About this opportunity

Provo City Corporation is soliciting sealed bids for the 2026 Provo Airport runway lighting replacement project (AIP 3-49-0027-069-2026), with bids due June 30, 2026 at 11:00 a.m. local time. The project is federally funded through FAA Airport Improvement Program grants, so Buy American Preference and Build America, Buy America (BABA) requirements govern product sourcing. The only small-business provision is DBE participation through race-neutral means.

The work spans three schedules: Schedule I (Runway 13/31 lighting), Schedule II (Runway 31 PAPI replacement), and Schedule III (Runway 18-36 lighting, non-federal). Federal Schedules I and II award together to a single bidder, and Schedule III may award separately to a different low bidder, but the Notice to Bidders requires bids on all items across every schedule. Scope covers removal and installation of LED runway edge, threshold, and in-pavement lights and PAPI systems, plus approximately 68,000 linear feet of wire and conduit combined. Equipment must meet FAA-specified L-series fixture standards and FAA construction specifications. The contractor must obtain FAA 7460-1, CDPHE stormwater, and fugitive dust permits at its own cost, follow FAA Advisory Circular 150/5370-2G safety requirements, and submit a Quality Control Plan 14 days before construction. Runway closures run nightly from 7:00 p.m. to 5:00 a.m., and site access is limited to three designated gates with security badges.

Bidders must conduct site visits during normal working hours. Work must commence within 10 calendar days of the Notice to Proceed and finish within 55 calendar days. A voluntary pre-bid conference is set for June 16, 2026 at 11:00 a.m. at the airport, with Microsoft Teams participation available. Written questions are due at least seven calendar days before the bid date to Alex Nodich at Woolpert, Inc., and responses issue by addenda. Bidders must register as plan holders at utah.bonfirehub.com to receive addenda. Award goes to the lowest responsive and responsible bidder, and bids remain subject to acceptance for 90 calendar days after opening.

Bidders post a bid bond or certified check equal to 5 percent of the bid total. The successful bidder furnishes separate performance and payment bonds, each at 100 percent of the contract price, and a one-year warranty applies (four years for LED fixtures) backed by warranty bond coverage at final acceptance. Required federal and state compliance includes Davis-Bacon wage requirements, Title VI, debarment and suspension certification, drug-free workplace rules, prohibition on covered unmanned aircraft systems, and immigration status verification under Utah Code Annotated 63G-12-302.

Opportunity text

Provo Airport Lighting Replacement Project - AIP 069