S02 - Exhibit 01b1 537-17-115 PH2 DWGs Bid 20240701.pdf

PDF 7 MB Posted

Attached to
Z2DA--537-17-115: SPS Construction Phase 2, 3 &4 Federal contract opportunity
Solicitation number
36C25225B0001
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12

About this file

This is a set of architectural and engineering demolition drawings for Phase 2 of a Sterile Processing Service (SPS) remodeling project at Jesse Brown VA Medical Center in Chicago, IL. The drawings detail selective demolition work to be performed at 820 S. Damen Avenue, Chicago IL 60612 (VA Project #537-17-115).

The drawings include detailed demolition plans for architectural elements, fire protection systems, plumbing, mechanical systems, and electrical systems. Key demolition work includes removal of existing doors, frames, walls, sinks, medical equipment (Medivators, scope processing equipment), flooring, ceilings, sprinkler heads, ductwork, and electrical devices in the SPS areas on the first floor and mechanical room on the third floor. The plans specify infection control requirements (ICRA) including construction of critical barriers, negative air pressure requirements, and dust control measures. The drawings indicate equipment that must be salvaged and protected for reinstallation, such as the Medivators and scope processing equipment. The project requires coordination between architectural, mechanical, electrical, and plumbing demolition work while maintaining operations in adjacent occupied spaces.

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JESSE BROWN

VA HOSPITAL

W TAYLOR ST

W POLK ST

S D

A M

E N

A V

E

W O

G D

E N

A V

E

1ST FLOOR

AREA

3RD FLOOR

AREA

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

PROJECT SITE MAP PROJECT LOCATION MAP

PROJECT IMAGE

SPS SELECTIVE DEMOLITION

/1

/2

:0

:5

P

M

G-001-2

SPS SELECTIVE DEMOLITION - COVER

1 5MVK

JESSE BROWN VA MEDICAL CENTER

820 S. DAMEN AVE, CHICAGO IL 60612

06/13/2024

ISSUED FOR CONSTRUCTION

537-17-11518-327

REMODEL STERILE PROCESSING SERVICE

JESSE BROWN VA MEDICAL CENTER

820 S. DAMEN AVE, CHICAGO IL 60612

VA PROJECT #: 537-17-115 APOGEE PROJECT #: 18-327

RMC

PHASE 2: SPS SELECTIVE DEMOLITION

DRAWING LIST

GENERAL

G-001-2 SPS SELECTIVE DEMOLITION - COVER 1 5

G-100-2 GENERAL INFORMATION - PHASE 2 2 5

G-101-2 FIRST FLOOR ICRA PLAN - PHASE 2 3 5

G-102-2 ICRA DETAILS - PHASE 2 4 5

LS-100-2 FIRST FLOOR LIFE SAFETY PLAN - PHASE 2 5 5

ARCHITECTURAL

A-001-2 ARCHITECTURAL SYMBOLS, ABBREVIATIONS, AND NOTES 1 4

AD-101-2 FIRST FLOOR DEMOLITION PLANS 2 4

AD-102-2 THIRD FLOOR DEMOLITION PLAN 3 4

AD-111-2 FIRST FLOOR REFLECTED CEILING DEMOLITION PLAN 4 4

FIRE PROTECTION

FS-001-2 FIRE SUPRESSION GENERAL INFORMATION - PHASE 2 1 2

FS-101-2 FIRST FLOOR FIRE SUPRESSION PLANS - PHASE 2 2 2

PLUMBING

P-001-2 PLUMBING GENERAL INFORMATION - PHASE 2 1 2

PD-101-2 FIRST FLOOR PLUMBING DEMOLITION PLAN - PHASE 2 2 2

MECHANICAL

M-001-2 MECHANICAL GENERAL INFORMATION - PHASE 2 1 2

MD-101-2 MECHANICAL DEMOLITION PLANS - PHASE 2 2 2

ELECTRICAL

E-001-2 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS -

PHASE 2

1 2

ED101-2 ELECTRICAL DEMOLITION PLANS - PHASE 2 2 2

NORTH

PLAN

PROJECT LOCATION

24514

LICENSED

ARCHITECT

DocuSign Envelope ID: B0CA22F4-B9A3-463C-9AC8-E13FC488A65D

6/14/2024

INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF

PRECAUTIONS FOR CONSTRUCTION AND RENOVATION

INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF

PRECAUTIONS FOR CONSTRUCTION AND RENOVATION

WALL SECTION

SYMBOL

INTERIOR ELEVATION

SYMBOL

COLUMN GRID

ELEVATION SYMBOL

REVISION NOTE

ENLARGED DETAIL CALLOUT

ROOM DESIGNATION

SYMBOL

BREAK LINE

ROOF SLOPE

DIRECTION SYMBOL

TYPICAL GRAPHIC SCALE

DETAIL #

PAGE #

DETAIL #

PAGE #

TRUE NORTH ARROW

PROJECT NORTH ARROW

A8.1

EXTERIOR ELEVATION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

A8.1

BUILDING SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

DETAIL SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

WALL GRID

(REPRESENTS

FACE OF EXISTING

WALL)

XX.X

XX.X

ELEVATION

0'-0"

ROOM

NAME

101A

NORTH

PLAN

NORTH

TRUE

0 4 8 16

IIILOW Risk Group 1

Class III

Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that

It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation

I

I

III

MEDIUM Risk Group 2

HIGH Risk Group 3

HIGHEST Risk Group 4 V

V

IV

V

IV

III

IV

II

III

Patient Risk Group Table

Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk

TYPE A

Construction Project Type

Major demolition and construction projects Includes, but is not limited to:

• Removal or replacement of building system component(s).

• Removal/installation of drywall partitions.

• Invasive large-scale new building construction.

• Renovation work in two or more rooms.

Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies Includes, but is not limited to:

• Removal of preexisting floor covering, walls, casework or other building components.

• New drywall placement.

• Renovation work in a single room.

• Nonexisting cable pathway or invasive electrical work above ceilings.

• The removal of drywall where a moderate amount of dust and debris is created.

• Dry sanding where a moderate amount of dust and debris is created.

• Work creating significant vibration and/or noise.

• Any activity that cannot be completed in a single work shift.

Small scale, short duration activities which create minimal dust Includes, but is not limited to:

• Work conducted above the ceiling (e.g., prolonged inspection or repair of firewalls and barriers, installation of conduit and/or cabling, and access to mechanical and/or electrical chase spaces).

• Fan shutdown/startup.

• Installation of electrical devices or new flooring that produces minimal dust and debris.

• The removal of drywall where minimal dust and debris is created.

• Controlled sanding activities (e.g., wet or dry sanding) that produce minimal dust and debris.

Inspection and Non-Invasive Activities Includes, but is not limited to:

• Removal of ceiling tile for visual inspection-limited to 1 tile per 50 square feet with limited exposure time.

• Limited building system maintenance (e.g., pneumatic tube station, HVAC system, fire suppression system, electrical and carpentry work to include painting without sanding) that does not create dust or debris.

• Clean plumbing activity limited in nature.

Type of Construction / Project Activity Table

Group 2 Medium Risk

Group 1 Low Risk

• Physical Therapy

• Radiology departments

• All patient waiting rooms

• All outpatient clinics

• Research Areas

• Respiratory Therapy

• Office areas (non-clinical)

• FES/EMS areas

I

Patient Risk Group

TYPE D

TYPE C

TYPE B

TYPE A

Group 4 Highest Risk

Group 3 High Risk

• Emergency Room

• Clinical Laboratories (specimen)

• Same Day Surgery

• Pharmacy

• Nutrition and Food

Service/Canteen

• Procedural Areas (GI)

• Inpatient Mental Health

• Any area caring for immunocompromised patients

• Cardiac Cath Lab/IR

• Central Sterile Supply

• Sterile Processing Service

• Intensive Care Units

IIII

TYPE DTYPE CTYPE B

Class IVor control procedures are necessary.

C

LA

S S

IV

During Construction Project Upon Completion of Project

1. Includes all activities required by Class III

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management

Maintenance and Engineering department before construction begins.

3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.

4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.

5. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).

6. Containment units or environmental containment units (ECUs) approved for Class IV precautions in small areas totally contained by the unit and that has HEPA-filtered exhaust air.

7. Remove or isolate return air diffusers to avoid dust entering the HVAC system.

8. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.

9. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.

10. Maintain negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.

11. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.

12. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is not acceptable.

13. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.

14. Contain all trash and debris in the work area.

15. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.

16. Worker clothing must be clean and free of visible dust before leaving the work area.

HEPA vacuuming of clothing or use of cover suites is acceptable.

17. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be immediately changed.

18. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.

19. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.

• Medical/Surgical Units

• Negative pressure isolation rooms

• Outpatient Chemotherapy

Areas

• Operating rooms

• Post Anesthesia Care Unit

• Dialysis

• Dental

C

LA

S S

V

1. Includes all activities required by Class IV

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management

Maintenance and Engineering department before construction begins.

3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.

4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.

5. Seal all penetrations in containment barriers, anteroom barriers, including floors and ceiling using approved materials (UL schedule firestop if applicable for barrier type).

6. Construct anteroom large enough for equipment staging, cart cleaning, workers. The anteroom must be constructed adjacent to entrance of construction work area.

7. Personnel will be required to wear coveralls at all times during Class V work activities.

Coveralls must be removed before leaving the anteroom.

8. Remove or isolate return air diffusers to avoid dust entering the HVAC system.

9. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.

10. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.

11. Maintain negative pressurization of the entire workspace using HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.

12. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.

13. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (bathroom exhaust) is not acceptable.

14. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.

15. Contain all trash and debris in the work area.

16. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.

17. Worker clothing must be clean and free of visible dust before leaving the work area anteroom.

18. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area).

Damaged shoe covers must be immediately changed.

19. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.

20. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.

Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.

Work Area Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

Removal of Critical Barriers:

1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.

2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:

1. Carefully remove screws and painter tape.

2. If dust will be generated during screw removal, use hand-held HEPA vacuum.

3. Drywall cutting is prohibited during removal process.

4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.

5. Use a plastic barrier to enclose area if dust could be generated.

Negative Air Requirements:

1. The use of negative air must be designed to remove contaminates from the work area.

2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.

HVAC systems:

1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.

2. Verify that HVAC systems are clean and operational.

3. Verify the HVAC systems meets original airflow and air exchange design specifications.

It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation

During Construction Project

C

LA

S S

I

Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

HVAC Systems:

1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.

2. Verify the HVAC systems meet original airflow and air exchange design specifications.

Upon Completion of Project

1. Execute work by methods to minimize raising dust from construction operations.

2. Perform noninvasive work activity as to not block or interrupt patient care.

3. Perform noninvasive work activities in areas that are not directly occupied with patients.

4. Perform noninvasive work activity in a manner that does not create dust.

5. Immediately replace any displaced ceiling tile before leaving the area and/or at end of noninvasive work activity.

C

LA

S S

II

Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

HVAC Systems:

1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.

2. Verify the HVAC systems meet original airflow and air exchange design specifications.

1. Includes all activities required by Class I

2. Perform only limited dust work and/or activities designed for basic facilities and engineering work.

3. Perform limited dust and invasive work following standing precautions procedures approved by the organization.

4. This Class of Precautions must never be used for construction or renovation activities.

5. Provide active means to prevent airborne dust from dispersing into atmosphere.

6. Water mist work surfaces to control dust while cutting.

7. Seal unused doors with duct tape.

8. Block off and seal air vents.

9. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.

10. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.

Work Area Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

Removal of Critical Barriers:

1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.

2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:

1. Carefully remove screws and painter tape.

2. If dust will be generated during screw removal, use hand-held HEPA vacuum.

3. Drywall cutting is prohibited during removal process.

4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.

5. Use a plastic barrier to enclose area if dust could be generated.

Negative Air Requirements:

1. The use of negative air must be designed to remove contaminates from the work area.

2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.

HVAC systems:

1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.

2. Verify that HVAC systems are clean and operational.

3. Verify the HVAC systems meets original airflow and air exchange design specifications.

CONSTRUCTION ACTIVITIES SHALL BE CLASSIFIED AS FOLLOWS UNLESS NOTED OTHERWISE:

1. INSTALLATION OF CABLE TRAY IN CORRIDOR CEILINGS SHALL BE CONSIDERED CONSTRUCITON ACTIVITY TYPE B.

2. ALL CONDUIT SPECIFIED TO BE INSTALLED IN WALL SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE C.

3. CONSTRUCTION OF NEW ROOMS SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE D.

4. INSTALLATION OF NEW DOORS TO OR FROM EXISTING SPACES SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE C.

C

LA

S S

II

I

1. Includes all activities required by Class II

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities

Management Maintenance and Engineering department before construction begins.

3. Provide active means to prevent airborne dust dispersion into the occupied areas.

4. Means for controlling minimal dust dispersion may include hand-held HEPA vacuum devices, polyethylene plastic containment, or isolation of work area by closing room door.

5. Remove or isolate return air diffusers to avoid dust from entering the HVAC system.

6. Remove or isolate the supply air diffusers to avoid positive pressurization of the space,

7. If work area is contained, then it must be neutrally to negatively pressurized at all times.

8. Seal all doors with tape that will not leave residue.

9. Contain all trash and debris in the work area.

10. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.

11. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.

12. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces.

13. Clean construction area at the end of each shift by damp mopping or HEPA Vacuum.

For Type C activities, follow procedures for Class IV.

Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

HVAC Systems:

1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.

2. Verify the HVAC systems meet original airflow and air exchange design specifications.

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

SPS SELECTIVE DEMOLITION

/1

/2

:4

:2

P

M

G-100-2

GENERAL INFORMATION - PHASE 2

2 5MVK

JESSE BROWN VA MEDICAL CENTER

820 S. DAMEN AVE, CHICAGO IL 60612

06/13/2024

ISSUED FOR CONSTRUCTION

537-17-11518-327

RMC

GENERAL SYMBOL LEGEND

NFPA 10, STANDARD FOR PORTABLE FIRE EXTINGUISHERS, 2018

NFPA 13, INSTALLATION OF SPRINKLER SYSTEMS, 2016

NFPA 70, NATIONAL ELECTRICAL CODE (NEC), 2023

NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE, 2022

NFPA 80, STANDARD FOR FIRE DOORS AND OTHER OPENING PROTECTIVES, 2019

NFPA 90A: STANDARD FOR THE INSTALLATION OF AIR CONDITIONING & VENTILATING SYSTEMS, 2018

NFPA 99, HEALTH CARE FACILITIES CODE, 2018

NFPA 101, LIFE SAFETY CODE, 2018

PG 18-13: VA BARRIER FREE DESIGN STANDARD, 2024

PG 18-12: 285: STERILE PROCESSING SERVICE, 2022

ASHRAE 90.1, 2022

ASHRAE 170, VENTILATION OF HEALTH CARE FACILITIES, 2021

DEPARTMENT OF VETERANS AFFAIRS: FIRE PROTECTION DESIGN MANUAL, 2023

DEPARTMENT OF VETERANS AFFAIRS: PLUMBING DESIGN MANUAL, 2024

DEPARTMENT OF VETERANS AFFAIRS: HVAC DESIGN MANUAL, 2024

DEPARTMENT OF VETERANS AFFAIRS: ELECTRICAL DESIGN MANUAL, 2019

DEPARTMENT OF VETERANS AFFAIRS: LIGHTING DESIGN MANUAL, 2021

DEPARTMENT OF VETERANS AFFAIRS: TELECOMMUNICATIONS DESIGN MANUAL, 2016

APPLICABLE CODES AND STANDARDS

Scale: 12" = 1'-0"

ICRA RISK ASSESSMENT

OVERALL PHASE SUMMARY

PHASE 1: INSTALLATION OF TEMPORARY SPS MOBILE TRAILER AND ACCESS CORRIDOR (NOT IN CONTRACT, ALREADY COMPLETED).

PHASE 2: INTERIOR DEMOLITION WITHIN SPS AREA (FIRST FLOOR) AND MECHANICAL ROOM (THIRD FLOOR).

PHASE 3: NEW CONSTRUCTION WITHIN SPS AREA (FIRST FLOOR) AND MECHANICAL ROOM (THIRD FLOOR).

PHASE 4: INTERIOR DEMOLITION AND NEW WORK AT EXISTING SCOPE PROCESSING AND STORAGE AREA (FIFTH FLOOR).

THIS PHASE ALSO INCLUDES THE DEMOLITION OF THE TEMPORARY SPS TRAILER ACCESS CORRIDOR THAT WAS CONSTRUCTED IN PHASE 1.

DocuSign Envelope ID: 5C2FFA19-F1BC-408D-8005-D330D0E23A4A

6/13/2024

UP

S SS

ETO

SERVICE

ETO

ROOM

1639A

STAFF

OFFICE

OFFICE

1642A

CHIEF

OFFICE

SPS

PREPARATION

STAFF

TOILET

1645A

STAFF

LOCKERS

STAFF

LOCKERS

STAFF

TOILET

1643A

CLEAN

RECEIVING

BREAK-OUT

STERILE

SUPPLY

STOR. &

DIST.

ELEV

LOBBY

CART

STAGING

AREA

ELECT.

ROOM

16E3

ELEVATOR

MACHINE

ROOM

STAIR 11

ELEV

P25

CORRIDOR

SOILED

RECEIVING

DECONTAM

STAFF

TOILET

1627A

STAFF

LOCKERS

- FEMALE

16H5

STAFF

LOCKERS

- MALE

STAFF

TOILET

SCOPE

DECONTAM

STAFF

PPE

EXISTING

ROOM

FD

FD

ANTE

ROOM

9'-0"

CONSTRUCTION

ENTRANCE #1

ANTE

ROOM

CONSTRUCTION

ENTRANCE #2

CONSTRUCTION

ENTRANCE #3

ANTE

ROOM

B

C

C.5

D

D.9

E

E.5

F

G

18X13X12X11X10 X14

ELEV

LOBBY

OFFICE

STORAGE

2 HOUR FIRE SEPARATION

1 HOUR FIRE SEPARATION

SMOKE RATED

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

SPS SELECTIVE DEMOLITION

/1

/2

:4

:2

P

M

G-101-2

FIRST FLOOR ICRA PLAN - PHASE 2

3 5MVK

JESSE BROWN VA MEDICAL CENTER

820 S. DAMEN AVE, CHICAGO IL 60612

06/13/2024

ISSUED FOR CONSTRUCTION

537-17-11518-327

RMC

Scale: 1/8" = 1'-0"

FIRST FLOOR ICRA PLAN 0 4 8 16

NORTH

PLAN

N

KEY PLAN

SCALE: NO SCALE

TEMPORARY MODULAR CONTAINMENT WALL

SYSTEM (ICRA/DUST BARRIER AND LIFE

SAFETY BARRIER). BASIS OF DESIGN: EDGE-

GUARD PANELS OR STARC REALWALL. SEE

DETAIL ON SHEET G-102-2.

MAGNETIC, HANDS-FREE, SELF-CLOSING

PLASTIC DOOR IN CONTAINMENT WALL.

BASIS OF DESIGN: ZIPWALL MAGNETIC

DOOR.

HEPA FILTERATION/NEGATIVE AIR MACHINE.

BASIS OF DESIGN: HEPACART OMNIAIRE

NEGATIVE AIR MACHINE.

TEMPORARY CONTAINMENT WALL SYSTEM:

ICRA/DUST BARRIER PLASTIC SHEETS,

CONTINUOUS FROM FLOOR TO CEILING, WITH

SEALED JOINTS AT PERIMETER. BASIS OF

DESIGN: ZIPWALL DUST BARRIER SYSTEM.

TEMPORARILY SECURE DOOR DURING

CONSTRUCTION AND SEAL WITH PLASTIC

SHEET DUST BARRIER, TAPED AT PERIMETER.

STICKY MAT ON FLOOR. 06

WALL RATING LEGEND

A. SEE SHEET G-102-2 FOR INFECTION CONTROL NOTES.

B. ANY EXISTING EXIT SIGNS OR FIRE EXTINGUISHERS

THAT ARE MODIFIED DURING THE CONSTRUCTION

NEED TO BE RELOCATED AS REQUIRED BY CURRENT

CODES.

OUTSIDE OF BUILDING

MONTHLY CHANGED HEPA

FILTER

HEPA NEGATIVE

AIR UNIT

WEEKLY CHANGED (OR MORE AS

NEEDED) PRE FILTER

FIRE RATED PLYWOOD

F L E

X D

U C

T

ISOLATE AND COVER ALL SUPPLY

DIFFUSERS NOT IN OPERATION

DURING PROJECT - COORDINATE

WITH COR

TAPE ALL SERVICES

TO PROTECT AGAINST

CONTAMINATION

A

O

V

FIRE EXTINGUISHER ON PORTABLE

FLOOR BRACKET (ILSM MAY REQUIRE

MORE THAN ONE)

SUSPENDED PLASTIC ZIPPER

WALL CURTAIN BARRIER

INDICATOR SHALL BE AT -0.01 OR

GREATER (VERIFY DAILY). IF NOT

VERIFY ALL OPENINGS SUCH AS DOOR

ARE CLOSED AND/OR CHANGE OUT

NEGATIVE AIR PRE-FILTER

PROVIDE STICKY MATS

(CHANGED END OF SHIFT

OR MORE IF NECESSARY

TO MAINTAIN CLEANLINESS)

POST ICRA ILSM FIRE

INSPECTION SHEETS

VISIBLE TO PUBLIC

COVER ALL RETURNS AT THE

GRATE/DIFFUSERS

OPTIONAL EXHAUST DUCTS

(COVER THE GRATES AND THE DIFFUSERS)

A

E

A

DOOR OPENING

VENT TO OUTSIDE

ROUTE TO BE

APPROVED BY OWNER

HEATED DETECTOR CUT-OFF

BASIS OF DESIGN: HEPA

NEGATIVE AIR UNIT INTEGRAL

WITH EDGEGUARD BARRIER

SYSTEM.

FIRE RATED PLYWOOD (TEMP.

REMOVE GLASS PANEL)

EXISTING WINDOW FRAME

ICRA BARRIER ICRA BARRIER

ADJUSTS FROM

7'-8" TO 10'-0" A.F.F

EXISTING CEILING

EXISTING CONCRETE SLAB FLOORING

FINISHED FLOORING TO BE

KEPT CLEAN. FLOORS NOT

BEING REPLACED MUST BE

PROTECTED. COVER WITH

ROSIN PAPER/ FIRE RATED

PLYWOOD.

PROJECT:

PRIME CONTRACTOR:

SUB CONTRACTOR:

EMERGENCY CONTACT NO.:

BARRIER INSTALLATION DATE:

BARRIER EXPIRATION DATE:

ILSM TEMPORARY BARRIER TAG

ICRA, ILSM, FIRE WATCH AND

MISC. FORMS

PAPER

CADDY

1'-5"

ILSM SIGNAGE

• THIS EXIT IS CLOSED AND LEADS TO A

CONSTRUCTION AREA

• PLEASE USE ALTERNATE EXITS AS MARKED

INTERIM LIFE SAFETY MEASURES IN EFFECT FOR THE

STERILE PROCESSING SUITE REMODEL PROJECT

TEMPORARY ICRA/DUST/LIFE SAFETY BARRIER

EXISTING

STRUCTURAL DECK

ABOVE

EXISTING CEILING

MODULAR PANELS

SEE PLAN

BASIS OF DESIGN PRODUCTS:

EDGE-GUARD PANELS

STARC REALWALL.

TEMPORARY CONTAINMENT WALL SYSTEM: ICRA/DUST

BARRIER PLASTIC SHEETS, CONTINUOUS FROM FLOOR TO

CEILING, WITH SEALED JOINTS AT PERIMETER.

BASIS OF DESIGN: ZIPWALL DUST BARRIER SYSTEM.

TEMPORARY ICRA/DUST/BARRIER - PLASTIC SHEET

EXISTING

STRUCTURAL DECK

ABOVE

EXISTING CEILING

PLASTIC SHEET

BARRIER

SEE PLAN

A. THE CONTRACTOR SHALL NOT HAUL DEBRIS

THROUGH PATIENT-CARE AREAS WITHOUT PRIOR

APPROVAL OF THE COR AND THE MEDICAL CENTER.

B. ACTIVITY HAZARD RISK CLASSIFICATIONS OF CLASS

I OR CLASS II SHALL REQUIRE APPROVAL BY THE

FACILITY SAFETY MANAGER AND CONTRACTING

OFFICER REPRESENTATIVE BEFORE BEGINNING

ANY CONSTRUCTION WORK. HAZARD RISK

CLASSIFICATIONS OF CLASS III OR IV SHALL

REQUIRE A PERMIT BEFORE BEGINNING ANY

CONSTRUCTION WORK. INFECTION CONTROL

PERMITS WILL BE ISSUED BY THE FACILITY SAFETY

MANAGER AND CONTRACTING OFFICER

REPRESENTATIVE.

C. INFECTION CONTROL PERMITS SHALL BE POSTED

OUTSIDE THE APPROPRIATE CONSTRUCTION AREA.

MORE THAN ONE PERMIT MAY BE ISSUED, AS WORK

IS LOCATED IN MULTIPLE AREAS.

D. THE REQUIRED INFECTION CONTROL PRECAUTIONS

ARE AS FOLLOWS:

CLASS 1:

• NOTIFY THE COR.

• EXECUTE WORK USING METHODS TO MINIMIZE

RAISING DUST FROM CONSTRUCTION OPERATIONS.

• CEILING TILES: IMMEDIATELY REPLACE ANY CEILING

TILES DISPLACED FOR VISUAL INSPECTION.

• UPON COMPLETION: CLEAN WORK AREA, AND

NOTIFY COR.

CLASS 2:

• NOTIFY THE COR.

• PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE

DUST FROM DISPERSING INTO ATMOSPHERE SUCH

AS WET METHODS OR TOOL MOUNTED DUST

COLLECTORS.

• WATER MIST WORK SURFACES TO CONTROL DUST

WHILE CUTTING.

• SEAL UNUSED DOORS WITH PAINTERS TAPE.

• BLOCK OFF AND SEAL AIR VENTS.

• REMOVE OR ISOLATE HVAC SYSTEM IN AREAS

WHERE WORK IS BEING PERFORMED.

• UPON COMPLETION: WIPE WORK SURFACES WITH

CLEANER/ DISINFECTANT. CONTAIN CONSTRUCTION

WASTE BEFORE TRANSPORT IN TIGHTLY COVERED

CONTAINERS.

CLASS 3:

DURING CONSTRUCTION WORK:

• OBTAIN PERMIT FROM THE COR.

• REMOVE OR ISOLATE HVAC SYSTEM IN AREA

WHERE WORK IS BEING DONE TO PREVENT

CONTAMINATION OF DUCT SYSTEM.

• COMPLETE ALL CRITICAL BARRIERS TO SEAL AREA

FROM NON-WORK AREA OR IMPLEMENT CONTROL

CUBE METHOD (CART WITH PLASTIC COVERING AND

SEALED CONNECTION TO WORK SITE WITH HEPA

VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE

CONSTRUCTION BEGINS. INSTALL CONSTRUCTION

BARRIERS AND CEILING PROTECTION CAREFULLY,

OUTSIDE OF NORMAL WORK HOURS.

• MAINTAIN NEGATIVE AIR PRESSURE, 0.01 INCHES OF

WATER GAUGE, WITHIN WORK SITE UTILIZING HEPA

EQUIPPED AIR FILTRATION UNITS AND

CONTINUOUSLY MONITORED WITH A DIGITAL

DISPLAY, RECORDING AND ALARM INSTRUMENT,

WHICH MUST BE CALIBRATED ON INSTALLATION,

MAINTAINED WITH PERIODIC CALIBRATION AND

MONITORED BY THE CONTRACTOR.

• CONTAIN CONSTRUCTION WASTE BEFORE

TRANSPORT IN TIGHTLY COVERED CONTAINERS.

• COVER TRANSPORT RECEPTACLES OR CARTS.

TAPE COVERING UNLESS SOLID LID.

UPON COMPLETION:

• DO NOT REMOVE BARRIERS FROM WORK AREA

UNTIL COMPLETED PROJECT THOROUGHLY

CLEANED, AND IS INSPECTED BY THE CONTRACTING

OFFICER REPRESENTATIVE AND BY THE VA

ENVIRONMENTAL SERVICES DEPARTMENT.

• REMOVE CONSTRUCTION BARRIERS AND CEILING

PROTECTION CAREFULLY TO MINIMIZE SPREADING

OF DIRT AND DEBRIS ASSOCIATED WITH

CONSTRUCTION, OUTSIDE OF NORMAL WORK

HOURS.

