Wage_Decision_MC-25-3375-A.pdf
PDF 249 KB Posted
- Attached to
- Carbon Coal Road, McKinley County Industrial Park Waterline - US Department of Commerce (EDA) 08-79-05634
- Solicitation number
- ITB-2609
- Issued by
- Quay County, New Mexico
About this file
Wage Decision Approval Summary
This is a Wage Decision Approval document issued by the New Mexico Department of Workforce Solutions, Labor Relations Division, for the City of Gallup. The project involves the installation of new waterline infrastructure consisting of approximately 2,395 linear feet of 12-inch CL350 ductile iron pipe on Carbon Coal Road and 535 linear feet of 8-inch CL350 ductile iron pipe in the McKinley County Industrial Park. Associated work includes the installation of gate valves, air release valves, fire hydrant assemblies, waterline tie-ins, fittings, trenching, rock excavation, backfilling, and traffic control measures. The wage decision was requested on October 13, 2025, and approved on October 15, 2025, with approval number MC-25-3375-A. The decision remains effective through February 12, 2026, and the estimated contract award date is December 15, 2025.
The estimated total project cost is $834,458.63, with all funding derived from federal sources. The project is classified as Highway/Utilities (Type A) construction and is subject to New Mexico prevailing wage requirements under 11.1.2.13 NMAC. The wage decision establishes hourly base rates and fringe benefit rates for multiple trade classifications applicable to the project period, including laborers, equipment operators, truck drivers, plumbers, electricians, and other skilled trades. Prevailing wage rates vary by classification and geographic location, with base rates ranging from $17.39 per hour for unskilled laborers to $55.50 per hour for cable splicers in Los Alamos County. Fringe benefit rates range from $5.75 to $21.11 per hour depending on trade classification. All contractors and subcontractors performing work on this public works project must comply with these established prevailing wage and fringe benefit requirements.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Wage Decision Approval Summary
1) Project Title: Carbon Coal Road McKinley County Industrial Park Waterline Requested Date: 10/13/2025 Approved Date: 10/15/2025 Approved Wage Decision Number: MC-25-3375-A
Wage Decision Expiration Date: 02/12/2026
2) Physical Location of Jobsite for Project:
Job Site Address: Carbon Coal Road Job Site City: Gallup Job Site County: McKinley
3) Contracting Agency Name (Department or Bureau): City of Gallup Contracting Agency Contact's Name: Frances Rodriguez Contracting Agency Contact's Phone: (505) 863-1334 Ext.
4) Estimated Contract Award Date: 12/15/2025
5) Estimated total project cost: $834,458.63
a. Are any federal funds involved?: Yes - $834,458.63
b. Does this project involve a building?: No
c. Is this part of a larger plan for construction on or appurtenant to the property that is subject to this project?: No
d. Are there any other Public Works Wage Decisions related to this project?: No
e. What is the ultimate purpose or functional use of the construction once it is completed?:
The Carbon Coal Road waterline will consist of installing approximately 2,395 linear feet of 12-inch CL350 ductile iron pipe. Work will also include gate valves, air release valves, a fire hydrant assembly, waterline tie-in, fittings, specials, trenching, rock excavation, backfilling, and traffic control.
The Industrial Park waterline will consist of installing approximately 535 linear feet of 8-inch CL350 ductile iron pipe. Work will also include gate valves, air release valves, a fire hydrant assembly, fire post indicator, high pressure water service meter, fittings, specials, trenching, rock excavation, backfilling, and traffic control.
6) Classifications of Construction:
Classification Type and Cost Total
Description
Highway/Utilities (A) Cost: $834,458.63
The Carbon Coal Road waterline will consist of installing approximately 2,395 linear feet of 12-inch CL350 ductile iron pipe.
Work will also include gate valves, air release valves, a fire hydrant assembly, waterline tie-in, fittings, specials, trenching, rock excavation, backfilling, and traffic control.
The Industrial Park waterline will consist of installing approximately 535 linear feet of 8-inch CL350 ductile iron pipe. Work will also include gate valves, air release valves, a fire hydrant assembly, fire
LABOR RELATIONS DIVISION WWW.DWS.STATE.NM.US
401 Broadway NE Albuquerque, NM 87102 Phone: 505-841-4400 Fax: 505-841-4424
226 South Alameda Blvd Las Cruces, NM 88005 Phone: 575-524-6195 Fax: 575-524-6194
An Equal Opportunity Employer Page 1 of 2 post indicator, high pressure water service meter, fittings, specials, trenching, rock excavation, backfilling, and traffic control.
An Equal Opportunity Employer Page 2 of 2
11.1.2.20 PREVAILING WAGE AND FRINGE BENEFIT AND APPRENTICESHIP
CONTRIBUTION RATES: Pursuant to 11.1.2.13 NMAC, the director of the labor relations division of the department of workforce solutions hereby publishes the 2025 prevailing wage and fringe benefit rates and apprenticeship contributions that will apply to all wage rate decisions issued from January 1, 2025 through December
31, 2025.
TYPE “A” - STREET, HIGHWAY, UTILITY AND LIGHT ENGINEERING
Effective January 1, 2025
A. TYPE A: STREET, HIGHWAY, UTILITY
AND LIGHT ENGINEERING
Trade Classification Base Rate Fringe Rate Apprenticeship
Bricklayer/block layer/stonemason 27.03 10.99
Bricklayer/block layer/stonemason: Curry, DeBaca, Quay and Roosevelt counties
23.10 8.98
Bricklayer/block layer/stonemason: Dona Ana, Otero, Eddy, and Lea counties
29.56 14.10
Carpenter/lather 30.89 13.26
Carpenter: Los Alamos county 37.39 14.18
Cement mason 20.52 7.61
Drywall Finisher/Taper 29.60 9.63
Glazier/Fabricator 22.25 7.40
Ironworker
Ironworker journeyman 28.96 19.51
Probationary ironworker 23.17 19.51
Painter – Commercial 21.00 5.75
Paper Hanger 21.00 5.75
Plumber/pipefitter 43.07 17.25
Electricians – outside classifications: Zone 1
Ground man 27.18 13.32
Equipment operator 38.99 17.67
Lineman 49.25 20.82
Journeyman technician 45.86 19.97
Cable splicer 50.46 21.11
Electricians – outside classifications: Zone 2
Ground man 27.18 13.32
Equipment operator 38.99 17.67
Lineman 49.25 20.82
Journeyman technician 45.86 19.97
Cable splicer 50.46 21.11
Electricians – outside classifications: Los Alamos county
Ground man 27.95 13.34
Equipment Operator 40.11 17.70
Lineman/Technician 50.54 21.14
Journeyman technician 47.19 20.29
Cable Splicer 55.50 22.38
Laborers
Group I – Unskilled 17.39 7.51
Group II – Semi-Skilled 17.39 7.51
Group III – Skilled 18.89 7.51
Group IV - Specialty 19.39 7.51
Operators
Group I 23.00 6.95
Group II 24.00 6.95
Group III 25.50 6.95
Group IV 27.03 6.95
Group V 27.16 6.95
Group VI 27.41 6.95
Group VII 27.62 6.95
Group VIII 28.56 6.95
Group IX 37.81 6.95
Group X 42.19 6.95
Soft Floor Layer 21.00 9.20
Truck drivers
Group I – IX 20.55 9.40
File details come from the government source that posted it. Updated .