About this file
This is a bid form for the City of Casselberry, Florida's Eastbrook Water Main Replacement Phase I project, a federally-assisted construction initiative requiring furnishing of all labor, equipment, and materials to upgrade the city's water distribution system. The project encompasses replacement of approximately 5,000 linear feet of aging asbestos cement water mains with new PVC and HDPE piping ranging from 2 to 8 inches in diameter throughout the Eastbrook residential community. Work includes removal of existing AC and galvanized mains, installation of 38 fire hydrant assemblies, water service connections and meter boxes, valve installations, directional drilling beneath Eastbrook Boulevard and a drainage canal (338 linear feet of 8-inch HDPE), asphalt milling and resurfacing of approximately 10,269 square yards, sidewalk and curb replacement, and site restoration. The mandatory pre-bid meeting and site visit occurred on July 16, 2026 at 8:00 a.m. at Lift Station 37, 1238 Eastbrook Boulevard, Winter Park, with bids due August 6, 2026 at 2:00 p.m. Substantial completion is required within 330 consecutive calendar days after issuance of the Notice to Proceed, with final completion 30 days thereafter. City Commission approval is anticipated for September 14, 2026.
The engineer's cost estimate is $9.36 million, with the bid form establishing unit prices for various line items including general mobilization and demobilization, site and civil preparation, water main materials and installation, and fire hydrant assemblies. Bidders must hold a valid Florida General Contractor or Underground Utility Contractor license and demonstrate a minimum of three consecutive years of experience in similar work. Bid security of five percent of bid price is required, along with performance and payment bonds equal to 100 percent of the contract amount. The project is subject to Davis-Bacon prevailing wage rates for Seminole County, American Iron and Steel requirements, and Build America, Buy America Act compliance mandating that all iron, steel, manufactured products, and construction materials be produced in the United States. All materials must conform to the City of Casselberry's List of Approved Products and comply with AWWA specifications for pressure testing at 150 PSI for two hours, chlorination, and bacteriological testing. Contractors must make good faith efforts to utilize Minority Business Enterprises and Women's Business Enterprises, and liquidated damages apply for missed deadlines.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Form
| City of Casselberry | |||||||||||||||||||||||||||||||||||||||||||||
| Eastbrook Water Main Replacement - Phase 1 | Date: | 7/26/26 | |||||||||||||||||||||||||||||||||||||||||||
| Sheet | |||||||||||||||||||||||||||||||||||||||||||||
| Item | Description | UNIT | QTY | Unit Price | Extended Price | Notes | C1 | C2 | C3 | C4 | C5 | C6 | C7 | C8 | C9 | C10 | C11 | C12 | C13 | C14 | C15 | C16 | C17 | C18 | C19 | C20 | C21 | C22 | C23 | C24 | C25 | C26 | C27 | C28 | C29 | C30 | C31 | C32 | C33 | C34 | C35 | C36 | C37 | C38 | Total |
| 1 | General | 0 | |||||||||||||||||||||||||||||||||||||||||||
| 1 | Mobilization/Demobilization, Bonds & Insurance | LS | 1 | $ - 0 | 0 | ||||||||||||||||||||||||||||||||||||||||
| 2 | Postconstruction Audio-Video Documentation | LS | 1 | $ - 0 | 0 | ||||||||||||||||||||||||||||||||||||||||
| 3 | Record Drawings and Closeout | LS | 1 | $ - 0 | 0 | ||||||||||||||||||||||||||||||||||||||||
| 4 | Maintenance of Traffic | LS | 1 | $ - 0 | 0 | ||||||||||||||||||||||||||||||||||||||||
| 2 | Site/Civil Preparation and Roadway Restoration | 0 | |||||||||||||||||||||||||||||||||||||||||||
| 5 | Erosion and Sedimentation Control | LS | 1 | $ - 0 | 0 | ||||||||||||||||||||||||||||||||||||||||
| 6 | Open Cut and Restore Asphalt Roadway | SY | 1,981 | $ - 0 | 219 | 243 | 177 | 172 | 77 | 129 | 106 | 13 | 110 | 50 | 145 | 18 | 61 | 42 | 19 | 28 | 19 | 48 | 64 | 47 | 24 | 41 | 25 | 51 | 139 | 2067 | |||||||||||||||
| 7 | Remove and Replace Concrete Sidewalk | SY | 426 | $ - 0 | 27 | 24 | 74 | 20 | 7 | 2 | 2 | 15 | 171 | ||||||||||||||||||||||||||||||||
| 8 | Remove and Replace Curbing and/or Curb and Gutter | LF | 2,123 | $ - 0 | 10 | 5 | 22 | 56 | 205 | 386 | 85 | 18 | 87 | 242 | 8 | 11 | 49 | 137 | 361 | 18 | 55 | 31 | 21 | 107 | 9 | 21 | 50 | 16 | 7 | 69 | 2086 | ||||||||||||||
| 9 | Mill and Resurface Roadway | SY | 10,269 | $ - 0 | 369 | 369 | 447 | 781 | 404 | 950 | 1022 | 153 | 512 | 785 | 471 | 159 | 455 | 203 | 191 | 367 | 199 | 717 | 861 | 142 | 385 | 313 | 181 | 232 | 1346 | 12014 | |||||||||||||||
| 10 | Remove and Replace Concrete Driveway | EA | 119 | $ - 0 | 3 | 4 | 2 | 1 | 4 | 1 | 1 | 6 | 2 | 3 | 5 | 3 | 7 | 4 | 7 | 2 | 6 | 7 | 1 | 6 | 7 | 1 | 4 | 2 | 1 | 2 | 6 | 4 | 2 | 1 | 105 | ||||||||||
| 11 | Replace Brick Pavers (Reused) | EA | 4 | $ - 0 | 1 | 1 | 1 | 3 | |||||||||||||||||||||||||||||||||||||
| 12 | Construct Public Sidewalk ADA Ramp | EA | 8 | $ - 0 | 2 | 1 | 2 | 2 | 2 | 9 | |||||||||||||||||||||||||||||||||||
| 3 | Phase I Water Mains Replacement | 0 | |||||||||||||||||||||||||||||||||||||||||||
| 3.1 | Remove Existing Pipe | 0 | |||||||||||||||||||||||||||||||||||||||||||
| 13 | Remove and Haul Existing 1" POLY Line | LF | 78 | $ - 0 | 78 | 78 | |||||||||||||||||||||||||||||||||||||||
| 14 | Remove and Replace Existing 12" Storm Pipe | LF | 5 | 5 | 5 | ||||||||||||||||||||||||||||||||||||||||
| 15 | Remove and Replace Existing 15" Storm Pipe | LF | 32 | 5 | 5 | 5 | 5 | 5 | 5 | 30 | |||||||||||||||||||||||||||||||||||
| 16 | Remove and Replace Existing 18" Storm Pipe | LF | 23 | 5 | 5 | 5 | 5 | 20 | |||||||||||||||||||||||||||||||||||||
| 17 | Remove and Replace Existing 21" Storm Pipe | LF | 10 | 5 | 5 | 10 | |||||||||||||||||||||||||||||||||||||||
| 18 | Remove and Replace Existing 12" x 18" Storm Pipe | LF | 5 | 5 | 5 | ||||||||||||||||||||||||||||||||||||||||
| 19 | Remove and Replace Existing 24" Storm Pipe | LF | 15 | 5 | 5 | 5 | 15 | ||||||||||||||||||||||||||||||||||||||
| 20 | Remove and Replace Existing 30" Storm Pipe | LF | 7 | $ - 0 | 5 | 5 | |||||||||||||||||||||||||||||||||||||||
| 21 | Remove Existing Fire Hydrant | EA | 8 | $ - 0 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 8 | ||||||||||||||||||||||||||||||||
| 3.2 | Grout Fill and Abandon Existing Pipe | 175 | 175 | ||||||||||||||||||||||||||||||||||||||||||
| Grout Fill Existing Piping | LF | - 0 | $ 10 | $ - 0 | 0 | ||||||||||||||||||||||||||||||||||||||||
| 22 | Grout Fill and Abandon Existing 8" AC Piping | LF | 4,980 | $ - 0 | 2 | 399 | 552 | 551 | 73 | 175 | 546 | 550 | 409 | 529 | 128 | 412 | 450 | 159 | 108 | 67 | 5110 | ||||||||||||||||||||||||
| 23 | Grout Fill and Abandon Existing 6" AC Piping | LF | 9,232 | $ - 0 | 427 | 500 | 500 | 145 | 517 | 548 | 378 | 525 | 548 | 303 | 525 | 550 | 232 | 523 | 550 | 174 | 453 | 170 | 565 | 548 | 467 | 84 | 9232 | ||||||||||||||||||
| 24 | Grout Fill and Abandon Existing 4" AC Piping | LF | 344 | $ - 0 | 344 | 344 | |||||||||||||||||||||||||||||||||||||||
| 25 | Grout Fill and Abandon Existing 2" AC Piping | LF | 736 | $ - 0 | 230 | 277 | 107 | 122 | 736 | ||||||||||||||||||||||||||||||||||||
| 3.3 | Furnish and Install Water Mains and Valves | 0 | |||||||||||||||||||||||||||||||||||||||||||
| 26 | Furnish and Install 2" POLY Line | LF | 280 | $ - 0 | 23 | 257 | 280 | ||||||||||||||||||||||||||||||||||||||
| 27 | Furnish and Install 4'' PVC Water Main | LF | 1,564 | $ - 0 | 386 | 354 | 341 | 299 | 159 | 121 | 1660 | ||||||||||||||||||||||||||||||||||
| 28 | Furnish and Install 6'' PVC Water Main | LF | 8,863 | $ - 0 | 429 | 500 | 397 | 538 | 550 | 349 | 563 | 556 | 278 | 543 | 550 | 186 | 534 | 552 | 118 | 357 | 212 | 540 | 561 | 501 | 8814 | ||||||||||||||||||||
| 29 | Furnish and Install 8'' PVC Water Main | LF | 5,357 | $ - 0 | 121 | 381 | 555 | 553 | 166 | 219 | 555 | 563 | 208 | 520 | 177 | 354 | 458 | 199 | 86 | 5115 | |||||||||||||||||||||||||
| 30 | Furnish and Install 2'' Gate Valves | EA | 1 | $ - 0 | 1 | 1 | |||||||||||||||||||||||||||||||||||||||
| 31 | Furnish and Install 4'' Gate Valves | EA | 8 | $ - 0 | 1 | 3 | 1 | 1 | 1 | 1 | 8 | ||||||||||||||||||||||||||||||||||
| 32 | Furnish and Install 6'' Gate Valves | EA | 26 | $ - 0 | 1 | 1 | 1 | 1 | 1 | 2 | 1 | 1 | 1 | 2 | 1 | 2 | 4 | 3 | 22 | ||||||||||||||||||||||||||
| 33 | Furnish and Install 8'' Gate Valves | EA | 24 | $ - 0 | 3 | 2 | 2 | 2 | 3 | 1 | 1 | 2 | 1 | 2 | 3 | 22 | |||||||||||||||||||||||||||||
| 34 | Furnish and Install 2" Blow Off Assembly | EA | 1 | $ - 0 | 1 | 1 | |||||||||||||||||||||||||||||||||||||||
| 35 | Furnish and Install 8" Tapping Sleeve and Tapping Valve | EA | 5 | $ - 0 | 1 | 1 | 1 | 1 | 1 | 5 | |||||||||||||||||||||||||||||||||||
| 36 | Furnish and Install 6" Line Stop and Cap | EA | 1 | $ - 0 | 1 | 1 | 2 | ||||||||||||||||||||||||||||||||||||||
| 37 | Furnish and Install 8" Line Stop and Cap | EA | 5 | $ - 0 | 1 | 1 | 2 | 1 | 1 | 6 | |||||||||||||||||||||||||||||||||||
| 38 | Furnish and Install 1-1/2" Double Water Service (long) | EA | 67 | $ - 0 | 2 | 3 | 4 | 1 | 1 | 3 | 3 | 1 | 3 | 3 | 1 | 3 | 4 | 1 | 3 | 4 | 1 | 3 | 2 | 1 | 3 | 1 | 1 | 2 | 3 | 2 | 4 | 3 | 66 | ||||||||||||
| 39 | Furnish and Install 1-1/2" Double Water Service (short) | EA | 53 | $ - 0 | 3 | 3 | 1 | 1 | 1 | 1 | 1 | 3 | 1 | 1 | 1 | 3 | 3 | 2 | 3 | 3 | 2 | 3 | 4 | 1 | 3 | 3 | 2 | 1 | 1 | 1 | 2 | 1 | 2 | 57 | |||||||||||
| 40 | Furnish and Install 1" Water Service (long) | EA | 31 | $ - 0 | 2 | 1 | 3 | 2 | 1 | 1 | 1 | 1 | 2 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 22 | |||||||||||||||||||||||
| 41 | Furnish and Install 1" Water Service (short) | EA | 24 | $ - 0 | 2 | 3 | 2 | 1 | 2 | 1 | 1 | 1 | 2 | 2 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 25 | ||||||||||||||||||||||
| 130 | $ - 0 | ||||||||||||||||||||||||||||||||||||||||||||
| 42 | Relocation of Existing Water Service Meter Box | EA | 120 | $ - 0 | 4 | 2 | 2 | 2 | 4 | 4 | 5 | 4 | 2 | 4 | 7 | 2 | 3 | 2 | 7 | 7 | 5 | 6 | 8 | 3 | 4 | 8 | 2 | 6 | 6 | 4 | 2 | 2 | 2 | 3 | 6 | 1 | 1 | 5 | 4 | 3 | 142 | ||||
| 43 | Remove and Replace Water Service Meter Box | EA | 34 | $ - 0 | 4 | 4 | 3 | 2 | 4 | 4 | 5 | 4 | 2 | 5 | 7 | 3 | 2 | 2 | 6 | 6 | 4 | 6 | 7 | 3 | 5 | 8 | 2 | 6 | 6 | 1 | 3 | 3 | 3 | 1 | 3 | 5 | 2 | 4 | 5 | 3 | 143 | ||||
| 3.4 | Furnish and Install Fire Hydrants | 0 | |||||||||||||||||||||||||||||||||||||||||||
| 44 | Furnish and Install Fire Hydrant Assembly ( Includes 6" Gate Valve and up to 20 ft of pipe) | EA | 38 | - 0 | 2 | 1 | 2 | 1 | 1 | 2 | 1 | 2 | 1 | 1 | 2 | 1 | 1 | 1 | 2 | 1 | 2 | 2 | 1 | 1 | 1 | 2 | 1 | 1 | 2 | 1 | 2 | 38 | |||||||||||||
| 3.5 | Directional Drilling | ||||||||||||||||||||||||||||||||||||||||||||
| 45 | Furnish and Install 8'' HDPE Water Main via Directional Drill | LF | 338 | $ - 0 | 338 | 338 | |||||||||||||||||||||||||||||||||||||||
| SUBTOTAL | $ - 0 | 0 | |||||||||||||||||||||||||||||||||||||||||||
| Construction Contingency | 10% | $ - 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||
| TOTAL | $ - 0 | 0 | |||||||||||||||||||||||||||||||||||||||||||
| Engineering | 0.0% | $ 318,800 | 0 | ||||||||||||||||||||||||||||||||||||||||||
| Survey | 0.0% | $ 121,930 | 0 | ||||||||||||||||||||||||||||||||||||||||||
| Permitting | 0.0% | $ 12,440 | 0 | ||||||||||||||||||||||||||||||||||||||||||
| Public Relations | 6.2% | $ 19,780 | 0 | ||||||||||||||||||||||||||||||||||||||||||
| Bidding and Construction Administration | 0.0% | $ 181,450 | 0 | ||||||||||||||||||||||||||||||||||||||||||
| TOTAL | $ 654,400 | 0 | |||||||||||||||||||||||||||||||||||||||||||
| CPH Professional Design Services Total = | $ 654,400 | 0 | |||||||||||||||||||||||||||||||||||||||||||
| TOTAL | $ - 0 | ||||||||||||||||||||||||||||||||||||||||||||
| NOTE: The Bidder agrees that the quantities shown for unit price items are approximate and are subject to variations in the field and further agrees to do the work at the unit bid price whether the quantities are increased or decreased. I/we, the undersigned, as authorized signatory to commit the firm, do hereby accept in total all the terms and conditions stipulated and referenced in this ITB document and do hereby agree that if a contract is offered or negotiated it will abide by the terms and conditions presented in the ITB document or as negotiated pursuant thereto. The undersigned, having familiarized him/herself with the terms of the ITB documents, local conditions, and the cost of the work at the place(s) where the work is to be done, hereby proposes and agrees to perform within the time stipulated, all work required in accordance with the scope of services and other documents including Addenda, if any, on file at the City of Casselberry Procurement Division for the price set forth herein. The signature(s) below are an acknowledgment of my/our full understanding and acceptance of all the terms and conditions set forth in this ITB document or as otherwise agreed to between the parties in writing. | |||||||||||||||||||||||||||||||||||||||||||||
| Bidder/Contractor: | |||||||||||||||||||||||||||||||||||||||||||||
| Printed Name: | |||||||||||||||||||||||||||||||||||||||||||||
| Title: | |||||||||||||||||||||||||||||||||||||||||||||
| Signature: | |||||||||||||||||||||||||||||||||||||||||||||
| Address: | |||||||||||||||||||||||||||||||||||||||||||||
| City/State/Zip: | |||||||||||||||||||||||||||||||||||||||||||||
| FEIN: | |||||||||||||||||||||||||||||||||||||||||||||
| Phone: | |||||||||||||||||||||||||||||||||||||||||||||
| Email: |
File details come from the government source that posted it. Updated .