• VACUUM WORK AREA WITH HEPA FILTERED

VACUUMS.

• WET MOP AREA WITH CLEANER/DISINFECTANT.

• UPON COMPLETION, RESTORE HVAC SYSTEM

WHERE WORK WAS PERFORMED.

• RETURN PERMIT TO THE COR.

CLASS 4:

DURING CONSTRUCTION WORK:

• OBTAIN PERMIT FROM THE COR.

• ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS

BEING DONE TO PREVENT CONTAMINATION OF

DUCT SYSTEM.

• COMPLETE ALL CRITICAL BARRIERS TO SEAL AREA

FROM NON-WORK AREA OR IMPLEMENT CONTROL

CUBE METHOD (CART WITH PLASTIC COVERING AND

SEALED CONNECTION TO WORK SITE WITH HEPA

VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE

CONSTRUCTION BEGINS. INSTALL CONSTRUCTION

BARRIERS AND CEILING PROTECTION CAREFULLY,

OUTSIDE OF NORMAL WORK HOURS.

• MAINTAIN NEGATIVE AIR PRESSURE, 0.01 INCHES OF

WATER GAUGE, WITHIN WORK SITE UTILIZING HEPA

EQUIPPED AIR FILTRATION UNITS AND

CONTINUOUSLY MONITORED WITH A DIGITAL

DISPLAY, RECORDING AND ALARM INSTRUMENT,

WHICH MUST BE CALIBRATED ON INSTALLATION,

MAINTAINED WITH PERIODIC CALIBRATION AND

MONITORED BY THE CONTRACTOR.

• SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES.

• CONSTRUCT ANTEROOM AND REQUIRE ALL

PERSONNEL TO PASS THROUGH THIS ROOM SO

THEY CAN BE VACUUMED USING A HEPA VACUUM

CLEANER BEFORE LEAVING WORK SITE OR THEY

CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE

REMOVED EACH TIME THEY LEAVE WORK SITE.

• ALL PERSONNEL ENTERING WORK SITE ARE

REQUIRED TO WEAR SHOE COVERS. SHOE COVERS

MUST BE CHANGED EACH TIME THE WORKER EXITS

THE WORK AREA.

UPON COMPLETION:

• DO NOT REMOVE BARRIERS FROM WORK AREA

UNTIL COMPLETED PROJECT THOROUGHLY

CLEANED, AND IS INSPECTED BY THE CONTRACTING

OFFICER REPRESENTATIVE AND BY THE VA

ENVIRONMENTAL SERVICES DEPARTMENT.

• REMOVE CONSTRUCTION BARRIERS AND CEILING

PROTECTION CAREFULLY TO MINIMIZE SPREADING

OF DIRT AND DEBRIS ASSOCIATED WITH

CONSTRUCTION, OUTSIDE OF NORMAL WORK

HOURS.

• CONTAIN CONSTRUCTION WASTE BEFORE

TRANSPORT IN TIGHTLY COVERED CONTAINERS.

• COVER TRANSPORT RECEPTACLES OR CARTS.

TAPE COVERING UNLESS SOLID LID.

• VACUUM WORK AREA WITH HEPA FILTERED

VACUUMS.

• WET MOP AREA WITH CLEANER/DISINFECTANT.

• UPON COMPLETION, RESTORE HVAC SYSTEM

WHERE WORK WAS PERFORMED.

• RETURN PERMIT TO THE COR.

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

SPS SELECTIVE DEMOLITION

/1

/2

:4

:2

P

M

G-102-2

ICRA DETAILS - PHASE 2

4 5MVK

JESSE BROWN VA MEDICAL CENTER

820 S. DAMEN AVE, CHICAGO IL 60612

06/13/2024

ISSUED FOR CONSTRUCTION

537-17-11518-327

RMC

Scale: 1/2" = 1'-0"

ICRA TYPICAL CONSTRUCTION PLAN LAYOUT_2

Scale: 1/2" = 1'-0"

CROSS SECTION A_2

Scale: 12" = 1'-0"

ILSM TEMPORARY BARRIER TAG_2

Scale: 6" = 1'-0"

ILSM SIGNAGE_2

Scale: 3/4" = 1'-0"

TEMP DUST AND INFECTION CONTROL BARRIER TYPES_2

E

13.1

C.5

12.111.1 14.1 16

B

C

C1

D

A

F

G

D

C

B

A.5

A

D.9

X

E.5

DN

UP

U P

UP

46.597°

T O

G R

ID

D

EXIST

ROOM

EXIST

ROOM

EXIST

ROOM

EXIST

ROOM

EXIST

ROOM

EXIST

ROOM EXIST

ROOM

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

WP 1

WP 2

WP 4

WP 3

WP 5

1R-121

1R-122 1R-123

1R-124 1R-125

1R-126 1R-127

1R-112

1R-111

1R-101

1R-102

1 _ 4

'-4

'-4

'-8

'-4

'-0

116' -6"

30'-6"

28'-8"

28'-8"

28'-8"

26'-5 3_ 8 "

26'-5 3_ 8 "

26'-5 3_

1 _ 4

'-3

R96'-6 3__

R138'-2 7__

21.344°

'-6

'-0

T O

G R

ID

D

.0

18.1°

9'-0"29'-6 5__

28'-8" 28'-7

3__

" 28'-7 3__

" 30'-11

1_

" 29'-6 5__

4.0°

28'-8"

28'-8"

28'-8"

28'-8"

31'-0"

L

L

L

L

L

L

L

L

S

S S

S

S

S

S

S

S

S

S

S

S

S

S S

S

L

L

L

L

L

L

L

L

L

L

L

L

L

L

S

S

S

FRS

FRS

S

L

CONNECTING

CORRIDOR

INFORMATION

DESK

TRANSPORT

WAITING

SEATING

GAS

CYLINDER

STORAGE

HAC

FIRE

COMMAND

CENTER

CART

WASH

CONNECTOR

REGIST.

SURG. RECEPT.

CLEAN

SUPPLY

HAC

HAC

HAC

ELECT.

ROOM

ELECT.

ROOM

ELECT.

ROOM

ELEVATOR

MACHINE

ROOM

SOILED

RECEIVING/

DECONTAM

STAFF

TOILET

STAFF

LOCKERS

STAFF

LOUNGE

STAFF

TOILET

STAFF

LOCKERS

PREPARATION

CART

STAGING

AREA

STERILE

SUPPLY

STOR.&DIST.

STAFF

LOUNGE

STAFF

TOILET

STAFF

TOILET

CLEAN

RECEIVING

BREAK-OUT

STAFF

LOCKERS

STAFF

LOCKERS

SPD

CHIEF

OFFICE

SPD

STAFF

OFFICE

BLESSED

SACRAMENT

SACRISTY

CHAPEL

VESTIBULE

ESCORT

WAITING

ROOM

CHAPLAIN

CONF.

ROOM

CHAPLAIN

OFFICE

CORRIDOR

PUBLIC

TOILETS

PUBLIC

TOILETS

PATIENT

CLOTHING

ROOM

DRESSING

VESTIBULE

LINEN

CHUTE

ROOM

COMM.

ROOM

SHOWER

TOILETS

SHOWER

TOILETS

VESTIBULEVESTIBULE

STAFF

LOCKERS

STAFF

LOCKERS

INTERVIEW

CONSULTATION

ROOM

CONSULTATION

ROOM

SURGERY

FAMILY

WAITING

ELEV.

MACHINE

ROOM

MINOR

PROCEDURES

VESTIBULE

CLEAN

SUPPLY

OFFICE

NOURISHMENT

STATION

PAT

TOILET

CONF

ROOM

SOILED

UTILITY

NURSE

STATION

STAFF

TOILET

STAFF

LOUNGE

LOBBY

VESTIBULE

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

ELEV

LOBBY

CORRIDOR

CORRIDOR

ELEV

LOBBY

ELEV

LOBBY

CORRIDOR

ELEV

ELEV

ELEV

ELEVELEV

ELEVELEVELEV

ELEV

ELEV

ETO

ROOM

HAC

PAT

CLOTHING

CLOSET

TELEPHONE

ALCOVE

CLEAN

LINEN

SECURED

ITEMS

VENDING

MACHINES

HOLDING

ROOM

HOLDING

ROOM

HOLDING

ROOM

HOLDING

ROOM

HOLDING

ROOM

HOLDING

ROOM

HOLDING

ROOM

HOLDING

ROOM

HOLDING

ROOM

HOLDING

ROOM

HOLDING

ROOM

HOLDING

ROOM

HOLDING

ROOM

HOLDING

ROOM

MINOR

PROCEDURE

EQUIPMENT

STORAGE

STORAGE

CLOSET

WARD

EQUIPMENT

STORAGE

EXISTING

ROOM

EXISTING

ROOM

EXISTING

ROOM

EXISTING

ROOM

EXISTING

ROOM

EXISTING

ROOM

CORRIDOR

ALCOVE

MANUAL

EQUIPMENT

WASH

PAT

TOILET

PAT

TOILET

RECYCLING

EMS

FIRE

PUMP

ROOM

MECH

PUMP

ROOM

MED

ROOM

VEST

VEST

VEST

WHEELCHAIR

WASH

EQUIPMENT

STORAGE

STAIR 8

STAIR 10

STAIR 9

EGRESS

VEST.

ETO

SERVICE

C1-010

C1-014A

C1-015A

C1-016A

1B-105

1B-106A

1D-108A

1C-107C

C1-014

1A-139

1A-123

1A-100

1C-104C

1C-107B

1A-112A

1B-108

1C-108A 1C-108

1C-107A 1C-106A

1C-106

1C-105B

1C-105A

1C-105

1C-104B

1C-104A

1C-104

1C-101B

1C-102A

1C-101A

1C-103 1C-102

1C-101

1C-100A1C-100

1D-109D

1D-109C

1D-109B

1D-109

1D-108

1D-106

1D-105

C1-018

1D-102

1D-101

1B-104

1B-103A

1B-103 1B-101

1B-100

1A-103C

1A-103B

1A-102C

1A-102B

1A-102A1A-103A

1A-103

1A-102

1A-140

1A-137

1A-136

1A-135

1A-134

1A-130

1A-128

1A-127

1A-126

1A-122

1A-120

1A-118

1A-112

1A-107

1A-101A

1A-101

C1-016

C1-015

C1-013

C1-012

C1-011

C1-009

C1-008

C1-007

C1-006

C1-004

C1-003

C1-001

C1-002

S-7

S-6

P-3 P-2P-1

S-3S-2S-1

S-5

S-4

1C-104D

1D-100A

C1-006A

1D-100

1A-132

1C-104E

1D-104

1A-105

1A-106

1A-108

1A-109

1A-113

1A-111

1A-115

1A-117

1A-119

1A-121

1A-124

1A-116

1A-114

1A-110

1A-129

1A-133

C1-006B

1R-105

1R-103 1R-104

1R-106

1R-107

1R-108

1R-109

1R-110

C1-006C

1C-107D

1A-131 1A-104

1B-102

1B-106

1D-110

1D-111

1A-125

1A-138

1A-103D

1A-102D

1D-107

1D-109A

ST-8

ST-10

ST-9

C1-005

1C-101C

UP

UP

S SS

BUILDING 40

BUILDING 1

2 HOUR FIRE

BARRIER

BETWEEN

BUILDINGS

AREA OF WORK

X15

X16

2 HOUR FIRE SEPARATION

1 HOUR FIRE SEPARATION

SMOKE RATED

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

SPS SELECTIVE DEMOLITION

/1

/2

:4

:3

P

M

LS-100-2

FIRST FLOOR LIFE SAFETY PLAN -

PHASE 2

5 5MVK

JESSE BROWN VA MEDICAL CENTER

820 S. DAMEN AVE, CHICAGO IL 60612

06/13/2024

ISSUED FOR CONSTRUCTION

537-17-11518-327

RMC

Scale: 1" = 20'-0"

FIRST FLOOR LIFE SAFETY PLAN 0 4 8 16

NORTH

PLAN

WALL RATING LEGEND

A. SEE SHEET A-001-2 FOR GENERAL NOTES.

EXISTING BUILDING 40:

NFPA 101 OCCUPANCY CLASSIFICATION:

AMBULATORY HEALTH CARE

EXISTING BUILDING 1:

NFPA 101 OCCUPANCY CLASSIFICATION:

AMBULATORY HEALTH CARE

CODE OVERVIEW

DEMOLITION KEYNOTE#

APPROX APPROXIMATE(LY)

BLDG BUILDING

BLKG BLOCKING

CLG CEILING

CLR CLEAR

COL COLUMN

CONC CONCRETE

CONT CONTINUOUS

DEMO DEMOLITION

DET/DTL DETAIL

DIM DIMENSION

DWG(S) DRAWING(S)

ELEC ELECTRIC(AL)

ELEV ELEVATOR

EQUIP EQUIPMENT

EXIST EXISTING

FV FIELD VERIFY

FIN FINISH

FLR FLOOR

GC GENERAL CONTRACTOR

HAC HOUSEKEEPING CLOSET

MECH MECHANICAL

MIN MINIMUM

MISC MISCELLANEOUS

N NORTH

NIC NOT IN CONTRACT

NTS NOT TO SCALE

NOM NOMINAL

OC ON CENTER

REQ'D REQUIRED

REV REVISED (REVISION)

RM ROOM

SF SQUARE FEET

SIM SIMILAR

SPEC SPECIFICATIONS

TYP TYPICAL

GENERAL NOTES

1. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF THE DESIGNER AS TO THE LIMITATIONS OF THE WORK AREA IN AN OCCUPIED AREA. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY AGREEMENT BETWEEN THE COR AND

CONTRACTOR BEFORE THE START OF THE WORK.

2. DRAWINGS ARE PREPARED USING DIMENSIONS FOR SPECIFIC PRODUCTS AND EQUIPMENT. IF THE PRODUCTS OR EQUIPMENT CHANGE BEFORE CONSTRUCTION, ACTUAL INSTALLATION DETAILS AND DIMENSIONS MAY DIFFER FROM THOSE SHOWN. CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE INCORPORATED IN THE WORK (INCLUDING THICKNESS FOR RECESSED OR SEMI-RECESSED

PRODUCTS) AND IS RESPONSIBLE FOR ACCOMMODATING AND COORDINATING CHANGES TO OTHER

MATERIALS OR PRODUCTS THAT ARE NECESSARY BECAUSE OF THESE DIFFERENCES.

3. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS USED ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS, OR OF THE DRAWINGS AND SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO BE CONSTRUCTED AS A COMPLETE, INTEGRATED AND UNIFIED WHOLE.

4. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE COR PRIOR TO BIDDING. WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR INTENT CANNOT BE REASONABLY INFERRED, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR GREATER

QUANTITY OF WORK.

5. USE OF THE WORD "VERIFY" POINTS OUT A SITUATION WHICH MUST BE CONFIRMED PRIOR TO PROCEEDING WITH THE WORK, FABRICATION OF EQUIPMENT, OR ORDERING MATERIAL. NOTIFY THE COR OF ANY

DISCREPANCY DISCOVERED.

6. THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY SHOULD DISCREPANCIES BE FOUND IN THE

DRAWINGS AND SPECIFICATIONS.

7. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS AND DIMENSIONS AS THEY RELATE TO THIS PROJECT. SHOULD DISCREPANCIES EXIST BETWEEN THE WORK INDICATED AND ACTUAL FIELD

CONDITIONS NOTIFY THE COR PRIOR TO PROCEEDING WITH THE WORK.

8. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL OR DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL

GOVERN.

9. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION.

10. THE CONTRACTOR AND SUBCONTRACTORS INVOLVED IN THIS PROJECT SHALL BE RESPONSIBLE FOR DESIGNING AND INSTALLING THEIR RESPECTIVE WORK AND SYSTEMS TO MEET ALL APPLICABLE FEDERAL, STATE, AND LOCAL CODES, LAWS, SAFETY REGULATIONS, HAZARDOUS WASTE LAWS, ETC. THE CONTRACTOR

SHALL FURNISH ALL NECESSARY PERMITS.

11. THE CONTRACTOR SHALL REVIEW THE DRAWINGS AND UNDERSTAND THE SCOPE OF THE DRAWINGS TO BE THE FOLLOWING: THESE CONSTRUCTION DOCUMENTS (DRAWINGS, SPECIFICATIONS, ADDENDA, ETC.)

INDICATE THE GENERAL SCOPE OF THE PROJECT IN TERMS OF ARCHITECTURAL DESIGN CONCEPTS, THE DIMENSIONS OF THE BUILDING, THE MAJOR ARCHITECTURAL ELEMENTS, AND THE MAJOR STRUCTURAL, MECHANICAL, ELECTRICAL, AND DATA SYSTEMS. THE DOCUMENTS DO NOT AND ARE NOT INTENDED TO INDICATE OR DESCRIBE IN DETAIL ALL THE NECESSARY WORK REQUIRED FOR FULL PERFORMANCE OF, AND COMPLETION OF THE REQUIREMENTS OF THE CONTRACT. ON THE BASIS OF THE GENERAL SCOPE INDICATED IN THESE DOCUMENTS, THE TRADE CONTRACTORS SHALL FURNISH ALL ITEMS REQUIRED FOR THE PROPER EXECUTION AND COMPLETION OF THEIR WORK. ALL WORK SHALL BE COMPLETE IN EVERY DETAIL AND THE CONTRACTORS SHALL PROVIDE A ONE YEAR WARRANTY FOR THEIR WORK UNLESS A LONGER WARRANTY IS

INDICATED IN THE SPECIFICATIONS.

12. CONTRACTORS SHALL FOLLOW AND OBEY ALL FEDERAL, STATE AND LOCAL CODES, LAWS, SAFETY

REGULATIONS AND HAZARDOUS WASTE LAWS, ETC.

DEMOLITION NOTES

1. KEY NOTES AND DRAWINGS ARE INTENDED TO GRAPHICALLY REPRESENT

GENERAL WORK AND DO NOT PORTRAY FULL SCOPE OF THE PROJECT. SEE

SPECIFICATIONS FOR DETAILED REQUIREMENTS.

2. REMOVE EXISTING CONSTRUCTION AS DESIGNATED HEREIN AND CLEAR AREA

OF DEBRIS PRIOR TO PROCEEDING WITH NEW CONSTRUCTION.

3. EXISTING EQUIPMENT REMOVED SHALL BE PROPERLY DISPOSED OFF MEDICAL

CENTER GROUNDS.

4. PATCH WALL OPENING SHALL MATCH THE INTEGRITY OF ADJACENT

CONSTRUCTION UNLESS INDICATED OTHERWISE.

5. NOTIFY COR OF ANY DEMOLITION REQUIRED AND NOT INDICATED FOR

INSTALLATION OF ELECTRICAL OR DATA ITEMS. AFTER SUCH DEMOLITION AND

INSTALLATION, PATCH OR REPLACE MATERIALS AND FINISHES TO MATCH

EXISTING.

6. THE INFORMATION CONTAINED IN THESE DEMOLITION DOCUMENTS DEFINES

GENERAL SCOPE ONLY AND DOES NOT RELIEVE THE CONTRACTOR OF THE

RESPONSIBILITY OF PROVIDING ALL DEMOLITION REQUIRED FOR THE

COMPLETION OF THE PROJECT.

7. REFER TO THE ELECTRICAL DRAWINGS FOR FURTHER INFORMATION

REGARDING DEMOLITION OF ELECTRICAL SYSTEMS.

8. BEFORE THE START OF WORK, IDENTIFY ANY REQUIRED DEMOLITION BEYOND

THE IDENTIFIED PROJECT SCOPE WHETHER ABOVE, BELOW OR OUTSIDE

PROJECT AREA. NOTIFY AND COORDINATE WITH THE COR, PROVIDE

DEMOLITION OF THESE AREAS AND PATCH THE SAME AS A PART OF THE

SCOPE OF THE PROJECT.

9. ALL DEMOLITION WORK SHALL BE PERFORMED WITH DUE CARE AND

DILIGENCE IN ORDER TO PREVENT ARBITRARY DAMAGE OR INTERRUPTION OF

SERVICE OR CONCEALED UTILITIES INTENDED TO REMAIN IN SERVICE.

DISCOVERY OF UTILITIES OR CONDITIONS LOCATED DIFFERENTLY FROM THAT

INDICATED OR THAT ARE NOT IDENTIFIED. SHALL BE REPORTED TO THE

CONTRACTING OFFICER.

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

SPS SELECTIVE DEMOLITION

/1

/2

:5

:4

P

M

A-001-2

ARCHITECTURAL SYMBOLS,

ABBREVIATIONS, AND NOTES

1 4MVK

JESSE BROWN VA MEDICAL CENTER

820 S. DAMEN AVE, CHICAGO IL 60612

06/13/2024

ISSUED FOR CONSTRUCTION

537-17-11518-327

RMC

ARCHITECTURAL SYMBOL LEGEND 002

ABBREVIATIONS 002

UP

ETO

SERVICE

STAFF

LOUNGE

ETO

ROOM

1639A

STAFF

OFFICE

OFFICE

1642A

CHIEF

OFFICE

SPS

PREPARATION

STAFF

TOILET

1645A

STAFF

LOCKERS

STAFF

LOCKERS

STAFF

TOILET

1643A

CLEAN

RECEIVING

BREAK-OUT

STERILE

SUPPLY

STOR. &

DIST.

CART

STAGING

AREA

ELECT.

ROOM

16E3

ELEVATOR

MACHINE

ROOM

STAIR 11

ELEV

P25

CORRIDOR

SOILED

RECEIVING

DECONTAM

STAFF

TOILET

1627A

STAFF

LOCKERS

- FEMALE

ANTE

ROOM

16H5

STAFF

LOCKERS

- MALE

ANTE

ROOM

STAFF

TOILET

SCOPE

DECONTAM

FD

04 FD

4'-0"

B

C

C.5

D

D.9

E

E.5

F

G

18X13X12X11X10 X14

EXISTING

OFFICE

CLEAN

SUPPLY

EXISTING

OFFICE

ELEV

LOBBY

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

SPS SELECTIVE DEMOLITION

/1

/2

:5

:4

P

M

AD-101-2

FIRST FLOOR DEMOLITION PLANS

2 4MVK

JESSE BROWN VA MEDICAL CENTER

820 S. DAMEN AVE, CHICAGO IL 60612

06/13/2024

ISSUED FOR CONSTRUCTION

537-17-11518-327

RMC

Scale: 1/8" = 1'-0"

FIRST FLOOR DEMOLITION PLAN 0 4 8 16

NORTH

PLAN

01 REMOVE EXISTING DOOR AND FRAME

02 REMOVE PORTION OF EXISTING WALL TO

CREATE NEW DOOR OPENING. PROVIDE

4"X8"X3/8" STEEL ANGLE LOOSE LINTEL AT

HEAD OF OPENING. .

03 REMOVE EXISTING SINK/TABLE UNIT

04 REMOVE MEDIVATOR, COMPRESSOR, AND

WATER HEATER, AND SALVAGE/PROTECT

AS DIRECTED BY COR, CONTRACTOR TO

RE-INSTALL MEDIVATOR IN NEW LOCATION

05 REMOVE WALL AND DOOR WHERE SHOWN

DASHED.

06 REMOVE SINK. SEE PLUMBING DRAWINGS.

07 REMOVE EXISTING STERIS CAVIWAVE

ULTRASONIC CLEANING SYSTEM. SALVAGE

AND PROTECT AS DIRECTED BY COR.

CONTRACTOR TO REINSTALL THIS

EQUIPMENT IN NEW LOCATION AS PART OF

PROJECT WORK.

08 REMOVE VIEW WINDOW

09 REMOVE STAINLESS STEEL TABLE.

SALVAGE AS DIRECTED BY COR

10 REMOVE EXISTING SCOPE PROCESSING

EQUIPMENT AND SALVAGE/PROTECT AS

DIRECTED BY COR. CONTRACTOR TO

RE-INSTALL EQUIPMENT INTO NEWLY

REMODELED SPACE.

11 REMOVE CASEWORK AND SINK.

12 REMOVE A PORTION OF EXISTING WALL

WHERE SHOWN DASHED, TO CREATE A

NEW OPENING. TOP OF OPENING TO BE AT

7'-0" AFF.

13 REMOVE PORTION OF EXISTING HANDRAIL

AS REQUIRED TO CREATE NEW DOOR

OPENING.

14 REMOVE FLOORING THIS ROOM

15 REMOVE A PORTION OF EXISTING WALL AS

REQUIRED FOR NEW DOOR OPENING

N

KEY PLAN

SCALE: NO SCALE

1. SEE SHEET A-001-2 FOR GENERAL DEMOLITION NOTES.

DASHED LINES INDICATE WALL AND

DOOR TO BE REMOVED

NO WORK THIS AREA

DEMOLITION LEGEND

A

A.5

B

C

C.5

D

D.9

E

E.5

F

G

18X13X12X11X10 X14

EXTERIOR

PAVED ROOF

AREA

EXTERIOR

PAVED ROOF

AREA

EXTERIOR

PAVED ROOF

AREA

REMOVE EXISTING

MESH PARTITION AND

GATE. SALVAGE FOR

REINSTALLATION

REMOVE SECTION OF

EXISTING LOUVER TO

INSTALL NEW MECHANICAL

EQUIPMENT, INCLUDING

THE NEW AIR HANDLING

UNIT.

REMOVE SECTION

OF EXISTING

LOUVER TO INSTALL

NEW MECHANICAL

EQUIPMENT

REMOVE EXISTING MESH PARTITION

AND GATE. REINSTALL IN A NEW

LOCATION AS DIRECTED BY THE COR.

3C-103

ELECTRICAL

SUBSTATION

ROOM

3C-102

SWITCHGEAR

ROOM

3C-104

ELECTRICAL

3C-105

ELECTRICAL

ST-11

STAIRS

3C-101

MECHANICAL

EXISTING

AHU

EXISTING

AHU

EXISTING

AHU

JESSE BROWN

VA HOSPITAL

W TAYLOR ST

W POLK ST

S D

A M

E N

A V

E

W O

G D E N A

V E

3RD FLOOR

AREA

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

SPS SELECTIVE DEMOLITION

/1

/2

:5

:4

P

M

AD-102-2

THIRD FLOOR DEMOLITION PLAN

3 4MVK

JESSE BROWN VA MEDICAL CENTER

820 S. DAMEN AVE, CHICAGO IL 60612

06/13/2024

ISSUED FOR CONSTRUCTION

537-17-11518-327

RMC

Scale: 1/8" = 1'-0"

THIRD FLOOR DEMOLITION PLAN

1. SEE SHEET A-001-2 FOR GENERAL

DEMOLITION NOTES.

KEY PLAN

01 01

B

C

C.5

D

D.9

E

E.5

F

G

18X13X12X11X10 X14

010101

EXISTING

OFFICE

CLEAN

SUPPLY

EXISTING

OFFICE

EXISTING

SCOPE

DECONTAM

ANTEROOM

SOILED

RECEIVING

DECONTAM

SPS

PREPARATION

CART

STAGING

AREA

ELEV

LOBBY

STERILE

SUPPLY

STOR. &

DIST.

ANTE

ROOM

16H5

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

SPS SELECTIVE DEMOLITION

/1

/2

:5

:4

P

M

AD-111-2

FIRST FLOOR REFLECTED CEILING

DEMOLITION PLAN

4 4Author

JESSE BROWN VA MEDICAL CENTER

820 S. DAMEN AVE, CHICAGO IL 60612

06/13/2024

ISSUED FOR CONSTRUCTION

537-17-11518-327

Checker

Scale: 1/8" = 1'-0"

FIRST FLOOR REFLECTED CEILING DEMOLITION PLAN

N

KEY PLAN

SCALE: NO SCALE

0 4 8 16

NORTH

PLAN

01 REMOVE CEILING

02 EXISTING CEILING TO REMAIN

1. SEE SHEET A-001-2 FOR GENERAL

DEMOLITION NOTES.

2. AT THE END OF EACH DAILY SHIFT,

ANY CEILING TILES THAT HAVE BEEN

REMOVED TO COMPLETE WORK

MUST BE RE-INSTALLED IN ORDER

FOR THE SPRINKLER SYSTEM IN

THAT AREA TO BE CONSIDERED "IN

SERVICE".

DEMOLITION LEGEND

DASHED LINES INDICATE WALL AND

DOOR TO BE REMOVED

NO WORK THIS AREA

DASHED LINES INDICATE

SUSPE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .