This is a set of bid submittal plans and specifications for the City of Casselberry's Eastbrook Phase 1 Water Main Replacement project located in Seminole County, Florida. The project scope involves the replacement of approximately 5,000 linear feet of aging asbestos cement (AC) water mains with new polyvinyl chloride (PVC) and high-density polyethylene (HDPE) piping throughout the Eastbrook residential community. The work includes installation of new water mains ranging from 2 inches to 8 inches in diameter, replacement of fire hydrant assemblies, installation of water service connections and meter relocations, valve installations, and associated site restoration including asphalt milling and resurfacing, curb and gutter replacement, sidewalk replacement, and sodding of disturbed grassed areas. The project encompasses multiple streets including Seagrape Drive, Bougainvillea Drive, and Eastbrook Boulevard, with detailed plan and profile sheets (C-1 through C-12) specifying construction sequences, utility locations, and phasing information. One section of the work utilizes directional drilling techniques to install water mains beneath Eastbrook Boulevard and a drainage canal to minimize surface disruption.
The contract requirements mandate that the contractor obtain all necessary permits prior to construction commencement, coordinate with utility locators (Sunshine One Call) at least two business days before excavation, and submit a Stormwater Pollution Prevention Plan (SWPPP) at least 14 days prior to construction start. The contractor bears responsibility for utility relocation, dewatering operations, erosion and sediment control, tree protection and root pruning by a certified arborist, pre-construction video documentation, and as-built surveys prepared by a Florida-licensed surveyor. All water main pressure testing, flushing, and disinfection must comply with AWWA specifications, and the contractor must obtain written clearance from the Florida Department of Environmental Protection (FDEP) before placing the water main in service. The contract specifies a minimum 36-inch cover on all mains, 150 PSI pressure testing for two hours, chlorination at 50 mg/L with verification of 25 mg/L residual after 24 hours, and bacteriological testing on two consecutive days prior to final clearance. Emergency vehicle access must be maintained throughout construction, and all damaged public and private property must be restored to pre-construction condition or better at no additional cost to the owner.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet No.
C
- E
AS
TB
R
O O
K W
M R
EP
LA
C
EM
EN
T
- P H
AS
E
VICINITY MAP
CITY OF CASSELBERRY
OWNER:
95 TRIPLET LAKE DRIVE
(407) 262-7725
CASSELBERRY, FLORIDA 32707
CONTACT: TARA LAMOUREUX, P.E. CONTACT: ERIC P. RATLIFF, P.E.
(407) 425-0452
ORLANDO, FLORIDA 32801
1117 EAST ROBINSON STREET
ENGINEER:
CPH CONSULTING, LLC.
PROJECT
LOCATION
VICE MAYOR / CITY COMMISSIONER:MARK BUSCH
MAYOR / CITY COMMISSIONER:
CITY COMMISSIONER:
CITY COMMISSIONER:
CITY OFFICIALS:
DAVID HENSON
ANTHONY ARAMENDIA
CITY MANAGER:
NANCY DIVITA
THOMAS E. KIRK
CITY COMMISSIONER:
JAMES R. NEWLON
G-1
G-2 G-1
GENERAL NOTES
COVER SHEET
G-3 KEY SHEET
ERIC P. RATLIFF, P.E.
REG NO. 94729
PLAN AND PROFILEC-1 - C-38
D-1 UTILITY DETAILS
N
E as tb ro ok B lv d.
D-2 UTILITY DETAILS
J:\C19117\Civil\DWG\_Current_Plan_Set\C19117 - Cover.dwg, 9/4/2025 9:04 AM
CITY OF CASSELBERRY
Eastbrook - Phase 1
Water Main Replacement
SHEET INDEX
June 2026
BID SUBMITTAL
D-3 UTILITY DETAILSUTILITIES DIRECTOR: TARA LAMOUREAUX, P.E.
D-4 PAVING & SWPPP DETAILS
Ta ng er in e A ve .S.R
. 436
Aloma Ave.
B etty St.
Howell Branch Rd.
C asselton D r.
E as tb ro ok
B lv d.
S em in ol e A ve
1117 East Robinson Street Orlando, FL 32801 Ph: 407.425.0452 www.cphcorp.com Building Better
Communities Together
CPH, LLC
A Full Service A & E Firm
Plans Prepared By:
State of Florida Licenses:
Engineer No. 3215
Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298
Job No.
Date:
Checked by:
Designed by:
Drawn by:
Sheet No.
C19117 1/23/2025
KL
EPR
DGH
Eric P. Ratliff, P.E.
License #94729
CITY OF CASSELBERRY
EASTBROOK - PHASE 1
WATER MAIN REPLACEMENT
Seminole County, Florida B
ID
S
U B
M
IT
T A
L
Drawing name: J:\C19117\Civil\DWG\_Current_Plan_Set\C19117 - General Notes.dwg Jun 04, 2026 - 9:27am dg.Holland
No. DateNo. Date Revision Revision www.cphcorp.com1
C 2026
1117 East Robinson Street Orlando, FL 32801 Ph: 407.425.0452
CPH, LLC
A Full Service A & E Firm
Plans Prepared By:
State of Florida Licenses:
Engineer No. 3215
Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298
Building Better Communities Together
GENERAL NOTES G-2
GENERAL CONSTRUCTION NOTES
THE FOLLOWING ARE THE UTILITIES WHICH MAY HAVE LINES IN THE CONSTRUCTION AREA:
CITY OF CASSELBERRY UTILITIES 407-262-7725
SEMINOLE COUNTY 407-665-2040
UNITI FIBER LLC 904-718-8152
CHARTER COMMUNICATIONS 407-215-5870
MCI/VERIZON 469-886-4091
DUKE ENERGY FLORIDA 407-905-3376
TECO PEOPLES GAS 813-275-3783
CENTURY LINK 850-599-1444
CITY OF WINTER PARK 407-599-3219
1. THE CONTRACTOR SHALL CONTACT "SUNSHINE ONE CALL" UTILITY LOCATOR AT LEAST TWO (2) FULL BUSINESS DAYS PRIOR TO COMMENCEMENT OF WORK PER CHAPTER 556 OF THE FLORIDA STATURES FOR ANY LOCATES. CALL CITY
AT 800-432-4770 OR DIAL 811.
2. THE CONTRACTOR SHALL OBTAIN FROM THE ENGINEER COPIES OF ALL REGULATORY AGENCY PERMITS AND LOCAL AGENCY PERMITS. THE CONTRACTOR SHALL BE EXPECTED TO REVIEW AND ABIDE BY ALL THE REQUIREMENTS AND LIMITATIONS SET FORTH IN THE PERMITS. LIKEWISE, HE SHALL BE RESPONSIBLE IN SECURING ANY LOCAL PERMITS
WHICH WILL BE REQUIRED BY THE CITY. PERMITS AVAILABLE TO CONTRACTOR:
FDEP DRINKING WATER PERMIT
3. THE LOCATIONS OF EXISTING PIPING AND UTILITIES, SUCH AS GAS, WATER LINES, RAW SEWAGE LINES, SLUDGE LINES, DRAIN LINES, TELEPHONE, CABLE TV, UNDERGROUND ELECTRIC CABLES, ETC., AS SHOWN ON THE DRAWINGS, HAVE BEEN DETERMINED FROM THE BEST AVAILABLE INFORMATION, AND ARE GIVEN FOR THE CONVENIENCE OF THE CONTRACTOR. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR ACCURACY. PRIOR TO CONSTRUCTION AND THE ORDERING OF MATERIALS, THE CONTRACTOR SHALL FIELD VERIFY THE LOCATIONS OF ALL EXISTING UTILITIES. THE CONTRACTOR SHALL NOTIFY THE VARIOUS UTILITIES AND MAKE THE NECESSARY ARRANGEMENTS FOR RELOCATION OF THESE UTILITIES. ANY DELAY, INCONVENIENCE, OR EXPENSE CAUSED BY THE RELOCATION OF THE VARIOUS UTILITIES SHALL BE INCIDENTAL TO THE CONTRACT AND NO EXTRA COMPENSATION WILL BE ALLOWED.
4. THE CONTRACTOR SHALL STORE CONSTRUCTION EQUIPMENT AND MATERIALS IN A LOCATION SUITABLE TO PROJECT AREAS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO OBTAIN THE LAYDOWN AREA. SECURITY OF CONSTRUCTION EQUIPMENT AND MATERIALS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
5. WHERE PROPERTY MARKERS, SECTION CORNERS, SURVEY MARKS, SUCH AS STONES, PIPES OR OTHER MONUMENTS ARE ENCOUNTERED, THE ENGINEER AND OWNER ARE TO BE NOTIFIED BEFORE THEY ARE MOVED. THE MARKER SHALL BE PROTECTED AND PRESERVED UNTIL THE ENGINEER AND OWNER, AUTHORIZED SURVEYOR OR AGENT HAS WITNESSED OR REFERENCED THEIR LOCATIONS. THE MARKERS SHALL BE REPLACED BY AN APPROVED
SURVEYOR AT THE CONTRACTORS EXPENSE.
6. TYPICAL DETAILS AS SHOWN ARE TO ILLUSTRATE THE ENGINEER'S INTENT AND ARE NOT PRESENTED AS A SOLUTION TO ALL CONSTRUCTION PROBLEM ENCOUNTERED IN THE FIELD. THE CONTRACTOR MAY ALTER THE METHOD OF CONSTRUCTION TO SUIT FIELD CONDITIONS, PROVIDING HE SUBMITS A PROPOSAL FOR AN ALTERNATE METHOD TO
ENGINEER FOR APPROVAL AND USES MATERIALS AS DESIGNATED IN THE SPECIFICATIONS.
7. ALL TREES, SHRUBS, MAILBOXES, LANDSCAPING, SOD, ETC., ALONG THE LINES OF CONSTRUCTION SHALL BE PROTECTED WHERE POSSIBLE. THESE ITEMS SHALL BE TEMPORARILY RELOCATED, IF NECESSARY, AND REPLACED TO THEIR ORIGINAL LOCATION UPON COMPLETION OF CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE
FOR THE SURVIVAL OF ANY DISTURBED TREES, SHRUBS, LANDSCAPING, ETC.
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LEGAL DISPOSAL OF ALL UNSUITABLE EXCAVATED MATERIAL. ALL
EXCESS CLEAN FILL SHALL BE DISPOSED OF AS DIRECTED BY THE OWNER.
9. REPAIR AND REPLACEMENT OF ALL PRIVATE AND PUBLIC PROPERTY AFFECTED BY THIS WORK SHALL BE RESTORED
TO A CONDITION EQUAL TO OR BETTER THAN EXISTED BEFORE COMMENCING CONSTRUCTION.
10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY TEMPORARY CONTROLS AND/OR STRUCTURES REQUIRED TO MAINTAIN SUITABLE AND SAFE WORKING CONDITIONS AT ALL TIMES. SUCH ITEMS SHALL BE REMOVED ONCE THAT
PORTION OF WORK HAS BEEN COMPLETED.
11. CONTRACTOR MUST PROVIDE AND MAINTAIN SHORING TO SUPPORT THE SIDES OF THE EXCAVATION AND TO PREVENT ANY MOVEMENT WHICH MAY DAMAGE ADJACENT STRUCTURES OR UTILITIES AS REQUIRED.
12. UPON COMPLETION OF THE PROJECT, THE PROJECT AREA SHALL BE RESTORED TO ITS ORIGINAL CONDITION AND TO THE SATISFACTION OF THE OWNER. ALL DAMAGED PRIVATE PROPERTY SHALL BE RESTORED TO ORIGINAL
CONDITION.
13. THE CONTRACTOR SHALL PROTECT EXISTING UTILITIES WHILE PERFORMING WORK.
14. THE CONTRACTOR IS RESPONSIBLE TO PERFORM EXPLORATORY WORK ON THE EXISTING PIPELINE TO IDENTIFY ANY PROBLEM AREAS THAT MAY SLOW OR HALT THE PROGRESSION OF WORK TO BE PERFORMED FOR THIS
PROJECT.
15. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH AND CONFORM TO THE MOST STRINGENT REQUIREMENTS OF THE PROJECT'S SPECIFICATIONS AND SPECIAL PROVISIONS, THE LATEST EDITION OF THE F.D.O.T. STANDARD SPECIFICATIONS FOR THE ROAD AND BRIDGE CONSTRUCTIONS, CITY OF CASSELBERRY STANDARDS FOR UTILITY WORK. AND SEMINOLE COUNTY PUBLIC WORKS ENGINEERING MANUAL FOR ROAD WORK IN THE RIGHT OF WAY.
16. THE CONTRACTOR SHALL HAVE ALL NECESSARY PERMITS IN-HAND PRIOR TO BEGINNING CONSTRUCTION.
17. THE CONTRACTOR SHALL PERFORM HIS WORK IN ACCORDANCE WITH REQUIREMENTS OF THE VARIOUS PERMITS INCLUDED IN THE BID SPECIFICATIONS. ENVIRONMENTAL CONTROLS SHALL BE USED AT LOCATIONS DESIGNATED IN
THE PLANS AND AS DESIGNATED BY THE CITY.
18. PUBLIC LAND CORNERS OR COUNTY AND CITY MONUMENTS WITHIN THE LIMITS OF CONSTRUCTION ARE TO BE PROTECTED. IF A CORNER MONUMENT IS IN DANGER OF BEING DESTROYED OR DISTURBED AND HAS NOT BEEN PROPERLY REFERENCED, THE CONTRACTOR SHALL NOTIFY THE SEMINOLE COUNTY SURVEYOR WITHOUT DELAY, BY TELEPHONE. CONTACT THE SEMINOLE COUNTY ENGINEERING DIVISION, 520 WEST LAKE MARY BOULEVARD, SUITE
200, SANFORD, FLORIDA 32773. TELEPHONE (407) 665-5674.
19. ALL SURVEY CORNERS INDICATED ON THE PLANS SHALL BE REFERENCED AND CERTIFIED BY A REGISTERED PROFESSIONAL LAND SURVEYOR PRIOR TO COMMENCEMENT OF CONSTRUCTION. ALL CORNERS DESTROYED OR OBLITERATED BY CONSTRUCTION SHALL BE RESET AND SO CERTIFIED BY THE LAND SURVEYOR PRIOR TO THE
COMPLETION OF THE PROJECT. CERTIFIED SKETCHES SHALL BE SUBMITTED TO:
SEMINOLE COUNTY ENGINEERING DIVISION & CITY OF CASSELBERRY PUBLIC WORKS DEPT.
SURVEY SECTION ENGINEERING DIVISION
100 E. 1ST STREET 95 TRIPLET LAKE DRIVE
SANFORD, FLORIDA 32771 CASSELBERRY, FLORIDA 32707
(407) 665-5674 (407) 262-7725 X-1235
20. THE CONTRACTOR SHALL BE ENTIRELY RESPONSIBLE AND LIABLE FOR ALL DAMAGE OR INJURY AS A RESULT OF HIS OPERATIONS TO ALL ADJACENT PUBLIC AND PRIVATE PROPERTIES, LANDSCAPING TREES, FENCES, UTILITIES, STRUCTURES OF ANY KIND AND APPURTENANCES THERETO MET WITH DURING THE PROGRESS OF THE WORK. THE IRRIGATION SYSTEM, IN THE ZONES ADJACENT TO THE PROPERTY MAY NEED TO BE MODIFIED BY THE CONTRACTOR.
ANY RESTORATION WORK SHALL BE COORDINATED WITH THE PROPERTY OWNERS. COST TO BE INCIDENTAL TO
OTHER CONSTRUCTION AND NO EXTRA COMPENSATION WILL BE ALLOWED.
21. ALL PRIVATE AND PUBLIC PROPERTY AFFECTED BY THE CONSTRUCTION WORK SHALL BE RESTORED TO A CONDITION EQUAL OR BETTER TO THE EXISTING PRE-CONSTRUCTION CONDITION, UNLESS OTHERWISE NOTED.
COST TO BE INCIDENTAL TO OTHER CONSTRUCTION AND NO EXTRA COMPENSATION WILL BE ALLOWED.
22. ALL GRASSED AREAS DISTURBED AS A RESULT OF CONSTRUCTION SHALL BE SODDED.
23. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS, QUANTITIES AND DETAILS SHOWN ON THE PLANS, SPECIFICATIONS, SPECIAL PROVISIONS AND OTHER DATA RECEIVED FROM THE ENGINEER AND SHALL NOTIFY THE ENGINEER OF ANY ERRORS, OMISSIONS, CONFLICTS OR DISCREPANCIES FOUND THEREIN. FAILURE TO DISCOVER OR CORRECT ERRORS, CONFLICTS FOR DISCREPANCIES SHALL NOT RELIEVE THE CONTRACTOR OF FULL RESPONSIBILITY FOR UNSATISFACTORY WORK, FAULTY CONSTRUCTION, IMPROPER OPERATION RESULTING THEREFROM, NOR FROM RECTIFYING SUCH CONDITIONS AT HIS OWN EXPENSE. CONTRACTOR SHALL NOT TAKE
ADVANTAGE OF ANY ERRORS OR OMISSIONS.
24. THE CONTRACTOR SHALL COMPLY WITH THE DEPARTMENT OF LABOR, SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION PROMULGATED UNDER THE OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970 (PL 91-596) AND
UNDER SECTION 10 OF THE CONTRACT WORK HOURS AND SAFETY STANDARDS ACT (PL 91-54).
25. NO BURNING SHALL BE DONE WITHOUT APPROVAL BY THE CITY.
26. TEMPORARY DRAINAGE SHALL BE PROVIDED DURING CONSTRUCTION TO ELIMINATE ANY FLOODING OF PRIVATE OR
PUBLIC PROPERTY.
27. DURING CONSTRUCTION, TRAFFIC SHALL BE MAINTAINED IN ACCORDANCE WITH THE "MANUAL ON TRAFFIC CONTROLS AND SAFE PRACTICES FOR STREET AND HIGHWAY CONSTRUCTION MAINTENANCE AND UTILITY
OPERATION" (F.D.O.T.)
28. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL MAKE A PRE-CONSTRUCTION VIDEO (DVD FORMAT) ALONG THE PROPOSED ROUTE IN ACCORDANCE WITH THE SPECIFICATIONS. IN PARTICULAR, THE VIDEO SHALL DOCUMENT THE CONDITION OF EXISTING VISIBLE CONTROL MONUMENTATION, DRIVEWAYS, BUILDINGS, STRUCTURES, MAILBOXES, SIGNS, FENCES, AND LANDSCAPING ALONG PROPOSED CONSTRUCTION AREAS.
29. ALL EXISTING VALVE, PULL BOX, & MANHOLE TOPS SHALL BE MARKED PRIOR TO CONSTRUCTION OPERATIONS. ALL SUCH TOPS SHALL BE ADJUSTED TO MATCH PROPOSED GRADE PRIOR TO SUBSTANTIAL COMPLETION OF WORK.
30. CONTRACTOR'S USE OF THE PREMISES SHALL BE CONFINED TO THE LIMITS OF THE EXISTING RIGHT-OF-WAY AND/OR EASEMENTS. ALL PUBLIC AND PRIVATE PROPERTY AFFECTED BY THE CONSTRUCTION SHALL BE PROTECTED WHERE POSSIBLE. ALL AREAS DISTURBED AS PART OF THIS WORK SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITION AT NO ADDITIONAL COST TO THE OWNER. ALL EXISTING SODDED AREAS DISTURBED DURING THE CONSTRUCTION SHALL BE REPLACED WITH THE SAME TYPE OF SOD IN CONFORMANCE WITH THE STANDARD SPECIFICATIONS. THE MAINTAINING AGENCY SHALL APPROVE THE REMOVAL AND REPLACEMENT OF EXISTING IRRIGATION SYSTEMS, AS REQUIRED, AT NO ADDITIONAL COST TO THE MAINTAINING AGENCY OR PROPERTY OWNER. PROPER TEMPORARY ADJUSTMENTS SHALL BE DONE AT SUCH TIME TO MAINTAIN IRRIGATION SYSTEMS FROM BEING INTERRUPTED FOR EXTENDED PERIODS DURING CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE OF ALL NEWLY PLANTED GRASS OR VEGETATION UNTIL WELL ESTABLISHED AND ACCEPTED BY THE MAINTAINING
AGENCY.
31. THE MAXIMUM ALLOWABLE LONGITUDINAL GRADE ON PEDESTRIAN FACILITIES IS 5% UNLESS OTHERWISE INDICATED IN THE PLANS. THE MAXIMUM ALLOWABLE CROSS-SLOPE ON ALL PEDESTRIAN FACILITIES THE SHARED USE PATH IS 2% (PLAN INTENT IS 1.5% UNLESS SPECIFICALLY NOTED OTHERWISE). ALL GRADES AND CROSS SLOPES SHALL COMPLY WITH THE LATEST AMERICANS WITH DISABILITIES ACT (A.D.A.) STANDARDS FOR ACCESSIBLE DESIGN. ALL NON-COMPLIANT FACILITIES, PROPOSED OR CONSTRUCTED, SHALL BE IMMEDIATELY IDENTIFIED (REFER TO
NOTIFICATION REQUIREMENTS SECTION).
32. THE CONTRACTOR SHALL PROVIDE THE SERVICES OF A TESTING LABORATORY TO DETERMINE WHETHER THE REQUIREMENTS FOR MATERIALS SPECIFICATIONS ARE MET. THE CONTRACTOR SHALL GIVE THE MAINTAINING AGENCY A MINIMUM OF 48 HOURS NOTICE WHEN REQUESTING FIELD TESTS. THE CONTRACTOR SHALL NOTIFY THE
MAINTAINING AGENCY 48 HOURS BEFORE STARTING ANY ACTIVITY THAT REQUIRES TESTING.
33. THE CONTRACTOR SHALL FURNISH THE CITY WITH AN "AS-BUILT SURVEY" PREPARED BY A FLORIDA LICENSED SURVEYOR AND MAPPER ACCORDING TO SECTION 01050. THE AS-BUILT SURVEY WILL INCLUDE HORIZONTAL AND VERTICAL DIMENSIONS OF ALL CONSTRUCTED IMPROVEMENTS (INCLUDING FENCING, ADJUSTED SANITARY AND STORM SEWERS AND STRUCTURES, CLEAN-OUTS, WATER MAINS, VALVES, ETC.) WHICH MUST BE CLEARLY SHOWN BY SYMBOLS, NOTATIONS AND DELINEATION, AND SHALL BE LOCATED IN STATE PLANE COORDINATES. THE CONTRACTOR SHALL SUBMIT THE AS-BUILT SURVEY WITH EACH PAY REQUEST FOR PARTIAL APPROVAL, AS SPECIFIED IN SECTION 01050. FAILURE TO MEET THIS REQUIREMENT WILL BE REASON TO REJECT FUTURE PAY REQUESTS UNTIL APPROVAL IS OBTAINED. ALL AS-BUILT SURVEYS WILL BE REVIEWED AND APPROVED FOR CONFORMITY WITH FLORIDA ADMINISTRATIVE CODE 5J-17.052 BY THE MAINTAINING AGENCY, AS REQUIRED BY
SECTION 01050 OF THE CONTRACT DOCUMENTS.
34. USE EXTREME CAUTION WHEN EXCAVATING OR CONNECTING TO ASBESTOS CEMENT PIPE. WHEN CONNECTING TO ASBESTOS CEMENT WATER MAIN OR FORCE MAIN THE CONTRACTOR IS REQUIRED TO REPLACE ANY DAMAGED LENGTHS OF PIPE. THE AMOUNT OF REPLACED PIPE WILL BE DETERMINED BY THE CITY AND RPR.
35. ALL ASBESTOS CEMENT PIPE TO BE TAKEN OUT OF SERVICE WILL BE REMOVED UNLESS OTHER WISE NOTED ON PLANS. ASBESTOS CEMENT PIPE WILL BE REMOVED AND DISPOSED OF ACCORDING TO STATE AND FEDERAL
ORDINANCES AND REGULATIONS.
36. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL TEMPORARY PLUGS, BLOCKING, TAPS, AND TESTING
EQUIPMENT REQUIRED TO COMPLETE PRESSURE TESTING, AS SPECIFIED.
37. FLUSHING, HYDROSTATIC TESTING AND DISINFECTING OF WATER MAINS SHALL BE PERFORMED BY THE CONTRACTOR IN ACCORDANCE WITH AWWA SPECIFICATIONS C-600, C-651 AND APPLICABLE SECTIONS OF THE CURRENT CITY OF CASSELBERRY STANDARDS AND SPECIFICATIONS MANUAL. FITTINGS AND MINOR REPLACEMENT SEGMENTS ARE REQUIRED TO MAKE CONNECTIONS TO EXISTING WATER LINES SHALL BE THOROUGHLY DISINFECTED BY SWABBING THE ENTIRE INTERIOR WITH A MINIMUM 5% CHLORINE SOLUTION PRIOR TO INSTALLATION. CONTRACTOR SHALL PROVIDE ALL NECESSARY EQUIPMENT, MATERIALS AND MANPOWER TO ACCOMPLISH THESE OPERATIONS. AUTHORIZED CITY PERSONNEL AND RPR SHALL BE PRESENT DURING THE TEST.
COORDINATE WITH THE CITY AND RPR AT LEAST SEVEN (7) DAYS PRIOR TO START OF THIS WORK. THE CONTRACTOR SHALL PROVIDE A JUMPER ASSEMBLY WITH A BACKFLOW PREVENTER FOR MAKING TEMPORARY CONNECTIONS TO AN EXISTING POTABLE WATER SOURCE IN ORDER TO CHLORINATE AND FLUSH NEW WATER MAINS WITH POTABLE WATER. ANY TEMPORARY POTABLE WATER CONNECTIONS TO RECLAIMED WATER OR FORCE MAIN
SHALL ALSO BE EQUIPPED WITH A BACKFLOW PREVENTER.
38. THE CONTRACTOR SHALL PROTECT EXISTING WATER METERS AND SERVICE CONNECTIONS DURING CONSTRUCTION AND SHALL COORDINATE THE RELOCATION OF WATER SERVICE METERS WITH THE MAINTENANCE PERSONNEL OF THE CITY OF CASSELBERRY. THE CONTRACTOR WILL RELOCATE WATER METERS AS NECESSARY AND AS DIRECTED
BY THE CITY PERSONNEL.
39. ALL PVC WATER MAIN, SEWER AND RECLAIMED WATER MAIN PIPE SHALL CONFORM TO AWWA C900, DR 18, DR 25.
ALL DUCTILE IRON WATER MAIN AND RECLAIM WATER MAIN SHALL CONFORM TO ANSI/AWWA A21.51/C151. ALL PVC PRESSURE PIPES SHALL USE DUCTILE IRON FITTINGS. FITTINGS FOR ALL SERVICES SHALL BE BRASS.
40. ALL PIPE, PIPE FITTINGS AND APPURTENANCES INSTALLED UNDER THIS PROJECT WILL BE COLOR CODED OR MARKED IN ACCORDANCE WITH SUBPARAGRAPH 62-555.320 (21) (b) 3, FAS, USING BLUE AS PREDOMINANT COLOR
FOR WATER; GREEN FOR WASTEWATER; AND PURPLE FOR RECLAIMED WATER.
41. PIPE LENGTHS SHOWN ON PLANS ARE APPROXIMATE. ACTUAL LENGTHS ARE TO BE DETERMINED DURING
CONSTRUCTION.
42. ALL STATIONS AND OFFSETS REFER TO BASELINE OF STATIONING.
43. MAINTAIN EMERGENCY VEHICLE ACCESS TO ALL BUSINESSES AND RESIDENCES AT ALL TIMES.
44. ALL MAINS SHALL BE CONSTRUCTED AS SHOWN ON PLANS. A MINIMUM COVER OF 36 INCHES SHALL BE MAINTAINED ON ALL MAINS, WHERE IT IS NOT OTHERWISE SPECIFIED ON PLANS OR DIRECTED BY ENGINEER. FOR DUCTILE IRON PIPE, ALL DIRECTION CHANGES IN THE PIPE BOTH HORIZONTAL AND VERTICAL SHALL BE BY INSTALLATION OF FITTINGS UNLESS OTHERWISE NOTED OR DIRECTED BY ENGINEER. JOINT DEFLECTION, IF ALLOWED BY THE CITY, SHALL NOT EXCEED 75% OF THE MANUFACTURER'S RECOMMENDED DEFLECTION. NO DEFLECTION OR BENDING OF
ANY KIND SHALL BE PERMITTED FOR PVC PIPE.
45. ALL PIPES SHALL BE RESTRAINED IN ACCORDANCE WITH THE RESTRAINT TABLES SHOWN ON DETAIL SHEETS. IN ADDITION, ALL FITTINGS SHALL BE MECHANICAL JOINT RESTRAINED. NO THRUST BLOCKS SHALL BE PERMITTED.
RESTRAIN EXISTING PIPE WHERE REQUIRED IN ACCORDANCE WITH THE RESTRAINT TABLE.
46. PIPE SIZES SHOWN ON PLANS ARE MINIMUM INSIDE DIAMETER.
47. KEEP VALVES ON ALL WET TAPS CLOSED UNTIL CLEARED BY FDEP. DO NOT CONNECT ANY PROPOSED WATER MAIN TO ANY EXISTING WATER MAIN UNLESS CLEARED BY FDEP. CONTRACTOR SHALL NOT OPERATE ANY VALVES IN THE
SYSTEM.
48. ALL CONNECTIONS TO EXISTING MAINS SHALL BE MADE BY THE CONTRACTOR ONLY AFTER THE PROPOSED CONNECTION PROCEDURE AND WORK SCHEDULE HAVE BEEN REVIEWED AND ACCEPTED BY THE OWNER. THE CONTRACTOR SHALL SUBMIT A WRITTEN REQUEST TO THE OWNER A MINIMUM OF SEVEN (7) WORKING DAYS PRIOR TO SCHEDULING ANY CONNECTIONS. THE REQUEST SHALL REFERENCE THE PROFESSIONAL LAND SURVEYOR CERTIFIED COMPLETED AS-BUILT RECORD DRAWINGS PREVIOUSLY SUBMITTED AND SHALL OUTLINE THE
FOLLOWING:
A. POINTS OF CONNECTION, FITTINGS TO BE USED, METHODS OF FLUSHING AND DISINFECTION AND VERIFICATION
OF RESTRAINT ON EXISTING PIPE.
B. ESTIMATED CONSTRUCTION TIME FOR THE CONNECTIONS.
THE OWNER SHALL REVIEW THE SUBMITTAL WITHIN FIVE (5) WORKING DAYS AFTER RECEIVING IT AND INFORM THE CONTRACTOR REGARDING APPROVAL OR DENIAL OF THE REQUEST. IF THE OWNER REJECTS THE REQUEST, THE CONTRACTOR SHALL RESUBMIT THE REQUEST MODIFYING IT IN A MANNER ACCEPTABLE TO THE OWNER. ALL CONNECTIONS SHALL ONLY BE MADE ON THE AGREED UPON DATE AND TIME. SHOULD THE CONTRACTOR NOT INITIATE AND COMPLETE THE CONNECTION WORK IN THE AGREED UPON MANNER, HE SHALL BE REQUIRED TO RESCHEDULE THE CONNECTION BY FOLLOWING THE PROCEDURE OUTLINED ABOVE. THE CONTRACTOR SHALL NOT OPERATE ANY VALVES IN THE SYSTEM. MAINS SHALL NOT BE PLACED IN SERVICE UNTIL CLEARANCE IS RECEIVED FROM FDEP; AS-BUILT DRAWINGS MUST BE COMPLETED AND SUBMITTED PRIOR TO WATER MAIN CHLORINATION.
