About this file

This is a Project Boundary Map for professional architectural and engineering services related to the South Mayde Creek Bypass Channel and Stormwater Detention Basin project under the Harris County Flood Control District in Texas. The map delineates the project boundary within Cullen Park Watershed, identified as part of the Addicks Reservoir project with ID U101-00-00-E003, located in Harris County Precinct 4. The project area is bounded by major roads including Baker Road, Groeschke Road, Barker Cypress Road, Park Row Drive, Morton Road, Greenhouse Road, and Saums Road, with South Mayde Creek running through the mapped region. The map includes references to Harris County Precinct judges and commissioners responsible for the area, including Judge Lina Hidalgo and Precinct representatives Rodney Ellis, Adrian Garcia, Tom S. Ramsey P.E., and Lesley Briones.

The map serves as a geographic reference document for the Request for Sealed Qualifications (RFSQ) process for engineering and architectural services related to flood control infrastructure improvements. This boundary documentation enables prospective bidders to clearly identify the project location and scope area for the proposed stormwater detention and bypass channel improvements within the Addicks Reservoir watershed management system.

View the file

Other files

File Type Posted
8-Attachment V – MWBE Trucking Procedure Compliance Packet.pdf PDF
4-Attachment I - Minimum Insurance Requirements for Flood Control District.pdf PDF
20-Attachment Y - General Scope of Basic Services – Appendix B.pdf PDF
17-Attachment CC - Preliminary Engineering Report.pdf PDF
15-Attachment X - General Scope of Basic Services – Appendix A.pdf PDF
13-Harris County Minimum Wage FAQs as of December 2025 - Final.pdf PDF
19-Attachment Z - Identify Need Statement.pdf PDF
7-Attachment K - Required Contract Provisions.docx DOCX document
2-Attachment C - Statement of Offeror Qualifications.pdf PDF
9-Attachment F - Contractor Profile.pdf PDF
23-Federal Single Vendor RFQ General Requirements and Specifications.pdf PDF
21-Attachment EE - Final Build America, Buy America (BABA) Certification.pdf PDF
6-Attachment Q - Standard Form 330 Architect - Engineer Qualifications.pdf PDF
10-Attachment A - RFQ and Addenda Acknowledgement.pdf PDF
18-Attachment U – Non-HUB MWBE Goal Participation Information Packet.pdf PDF
22-Attachment DD - Texas Water Development Board Build America, Buy America Act Guidance.pdf PDF
14-Attachment AA - Sample Exercise.pdf PDF
12-Attachment T – Non-HUB MWBE Utilization Plan Commitment Form.pdf PDF
5-Attachment J - Workers Compensation Insurance Coverage Rule 110.110.pdf PDF
1-Attachment B - Certification Regarding Lobbying.pdf PDF
3-Attachment E - References.pdf PDF
11-Attachment W - Harris County Minimum Wage Policy and Certification.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U 1- -0

U101-01-01

U -1 -0

U -0 -0

U 201-01-01

W170-00-00

U -0 -0

U -0 -0

U -2 -0

SOUTH MAYDE CREEK U101-00-00

B A

K

ER

R D

GROESCHKE RD

B A

R K

ER

C

Y P

R

ESS R

D

PARK ROW DR

MORTON RD

G R

EEN

H

O U

SE R

D

SAUMS RD

Cullen Park

Watershed: Addicks Reservoir Project ID: U101-00-00-E003

Precinct: 4 Map Extent

8/5/2025

Project Boundary

1 - Rodney Ellis 2 - Adrian Garcia

3 - Tom S. Ramsey,P.E.

4 - Lesley Briones

Judge Lina Hidalgo Harris County Precincts

File details come from the government source that posted it. Updated .