PW 2008 Eastbrook Water Main Replacement Phase I
Closed State & local contract opportunity
- Solicitation number
- ITB-2026-1395
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 91242 Drilling And Boring Services, Horizontal Directional (Hdd And Hdb)
- 91315 Construction, Canal Or Aquaduct
- 91319 Construction, Curb And Gutter (Includes Maintenance, Repair, And Removal)
- 91327 Construction, Highway And Road
- 91336 Construction, Parking Lot And Alley
- 91338 Construction, Chilled Water Pipe Installation
- 91339 Construction, Pipe Culvert
- 91340 Construction, Pipeline
- 91345 Construction, Sewer And Storm Drain
- 91347 Construction, Sidewalk And Driveway (Includes Pedestrian And Handicap Ramps)
Show all 33
- 91350 Construction, Street (Major And Residential)(Includes Reconstruction)
- 91356 Construction, Utility/Underground Projects
- 91357 Construction, Vaulted Sidewalk
- 91358 Construction, Viaduct (Includes Reconstruction)
- 91359 Construction And Upgrades, Wastewater Treatment Plant
- 91360 Construction, Water System/Plants, Main And Service Line
- 91361 Construction, Vertical, Concrete, Pour-In-Place, Form/Place/Finish
- 91363 Lime Slurry Removal Services
- 91367 Maintenance, Repair, And Operation Of Drawbridges
- 91369 Maintenance And Repair, Defense And Military Structure
- 91371 Maintenance And Repair, Highway And Road (To Include The Removal Of Asphalt, Concrete, Bitumens, Etc)
- 91375 Maintenance And Repair, Parking Lot And Alley
- 91377 Maintenance And Repair, Pipe Culvert
- 91378 Maintenance And Repair, Pipeline (Includes Removal And Relocation)
- 91381 Maintenance And Repair, Sewer And Storm Drain (Including Removal)
- 91382 Maintenance And Repair, Sidewalk And Driveway (Including Removal)
- 91384 Maintenance And Repair, Street (Major And Residential)
- 91388 Maintenance And Repair, Tunnel
- 91389 Maintenance And Repair, Utility/Underground Projects
- 91390 Maintenance And Repair, Viaduct
- 96893 Well Pointing Services (Dewatering)
- 96895 Wastewater Treatment Plant, Operations, And Testing
- 96896 Water And Wastewater Treatment Services
- Point of contact
-
- Elsie Burgess eburgess@casselberry.org (407) 262-7700
Updated .
About this opportunity
The City of Casselberry, Florida is requesting bids for the Eastbrook Water Main Replacement Phase I project involving furnishing all labor, equipment, and materials to upgrade the city's water distribution system, with bids due August 6, 2026 at 2:00 p.m. and a mandatory pre-bid meeting and site visit on July 16, 2026 at 8:00 a.m. at Lift Station 37, 1238 Eastbrook Boulevard, Winter Park. This is a federally-assisted construction project subject to Davis-Bacon prevailing wage rates for Seminole County, American Iron and Steel requirements, and Build America, Buy America Act compliance mandating that all iron, steel, manufactured products, and construction materials be produced in the United States.
The scope encompasses replacement of approximately 5,000 linear feet of aging asbestos cement water mains with new PVC and HDPE piping ranging from 2 to 8 inches in diameter throughout the Eastbrook residential community on multiple streets. Work includes removal of existing AC and galvanized mains, installation of fire hydrant assemblies (38 total), water service connections, meter boxes, valve installations, directional drilling beneath Eastbrook Boulevard and a drainage canal (338 linear feet of 8-inch HDPE), asphalt milling and resurfacing (approximately 10,269 square yards), sidewalk and curb replacement, and site restoration. The contractor must obtain permits, coordinate utility locations, submit a Stormwater Pollution Prevention Plan, perform utility relocation, manage dewatering and erosion control, obtain surveyor certification for as-built documentation, and comply with AWWA specifications for pressure testing (150 PSI for two hours), chlorination, and bacteriological testing. All materials must conform to the City of Casselberry's List of Approved Products.
The engineer's cost estimate is $9.36 million. Substantial completion is required within 330 consecutive calendar days after issuance of the Notice to Proceed, with final completion 30 days thereafter. Bidders must hold a valid Florida General Contractor or Underground Utility Contractor license and demonstrate a minimum of three consecutive years of experience in similar work. Bid security of five percent of bid price is required, along with performance and payment bonds equal to 100 percent of the contract amount. Liquidated damages apply for missed deadlines. The contractor must make good faith efforts to utilize Minority Business Enterprises and Women's Business Enterprises. Questions are due July 23, 2026 before 2:00 p.m. City Commission approval is anticipated for September 14, 2026.
Opportunity text
The purpose of this solicitation is to upgrade the City of Casselberry's water distribution system within the Eastbrook residential community. The work consists of furnishing all labor, equipment, and materials for the construction of the water main.
Files
Show all 19
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity