Runway Lighting Project Plans - Provo Municipal Airport
This document is a comprehensive set of design plans and specifications for the Provo Municipal Airport Runway Lighting Replacement Project (AIP 069) sponsored by Provo City Corporation and managed by the Federal Aviation Administration. The project encompasses the installation of new LED runway lighting systems, runway end indicator lights (REILs), precision approach path indicators (PAPIs), and associated electrical infrastructure across Runways 13/31 and 18/36, along with supporting taxiway systems. The scope of work includes the removal of existing lighting fixtures and electrical duct banks (approximately 86 runway edge lights, 16 runway threshold lights, and associated PAPI systems), installation of new LED L-861 runway edge lights, L-861E threshold lights, L-850C in-pavement lights, L-881 PAPI systems, and approximately 15,674 to 27,064 linear feet of various electrical conductors and conduit installations. The project is organized into three construction phases: Phase 1 (5 calendar days) focusing on Runway 18/36 modifications within the Runway 13/31 object free zone; Phase 2 (10 calendar days) addressing Runway 13/31 edge and threshold lights plus PAPI installation at Runway 31; and Phase 3 (40 calendar days) completing Runway 18/36 lighting and PAPI installation at Runway 18, with a total project duration of 33 calendar days excluding nighttime closures. The contract was issued for bid on June 4, 2026, with runway closures scheduled during nighttime hours (7:00 PM to 5:00 AM) and daytime restrictions on Runway 18/36 during Phase 3 (7:00 AM to 7:00 PM).
The project requires strict compliance with FAA Advisory Circular 150/5370-2G for operational safety during construction, including foreign object debris (FOD) management, navigation aid protection, and coordination with airport operations through Notice to Airmen (NOTAM) procedures. All contractor work must conform to the National Electrical Code, FAA specifications (FAA-C-1217f, FAA-C-1391b, FAA-STD-019e), and local Utah codes. The contractor is responsible for obtaining all necessary permits including FAA 7460-1 notices, CDPHE stormwater permits, and fugitive dust permits, with costs borne by the contractor. Environmental requirements include archaeological monitoring during excavation in designated areas, erosion control measures per FAA AC 150/5370-10, and daily wildlife inspections to prevent hazardous wildlife attractions. Contractor access is limited to three designated gates with required security badges and airport familiarization training for key personnel, while all personnel must maintain 24-hour radio contact with airport operations. The project requires submission of a Quality Control Plan fourteen days prior to construction commencement, as-built drawings throughout the project, material submittals at least ten days prior to ordering, and final inspection and approval by the resident engineer before any area reopens to aircraft operations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .