22-Attachment DD - Texas Water Development Board Build America, Buy America Act Guidance.pdf

PDF 6 MB Posted

Attached to
RFSQ - Professional Architectural and/or Engineering Services for South Mayde Creek Bypass Channel and Stormwater Detention Basin for the Harris County Flood Control District
Solicitation number
26/0119
Issued by
Harris County, Texas

About this file

This is a guidance document issued by the Texas Water Development Board (TWDB) regarding compliance with the Build America, Buy America (BABA) Act requirements for projects funded through TWDB programs. The document serves as a resource for Harris County Flood Control District and other entities undertaking state and federally-funded water infrastructure projects, including the South Mayde Creek Bypass Channel and Stormwater Detention Basin project. The guidance establishes mandatory procurement and manufacturing requirements that apply to iron, steel, manufactured products, and construction materials used in BABA-funded projects, with specific emphasis on domestic sourcing and production standards.

The BABA guidance requires that all iron and steel products, as well as manufactured products, must be produced in the United States, with domestic content requirements becoming progressively more stringent through 2029. The document outlines the process for obtaining waivers when domestic products are unavailable or cost-prohibitive, establishes documentation and certification procedures for compliance verification, and specifies the consequences of non-compliance, including potential disqualification of bids and project funding suspension. Contractors and design professionals must incorporate BABA compliance language into contracts, conduct due diligence on supply chains and manufacturers, maintain records demonstrating domestic sourcing, and provide certifications of compliance. The guidance applies to all projects receiving funding from TWDB and other federal sources administered through state programs, making it a critical compliance document for the South Mayde Creek project's procurement and contract management phases.

View the file

Other files

File Type Posted
8-Attachment V – MWBE Trucking Procedure Compliance Packet.pdf PDF
4-Attachment I - Minimum Insurance Requirements for Flood Control District.pdf PDF
20-Attachment Y - General Scope of Basic Services – Appendix B.pdf PDF
17-Attachment CC - Preliminary Engineering Report.pdf PDF
15-Attachment X - General Scope of Basic Services – Appendix A.pdf PDF
13-Harris County Minimum Wage FAQs as of December 2025 - Final.pdf PDF
19-Attachment Z - Identify Need Statement.pdf PDF
7-Attachment K - Required Contract Provisions.docx DOCX document
2-Attachment C - Statement of Offeror Qualifications.pdf PDF
9-Attachment F - Contractor Profile.pdf PDF
23-Federal Single Vendor RFQ General Requirements and Specifications.pdf PDF
21-Attachment EE - Final Build America, Buy America (BABA) Certification.pdf PDF
6-Attachment Q - Standard Form 330 Architect - Engineer Qualifications.pdf PDF
10-Attachment A - RFQ and Addenda Acknowledgement.pdf PDF
18-Attachment U – Non-HUB MWBE Goal Participation Information Packet.pdf PDF
16-Attachment BB - Project Boundary Map.pdf PDF
14-Attachment AA - Sample Exercise.pdf PDF
12-Attachment T – Non-HUB MWBE Utilization Plan Commitment Form.pdf PDF
5-Attachment J - Workers Compensation Insurance Coverage Rule 110.110.pdf PDF
1-Attachment B - Certification Regarding Lobbying.pdf PDF
3-Attachment E - References.pdf PDF
11-Attachment W - Harris County Minimum Wage Policy and Certification.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .