PW 2027 Concrete Restoration Contract 4, City Project No. 106795

Closed State & local contract opportunity Posted

Solicitation number
26-0302
State
Texas
Responses due

Opportunity facts

Jurisdiction
UNSPSC codes
Show all 33

Opportunity details come from fortworthtexas.bonfirehub.com. Updated .

About this opportunity

The City of Fort Worth is requesting sealed bids for Concrete Restoration Contract 4 (City Project No. 106795) involving approximately 13,000 square yards of concrete panel replacement, 1,000 cubic yards of flexible base Type A GR-2, and 4,100 square yards of geogrid base reinforcement Type 2, with bids due September 24, 2026 at 2:00 PM CDT. A mandatory 30 percent small business utilization goal applies; certified small business firms must be located in Denton, Johnson, Parker, Tarrant, or Wise counties.

The scope encompasses full-depth concrete panel replacement, partial-depth concrete structure repair, 30,000 linear feet of crack routing and sealing, joint sealing, concrete driveway and sidewalk installation, 17 barrier-free ramps, pavement markings, traffic control, and ancillary site work including irrigation adjustment and landscape repair on Basswood Boulevard from North Riverside Drive to North Beach Street and from Blackthorn Drive to approximately 400 feet east of Teal Drive. The contract completion time is 180 days from the Notice to Proceed. No prequalification is required.

The engineer's estimate is $2.3 million. The City anticipates council approval for award on November 3, 2026, with pre-construction meeting targeted for December 2026 and construction starting in January 2027. Award will be made to the lowest price bidder, with qualifications and competencies considered. Contractors must submit a bid bond (5 percent of maximum bid price), conflict of interest statement, Texas Labor Code Section 406.096 worker's compensation certification, vendor compliance to state law certification, small business utilization form with small business certificates, and completed bid table through the Bonfire portal. The question period runs through September 14, 2026 at 2:00 PM CDT. A pre-bid conference was held September 8, 2026 with seven contractors and City representatives attending. Iretomiwa Otuyelu, P.E., Transportation and Public Works Capital Delivery, is the project manager.

Opportunity text

The major work will consist of the (approximate) following: 13,000 SY Concrete Panel Replacement 1,000 CY Flexible Base, Type A, GR-2 4,100 SY Geogrid Base Reinforcement (TY 2)

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors