachment J - Workers Compensation Insurance Coverage Rule 110.110.pdf PDF
8-Attachment V – MWBE Trucking Procedure Compliance Packet.pdf PDF
1-Attachment B - Certification Regarding Lobbying.pdf PDF
14-Attachment AA - Sample Exercise.pdf PDF
4-Attachment I - Minimum Insurance Requirements for Flood Control District.pdf PDF
2-Attachment C - Statement of Offeror Qualifications.pdf PDF
7-Attachment K - Required Contract Provisions.docx DOCX document
18-Attachment U – Non-HUB MWBE Goal Participation Information Packet.pdf PDF
Show all 23

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors