Z2DA--537-17-115: SPS Construction Phase 2, 3 &4

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
36C25225B0001
Agency
Veterans Integrated Service Network 12 Veterans Health Administration, Department of Veterans Affairs
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
238220 Plumbing, Heating, and Air-Conditioning Contractors
PSC
Z2DA Repair Or Alteration Of Hospitals And Infirmaries
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Veterans Affairs Great Lakes Acquisition Center is seeking a Service-Disabled Veteran-Owned Small Business (SDVOSB) contractor to complete a comprehensive renovation of the Sterile Processing Services (SPS) department at Jesse Brown VA Medical Center in Chicago, IL. The project involves reconstructing approximately 10,930 square feet across three floors, including significant mechanical, electrical, plumbing, and architectural work. Contractors must be prepared to perform selective demolition, construct new walls and ceilings, install specialized medical equipment, and upgrade HVAC systems while maintaining operational hospital environments. The solicitation requires a bid guarantee of 20% (not exceeding $3 million) and performance/payment bonds for the full contract value. Key dates include a pre-bid site visit on February 24, 2025, with questions due by March 3, 2025, and a virtual bid opening scheduled for March 26, 2025, at 10:00 AM CDT.

The contract is a 100% Service-Disabled Veteran-Owned Small Business set-aside with an estimated value between $2-5 million, categorized under NAICS code 236220. The project has a total performance period of 448 calendar days from the Notice to Proceed, with construction expected to start March 16, 2025, and complete March 15, 2026. Work will be conducted at 820 S. Damen Avenue in Chicago, primarily focusing on renovating first-floor SPS areas, third-floor mechanical spaces, and fifth-floor scope processing zones. The renovation involves replacing air handling units, upgrading mechanical infrastructure, installing new medical equipment, and implementing strict infection control measures. Cost estimates project approximately $4,489,751 for construction, with detailed specifications covering mechanical design, equipment installation, and comprehensive systems upgrades across multiple project phases.

Notice text

5 versions

Update #5 · Latest ·

Accompanying Amendment 36C25225B0001 0004

SPS Renovation Construction Phases 2, 3 & 4

project#537-17-115

Jesse Brown VA Medical Center, Chicago, IL

I. The following changes are to be made to the solicitation:

1. THE BID OPENING IS HEREBY CHANGED FROM IN-PERSON TO VIRTUAL.

2. THE BID OPENING DATE IS HEREBY EXTENDED FROM MARCH 24, 2025 TO MARCH 26, 2025 (see additional information below in red)

3. ADD RYAN McMILLIN TO THE point of contact OF REQUEST FOR INFORMATION (RFI) AND BID RECIPIANTS AT RYAN.McMILLIN@va.gov

a. VIRTUAL BID OPENING INFORMATION:

1) Reminder, there will be no in-person public bid opening process. This will be conducted as a public virtual activity.

2) The virtual bid opening will be available to the public via Microsoft Teams at the following link and/or phone number:

Join the meeting now

(Meeting will be available to be accessed 15 min prior to bid opening)

Meeting ID: 243 355 189 787

Passcode: B2gJ7Ae7

Dial-in by phone: 872-701-0185; Phone conference ID: 699 467 033#

3) IAW FAR 52.214-5 Submission of Bids and FAR 14.202-8 Electronic Bids; Bids shall be provided via email to the Contracting Officer at Stacy.Hoover2@va.gov AND Ryan.McMillin@va.gov as follows:

BIDS DUE: Vendor bids are due via email as shown above at 10:00 AM local time on 3/26/2025.

The virtual public bid opening will be held at 11:00 AM local time on 3/26/2025 at the link and/or the phone # provided above.

A hard copy submission is not required. Any bids received after the date and time specified for receipt of bids will be processed in accordance with FAR 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids (Nov 1999).

4) Ensure your complete bid including bid bond are provided in your submission. The successful low bidder is required to furnish their original bid bond within five (5) days after notification by the Contracting Officer.

5) Ensure your bid includes the completed VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION) found on pages 67 and 68 in the original SF1442 solicitation document for reference.

6) It is highly recommended that Bidders submit their bid at least one hour prior to the bid due date/time to avoid any transmission issues.

II. The following changes are made on project specifications:

Add Specification 09 65 16 Resilient Sheet Flg

III. The following changes are made on project drawings:

n/a

IV. The following Questions and Answers / Clarifications are the result of bidders request(s) for information:

13. How long is the duration of each phase of this project?

13A: It may vary. Not all activities of phases are inter-dependent, but some activities may be related and must follow up the previous activity before starting a new one. Contractor to keep in mind to meet the project finishing deadline, and diligently maintain the flow of work accordingly.

14. The mechanical drawings (MH-102-3 Demo KN 1) and the statement of work indicate that the new AHU is to be ready to connect before demolition of the existing AHU and that the SPS area is to continue to function throughout construction. There will be a significant amount of down time required for the AHU switchover. What is the intent for continuous operation during this time? Will temporary air handling units be required? If so, how many, and where will they be required?

14A: The function of this department is Sterile Processing of clinical tools and utensils. It is important to maintain strict temperature and humidity and anticipated down-time shall be minimal so that high cost of temporary trailer can be released upon completion of the project. Temporary air handling units or spot coolers for SPD may be required depending upon the area coverage needed.

15. Can you please confirm is the highlighted rooms below are the same.

15A:

16. In Phase 4 the flooring called out is WSF-1 I do not see this called out in the spec book. Can you please confirm the spec for WSF-1.

16A: A new specification Section 09 65 16 is added.

V. general information:

1. Additional Instructions to bidders:

VAAR 852.219-73 was included in this solicitation and references the SBA certification database at https://veterans.certify.sba.gov/. However, the website portal at the foregoing link is now static and is no longer being updated as of August 2024. To be eligible for award, a vendor must be listed as SDVOSB certified in the SBA certification database (under Government Certifications) found at the Dynamic Small Business Search website:  https://dsbs.sba.gov/search/dsp_dsbs.cfm.       Â

******NOTHING FOLLOWS******

Update #4 ·

36C25225B0001 0003

SF30 Continuation Sheet

ACCOMPANYING 36C25225B0001 0003

SPS Renovation Construction Phases 2, 3 & 4

project#537-17-115

Jesse Brown VA Medical Center, Chicago, IL

I. The following changes are to be made to the solicitation:

1. THE BID OPENING IS HEREBY CHANGED FROM IN-PERSON TO VIRTUAL.

2. THE BID OPENING DATE IS HEREBY EXTENDED FROM MARCH 17, 2025 AT 10:00AM TO MARCH 24, 2025 (see additional information below in red)

3. ADD RYAN McMILLIN TO THE point of contact OF REQUEST FOR INFORMATION (RFI) AND BID RECIPIANTS AT RYAN.McMILLIN@va.gov

a. VIRTUAL BID OPENING INFORMATION:

1) Reminder, there will be no in-person public bid opening process. This will be conducted as a public virtual activity.

2) The virtual bid opening will be available to the public via Microsoft Teams at the following link and/or phone number:

Join the meeting now

(Meeting will be available to be accessed 15 min prior to bid opening)

Meeting ID: 243 355 189 787

Passcode: B2gJ7Ae7

Dial-in by phone: 872-701-0185; Phone conference ID: 699 467 033#

3) IAW FAR 52.214-5 Submission of Bids and FAR 14.202-8 Electronic Bids; Bids shall be provided via email to the Contracting Officer at Stacy.Hoover2@va.gov AND Ryan.McMillin@va.gov as follows:

BIDS DUE: Vendor bids are due via email as shown above at 10:00 AM local time on 3/24/2025.

The virtual public bid opening will be held at 11:00 AM local time on 3/24/2025 at the link and/or the phone # provided above.

A hard copy submission is not required. Any bids received after the date and time specified for receipt of bids will be processed in accordance with FAR 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids (Nov 1999).

4) Ensure your complete bid including bid bond are provided in your submission. The successful low bidder is required to furnish their original bid bond within five (5) days after notification by the Contracting Officer.

5) Ensure your bid includes the completed VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION) found on pages 67 and 68 in the original SF1442 solicitation document for reference.

6) It is highly recommended that Bidders submit their bid at least one hour prior to the bid due date/time to avoid any transmission issues.

II. The following changes are made on project specifications:

n/a

III. The following changes are made on project drawings:

n/a

IV. The following Questions and Answers / Clarifications are the result of bidders request(s) for information:

Please confirm if the superintendent can be SSHO and QCM.

1a. Yes. As long as the superintendent has the necessary qualifications and experience to manage safety and quality control responsibilities on-site.

Please confirm if the VA will be hiring the commissioning agent directly.

2a. Yes. VA has contract in place with commissioning services.

What are the construction hours? Are we able to start as early as 6:00 am? Please confirm any areas that require off-hour work for each phase.

3a. A 6:00am start time is acceptable. Work in all phases can generally be performed during the day M-F.

However, per the SOW work that generates significant noise, odor, vibration (e.g. core drilling) and any utility shutdowns that are not localized to just the construction area must be performed off-hours to minimize impact to the facility and without cost-increase to the VA.

Are contractors able to provide trailers and/or storage boxes?Â

4a. Not at this time

Will the VA provide laydown/storage areas? If so, where will they be located?Â

5a. There is limited space available on 3rd floor of bed tower. Contractors can also store within the construction zone.

Will the VA provide an area for a dumpster? If so, where will that be located?Â

6a. Space for a dumpster is not available for the full duration of the project. However, during demolition the COR / station will make every effort to free up space in one of the dock areas - however space is very limited and the dumpster location must be coordinated with the COR to prevent interference with deliveries and pick-ups.

Are CAD files available for all of the issued drawings? Or will they be available after award is made?

7a. CAD files will be made available after award.

Reference Specification 010000, Section 1.28 & 29: Please confirm that the photographer must be 3rd party contractor outside of GC s company, or can be performed by GC personnel. It lists Monthly, Weekly, and Regular photographic documentation are we required to have professional photographer provide the monthly? The weekly? And the regular progression photos? There are costs associated with this work, so please clarify specifically.

8a. This spec section is not applicate as this is not a Major construction project.

GC personnel are expected to take photographs for daily logs, inspections, RFI etc. But, professional photography is not required.

Reference Specification 010000, Section 1.31 Is there a cost for the use of VA Tririga CPMS? Will there be training required or provided for use of this system? Are we able to propose a separate project management software option, if GC provides?

9a. This is not a major construction project, therefore the Tririga CPMS requirement is not applicable.

Project Management Software Submittal Exchange to be used - VA will provide the software access (i.e. No cost to the GC / no licensing fee for this software).

Please confirm requirements for required onsite personnel when work is being performed. Refer to specifications 013526 and 014000. Is the GC required to have 1 or 2 onsite personnel full time while work is being performed? We interpret that we are required to have (1) SSHO/Safety onsite when work is being performed. Is the (1) QCM as a separate individual, required onsite while work is being performed? Can the QCM also serve as the site superintendent? This affects project costs. Please confirm.

10a. Please see response to question #1. Duties of the SSHO and QCM can be performed by the same person (e.g. the superintendent) provide that person has the necessary qualifications and experience to manage safety and quality control responsibilities on-site.

Will the VA be providing a 3rd party commissioning agent for this project? If yes, will they have separate documentation required to be completed prior to project being complete?

11a. See response #2 - Yes, VA will provide commissioning agent.

Specification 078400 Firestopping, please confirm that any inspectors of fireproofing are required to be independent 3rd party contractor and ASTM E699 certified.

12a. Yes, contractor to engage a qualified inspector to perform firestop inspections and final reports.

V. general information:

1. Additional Instructions to bidders:

VAAR 852.219-73 was included in this solicitation and references the SBA certification database at https://veterans.certify.sba.gov/. However, the website portal at the foregoing link is now static and is no longer being updated as of August 2024. To be eligible for award, a vendor must be listed as SDVOSB certified in the SBA certification database (under Government Certifications) found at the Dynamic Small Business Search website:  https://dsbs.sba.gov/search/dsp_dsbs.cfm.       Â

******NOTHING FOLLOWS******

Update #3 ·

36C25225B0001 0002

SF30 Continuation Sheet

ACCOMPANYING 36C25225B0001 0002

SPS Renovation Construction Phases 2, 3 & 4

Jesse Brown VA Medical Center, Chicago, IL

I. The following changes are to be made to the solicitation:

1. Provide sign-in sheet from the pre-bid site visit conducted on 2/24/2025.

II. The following changes are made on project specifications:

None.

III. The following changes are made on project drawings:

None.

IV. The following Questions and Answers / Clarifications are the result of bidders request(s) for information:

None.

V. GENERAL INFORMATION:

Reminders:

REQUEST FOR INFORMATION (RFI): Questions due NLT March 3, 2025 at 1:00P.M. Local Time. RFI s received after this date and time may not be answered. All RFI's shall be submitted in writing via email to the Contracting Officer at Stacy.Hoover2@va.gov. Please reference Solicitation # 36C25225B0001.

NO TELEPHONE INQUIRIES WILL BE ACCEPTED. ONLY WRITTEN INQUIRIES WILL BE ACCEPTED.

BID OPENING DATE: March 17, 2025 at 10:00am Local Time.

BID OPENING LOCATION: 115 South 84th Street, Milwaukee, WI 53214

Contractors, please report to Conference Room #205, south entrance.

Any bids received after the date and time specified for receipt of bids will be processed in accordance with FAR 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids (Nov 1999).

Ensure your bid package includes the COMPLETED CERTIFICATION for VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (NOV 2022). (See pages 67 and 68 of the original SF1442 solicitation document for reference)

----NOTHING FOLLOWS---

Update #2 ·

36C25225B0001 0001

SF30 Continuation Sheet

ACCOMPANYING 36C25225B0001 0001

SPS Renovation Construction Phases 2, 3 & 4

Jesse Brown VA Medical Center, Chicago, IL

I. The following changes are to be made to the solicitation:

1. Document provided Requirements for Identification and Replacement of A307 Bolts Memo

2. Questions and Answers / Clarifications are the result of potential bidders request(s) for information received to date.

II. The following changes are made on project specifications:

See attached Requirements for Identification and Replacement of A307 Bolts Memo

III. The following changes are made on project drawings:

None.

IV. The following Questions and Answers / Clarifications are the result of bidders request(s) for information:

It appears this project is set aside under NAICS code 238220 which is plumbing, heating and air conditioning. The project appears to be a general construction project which would typically fall under NAICS 236220. Please let me know if the 238220 code is correct.

1A. NAICS 236220 is correct.

V. GENERAL INFORMATION:

Reminders:

REQUEST FOR INFORMATION (RFI): Questions due NLT March 3, 2025 at 1:00P.M. Local Time. RFI s received after this date and time may not be answered. All RFI's shall be submitted in writing via email to the Contracting Officer at Stacy.Hoover2@va.gov. Please reference Solicitation # 36C25225B0001.

NO TELEPHONE INQUIRIES WILL BE ACCEPTED. ONLY WRITTEN INQUIRIES WILL BE ACCEPTED.

BID OPENING DATE: March 17, 2025 at 10:00am Local Time.

BID OPENING LOCATION: 115 South 84th Street, Milwaukee, WI 53214

Contractors, please report to Conference Room #205, south entrance.

Any bids received after the date and time specified for receipt of bids will be processed in accordance with FAR 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids (Nov 1999).

Ensure your bid package includes the COMPLETED CERTIFICATION for VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (NOV 2022). (See pages 67 and 68 of the original SF1442 solicitation document for reference)

----NOTHING FOLLOWS---

Update #1 ·

36C25225B0001

Project 537-17-115 SPS Construction Phase 2,3, &4

Â

///PAGE INTENTIONALLY LEFT BLANK///

Attachments

Show all 17

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Z2DA--537-17-115: SPS Renovation Phases 2, 3 & 4 Award Award Notice
Z2DA--537-17-115: SPS Construction Phase 2, 3 &4 This notice · Latest solicitation Solicitation
Z2DA--537-17-115: SPS Construction Phase 2, 3 &4 Original Pre-Solicitation