City of Harlem, Georgia Multi-Purpose Park
Closed State & local contract opportunity Posted
- Solicitation number
- PE-66205-NONST-2025-000000004
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 65038 Playground Equipment (Not Otherwise Classified) (See 420-04 For Bleachers)
- 74568 Recycled Asphalt And Asphalt Products
- 75595 Recycled Asphalt And Concrete Handling Equipment, Accessories And Supplies
- 90930 Building Construction (Not Otherwise Classified)
- 91347 Construction, Sidewalk And Driveway (Includes Pedestrian And Handicap Ramps)
- 91396 Paving/Resurfacing, Street (Major And Residential)
- 98854 Lighting Services For Parks, Athletic Fields, Parking Lots, Etc.
- 98863 Park Area Construction/Renovation
- UNSPSC codes
- 49241513 Playground track type ride
- 72153101 Bowling alley installation service
- 95121513 Bank
- 95121610 Tramway platform
- 46161538 Vehicle height restriction bars
- 72152707 Retaining wall construction service
- 72152706 Driveway construction service
- 95111616 Pedestrian way
- 95121516 Artificial rock and rockwall
- 49241507 Playground sandboxes
Show all 45
- 60141203 Play houses or huts
- 72121407 Mausoleum construction service
- 72121404 Post office construction service
- 72121301 Automotive garage construction service
- 95121809 Movable weir
- 95121812 Floating structure
- 95121512 Waterside leisure facility
- 95121808 Oil or gas platform
- 95121609 Tramway depot
- 95121709 Coastguard building
- 95121511 Park
- 49241600 Recreational equipment
- 49241511 Pergoal
- 49241512 Playground rocking equipment
- 60141005 Playhouses
- 72121300 Automotive garage and service station construction services
- 72121400 Specialized public building construction services
- 72111004 Patio and deck construction and repair service
- 72121302 Automotive service station construction service
- 95121502 Parking structure
- 95121710 Rescue service station
- 95121517 Crematorium
- 72152705 Sidewalk or ramp construction service
- 95111608 Bike path
- 49241503 Playground merry go rounds
- 49241506 Playground tunnels
- 95121510 Garden
- 95121708 Lifeboat station
- 95121707 Mountain rescue building
- 46161535 Pedestrian walkway street boundary marker
- 72141105 Sidewalk construction and repair service
- 95111617 Footpath
- 72141129 Park and garden construction and or remodelling service
- 95121515 Artificial water fall
- 95121508 Childrens play area or playground
- Point of contact
-
- Mandy Soares msoares@turnipseed.com (706) 863-8800
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The City of Harlem, Georgia is seeking a comprehensive multi-purpose park construction project located in Clayton County, with proposals due on October 24, 2025. The procurement involves a detailed site development effort spanning 9.09 acres, which includes extensive infrastructure and recreational amenities. Specific project deliverables encompass site clearing, grading, detention pond construction, water and sewer utility installations, drainage improvements, parking lot development, and multiple recreational features such as a 1,325 square foot bathroom facility, splash pad, playground equipment, and pavilion. The project also requires installation of perimeter fencing (including chain link, iron decorative, and split rail with brick posts), site lighting with 18 lamps and 6 spotlights, irrigation systems, decorative trash receptacles, and picnic tables. Contractors must implement best management practices for soil erosion and sediment control, with a strict completion timeline of 180 consecutive calendar days from project initiation.
While specific set-aside designations are not explicitly detailed in the procurement notice, potential bidders should anticipate standard local government contracting requirements typical of municipal infrastructure projects. The project's comprehensive nature suggests a preference for contractors with significant experience in municipal park and recreational facility construction, demonstrating technical capability, financial stability, and proven project management skills. Although no specific budget range is provided, the complexity of the project—involving multiple infrastructure components, recreational amenities, and specialized construction requirements—indicates a substantial investment by the City of Harlem. Prospective contractors should carefully review all technical specifications, prepare detailed proposals demonstrating compliance with the project's extensive scope, and be prepared to provide comprehensive documentation of their qualifications, past performance, and ability to complete the project within the specified 180-day timeframe.
Opportunity text
Site clearing and grading of approximately 9.09 acres including a detention pond, site water and sewer utilities, drainage and parking lot improvements, a 1,325 square foot bathroom facility, splash pad (coordinate installation by others), playground equipment, small pavilion, approximately 500 feet of 6 foot chain link fence, 245 feet of 4 foot iron decorative fence, 78 feet of split rail fence with brick posts, 3 flag poles with 24 square yards of herringbone brick base, site irrigation system, 18 site lighting lamps and 6 spot lights, decorative trash receptacles, picnic tables, including best management practices for soil erosion and sediment control and appurtenances. Time allotted for completion shall be 180 consecutive calendar days.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity