NMDOT_A-066TrafficControlRoadwayWorkPermit.pdf
PDF 217 KB Posted
- Attached to
- Carbon Coal Road, McKinley County Industrial Park Waterline - US Department of Commerce (EDA) 08-79-05634
- Solicitation number
- ITB-2609
- Issued by
- Quay County, New Mexico
About this file
This is a Traffic Control/Roadway Work Permit form issued by the New Mexico Department of Transportation (NMDOT) for the Carbon Coal Road, McKinley County Industrial Park Waterline Project in the City of Gallup, New Mexico. The permit authorizes traffic control and roadway work activities necessary to support the installation of new waterline infrastructure, which includes approximately 2,395 linear feet of 12-inch ductile iron pipe on Carbon Coal Road and 535 linear feet of 8-inch ductile iron pipe on Industrial Park Road. The permit requires the contractor to submit a Traffic Control Plan (TCP) prior to permit processing and specifies that work must comply with the Manual on Uniform Traffic Control Devices (MUTCD). The contractor must identify the work zone location by route, mile post, or intersection; specify road configuration (2, 4, 6, or 8 lanes and divided or undivided); document existing and proposed speed limits; and provide working duration details including start date, end date, and daily work hours. The permit identifies the traffic control firm and a Certified Traffic Control Supervisor as responsible parties for implementing traffic control measures.
The NMDOT permit is conditioned upon the contractor's compliance with MUTCD standards, indemnification of NMDOT and its employees from liability arising from the contractor's negligent acts, and provision of certified insurance with NMDOT named as an additional insured with primary coverage. The contractor and TCP firm must contact the NMDOT District Office to confirm actual start dates and adhere to all attached notes and conditions. The permit is issued by the NMDOT District Office Traffic Section and must be approved prior to commencing work. The City of Gallup project itself is funded by the US Department of Commerce Economic Development Administration (EDA) under grant 08-79-05634, with an Engineer's Estimate of $834,458.63 including New Mexico Gross Receipts Tax. The project completion deadline is 90 calendar days from the Notice to Proceed, with liquidated damages of $500 per calendar day assessed for delays, and contractors must comply with New Mexico prevailing wage requirements and maintain all required bonding and insurance.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Form No. A-66 New 03/13
NEW MEXICO DEPARTMENT OF TRANSPORTATION
(NMDOT)
TRAFFIC CONTROL/ROADWAY WORK PERMIT
NMDOT Project Number (If applicable): Control Number:
General Scope of work:
Contractor Name:
Contact Person:
Contact Telephone: ( ) - Fax: ( ) -
Traffic Control Firm:
Certified Traffic Control Supervisor:
Contact Telephone: ( ) - Fax: ( ) -
Work Zone Location Information:
Route:
Mile Post: From To:
Or Intersection: Intersection:
Direction (NB, SB, EB, WB, or both):
2 lane Road 4 lane Road 6 lane Road 8 Lane Road Divided Undivided Existing Speed limit in area: ___ MPH or Ranges from ___MPH to ___MPH Proposed Speed Limit reduction within work zone (If Applicable):______________ MPH
Working Duration:
Start Date: End Date :_______________________________ Daily Start Time End Time:
Purpose of Permit: Roadway Construction/Rehab. Shoulder Work Signal and Lighting Work Utility work Drainage/Excavation work Soil Testing Signing and Striping Placement
Other:
TCP Plan Enclosed ___ (TC Permit will not be processed without a TCP plan)
If no, describe why:
Approval is conditioned on the following terms that are deemed accepted by the Contractor upon submission of this Permit
1. Traffic Control for operations under this permit shall conform with the Manual on Uniform Traffic Control Devices (MUTCD).
2. The Contractor agrees to indemnify and hold harmless the NMDOT and its employees from liability, claims, damages losses or expenses due to any negligent act of the Contractor, the Contractor’s employees, any agent acting on the Contractor’s behalf, and anyone else engaged by the Contractor to work pursuant to this permit.
3. The Contractor shall provide the NMDOT a certified copy of the its insurance policy and certificate of insurance and shall include on the certificate of insurance the NMDOT as an additional-named insured, with notice that the coverage is primary over any other valid insurance.
4. Any additional conditions as attached and referenced below.
For Official Use:
Approved (see conditions below) Approved As Amended Not Approved
Contractor/TCP firm SHALL contact the District Office and confirm the actual start dates.
TCP Firm and Contractor must adhere to the attached notes.
Permit Number: - Approved By
NMDOT District Office – Traffic Section Submitted to the District Public Information Officer By:_____________________________ On:____/_____/_____
| TRAFFIC CONTROL/ROADWAY WORK PERMIT |
| Or Intersection: Intersection: |
| NMDOT Project Number If applicable: |
| Control Number: |
| General Scope of work: |
| Contractor Name: |
| Contact Person: |
| Traffic Control Firm: |
| Certified Traffic Control Supervisor: |
| Mile Post From: |
| To: |
| Or Intersection: |
| Intersection: |
| Direction NB SB EB WB or both: |
| 4 lane Road: Off |
| 6 lane Road: Off |
| 8 Lane Road: Off |
| Divided: Off |
| Undivided: Off |
| Proposed Speed Limit reduction within work zone If Applicable: |
| Start Date: |
| Daily Start Time: |
| End Time: |
| Other: |
| TCP Plan Enclosed 1: |
| TCP Plan Enclosed 2: |
| If no describe why: |
| Approved By: |
| Submitted to the District Public Information Officer By: |
| On: |
| undefined_7: |
| undefined_8: |
| Text1: |
| Text2: |
| Text3: |
| 2 lane Road: Off |
| Text7: |
| Text8: |
| Text9: |
| Text10: |
| Text11: |
| Text12: |
| 15: Off |
| 16: Off |
| 17: Off |
| 18: Off |
| 19: Off |
| 20: Off |
| 21: Off |
| 22: Off |
| Check Box23: Off |
| Check Box24: Off |
| Check Box25: Off |
| Check Box26: Off |
| Check Box27: Off |
| Text85: |
| Text86: |
| Text87: |
| Text13: |
| Text563: |
| Text564: |
| Text566: |
| Text258: |
File details come from the government source that posted it. Updated .