49. NO VALVE BOXES, METERS, PORTIONS OF MANHOLES OR OTHER APPURTENCES OF ANY KIND SHALL BE LOCATED IN ANY PORTION OF A CURB-AND-GUTTER SECTION. CONTRACTOR SHALL ADVISE ENGINEER IMMEDIATELY UPON
DISCOVERY OF A POTENTIAL CONFLICT.
50. LOCAL RESIDENTIAL ACCESS SHALL BE MAINTAINED AT ALL TIMES. PROVIDE WRITTEN NOTIFICATION TO RESIDENTS
SEVEN (7) DAYS PRIOR TO IMPLEMENTING ANY ROADWAY OR DRIVEWAY CLOSURE.
51. ALL VALVES LOCATED ON CITY CASSELBERRY WATER MAINS AND ARE PARALLEL TO SEMINOLE COUNTY WATER MAIN
SHALL BE IDENTIFIED AS CITY OF CASSELBERRY'S.
TREES
1. ALL TREES WITHIN LIMITS OF CONSTRUCTION SHALL REMAIN UNLESS OTHERWISE NOTED.
2. REMOVE AND DISPOSE OF ALL TREES IDENTIFIED IN THE PLANS TO BE REMOVED, OR AS IDENTIFIED FOR REMOVAL
BY THE MAINTAINING AGENCY (REFER TO NOTIFICATION REQUIREMENTS), WITHIN THE PROJECT LIMITS. TREE REMOVAL SHALL INCLUDE STUMPS, ROOTS AND OTHER SUCH PROTRUDING OBJECTS (UNLESS OTHERWISE SPECIFIED IN THE PLANS) OR PER FDOT SPECIFICATION 110-2 AT A MINIMUM. REMOVE AND DISPOSE OF ALL PRODUCT AND DEBRIS NOT REQUIRED TO BE SALVAGED OR NOT REQUIRED TO COMPLETE THE CONSTRUCTION.
3. FOR TREES THAT REMAIN, THE CONTRACTOR SHALL PROTECT TREES INCLUDING MAINTAINING MINIMUM UNDISTURBED AREAS. WHEN NECESSARY TO CUT ROOTS OVER 1-1/2" DIA., THE CUT MUST BE CLEAN. TEMPORARILY COVER EXPOSED ROOTS WITH WET BURLAP TO PREVENT DRYING AND COVER WITH EARTH AS SOON AS POSSIBLE.
INTERFERING BRANCHES MAY BE REMOVED AT THE DIRECTION OF MAINTAINING AGENCY BY A QUALIFIED TREE SURGEON. REPAIR OR REPLACE TREES DAMAGED DURING CONSTRUCTION AT THE DIRECTION OF THE MAINTAINING AGENCY AND OBTAIN PRIOR APPROVAL OF TREE REMOVAL, WHERE NECESSARY. EMPLOY A QUALIFIED TREE SURGEON TO REPAIR MAJOR DAMAGE TO TREES PROMPTLY TO PREVENT PROGRESSIVE DETERIORATION CAUSED BY THE DAMAGE. CONTRACTOR SHALL BE RESPONSIBLE, IN ADDITION TO ANY FINES, FOR THE REPLACEMENT OF ANY REMOVED OR DAMAGED TREE WITH NEW TREE(S) OF SIMILAR QUALITY AND SPECIES SIZED AT THE DIRECTION OF THE MAINTAINING AGENCY. IF TREES ARE HARMED THROUGH LACK OF PROTECTION OR THROUGH NEGLIGENCE OF THE CONTRACTOR OR HIS SUBCONTRACTORS, THE CONTRACTOR SHALL BEAR COST OF REPAIR AND REPLACEMENT. CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE MAINTAINING AGENCY PRIOR TO ANY TRIMMING OR REMOVAL. FDOT SPEC 110-2 SHALL BE MINIMUM CRITERIA FOR TREE (TO REMAIN) PROTECTION.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR LITTER REMOVAL (TRASH, TREE LIMBS, BRUSH PILES, AND OTHER MAN MADE DEBRIS) ALONG ENTIRE RIGHT-OF-WAY, TO PROVIDE A LITTER FREE CORRIDOR AT COMPLETION OF CONSTRUCTION. TREE LIMBS AND OTHER PLANT DEBRIS MAY BE FINELY MULCHED AND SPREAD IN BARE SOIL AREAS
OF THE PROJECT CORRIDOR AS DIRECTED BY THE MAINTAINING AGENCY.
ROOT PRUNING NOTES
1. WHERE CONSTRUCTION SHALL OCCUR 10 FEET OF THE TREE TRUNK, OR WITHIN THE DRIPLINE, WHICHEVER IS LARGER, ROOT PRUNING SHALL BE REQUIRED. ROOT PRUNING SHALL BE CONDUCTED A MINIMUM OF FOUR WEEKS PRIOR TO EARTH MOVING ACTIVITIES WITHIN THE PREDETERMINED TREE AND ROOT PROTECTION ZONE. THE ROOT PRUNING SHALL BE COMPLETED UTILIZING A SHARP, BLADED TRENCHING DEVICE. ROOT RAKING SHALL NOT OCCUR BEFORE THE ROOTS HAVE BEEN CLEANLY SEVERED. ALL ROOT PRUNING SHALL BE SUPERVISED BY THE CONTRACTOR SUPPLIED AND THE CITY APPROVED ISA CERTIFIED ARBORIST. THE APPROVED ISA CERTIFIED ARBORIST SHALL HAVE A MINIMUM OF FIVE YEARS OR MORE EXPERIENCE PRUNING LIVE OAKS TO ISA STANDARDS.
ARBORIST MUST OBTAIN APPROVAL FROM THE OWNER PRIOR TO COMMENCEMENT OF ANY PRUNING ACTIVITIES. A MINIMUM OF TWO WEEKS ADVANCED NOTIFICATION TO THE CITY AND LAND OWNER IS REQUIRED.
2. IF NECESSARY TO FACILITATE THE REMOVAL OF DESIGNATED EXOTIC SPECIES, BRUSH AND WEEDS OCCURRING WITHIN THE DESIGNATED TREE PROTECTION AREAS (TPA) AND/OR CONSERVATION EASEMENT THEN THE AREA SHALL BE CLEARED BY HAND OR UTILIZING ONLY A MOWER AND A LIGHT WHEELED FARM TRACTOR (LESS THAN
60HP). DURING SUCH ACTIVITIES SOIL PROFILES SHALL NOT BE DISTURBED.
UTILITIES
1. UNDER NO CIRCUMSTANCE SHALL THE ACTIVITIES OF THE CONTRACTOR OR HIS SUBCONTRACTORS CAUSE ANY INTERRUPTIONS TO THE SERVICE OR OPERATION OF EXISTING UTILITIES WITHOUT WRITTEN AUTHORIZATION FROM AN AUTHORIZED REPRESENTATIVE OF THE UTILITY COMPANY OR OWNER. ANY PIPING OR OTHER UTILITIES WHICH CAN BE REMOVED DURING CONSTRUCTION WITHOUT UNDUE INTERRUPTION OF SERVICE MAY BE REMOVED AND REPLACED BY THE CONTRACTOR WITH THE PERMISSION OF THE MAINTAINING AGENCY AND THE UTILITY OWNER.
CONTRACTOR SHALL COPY THE MAINTAINING AGENCY OF ALL CORRESPONDENCE WITH UTILITY OWNER.
2. ALL EXISTING UTILITIES ARE TO BE ADJUSTED BY THE UTILITY OWNER UNLESS OTHERWISE NOTED IN THE PLANS.
CONTRACTOR IS TO COORDINATE WITH THE UTILITY OWNER FOR SCHEDULING OF UTILITY ADJUSTMENTS SUCH THAT THEY WILL NOT INTERFERE WITH THE CONTRACTORS CONSTRUCTION SCHEDULE. FAILURE OF CONTRACTOR TO PROPERLY NOTIFY AND/OR SCHEDULE WORK BY THE UTILITY OWNER WILL NOT BE CONSIDERED AS CAUSE FOR
DELAY.
3. EXISTING IRRIGATION LINES/SYSTEMS IN CONFLICT WITH PROPOSED IMPROVEMENTS SHALL BE ADJUSTED AS NECESSARY TO BE RELOCATED OUTSIDE OF THE PROPOSED PAVEMENT. THE COST FOR THESE ADJUSTMENTS SHALL BE INCIDENTAL TO THE PAYMENT OF ASSOCIATED PAVING UNLESS OTHERWISE NOTED IN THE PLANS. ANY
IRRIGATION LINES REMOVED NEED TO BE REPLACED.
4. CHAPTER 17-153 OF THE FLORIDA STATUTES REQUIRES THAT THE COMPANY PERFORMING THE EXCAVATION WORK SHALL NOTIFY ALL GAS UTILITIES A MINIMUM OF THREE (3) WORKING DAYS PRIOR TO EXCAVATING. DRAWINGS SHOW ONLY THE APPROXIMATE LOCATION OF GAS MAINS (IF ANY ARE PRESENT), AND DO NOT SHOW SERVICE LINES. THE ONLY SAFE AND PROPER WAY TO LOCATE EITHER MAINS OR SERVICE LINES IS BY AN ON-SITE INSPECTION BY GAS SYSTEM PERSONNEL. THEREFORE, THE COMPANY PERFORMING THE EXCAVATION WORK IS INSTRUCTED TO TELEPHONE SUNSHINE STATE ONE CALL AT 1-800-432-4770 AT LEAST THREE (3) WORKING DAYS BEFORE DIGGING IN THE CONSTRUCTION AREA. NO MACHINE EXCAVATION SHALL BE PERFORMED WITHIN FIVE (5) FEET OF A GAS MAIN
WITHOUT THE UTILITY OWNERS PRESENCE.
DEWATERING
1. IN THE EVENT THAT GROUNDWATER IS ENCOUNTERED DURING THE CONSTRUCTION OF THE WATER MAIN, DEWATERING SHALL BE CONDUCTED. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE DESIGN, INSTALLATION, OPERATION, AND SUBSEQUENT REMOVAL OF DEWATERING SYSTEMS AND THEIR SAFETY AND CONFORMITY WITH
LOCAL, COUNTY, STATE AND FEDERAL CODES AND REGULATIONS.
2. DEWATERING SYSTEMS SHALL BE UTILIZED IN ACCORDANCE WITH GOOD STANDARD PRACTICE AND MUST BE EFFICIENT ENOUGH TO LOWER THE WATER LEVEL IN ADVANCE OF THE EXCAVATION AND MAINTAIN IT
CONTINUOUSLY TO KEEP THE TRENCH BOTTOM AND SIDES FIRM AND DRY.
3. AT ALL TIMES DURING CONSTRUCTION, KEEP EXCAVATIONS FREE FROM STANDING WATER. SUMPS, IF REQUIRED, SHALL BE LOCATED OUTSIDE OF LOAD BEARING AREAS SO THAT BEARING SURFACES WILL NOT BE DISTURBED.
WATER PUMPED FROM THE EXCAVATION SHALL BE DISCHARGED TO PREVENT RE-ENTRY INTO THE SOIL STRATA BEING DEWATERED. WATER CONTAINING SILT IN SUSPENSION SHALL NOT BE PUMPED INTO SEWER LINES OR ADJACENT STREAMS, PONDS, OR OTHER WATER BODIES. THE METHOD OF DISPOSING OF WATER PUMPED FROM
THE EXCAVATION SHALL BE APPROVED BY THE ENGINEER, PRIOR TO ACTUAL DISPOSAL.
EROSION & SEDIMENT CONTROL
1. THE EROSION CONTROL MEASURES PER F.D.O.T. INDEXES 102 AND 103 ARE THE MINIMUM REQUIRED. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED DUE TO FIELD CONDITIONS AS DETERMINED BY THE PROJECT
ENGINEER AND THE REGULATORY AGENCIES.
2. THE CONTRACTOR SHALL SUBMIT AN "SWPPP" AT LEAST 14 DAYS PRIOR TO THE START OF CONSTRUCTION.
3. ALL PIPES AND INLETS AFFECTED BY THE PROJECT ARE TO BE PROTECTED FROM SEDIMENT DURING CONSTRUCTION; CONTRACTOR TO INSTALL TURBIDITY BARRIERS AT AFFECTED OUTFALL TO PROTECT LAKE.
4. TEMPORARY SILT FENCES AND STAKED SILT BARRIERS, SHALL BE IN ACCORDANCE WITH F.D.O.T. STANDARD
SPECIFICATION, SEC. 104.6, 104.7 AND SEC. 985.
CLEARING, EARTHWORK
1. THE DISPOSAL OF EXCESS EARTHWORK MATERIALS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
2. EARTHWORK INCLUDES ALL EXCAVATION, SHEETING, SHORING, BRACING, FILL, COMPACTING AND GRADING
NECESSARY TO CONSTRUCT THE EROSION CONTROL MATERIALS.
3. EMBANKMENT IS FILL IN PLACE WITH NO SHRINKAGE FACTOR APPLIED.
4. ALL FILL AND EXPOSED SUBGRADE SURFACES SHOULD BE COMPACTED TO AT LEAST 100% OF MAXIMUM DENSITY AS DETERMINED BY AASHTO T99, METHOD C AS REQUIRED BY SECTION 120-9 OF THE STANDARD SPECIFICATIONS.
BORROW REQUIRED FROM OFFSITE SOURCES SHALL BE WELL-GRADED, CLEAN, GRANULAR NATURAL SOIL FREE OF TOPSOIL, ORGANIC MATERIAL, WOOD, RUBBISH, DEBRIS OR OTHER DELETERIOUS MATERIALS. PROPOSED BORROW SHALL BE SUBJECT TO REVIEW AND APPROVAL OF THE CITY PRIOR TO HAULING MATERIALS TO THE SITE.
PROPOSED BORROW MATERIALS SHOULD COMPLY WITH THE REQUIREMENTS OF SECTION 120-6, BE NON-PLASTIC
AND WELL GRADED WITH THE FOLLOWING LIMITS:
U.S. STANDARD SIEVE SIZE % FINER BY DRY WEIGHT
3" 100 1" 80-100 #4 50-100 #40 10-50 #200 0-10
5. TREES AND SIGNIFICANT VEGETATION OCCURRING WITHIN THE CONSTRUCTION LIMITS ARE TO BE PROTECTED DURING CONSTRUCTION UNLESS OTHERWISE SHOWN ON PLANS OR DIRECTED BY THE CITY. CLEARING SHALL BE PERFORMED IN AREAS TO BE EXCAVATED OR AREAS IN WHICH FILL OR STRUCTURES ARE TO BE PLACED.
CONTRACTOR PROCEDURE TO CONNECT NEW WATER MAIN TO EXISTING WATER MAIN
ALL WORK TO BE COMPLETED BY CONTRACTOR UNLESS OTHERWISE NOTED.
1. THE CITY AND RPR SHALL BE NOTIFIED AT LEAST SEVEN (7) DAYS PRIOR TO ANY CONSTRUCTION ACTIVITY, OR PRIOR TO ANY ACTIVITY REQUIRING THE PRESENCE OF OR AN ACTION BY UTILITIES STAFF SUCH AS VALVE OPERATION, PRESSURE TESTING, PIPE CONNECTION, PUMP STATION OPERATION OR SHUTDOWN, ETC.
2. INSTALL NEW WATER MAIN.
3. MAKE TEMPORARY CONNECTIONS TO AN EXISTING POTABLE WATER SOURCE; FLUSH OUT NEW WATER MAIN WITH
POTABLE WATER (USE “JUMPER” ASSEMBLY WITH BACKFLOW PREVENTER).
4. FILL NEW WATER MAIN WITH POTABLE WATER AND PRESSURE TEST AT 150 PSI FOR 2 HOURS.
5. AS-BUILTS MUST BE COMPLETED, SUBMITTED, AND APPROVED TO RPR AND CITY PRIOR TO WATER MAIN CHLORINATION.
6. CHLORINATE WATER MAIN (50 MG/L). LET STAND FOR 24 HOURS; VERIFY THAT CHLORINE RESIDUAL IS STILL 25 MG/L.
7. FLUSH HIGHLY CHLORINATED WATER OUT OF NEW WATER MAIN AND FILL WITH POTABLE WATER AGAIN. CONTRACTOR TO MAINTAIN ADEQUATE CONTROLS AND DIVERSION DEVICES, CHECK DAMS, HOLDING PONDS, DITCH BLOCKS, ETC. TO AVOID DIRECTLY DISCHARGING CHLORINATED WATER TO ENVIRONMENTALLY SENSITIVE AREAS, WETLANDS OR WATER
BODIES.
8. TAKE SAMPLES FOR BACTERIOLOGICAL TEST (TAKE SAMPLES ON TWO CONSECUTIVE DAYS).
9. AFTER ANALYSIS AND ACCEPTABLE RESULTS, SUBMIT TO CITY AND RPR WATER MAIN AND “CLEARANCE” PACKAGE
INCLUDING BACTERIOLOGICAL TEST RESULTS AS REQUIRED BY FDEP PERMIT.
10. WAIT FOR PERMISSION FROM FDEP TO RELEASE NEW WATER MAIN FOR USE.
11. ALL CONNECTIONS AND TAPS ON EXISTING MAINS SHALL MAINTAIN PRESSURE ON EXISTING MAIN (WET TAP).
12. VALVES ON EXISTING WATER MAIN ARE OPENED BY CITY PERSONNEL AND WATER FLOWS FROM EXISTING WATER MAIN TO NEW WATER MAIN. A VISUAL INSPECTION OF THE CONNECTION IS MADE PRIOR TO BACKFILLING THE EXCAVATION
TO INSURE THERE ARE NO LEAKS.
13. IF THE EXISTING WATER MAIN IS TO REMAIN IN SERVICE, IT IS TO BE FLUSHED WITH POTABLE WATER UNTIL NORMAL SYSTEM CHLORINE RESIDUAL IS OBTAINED. THE EXISTING WATER MAIN WILL NOT BE CHLORINATED IF IT IS TO BE
ABANDONED OR REMOVED.
102+00
3+
104+00 105+00 106+00 107+00 108+00 109+00 110+00 111+00 112+00 113+00 114+00 115+00 116+00 117+00 118+00 119+00
120+0030 0+
1+
2+
303+00 304+00
305+00 306+00
307+00 308+00
309+00 310+00
311+00
312+00
313+00
314+00
315+00
316+00
317+00
318+00
200+00 201+00 202+00
203+00
204+00 205+00 206+00 207+00 208+00 209+00 210+00 211+00 212+00 213+00 214+00 215+00 216+00 217+00 218+00 219+00 220+00
220+60
1000+00 1001+00
1002+00 1003+00
1004+00 1005+00
1006+00 1007+00
1008+00 1009+00
+0
1011+00 1012+00
1012+98
500+00 501+00
1300+00 1301+001301+26
799+70 800+00
801+00 802+00
803+00 804+00
805+00
806+00
807+00
808+00
809+00
810+00
811+00
812+00
813+00 813+10
699+70 700+00
701+00 702+00
703+00 704+00
705+00
706+00
707+00
708+00
709+00
710+00
711+00
712+00
713+00
713+82
400+00 401+00 402+00
899+70 900+00
901+00 902+00
903+00 904+00
905+00
906+00
907+00
908+00
909+00
910+00
911+00
912+00 912+451400+00 1401+00 1402+00 1403+00 1404+00 1405+00
1406+00 1407+00
1408+00 1409+00
1410+00 1411+00
1412+00 1413+00
1414+00 1415+00
1416+00 1417+00 1417+75
1200+001201+001202+00
1203+00 1204+00
1205+00 1206+00
1207+00 1208+00
1209+00 1210+00
1211+00 1211+35
1099+701100+00 1101+001101+50 599+70
600+00 601+00
602+00 603+00
604+00 605+00
606+00
607+00
608+00
609+00
610+00
611+00
612+00
613+00
614+00
614+53
Job No.
Date:
Checked by:
Designed by:
Drawn by:
Sheet No.
C19117 1/23/2025
KL
EPR
DGH
Eric P. Ratliff, P.E.
License #94729
CITY OF CASSELBERRY
EASTBROOK - PHASE 1
WATER MAIN REPLACEMENT
Seminole County, Florida B
ID
S
U B
M
IT
T A
L
Drawing name: J:\C19117\Civil\DWG\_Current_Plan_Set\C19117 - Key Sheet.dwg Jun 04, 2026 - 9:27am dg.Holland
No. DateNo. Date Revision Revision www.cphcorp.com1
C 2026
1117 East Robinson Street Orlando, FL 32801 Ph: 407.425.0452
CPH, LLC
A Full Service A & E Firm
Plans Prepared By:
State of Florida Licenses:
Engineer No. 3215
Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298
Building Better Communities Together
KEY SHEET G-3
N
SHEET C-1 SHEET C-2 SHEET C-3 SHEET C-4
SHEET C-5
SHEET C-6
SHEET C-30
SHEET C-14
SHEET C-13
SHEET C-7 SHEET C-8
SH
EE
T C -9
SHEET C-11
SHEET C-10
SHEET C-12
SHEET C-15
SHEET C-18
SHEET C-21
SHEET C-24
SHEET C-25
SHEET C-22
SHEET C-19
SHEET C-16
SHEET C-17
SHEET C-20
SHEET C-23
SHEET C-26SHEET C-35
SHEET C-29
SHEET C-27
SHEET C-28
SHEET C-31 SHEET C-34
SHEET C-32
SHEET C-33
SHEET C-36
SHEET C-38
SHEET C-37
SEAGRAPE DR.
EASTBRO
O
K BLVD.
CHILEAN LN.
VIBURNUM
LN.
PERUVIAN LN.CLEM
ATIS LN.
PU
R
ITA
N
A
VE.
BOUGAINVILLEA DR.
B R
A
ZILIA
N
LN
AUSTRALIAN CIR.
Graphic Scale in Feet
50 50 100
../TH REPORTS/114236 TH 21.pdf ../TH REPORTS/114236 TH 21.pdf ../TH REPORTS/114236 TH 21.pdf ../TH REPORTS/114236 TH 21.pdf ../TH REPORTS/114236 TH 21.pdf ../TH REPORTS/114236 TH 21.pdf ../TH REPORTS/114236 TH 21.pdf
SITE BENCHMARK #571
SITE BENCHMARK #569
3+
104+00
105+00 106+00 107+00 108+00
102+50 103+00 104+00 105+00 106+00 107+00 107+50
Job No.
Date:
Checked by:
Designed by:
Drawn by:
Sheet No.
C19117 1/23/2025
KL
EPR
DGH
Eric P. Ratliff, P.E.
License #94729
CITY OF CASSELBERRY
EASTBROOK - PHASE 1
WATER MAIN REPLACEMENT
Seminole County, Florida B
ID
S
U B
M
IT
T A
L
Drawing name: J:\C19117\Civil\DWG\_Current_Plan_Set\C19117 - Seagrape Dr Plan and Profile.dwg Jun 04, 2026 - 9:28am dg.Holland
No. DateNo. Date Revision Revision www.cphcorp.com1
C 2026
1117 East Robinson Street Orlando, FL 32801 Ph: 407.425.0452
CPH, LLC
A Full Service A & E Firm
Plans Prepared By:
State of Florida Licenses:
Engineer No. 3215
Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298
Building Better Communities Together
Graphic Scale in Feet
20 20 40
N
SEAGRAPE DRIVE
PLAN AND PROFILE C-1
EXISTING WATER MAIN
EXISTING GRAVITY SANITARY SEWER
LEGEND
EXISTING BURIED TELEPHONE
PROPOSED WATER MAIN
EXISTING FIBER OPTIC
EXISTING STORM
EXISTING GAS LINE
RIGHT OF WAY
EXISTING ABANDONED WATER MAIN
OPEN CUT & RESTORE ROADWAY
MILL & RESURFACE ROADWAY
EXISTING UNKOWN UTILITY
REMOVE & REPLACE CONCRETE DRIVEWAY
REMOVE & REPLACE SIDEWALK
EXISTING ABANDONED FORCE MAIN
EXISTING BURIED ELECTRIC
EXISTING COMMUNICATION REMOVE & REPLACE BRICK DRIVEWAY
EXISTING WATER MAIN TO BE REMOVED
EXISTING WATER MAIN TO BE GROUTED
EXISTING FORCE MAIN
EXISTING WATER MAIN TO BE ABANDONED
PROPOSED DIRECTIONAL DRILL
SEAGRAPE DRIVE
EXISTING GRADE
INSTALL 1-1/2" DOUBLE
WATER SERVICE PER
DETAIL, SHEET D-3 (TYP.)
INSTALL 6" -
11.25° BEND
EXISTING FIRE HYDRANT
ASSEMBLY TO BE REMOVED
INSTALL ±452 L.F. OF 6" PVC W.M.
GROUT FILL & ABANDON
±427 L.F. OF 6" AC W.M.
STA. 103+44 (17' LT.)
INSTALL 6" - 11.25° BEND
STA. 103+35 (16' LT.)
INSTALL 6" - 90° BEND
6" GATE VALVE
INSTALL FIRE HYDRANT ASSEMBLY
STA. 103+66 (17' LT.)
INSTALL 6" - 11.25° BEND
STA. 103+97 (16' LT.)
INSTALL 6" - 22.5° BEND
STA. 104+39 (9' LT.)
INSTALL 6" - 11.25° BEND
INSTALL FIRE
HYDRANT
ASSEMBLY
STA. 106+78 (9' LT.)
INSTALL 6" TEE
INSTALL 6" - 90° BEND
INSTALL 6" - 11.25° BEND
INSTALL 6" -
22.5° BEND INSTALL 6" PVC W.M.
INSTALL 6" TEE
INSTALL FIRE HYDRANT ASSEMBLY
MILL & RESURFACE ±316 S.Y.
OF EXISTING ASPHALT
OPEN CUT & RESTORE
±166 S.Y. OF EXISTING
ASPHALT
REMOVE & REPLACE
±33 L.F. OF EXISTING
CURB & GUTTER
REMOVE & REPLACE
±5 L.F. OF EXISTING
CURB & GUTTER
SITE SPECIFIC NOTES:
1. CONTRACTOR TO FIELD VERIFY ALL EXISTING UTILITIES PRIOR TO EXCAVATION. CONTRACTOR TO PROTECT, RESTRAIN, AND SUPPORT ALL EXISTING UTILITIES AS NECESSARY.
2. CONTRACTOR TO DEVELOP M.O.T. PLAN AND SUBMIT TO SEMINOLE COUNTY AND ORANGE COUNTY PUBLIC
WORKS FOR PERMITTING.
3. CONTRACTOR TO MAINTAIN ACCESS TO HOMEOWNERS AT ALL TIMES.
4. CONTRACTOR TO PROVIDE TEMPORARY DRIVEWAY ACCESS AT ALL DRIVEWAY REPLACEMENT LOCATIONS.
5. CONTRACTOR TO REPLACE ALL STRIPING WITHIN THE MILL AND RESURFACE AREA FOLLOWING RESURFACING.
6. CONTRACTOR IS RESPONSIBLE FOR ORDERING FIRE HYDRANTS WITH THE APPROPRIATE LENGTH OF PIPE AND
FITTINGS TO CONNECT TO THE WATER MAIN PER THE UTILITY STANDARDS.
7. CONTRACTOR TO INSTALL WATER SERVICES UP TO WATER METER PER STANDARD DETAIL FIG. 43.
8. CONTRACTOR TO FIELD VERIFY SERVICE CONNECTIONS AND METERS PRIOR TO INSTALLATION OF NEW SERVICES.
9. CONTRACTOR TO REPLACE METER BOXES AS NEEDED.
10. CONTRACTOR TO RELOCATE WATER METERS AND ASSOCIATED BOXES PER DETAIL ON SHEET D-3. NOTIFY
HOMEOWNER OF DISCONNECTION DURING WATER METER RELOCATION.
11. CONTRACTOR TO REPLACE ANY IRRIGATION LINES THAT ARE REMOVED OR DAMAGED DURING CONSTRUCTION.
12. CONTRACTOR SHALL FIELD VERIFY LOCATIONS AND DEPTHS OF ALL GRAVITY SANITARY SEWER LATERALS A MINIMUM OF 200 L.F. IN ADVANCE OF WATER MAIN CONSTRUCTION TO ALLOW GRADE CHANGES WITHOUT
FITTINGS.
13. CONTRACTOR TO SUPPORT AND PROTECT MAILBOXES. IF TEMPORARY RELOCATION IS REQUIRED, CONTRACTOR TO NOTIFY HOMEOWNER AND COORDINATE TEMPORARY LOCATION WITH HOMEOWNER. LOCATION TO MEET USPS
REQUIREMENTS.
14. CONTRACTOR SHALL PERFORM ALL SERVICE TAP AT LEAST 24" FROM ANY JOINT.
" M
IN
. C
O
VE
R
INSTALL 1" SINGLE
WATER SERVICE PER
DETAIL, SHEET D-3 (TYP.)
3452 SEAGRAPE DR 3458 SEAGRAPE DR
3462 SEAGRAPE DR 3470 SEAGRAPE DR 3476 SEAGRAPE DR
3453 SEAGRAPE DR
3455 SEAGRAPE DR
3457 SEAGRAPE DR 3459 SEAGRAPE DR 3461 SEAGRAPE DR 3469 SEAGRAPE DR 3475 SEAGRAPE DR
INSTALL 6" -
11.25° BEND
INSTALL FIRE
HYDRANT
ASSEMBLY
REMOVE & REPLACE
EXISTING DRIVEWAY FROM
E.O.P. TO R.O.W. (TYP.)
SAMPLE POINT
REMOVE EXISTING VALVE CAN
AND BURY EXISTING VALVE
SITE BENCHMARK #569
SITE BENCHMARK #568107+00 108+00 109+00 110+00 111+00 112+00 113+00
107+50 108+00 109+00 110+00 111+00 112+00 112+50
TH-1 6.5 AC WATER 2.85
TEST HOLE DATA
NUMBER UTILITY SIZE (O.D. IN.) MATERIAL UTILITY TYPE DEPTH TO TOP (FT.)
Job No.
Date:
Checked by:
Designed by:
Drawn by:
Sheet No.
C19117 1/23/2025
KL
EPR
DGH
Eric P. Ratliff, P.E.
License #94729
CITY OF CASSELBERRY
EASTBROOK - PHASE 1
WATER MAIN REPLACEMENT
Seminole County, Florida B
ID
S
U B
M
IT
T A
L
Drawing name: J:\C19117\Civil\DWG\_Current_Plan_Set\C19117 - Seagrape Dr Plan and Profile.dwg Jun 04, 2026 - 9:28am dg.Holland
No. DateNo. Date Revision Revision www.cphcorp.com1
C 2026
1117 East Robinson Street Orlando, FL 32801 Ph: 407.425.0452
CPH, LLC
A Full Service A & E Firm
Plans Prepared By:
State of Florida Licenses:
Engineer No. 3215
Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298
Building Better Communities Together
Graphic Scale in Feet
20 20 40
N
SEAGRAPE DRIVE
PLAN AND PROFILE C-2
EXISTING WATER MAIN
EXISTING GRAVITY SANITARY SEWER
LEGEND
EXISTING BURIED TELEPHONE
PROPOSED WATER MAIN
EXISTING FIBER OPTIC
EXISTING STORM
EXISTING GAS LINE
RIGHT OF WAY
EXISTING ABANDONED WATER MAIN
OPEN CUT & RESTORE ROADWAY
MILL & RESURFACE ROADWAY
EXISTING UNKOWN UTILITY
REMOVE & REPLACE CONCRETE DRIVEWAY
REMOVE & REPLACE SIDEWALK
EXISTING ABANDONED FORCE MAIN
EXISTING FORCE MAIN
EXISTING WATER MAIN TO BE ABANDONED
PROPOSED DIRECTIONAL DRILL
SEAGRAPE DRIVE
CA
RN
AT
IO
N
DR
IV
E
EXISTING GRADE
GROUT FILL & ABANDON
±500 L.F. OF 6" AC W.M.
INSTALL ±500 L.F. OF 6" PVC W.M.
STA. 107+72 (9' LT.)
INSTALL 6" GATE VALVE
STA. 110+00 (9' LT.)
INSTALL 6" TEE
INSTALL FIRE
HYDRANT ASSEMBLY
STA. 111+17 (9' LT.)
INSTALL 6" - 45° BEND
(ROTATED)
STA. 111+20 (9' LT.)
INSTALL 6" - 45° BEND
(ROTATED)
STA. 111+32 (9' LT.)
INSTALL 6" - 45° BEND
(ROTATED)
STA. 111+30 (9' LT.)
INSTALL 6" - 45° BEND
(ROTATED)
STA. 112+32 (5' LT.)
INSTALL 6" - 11.25° BEND
STA. 112+12 (9' LT.)
INSTALL 6" - 11.25° BEND
INSTALL 6" -
11.25° BENDS
12" MIN. SEPARATION
INSTALL 6" - 45° BENDS (ROTATED)
INSTALL 6" - 45° BENDS (ROTATED)
INSTALL FIRE HYDRANT ASSEMBLY
INSTALL 6" TEE
INSTALL 6" PVC W.M.
INSTALL 6"
GATE VALVE
MILL & RESURFACE
±369 S.Y. OF
EXISTING ASPHALT
OPEN CUT & RESTORE
±243 S.Y. OF EXISTING
ASPHALT
REMOVE & REPLACE
±5 L.F. OF EXISTING
CURB & GUTTER
" M
IN
. C
O
VE
R
CONTRACTOR TO PROTECT
STORM INLET DURING
WATER MAIN INSTALLATIONINSTALL 1-1/2" DOUBLE
WATER SERVICE PER
DETAIL, SHEET D-3 (TYP.)
SITE SPECIFIC NOTES:
1. CONTRACTOR TO FIELD VERIFY ALL EXISTING UTILITIES PRIOR TO EXCAVATION. CONTRACTOR TO PROTECT, RESTRAIN, AND
SUPPORT ALL EXISTING UTILITIES AS NECESSARY.
2. CONTRACTOR TO DEVELOP M.O.T. PLAN AND SUBMIT TO SEMINOLE COUNTY AND ORANGE COUNTY PUBLIC WORKS FOR
PERMITTING.
3. CONTRACTOR TO MAINTAIN ACCESS TO HOMEOWNERS AT ALL TIMES.
4. CONTRACTOR TO PROVIDE TEMPORARY DRIVEWAY ACCESS AT ALL DRIVEWAY REPLACEMENT LOCATIONS.
5. CONTRACTOR TO REPLACE ALL STRIPING WITHIN THE MILL AND RESURFACE AREA FOLLOWING RESURFACING.
6. CONTRACTOR IS RESPONSIBLE FOR ORDERING FIRE HYDRANTS WITH THE APPROPRIATE LENGTH OF PIPE AND FITTINGS TO
CONNECT TO THE WATER MAIN PER THE UTILITY STANDARDS.
7. CONTRACTOR TO INSTALL WATER SERVICES UP TO WATER METER PER STANDARD DETAIL FIG. 43.
8. CONTRACTOR TO FIELD VERIFY SERVICE CONNECTIONS AND METERS PRIOR TO INSTALLATION OF NEW SERVICES.
9. CONTRACTOR TO REPLACE METER BOXES AS NEEDED.
10. CONTRACTOR TO RELOCATE WATER METERS AND ASSOCIATED BOXES PER DETAIL ON SHEET D-3. NOTIFY HOMEOWNER OF
DISCONNECTION DURING WATER METER RELOCATION.
11. CONTRACTOR TO REPLACE ANY IRRIGATION LINES THAT ARE REMOVED OR DAMAGED DURING CONSTRUCTION.
12. CONTRACTOR SHALL FIELD VERIFY LOCATIONS AND DEPTHS OF ALL GRAVITY SANITARY SEWER LATERALS A MINIMUM OF 200 L.F. IN ADVANCE OF WATER MAIN CONSTRUCTION TO ALLOW GRADE CHANGES WITHOUT FITTINGS.
13. CONTRACTOR TO SUPPORT AND PROTECT MAILBOXES. IF TEMPORARY RELOCATION IS REQUIRED, CONTRACTOR TO NOTIFY HOMEOWNER AND COORDINATE TEMPORARY LOCATION WITH HOMEOWNER. LOCATION TO MEET USPS REQUIREMENTS.
14. CONTRACTOR SHALL PERFORM ALL SERVICE TAP AT LEAST 24" FROM ANY JOINT.
3480 SEAGRAPE DR 3484 SEAGRAPE DR 3488 SEAGRAPE DR
3494 SEAGRAPE DR
1084 CARNATION DR
3487 SEAGRAPE DR3483 SEAGRAPE DR 3499 SEAGRAPE DR3491 SEAGRAPE DR 3505 SEAGRAPE DR3479 SEAGRAPE DR 3495 SEAGRAPE DR
6' MIN. SEPARATION
REMOVE & REPLACE ±5 L.F. OF
EXISTING 12" CMP AS NECESSARY
1065 CARNATION DR
../TH REPORTS/114236 TH 1.pdf ../TH REPORTS/114236 TH 1.pdf ../TH REPORTS/114236 TH 1.pdf ../TH REPORTS/114236 TH 1.pdf ../TH REPORTS/114236 TH 1.pdf ../TH REPORTS/114236 TH 1.pdf ../TH REPORTS/114236 TH 1.pdf ../TH REPORTS/114236 TH 1.pdf
SITE BENCHMARK #566
SITE BENCHMARK #563
SITE BENCHMARK #564
112+00 113+00 114+00 115+00 116+00 117+00 118+00
0+
1+
112+50 113+00 114+00 115+00 116+00 117+00 117+50
TH-2 8.5 AC WATER 3.20
TH-3 6.5 AC WATER 3.30
TEST HOLE DATA
NUMBER UTILITY SIZE (O.D. IN.) MATERIAL UTILITY TYPE DEPTH TO TOP (FT.)
Job No.
Date:
Checked by:
Designed by:
Drawn by:
Sheet No.
C19117 1/23/2025
KL
EPR
DGH
Eric P. Ratliff, P.E.
License #94729
CITY OF CASSELBERRY
EASTBROOK - PHASE 1
WATER MAIN REPLACEMENT
Seminole County, Florida B
ID
S
U B
M
IT
T A
L
Drawing name: J:\C19117\Civil\DWG\_Current_Plan_Set\C19117 - Seagrape Dr Plan and Profile.dwg Jun 04, 2026 - 9:29am dg.Holland
No. DateNo. Date Revision Revision www.cphcorp.com1
C 2026
1117 East Robinson Street Orlando, FL 32801 Ph: 407.425.0452
CPH, LLC
A Full Service A & E Firm
Plans Prepared By:
State of Florida Licenses:
Engineer No. 3215
Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298
Building Better Communities Together
Graphic Scale in Feet
20 20 40
N
SEAGRAPE DRIVE
PLAN AND PROFILE C-3
EXISTING WATER MAIN
EXISTING GRAVITY SANITARY SEWER
LEGEND
EXISTING BURIED TELEPHONE
PROPOSED WATER MAIN
EXISTING FIBER OPTIC
EXISTING STORM
EXISTING GAS LINE
RIGHT OF WAY
EXISTING ABANDONED WATER MAIN
OPEN CUT & RESTORE ROADWAY
MILL & RESURFACE ROADWAY
EXISTING UNKOWN UTILITY
REMOVE & REPLACE CONCRETE DRIVEWAY
REMOVE & REPLACE SIDEWALK
EXISTING ABANDONED FORCE MAIN
EXISTING FORCE MAIN
EXISTING WATER MAIN TO BE ABANDONED
PROPOSED DIRECTIONAL DRILL
SEAGRAPE DRIVE
EA
ST
BR
OO
K
BL
VD
EA
ST
BR
O
O K
BL
VD
EXISTING GRADE
GROUT FILL & ABANDON
±500 L.F. OF 6" AC W.M.
INSTALL ±263 L.F.
OF 6" PVC W.M.
INSTALL ±23 L.F.
OF 2" POLY W.M.
INSTALL ±134 L.F.
OF 6" PVC W.M.
STA. 113+45 (5' LT.)
INSTALL 6" TEE
INSTALL FIRE HDYRANT ASSEMBLY
STA. 115+13 (30' LT.)
INSTALL 8" - 22.5° BEND (ROTATED)
STA. 115+30 (5' LT.)
INSTALL 8" - 11.25° BEND
STA. 115+98 (14' LT.)
INSTALL 8" TEE
(3) 8" GATE VALVES
8"x6" REDUCER
INSTALL FIRE HYDRANT
ASSEMBLY
STA. 117+32 (14' LT.)
INSTALL 6" TEE
6" PLUG WITH 2" TAP
INSTALL 6" TEE
INSTALL 8" PVC W.M.
INSTALL 6" - 45°
BEND (ROTATED)
INSTALL 8" -
11.25° BEND
12" MIN.
SEPARATION
INSTALL 8" TEE
INSTALL 8" GATE VALVES
INSTALL 8"x6" REDUCER
INSTALL FIRE
HYDRANT
ASSEMBLY
INSTALL 6" TEE
INSTALL 6" PLUG WITH 2" TAP 12" MIN.
SEPARATION
INSTALL 2" POLY W.M.
INSTALL 6" PVC W.M.
INSTALL 6" PVC W.M.
INSTALL FIRE
HYDRANT
ASSEMBLY
STA. 115+13 (5' LT.)
INSTALL 8" TEE
8" GATE VALVE
8"x6" REDUCER
STA. 115+23 (36' LT.)
INSTALL 8" TAPPING SLEEVE & VALVE
8" LINESTOP
(2) 8" CAP
INSTALL 8" TEE
MILL & RESURFACE
±447 S.Y. OF
EXISTING ASPHALT
GROUT FILL & ABANDON
±2 L.F. OF 8" AC W.M.
INSTALL 1-1/2" DOUBLE
WATER SERVICE PER
DETAIL, SHEET D-3 (TYP.)
INSTALL 1" SINGLE
WATER SERVICE PER
DETAIL, SHEET D-3 (TYP.)
INSTALL 8" -
11.25° BEND
INSTALL 8"x6" REDUCER
STA. 115+75 (14' LT.)
INSTALL 8" - 11.25° BEND
STA. 114+90 (5' LT.)
INSTALL 6" - 45° BEND (ROTATED)
STA. 115+14 (34' LT.)
INSTALL 8" - 45° BEND (ROTATED)
STA. 115+18 (37' LT.)
INSTALL 8" - 45° BEND
INSTALL ±35 L.F. OF 8" PVC W.M.
INSTALL ±86 L.F.
OF 8" PVC W.M.
REMOVE & REPLACE ±22 L.F.
OF EXISTING CURB & GUTTER
OPEN CUT & RESTORE
±177 S.Y. OF EXISTING
ASPHALT
" M
IN
. C
O
VE
R
SITE SPECIFIC NOTES:
1. CONTRACTOR TO FIELD VERIFY ALL EXISTING UTILITIES PRIOR TO EXCAVATION. CONTRACTOR TO PROTECT, RESTRAIN, AND
SUPPORT ALL EXISTING UTILITIES AS NECESSARY.
2. CONTRACTOR TO DEVELOP M.O.T. PLAN AND SUBMIT TO SEMINOLE COUNTY AND ORANGE COUNTY PUBLIC WORKS FOR
PERMITTING.
3. CONTRACTOR TO MAINTAIN ACCESS TO HOMEOWNERS AT ALL TIMES.
4. CONTRACTOR TO PROVIDE TEMPORARY DRIVEWAY ACCESS AT ALL DRIVEWAY REPLACEMENT LOCATIONS.
5. CONTRACTOR TO REPLACE ALL STRIPING WITHIN THE MILL AND RESURFACE AREA FOLLOWING RESURFACING.
6. CONTRACTOR IS RESPONSIBLE FOR ORDERING FIRE HYDRANTS WITH THE APPROPRIATE LENGTH OF PIPE AND FITTINGS TO
CONNECT TO THE WATER MAIN PER THE UTILITY STANDARDS.
7. CONTRACTOR TO INSTALL WATER SERVICES UP TO WATER METER PER STANDARD DETAIL FIG. 43.
8. CONTRACTOR TO FIELD VERIFY SERVICE CONNECTIONS AND METERS PRIOR TO INSTALLATION OF NEW SERVICES.
9. CONTRACTOR TO REPLACE METER BOXES AS NEEDED.
10. CONTRACTOR TO RELOCATE WATER METERS AND ASSOCIATED BOXES PER DETAIL ON SHEET D-3. NOTIFY HOMEOWNER OF
DISCONNECTION DURING WATER METER RELOCATION.
11. CONTRACTOR TO REPLACE ANY IRRIGATION LINES THAT ARE REMOVED OR DAMAGED DURING CONSTRUCTION.
12. CONTRACTOR SHALL FIELD VERIFY LOCATIONS AND DEPTHS OF ALL GRAVITY SANITARY SEWER LATERALS A MINIMUM OF 200 L.F. IN ADVANCE OF WATER MAIN CONSTRUCTION TO ALLOW GRADE CHANGES WITHOUT FITTINGS.
13. CONTRACTOR TO SUPPORT AND PROTECT MAILBOXES. IF TEMPORARY RELOCATION IS REQUIRED, CONTRACTOR TO NOTIFY HOMEOWNER AND COORDINATE TEMPORARY LOCATION WITH HOMEOWNER. LOCATION TO MEET USPS REQUIREMENTS.
14. CONTRACTOR SHALL PERFORM ALL SERVICE TAP AT LEAST 24" FROM ANY JOINT.
INSTALL 8" GATE VALVE
6" MIN. SEPARATION
1083 EASTBROOK BLVD
1092 EASTBROOK BLVD
S
EA
G R
AP
E
D R
1111 EASTBROOK BLVD
3615 SEAGRAPE DR
3533 SEAGRAPE DR
1118 EASTBROOK BLVD
3557 SEAGRAPE DR
1084 CARNATION DR
REMOVE & REPLACE ±5 L.F.
OF EXISTING CURB & GUTTER
REMOVE & REPLACE ±5 L.F.
OF EXISTING CURB & GUTTER
STA. 115+13 (24' LT.)
INSTALL (2) 8" - 45° BENDS (ROTATED)
REMOVE EXISTING TREE
REMOVE & REPLACE ±10 L.F.
OF EXISTING CURB & GUTTER
SAMPLE POINT
SAMPLE POINT
SAMPLE POINTREMOVE EXISTING VALVE CAN
AND BURY EXISTING VALVE
REMOVE EXISTING VALVE CAN
AND BURY EXISTING VALVE
../TH REPORTS/114236 TH 3.pdf ../TH REPORTS/114236 TH 3.pdf ../TH REPORTS/114236 TH 3.pdf ../TH REPORTS/114236 TH 3.pdf ../TH REPORTS/114236 TH 3.pdf ../TH REPORTS/114236 TH 3.pdf ../TH REPORTS/114236 TH 3.pdf ../TH REPORTS/114236 TH 3.pdf ../TH REPORTS/114236 TH 3.pdf ../TH REPORTS/114236 TH 3.pdf ../TH REPORTS/114236 TH 3.pdf ../TH REPORTS/114236 TH 3.pdf ../TH REPORTS/114236 TH 3.pdf ../TH REPORTS/114236 TH 2.pdf ../TH REPORTS/114236 TH 2.pdf ../TH REPORTS/114236 TH 2.pdf ../TH REPORTS/114236 TH 2.pdf ../TH REPORTS/114236 TH 2.pdf ../TH REPORTS/114236 TH 2.pdf ../TH REPORTS/114236 TH 2.pdf ../TH REPORTS/114236 TH 2.pdf ../TH REPORTS/114236 TH 2.pdf ../TH REPORTS/114236 TH 2.pdf ../TH REPORTS/114236 TH 2.pdf ../TH REPORTS/114236 TH 2.pdf ../TH REPORTS/114236 TH 2.pdf ../TH REPORTS/114236 TH 1.pdf ../TH REPORTS/114236 TH 1.pdf ../TH REPORTS/114236 TH 1.pdf ../TH REPORTS/114236 TH 1.pdf ../TH REPORTS/114236 TH 1.pdf ../TH REPORTS/114236 TH 1.pdf ../TH REPORTS/114236 TH 1.pdf
SITE BENCHMARK #564
116+00 117+00 118+00 119+00
120+00
0+
.8
1+
117+50 118+00 119+00 120+00 120+50
Job No.
Date:
Checked by:
Designed by:
Drawn by:
Sheet No.
C19117 1/23/2025
KL
EPR
DGH
Eric P. Ratliff, P.E.
License #94729
CITY OF CASSELBERRY
EASTBROOK - PHASE 1
WATER MAIN REPLACEMENT
Seminole County, Florida B
ID
S
U B
M
IT
T A
L
Drawing name: J:\C19117\Civil\DWG\_Current_Plan_Set\C19117 - Seagrape Dr Plan and Profile.dwg Jun 04, 2026 - 9:29am dg.Holland
No. DateNo. Date Revision Revision www.cphcorp.com1
C 2026
1117 East Robinson Street Orlando, FL 32801 Ph: 407.425.0452
CPH, LLC
A Full Service A & E Firm
Plans Prepared By:
State of Florida Licenses:
Engineer No. 3215
Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298
Building Better Communities Together
Graphic Scale in Feet
20 20 40
N
SEAGRAPE DRIVE
PLAN AND PROFILE C-4
EXISTING WATER MAIN
EXISTING GRAVITY SANITARY SEWER
LEGEND
EXISTING BURIED TELEPHONE
PROPOSED WATER MAIN
EXISTING FIBER OPTIC
EXISTING STORM
EXISTING GAS LINE
RIGHT OF WAY
EXISTING ABANDONED WATER MAIN
OPEN CUT & RESTORE ROADWAY
MILL & RESURFACE ROADWAY
EXISTING UNKOWN UTILITY
REMOVE & REPLACE CONCRETE DRIVEWAY
REMOVE & REPLACE SIDEWALK
EXISTING ABANDONED FORCE MAIN
EXISTING FORCE MAIN
EXISTING WATER MAIN TO BE ABANDONED
PROPOSED DIRECTIONAL DRILL
SEAGRAPE DRIVE
EXISTING GRADE
INSTALL ±257 L.F. OF 2" POLY W.M.
GROUT FILL & ABANDON
±145 L.F. OF 6" AC W.M.
INSTALL 2" POLY W.M.
REMOVE & REPLACE
EXISTING DRIVEWAY FROM
E.O.P. TO R.O.W. (TYP.)
INSTALL 1-1/2" DOUBLE
WATER SERVICE PER
DETAIL, SHEET D-3 (TYP.)
INSTALL 1" SINGLE
WATER SERVICE PER
DETAIL, SHEET D-3 (TYP.)
" M
IN
. C
O
VE
R
SITE SPECIFIC NOTES:
1. CONTRACTOR TO FIELD VERIFY ALL EXISTING UTILITIES PRIOR TO EXCAVATION. CONTRACTOR
TO PROTECT, RESTRAIN, AND SUPPORT ALL EXISTING UTILITIES AS NECESSARY.
2. CONTRACTOR TO DEVELOP M.O.T. PLAN AND SUBMIT TO SEMINOLE COUNTY AND ORANGE
COUNTY PUBLIC WORKS FOR PERMITTING.
3. CONTRACTOR TO MAINTAIN ACCESS TO HOMEOWNERS AT ALL TIMES.
4. CONTRACTOR TO PROVIDE TEMPORARY DRIVEWAY ACCESS AT ALL DRIVEWAY REPLACEMENT
LOCATIONS.
5. CONTRACTOR TO REPLACE ALL STRIPING WITHIN THE MILL AND RESURFACE AREA FOLLOWING
RESURFACING.
6. CONTRACTOR IS RESPONSIBLE FOR ORDERING FIRE HYDRANTS WITH THE APPROPRIATE
LENGTH OF PIPE AND FITTINGS TO CONNECT TO THE WATER MAIN PER THE UTILITY STANDARDS.
7. CONTRACTOR TO INSTALL WATER SERVICES UP TO WATER METER PER STANDARD DETAIL…