Northeast Hangar Taxilanes Reconstruction & Drainage Improvements, Phase 2B
Closed State & local contract opportunity Posted
- Solicitation number
- 909-0330-26
- State
- California
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 90910 Airport Facility Construction
- 90911 Airport Facility Maintenance And Repair
- 912 Construction Services, General, Including Maintenance And Repair Services)
- 913 Construction Services, Heavy, Including Maintenance And Repair Services
- 91310 Construction: Airport Roadway, Runway And Taxiway
- 91364 Maintenance And Repair: Airport Roadway, Runway And Taxiway
- 914 Construction Services, Trades, New Construction
- UNSPSC codes
- 72140000 Heavy construction services
- 72121410 Airport terminal and hanger construction
- 95121613 Airfield
- 72141103 Highway and road paving service
- 95121612 Airport control tower
- 95121614 Runway
- 95121611 Airport building
- 72141101 Airport runway construction service
- 72141104 Highway and road resurfacing service
- Point of contact
-
- Umiika Wright uwright@solanocounty.gov (707) 784-3236
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
Solano County, California is seeking competitive bids from qualified contractors for the Northeast Hangar Taxilanes Reconstruction & Drainage Improvements, Phase 2B project at Nut Tree Airport located at 301 County Airport Road, Vacaville, California. This construction procurement requires furnishing all labor, materials, coordination, transportation, and services necessary to reconstruct approximately 12,300 square yards of Northeast Hangar Taxilanes pavement that provides access to northern hangars. The scope of work includes removal of existing asphalt pavement and underlying base course; construction of a full-depth pavement section consisting of lime-treated subgrade, crushed aggregate base course, and asphalt concrete surface course; installation of reinforced portland cement concrete valley gutters; construction of storm drain piping and catch basins; and application of taxilane centerline markings. The project is divided into a 30-working-day Mobilization Element and a 41-working-day Construction Element, for a total anticipated duration of 71 working days, with construction activities limited to the county construction season (April 15 through October 15) and acceptable work hours of 7 a.m. to 5 p.m., Monday through Friday. Successful bidders must possess a current and valid California Contractor's License Class A at the time of award and throughout project execution, and must register with the California Department of Industrial Relations. Electronic bids must be submitted via Solano County's eProcurement Portal no later than 2:00 p.m. PST on April 30, 2026; a non-mandatory pre-bid conference with site walk is scheduled for April 14, 2026 at 10:00 a.m. at Nut Tree Airport Administration Building, and requests for information must be submitted by 5:00 p.m. PST on April 17, 2026. Bidders must submit a 10 percent bid bond or certified check with their bid submission, and the successful contractor will be required to provide 100 percent Performance and Payment Bonds within 15 calendar days of award notification and execute the contract within 15 calendar days of award.
The project is funded through the Federal Aviation Administration (FAA) Airport Improvement Program (AIP) and State Airport Infrastructure Grants, with award and Notice to Proceed contingent upon Solano County's receipt of both FAA and State grant funding; bids will remain valid for 180 calendar days from the bid opening date. All contractors and subcontractors must comply with Davis-Bacon Act prevailing wage requirements, paying the higher of applicable Federal or State wage rates, and must comply with federal contract provisions including Buy American Preference, Civil Rights requirements, and Disadvantaged Business Enterprise (DBE) participation standards. Liquidated damages are assessed at $3,500 per calendar day for the Mobilization Element and $5,000 per calendar day for the Construction Element if time limitations are not met, with mobilization costs limited to 10 percent of total project cost. The Engineer's Estimate for this project is $2,927,560. No incumbent vendors or current contractors are identified in the procurement documents. The project requires coordination with existing airport operations, including compliance with FAA standards in addition to County of Solano and State of California construction standards, with contractors required to maintain airport operations, install temporary fencing and low-profile barricades, coordinate utility potholing and protection, and implement erosion control best management practices; additionally, a grading permit from Solano County Public Works Division and a Construction General Permit with Stormwater Pollution Prevention Plan (SWPPP) are mandated for project execution.
Opportunity text
NOTICE IS GIVEN THAT SOLANO COUNTY, CALIFORNIA, A POLITICAL SUBDIVISION OF THE STATE OF CALIFORNIA will receive bids for the furnishing of all labor, materials, coordination, transportation, and services necessary for the completion of the:
Nut Tree Airport (VCB), Northeast Hangar Taxilanes Reconstruction and Drainage Improvements, Phase 2B Project at 301 County Airport Rd., Vacaville, CA
- General Statement of Work: The Project consists of reconstruction of the Northeast Hangar Taxilanes pavement, which provides access to the northern hangars (approximate area of 12,300 square yards), including drainage improvements. Work will include the following elements:
- Removal of the existing asphalt pavement and underlying base course.
- Construction of a full depth pavement section (asphalt concrete, aggregate base, and lime treated subgrade).
- Initial and final pavement markings.
- Construction of portland cement concrete valley gutters
- Installation of storm drain piping and catch basins.