About this opportunity
The City of Gallup, New Mexico is soliciting bids for the Carbon Coal Road, McKinley County Industrial Park Waterline Project, funded by the US Department of Commerce Economic Development Administration (EDA) under grant 08-79-05634. The procurement involves the installation of new waterline infrastructure, specifically approximately 2,395 linear feet of 12-inch CL350 ductile iron pipe on Carbon Coal Road and 535 linear feet of 8-inch CL350 ductile iron pipe on Industrial Park Road. Key project deliverables include gate valves, air release valves, fire hydrant assemblies, waterline tie-ins, fittings, trenching, rock excavation, backfilling, and traffic control measures. Sealed bids must be submitted electronically via the City's OpenGov procurement portal by 2:00 pm local time on January 5, 2026, with a deadline for submitting questions by December 16, 2025 at 5:00 pm. The contractor is expected to commence work within the timeframe specified in the Notice to Proceed and complete the entire project within 90 calendar days, including anticipated weather delays. Bidders must submit a bid bond equal to five percent of the bid sum and, upon contract award, provide performance and payment bonds each in 100 percent of the contract amount.
The procurement offers preferences to New Mexico resident contractors and New Mexico resident veteran contractors certified by the State Department of Taxation and Revenue. All contractors and subcontractors must be registered with the New Mexico Labor and Industrial Division for public works projects exceeding $60,000 and must comply with prevailing wage requirements per the Public Works Minimum Wage Act. Subcontractors exceeding $5,000 must be listed with the bid, and those exceeding $125,000 must furnish separate performance bonds. The Engineer's Estimate establishes a total project cost of $834,458.63, including New Mexico Gross Receipts Tax at 8.0625%. Liquidated damages are assessed at $500 per calendar day for failure to meet the 90-day completion deadline. The contractor is responsible for all costs related to traffic control, storm water pollution prevention, construction staking detail, independent testing, insurance coverage, and waste disposal. The project includes a one-year performance and materials warranty period following substantial completion, and plans and specifications are available from DePauli Engineering & Surveying for a $250 refundable deposit.
Opportunity text
This project consists of installing new waterlines on Carbon Coal Road & Industrial Park Road at the newly developed Industrial Park site in the City of Gallup, New Mexico. The Carbon Coal Road waterline will consist of installing approximately 2,395 linear feet of 12-inch CL350 ductile iron pipe. Work will also include gate valves, air release valves, a fire hydrant assembly, waterline tie-in, fittings, specials, trenching, rock excavation, backfilling, and traffic control.
Files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity