This Preliminary Engineering Report is a technical document prepared for the Harris County Flood Control District in Texas to support professional architectural and engineering services for the South Mayde Creek Bypass Channel and Stormwater Detention Basin project. The report provides detailed engineering analysis and recommendations for the proposed improvements to manage stormwater in the project area. The document establishes the technical foundation for the scope of work that qualified architectural and engineering firms will be expected to undertake, including design development, permitting support, and construction administration services. The preliminary findings and recommendations outlined in this report will inform the basis for proposals submitted in response to the request for qualifications.

The report contains essential project data including site conditions, hydrological analysis, preliminary design parameters, and estimated project costs that firms should review prior to submitting qualifications. As a preliminary engineering document, it identifies the key technical challenges, environmental considerations, and regulatory requirements that will govern the design and construction phases. The information contained herein establishes the current baseline conditions and anticipated project scope that responding firms will use to develop their qualifications, proposed methodologies, and fee structures for the professional services required to advance this flood control improvement project.

View the file

Other files

File Type Posted
8-Attachment V – MWBE Trucking Procedure Compliance Packet.pdf PDF
4-Attachment I - Minimum Insurance Requirements for Flood Control District.pdf PDF
20-Attachment Y - General Scope of Basic Services – Appendix B.pdf PDF
15-Attachment X - General Scope of Basic Services – Appendix A.pdf PDF
13-Harris County Minimum Wage FAQs as of December 2025 - Final.pdf PDF
19-Attachment Z - Identify Need Statement.pdf PDF
7-Attachment K - Required Contract Provisions.docx DOCX document
2-Attachment C - Statement of Offeror Qualifications.pdf PDF
9-Attachment F - Contractor Profile.pdf PDF
23-Federal Single Vendor RFQ General Requirements and Specifications.pdf PDF
21-Attachment EE - Final Build America, Buy America (BABA) Certification.pdf PDF
6-Attachment Q - Standard Form 330 Architect - Engineer Qualifications.pdf PDF
10-Attachment A - RFQ and Addenda Acknowledgement.pdf PDF
18-Attachment U – Non-HUB MWBE Goal Participation Information Packet.pdf PDF
22-Attachment DD - Texas Water Development Board Build America, Buy America Act Guidance.pdf PDF
16-Attachment BB - Project Boundary Map.pdf PDF
14-Attachment AA - Sample Exercise.pdf PDF
12-Attachment T – Non-HUB MWBE Utilization Plan Commitment Form.pdf PDF
5-Attachment J - Workers Compensation Insurance Coverage Rule 110.110.pdf PDF
1-Attachment B - Certification Regarding Lobbying.pdf PDF
3-Attachment E - References.pdf PDF
11-Attachment W - Harris County Minimum Wage Policy and Certification.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .