PW CPN 104760 – 2022 Bond Sidewalk Year 2 – Pinson Street Paving Improvements
Closed State & local contract opportunity Posted
- Solicitation number
- 26-0046
- State
- Texas
- Responses due
Opportunity facts
- Jurisdictions
- NIGP codes
- 91244 Excavation Services
- 91319 Construction, Curb And Gutter (Includes Maintenance, Repair, And Removal)
- 91347 Construction, Sidewalk And Driveway (Includes Pedestrian And Handicap Ramps)
- 91371 Maintenance And Repair, Highway And Road (To Include The Removal Of Asphalt, Concrete, Bitumens, Etc)
- 91382 Maintenance And Repair, Sidewalk And Driveway (Including Removal)
- 91395 Paving/Resurfacing, Highway And Road
- 91396 Paving/Resurfacing, Street (Major And Residential)
- 91430 Concrete
- 96861 Pavement Marking Services (Including Removal Of Markings)
- 96884 Traffic Control Services (To Include Placement And Removal Of Control Devices)
Show all 11
- UNSPSC codes
- 72141504 Timber removal service
- 46161538 Vehicle height restriction bars
- 72152706 Driveway construction service
- 72152707 Retaining wall construction service
- 95111616 Pedestrian way
- 72152701 Exterior concrete stucco service
- 72152710 Foundation and footing construction service
- 72152907 Precast concrete structural framing panel placing service
- 72151306 Pavement marking service
- 70131502 Soil conservation or protection services
Show all 33
- 72141503 Rock removal service
- 73151801 Sheeting services
- 72152704 Curb construction service
- 72152700 Concrete installation and repair services
- 72152709 Concrete pumping service
- 72152711 Concrete patio construction service
- 72152908 Smoke stack installation service
- 72141505 Earthmoving service
- 73151802 Slitting services
- 95121633 Culvert
- 72152705 Sidewalk or ramp construction service
- 95111608 Bike path
- 72141003 Highway and road maintenance service
- 73151502 Joint sealing services
- 72152702 Grouting service
- 72152703 Gunite installation service
- 72154012 Concrete forms erection and dismantling service
- 78142214 Airport and passenger terminals simulation modelling (airside and landside)
- 46161535 Pedestrian walkway street boundary marker
- 72141105 Sidewalk construction and repair service
- 95111617 Footpath
- 72152902 Concrete reinforcement placing service
- 70131503 Erosion control services
Opportunity details come from fortworthtexas.bonfirehub.com. Updated .
About this opportunity
The City of Fort Worth, Texas, is seeking bids for a 2022 Bond Sidewalk Year 2 project (CPN 104760) involving paving improvements on Pinson Street from Village Creek Road to Carverly Drive. The procurement encompasses approximately 23,000 square feet of concrete sidewalk and 7,000 square feet of concrete driveway, with additional work including tree removal, utility adjustments, and landscape restoration. Bidders must submit electronic proposals through the City's Procurement Portal (Bonfire) by December 18, 2025, at 2:00 PM CST, with a mandatory pre-bid conference scheduled for December 9, 2025, at 1:00 PM CST via web conferencing. Contractors must be prequalified for certain work components, particularly water distribution, and will be evaluated based on lowest responsive and responsible bid, considering qualification and competency. The contract duration is 180 calendar days after the Notice to Proceed, with liquidated damages of $650 per day for delays beyond the specified completion date.
The project includes a small business participation goal of 30 percent, requiring certified small businesses to be identified at bid time. Nonresident bidders are subject to specific bidding restrictions under Texas Government Code Chapter 2252, which may impact contract award. Bidders must provide a bid bond equal to five percent of the maximum bid price, along with performance, payment, and maintenance bonds equal to the contract price. Insurance requirements are comprehensive, including commercial general liability ($1,000,000 per occurrence), automobile liability ($1,000,000 combined single limit), and workers' compensation at statutory limits. The project is subject to prevailing wage rate requirements under Texas Government Code Chapter 2258, with detailed rates specified in the contract documents. While no specific incumbent vendor is mentioned, the project involves multiple bid units covering general work, removal, paving, utilities, and pavement marking/signage, suggesting potential opportunities for various contractors to participate in different aspects of the project.
Opportunity text
The major work will consist of the (approximate) following: The major work will consist of the (approximate) following: Paving improvements (23,000 SF of concrete sidewalk and 7,000 SF of concrete driveway) on Pinson Street from Village Creek Road to Carverly Drive.
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity