S02 - Exhibit 01b3 537-17-115 PH4 DWGs Bid 20240701.pdf

PDF 8 MB Posted

Attached to
Z2DA--537-17-115: SPS Construction Phase 2, 3 &4 Federal contract opportunity
Solicitation number
36C25225B0001
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12

About this file

This is a set of construction drawings for Phase 4 of a Sterile Processing Service (SPS) remodeling project at Jesse Brown VA Medical Center in Chicago, IL (VA Project #537-17-115). The drawings detail renovations to the fifth floor, specifically focusing on remodeling the scope processing and storage areas.

The drawings include architectural, fire protection, plumbing, mechanical, electrical, technology and fire alarm plans. Key elements include installation of new HVAC systems with a VAV terminal unit and compressor, replacement of sprinkler heads, installation of new lighting and power distribution, and security/access control systems for the renovated spaces. The scope encompasses both Clean Scope Storage (Room 5490) and Soiled Holding (Room 5491) areas, with specific requirements for maintaining proper air pressure relationships between these spaces. The drawings also detail infection control risk mitigation measures that must be implemented during construction to protect adjacent occupied areas. The documents appear to be issued for construction and dated June 13-14, 2024.

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JESSE BROWN

VA HOSPITAL

W TAYLOR ST

W POLK ST

S D

A M

E N

A V

EW

O

G D

E N

A V

E

5TH FLOOR

AREA

1ST FLOOR

AREA

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

PROJECT SITE MAP PROJECT LOCATION MAP

PROJECT IMAGE

FIFTH FLOOR REMODEL

/1

/2

:0

:1

P

M

G-001-4

FIFTH FLOOR REMODEL- COVER

1 5MVK

JESSE BROWN VA MEDICAL CENTER

820 S. DAMEN AVE, CHICAGO IL 60612

06/13/2024

ISSUED FOR CONSTRUCTION

537-17-11518-327

REMODEL STERILE PROCESSING SERVICE

JESSE BROWN VA MEDICAL CENTER

820 S. DAMEN AVE, CHICAGO IL 60612

VA PROJECT #: 537-17-115 APOGEE PROJECT #: 18-327

RMC

PHASE 4: FIFTH FLOOR REMODEL

DRAWING LIST

GENERAL

G-001-4 FIFTH FLOOR REMODEL- COVER 1 5

G-100-4 GENERAL INFORMATION - PHASE 4 2 5

G-101-4 ICRA PLAN 3 5

G-102-4 ICRA DETAILS 4 5

LS-100-4 FIFTH FLOOR LIFE SAFETY PLAN 5 5

ARCHITECTURAL

A-001-4 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 4

AD-101-4 FIRST FLOOR DEMOLITION PLAN 2 4

AD-105-4 FIFTH FLOOR DEMOLITION PLAN 3 4

A-105-4 FIFTH FLOOR PLAN AND REFLECTED CEILING PLAN 4 4

FIRE PROTECTION

FS-001-4 FIRE SUPPRESSION GENERAL INFORMATION 1 3

FS-101-4 FIRE SUPPRESSION PLANS- PHASE 4 2 3

FS-102-4 FIRE SUPPRESSION PLANS- PHASE 4 3 3

PLUMBING

P-001-4 PLUMBING GENERAL INFORMATION - PHASE 4 1 2

P-101-4 PLUMBING PLANS- PHASE 4 2 2

MECHANICAL

M-001-4 MECHANICAL GENERAL INFORMATION 1 4

MD-101-4 MECHANICAL DEMOLITION PLANS- PHASE 4 2 4

MH-101-4 MECHANICAL HVAC PLANS- PHASE 4 3 4

MP-101-4 MECHANICAL PIPING PLANS- PHASE 4 4 4

ELECTRICAL

E-001-4 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 4

EP101-4 FIFTH FLOOR ELECTRICAL PLAN - PHASE 4 2 4

EM101-4 ELECTRICAL FIFTH FLOOR POWER PLANS - PHASE 4 3 4

E-501-4 ELECTRICAL DETAILS PHASE 4 4 4

TECHNOLOGY

T-001-4 TECHNOLOGY GENERAL NOTES SYMBOL LEGEND AND ABBREVIATIONS, AND

DETAILS

1 2

T-101-4 FIFTH FLOOR TECHNOLOGY PLAN- PHASE 4 2 2

FIRE ALARM

FA101-4 FIFTH FLOOR FIRE ALARM PLAN- PHASE 4 2 2

NORTH

PLAN

PROJECT LOCATION

24514

LICENSED

ARCHITECT

DocuSign Envelope ID: B0CA22F4-B9A3-463C-9AC8-E13FC488A65D

6/14/2024

INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF

PRECAUTIONS FOR CONSTRUCTION AND RENOVATION

INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF

PRECAUTIONS FOR CONSTRUCTION AND RENOVATION WALL SECTION

SYMBOL

INTERIOR ELEVATION

SYMBOL

COLUMN GRID

ELEVATION SYMBOL

REVISION NOTE

ENLARGED DETAIL CALLOUT

ROOM DESIGNATION

SYMBOL

BREAK LINE

ROOF SLOPE

DIRECTION SYMBOL

TYPICAL GRAPHIC SCALE

DETAIL #

PAGE #

DETAIL #

PAGE #

TRUE NORTH ARROW

PROJECT NORTH ARROW

A8.1

EXTERIOR ELEVATION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

A8.1

BUILDING SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

DETAIL SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

WALL GRID

(REPRESENTS

FACE OF EXISTING

WALL)

XX.X

XX.X

ELEVATION

0'-0"

ROOM

NAME

101A

NORTH

PLAN

NORTH

TRUE

0 4 8 16

IIILOW Risk Group 1

Class III

Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that

It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation

I

I

III

MEDIUM Risk Group 2

HIGH Risk Group 3

HIGHEST Risk Group 4 V

V

IV

V

IV

III

IV

II

III

Patient Risk Group Table

Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk

TYPE A

Construction Project Type

Major demolition and construction projects Includes, but is not limited to:

• Removal or replacement of building system component(s).

• Removal/installation of drywall partitions.

• Invasive large-scale new building construction.

• Renovation work in two or more rooms.

Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies Includes, but is not limited to:

• Removal of preexisting floor covering, walls, casework or other building components.

• New drywall placement.

• Renovation work in a single room.

• Nonexisting cable pathway or invasive electrical work above ceilings.

• The removal of drywall where a moderate amount of dust and debris is created.

• Dry sanding where a moderate amount of dust and debris is created.

• Work creating significant vibration and/or noise.

• Any activity that cannot be completed in a single work shift.

Small scale, short duration activities which create minimal dust Includes, but is not limited to:

• Work conducted above the ceiling (e.g., prolonged inspection or repair of firewalls and barriers, installation of conduit and/or cabling, and access to mechanical and/or electrical chase spaces).

• Fan shutdown/startup.

• Installation of electrical devices or new flooring that produces minimal dust and debris.

• The removal of drywall where minimal dust and debris is created.

• Controlled sanding activities (e.g., wet or dry sanding) that produce minimal dust and debris.

Inspection and Non-Invasive Activities Includes, but is not limited to:

• Removal of ceiling tile for visual inspection-limited to 1 tile per 50 square feet with limited exposure time.

• Limited building system maintenance (e.g., pneumatic tube station, HVAC system, fire suppression system, electrical and carpentry work to include painting without sanding) that does not create dust or debris.

• Clean plumbing activity limited in nature.

Type of Construction / Project Activity Table

Group 2 Medium Risk

Group 1 Low Risk

• Physical Therapy

• Radiology departments

• All patient waiting rooms

• All outpatient clinics

• Research Areas

• Respiratory Therapy

• Office areas (non-clinical)

• FES/EMS areas

I

Patient Risk Group

TYPE D

TYPE C

TYPE B

TYPE A

Group 4 Highest Risk

Group 3 High Risk

• Emergency Room

• Clinical Laboratories (specimen)

• Same Day Surgery

• Pharmacy

• Nutrition and Food

Service/Canteen

• Procedural Areas (GI)

• Inpatient Mental Health

• Any area caring for immunocompromised patients

• Cardiac Cath Lab/IR

• Central Sterile Supply

• Sterile Processing Service

• Intensive Care Units

IIII

TYPE DTYPE CTYPE B

Class IVor control procedures are necessary.

C

LA

S

S

IV

During Construction Project Upon Completion of Project

1. Includes all activities required by Class III

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management

Maintenance and Engineering department before construction begins.

3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.

4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.

5. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).

6. Containment units or environmental containment units (ECUs) approved for Class IV precautions in small areas totally contained by the unit and that has HEPA-filtered exhaust air.

7. Remove or isolate return air diffusers to avoid dust entering the HVAC system.

8. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.

9. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.

10. Maintain negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.

11. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.

12. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is not acceptable.

13. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.

14. Contain all trash and debris in the work area.

15. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.

16. Worker clothing must be clean and free of visible dust before leaving the work area.

HEPA vacuuming of clothing or use of cover suites is acceptable.

17. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be immediately changed.

18. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.

19. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.

• Medical/Surgical Units

• Negative pressure isolation rooms

• Outpatient Chemotherapy

Areas

• Operating rooms

• Post Anesthesia Care Unit

• Dialysis

• Dental

C

LA

S S

V

1. Includes all activities required by Class IV

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management

Maintenance and Engineering department before construction begins.

3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.

4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.

5. Seal all penetrations in containment barriers, anteroom barriers, including floors and ceiling using approved materials (UL schedule firestop if applicable for barrier type).

6. Construct anteroom large enough for equipment staging, cart cleaning, workers. The anteroom must be constructed adjacent to entrance of construction work area.

7. Personnel will be required to wear coveralls at all times during Class V work activities.

Coveralls must be removed before leaving the anteroom.

8. Remove or isolate return air diffusers to avoid dust entering the HVAC system.

9. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.

10. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.

11. Maintain negative pressurization of the entire workspace using HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.

12. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.

13. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (bathroom exhaust) is not acceptable.

14. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.

15. Contain all trash and debris in the work area.

16. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.

17. Worker clothing must be clean and free of visible dust before leaving the work area anteroom.

18. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area).

Damaged shoe covers must be immediately changed.

19. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.

20. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.

Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.

Work Area Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

Removal of Critical Barriers:

1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.

2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:

1. Carefully remove screws and painter tape.

2. If dust will be generated during screw removal, use hand-held HEPA vacuum.

3. Drywall cutting is prohibited during removal process.

4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.

5. Use a plastic barrier to enclose area if dust could be generated.

Negative Air Requirements:

1. The use of negative air must be designed to remove contaminates from the work area.

2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.

HVAC systems:

1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.

2. Verify that HVAC systems are clean and operational.

3. Verify the HVAC systems meets original airflow and air exchange design specifications.

It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation

During Construction Project

C

LA

S S

I

Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

HVAC Systems:

1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.

2. Verify the HVAC systems meet original airflow and air exchange design specifications.

Upon Completion of Project

1. Execute work by methods to minimize raising dust from construction operations.

2. Perform noninvasive work activity as to not block or interrupt patient care.

3. Perform noninvasive work activities in areas that are not directly occupied with patients.

4. Perform noninvasive work activity in a manner that does not create dust.

5. Immediately replace any displaced ceiling tile before leaving the area and/or at end of noninvasive work activity.

C

LA

S S

II

Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

HVAC Systems:

1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.

2. Verify the HVAC systems meet original airflow and air exchange design specifications.

1. Includes all activities required by Class I

2. Perform only limited dust work and/or activities designed for basic facilities and engineering work.

3. Perform limited dust and invasive work following standing precautions procedures approved by the organization.

4. This Class of Precautions must never be used for construction or renovation activities.

5. Provide active means to prevent airborne dust from dispersing into atmosphere.

6. Water mist work surfaces to control dust while cutting.

7. Seal unused doors with duct tape.

8. Block off and seal air vents.

9. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.

10. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.

Work Area Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

Removal of Critical Barriers:

1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.

2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:

1. Carefully remove screws and painter tape.

2. If dust will be generated during screw removal, use hand-held HEPA vacuum.

3. Drywall cutting is prohibited during removal process.

4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.

5. Use a plastic barrier to enclose area if dust could be generated.

Negative Air Requirements:

1. The use of negative air must be designed to remove contaminates from the work area.

2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.

HVAC systems:

1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.

2. Verify that HVAC systems are clean and operational.

3. Verify the HVAC systems meets original airflow and air exchange design specifications.

CONSTRUCTION ACTIVITIES SHALL BE CLASSIFIED AS FOLLOWS UNLESS NOTED OTHERWISE:

1. INSTALLATION OF CABLE TRAY IN CORRIDOR CEILINGS SHALL BE CONSIDERED CONSTRUCITON ACTIVITY TYPE B.

2. ALL CONDUIT SPECIFIED TO BE INSTALLED IN WALL SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE C.

3. CONSTRUCTION OF NEW ROOMS SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE D.

4. INSTALLATION OF NEW DOORS TO OR FROM EXISTING SPACES SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE C.

C

LA

S S

II

I

1. Includes all activities required by Class II

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities

Management Maintenance and Engineering department before construction begins.

3. Provide active means to prevent airborne dust dispersion into the occupied areas.

4. Means for controlling minimal dust dispersion may include hand-held HEPA vacuum devices, polyethylene plastic containment, or isolation of work area by closing room door.

5. Remove or isolate return air diffusers to avoid dust from entering the HVAC system.

6. Remove or isolate the supply air diffusers to avoid positive pressurization of the space,

7. If work area is contained, then it must be neutrally to negatively pressurized at all times.

8. Seal all doors with tape that will not leave residue.

9. Contain all trash and debris in the work area.

10. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.

11. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.

12. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces.

13. Clean construction area at the end of each shift by damp mopping or HEPA Vacuum.

For Type C activities, follow procedures for Class IV.

Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

HVAC Systems:

1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.

2. Verify the HVAC systems meet original airflow and air exchange design specifications.

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

FIFTH FLOOR REMODEL

/1

/2

:5

:1

P

M

G-100-4

GENERAL INFORMATION - PHASE 4

2 5MVK

JESSE BROWN VA MEDICAL CENTER

820 S. DAMEN AVE, CHICAGO IL 60612

06/13/2024

ISSUED FOR CONSTRUCTION

537-17-11518-327

RMC

GENERAL SYMBOL LEGEND

APPLICABLE CODES AND STANDARDS

NFPA 10, STANDARD FOR PORTABLE FIRE EXTINGUISHERS, 2018

NFPA 13, INSTALLATION OF SPRINKLER SYSTEMS, 2016

NFPA 70, NATIONAL ELECTRICAL CODE (NEC), 2023

NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE, 2022

NFPA 80, STANDARD FOR FIRE DOORS AND OTHER OPENING PROTECTIVES, 2019

NFPA 90A: STANDARD FOR THE INSTALLATION OF AIR CONDITIONING & VENTILATING SYSTEMS, 2018

NFPA 99, HEALTH CARE FACILITIES CODE, 2018

NFPA 101, LIFE SAFETY CODE, 2018

PG 18-13: VA BARRIER FREE DESIGN STANDARD, 2024

PG 18-12: 285: STERILE PROCESSING SERVICE, 2022

ASHRAE 90.1, 2022

ASHRAE 170, VENTILATION OF HEALTH CARE FACILITIES, 2021

DEPARTMENT OF VETERANS AFFAIRS: FIRE PROTECTION DESIGN MANUAL, 2023

DEPARTMENT OF VETERANS AFFAIRS: PLUMBING DESIGN MANUAL, 2024

DEPARTMENT OF VETERANS AFFAIRS: HVAC DESIGN MANUAL, 2024

DEPARTMENT OF VETERANS AFFAIRS: ELECTRICAL DESIGN MANUAL, 2019

DEPARTMENT OF VETERANS AFFAIRS: LIGHTING DESIGN MANUAL, 2021

DEPARTMENT OF VETERANS AFFAIRS: TELECOMMUNICATIONS DESIGN MANUAL, 2016

Scale: 12" = 1'-0"

ICRA RISK ASSESSMENT - PHASE 4

OVERALL PHASE SUMMARY

PHASE 1: INSTALLATION OF TEMPORARY SPS MOBILE TRAILER AND ACCESS CORRIDOR (NOT IN CONTRACT, ALREADY COMPLETED).

PHASE 2: INTERIOR DEMOLITION WITHIN SPS AREA (FIRST FLOOR) AND MECHANICAL ROOM (THIRD FLOOR).

PHASE 3: NEW CONSTRUCTION WITHIN SPS AREA (FIRST FLOOR) AND MECHANICAL ROOM (THIRD FLOOR).

PHASE 4: INTERIOR DEMOLITION AND NEW WORK AT EXISTING SCOPE PROCESSING AND STORAGE AREA (FIFTH FLOOR).

THIS PHASE ALSO INCLUDES THE DEMOLITION OF THE TEMPORARY SPS TRAILER ACCESS CORRIDOR THAT WAS CONSTRUCTED IN PHASE 1.

DocuSign Envelope ID: 5C2FFA19-F1BC-408D-8005-D330D0E23A4A

6/13/2024

S SS

NN

OO

CLEAN

SCOPE

STORAGE

SOILED

HOLDING

PROCEDURE

ROOM 2

PROCEDURE

ROOM 3

SUPPLY

CORRIDOR

PROCEDURE

ROOM 4

MECHANICAL

ROOM

PROCEDURE

ROOM 1

PROCEDURE

ROOM 5

STAIR

5'-0" 03

EQUIPMENT

ROOM

NN

OO

PROCEDURE

ROOM 3

PROCEDURE

ROOM 2

SUPPLY

MECHANICAL

ROOM

SOILED

HOLDING

CORRIDOR

PROCEDURE

ROOM 4

PROCEDURE

ROOM 1

PROCEDURE

ROOM 5

STAIR

5'-0"

PROCEDURE

ROOM

EQUIPMENT

ROOM

2 HOUR FIRE SEPARATION

1 HOUR FIRE SEPARATION

SMOKE RATED

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

FIFTH FLOOR REMODEL

/1

/2

:5

:1

P

M

G-101-4

ICRA PLAN

3 5MVK

JESSE BROWN VA MEDICAL CENTER

820 S. DAMEN AVE, CHICAGO IL 60612

06/13/2024

ISSUED FOR CONSTRUCTION

537-17-11518-327

RMC

Scale: 1/4" = 1'-0"

FIFTH FLOOR PLAN ICRA 0 2 4 8

NORTH

PLAN

N

KEY PLAN

SCALE: NO SCALE

01 1 HOUR RATED ICRA/LIFE SAFETY

BARRIER.

Scale: 1/4" = 1'-0"

FIFTH FLOOR DEMOLITION- ICRA PLAN 0 2 4 8

NORTH

PLAN

WALL RATING LEGEND

02 FLOOR STICKY MAT.

HEPA FILTERATION/NEGATIVE AIR MACHINE.

BASIS OF DESIGN: HEPACART OMNIAIRE

NEGATIVE AIR MACHINE.

AREA OF MINOR RENOVATION WORK

AREA OF MODIFICATION WORK

A. SEE SHEET G-102-4 FOR INFECTION CONTROL NOTES.

OUTSIDE OF BUILDING

MONTHLY CHANGED HEPA

FILTER

HEPA NEGATIVE

AIR UNIT

WEEKLY CHANGED (OR MORE AS

NEEDED) PRE FILTER

FIRE RATED PLYWOOD

F L E

X D

U C

T

SUPPLY DUCTS EITHER KEEP

RUNNING OR COVER WHEN

RUNNING TO KEEP DUST OUT.

TAPE ALL SERVICES

TO PROTECT AGAINST

CONTAMINATION

A

O

V

FIRE EXTINGUISHER ON PORTABLE

FLOOR BRACKET (ILSM MAY REQUIRE

MORE THAN ONE)

SUSPENDED PLASTIC ZIPPER

WALL CURTAIN BARRIER

INDICATOR SHALL BE AT -0.01 OR

GREATER (VERIFY DAILY). IF NOT

VERIFY ALL OPENINGS SUCH AS DOOR

ARE CLOSED AND/OR CHANGE OUT

NEGATIVE AIR PRE-FILTER

PROVIDE STICKY MATS

(CHANGED END OF SHIFT

OR MORE IF NECESSARY

TO MAINTAIN CLEANLINESS)

POST ICRA ILSM FIRE

INSPECTION SHEETS

VISIBLE TO PUBLIC

COVER ALL RETURNS AT THE

GRATE/DIFFUSERS

OPTIONAL EXHAUST DUCTS

(COVER THE GRATES AND THE DIFFUSERS)

A

E

A

DOOR OPENING

VENT TO OUTSIDE

ROUTE TO BE

APPROVED BY OWNER

HEATED DETECTOR CUT-OFF

BASIS OF DESIGN: HEPA

NEGATIVE AIR UNIT INTEGRAL

WITH EDGEGUARD BARRIER

SYSTEM.

FIRE RATED PLYWOOD (TEMP.

REMOVE GLASS PANEL)

EXISTING WINDOW FRAME

ICRA BARRIER ICRA BARRIER

ADJUSTS FROM

7'-8" TO 10'-0" A.F.F

EXISTING CEILING

EXISTING CONCRETE SLAB FLOORING

FINISHED FLOORING TO BE

KEPT CLEAN. FLOORS NOT

BEING REPLACED MUST BE

PROTECTED. COVER WITH

ROSIN PAPER/ FIRE RATED

PLYWOOD.

ICRA, ILSM, FIRE WATCH AND

MISC. FORMS

PAPER

CADDY

1'-5"

ILSM SIGNAGE

• THIS EXIT IS CLOSED AND LEADS TO A

CONSTRUCTION AREA

• PLEASE USE ALTERNATE EXITS AS MARKED

INTERIM LIFE SAFETY MEASURES IN EFFECT FOR THE

STERILE PROCESSING SUITE REMODEL PROJECT

PROJECT:

PRIME CONTRACTOR:

SUB CONTRACTOR:

EMERGENCY CONTACT NO.:

BARRIER INSTALLATION DATE:

BARRIER EXPIRATION DATE:

ILSM TEMPORARY BARRIER TAG

TEMPORARY ICRA/DUST/LIFE SAFETY BARRIER

EXISTING

STRUCTURAL DECK

ABOVE

EXISTING CEILING

MODULAR PANELS

SEE PLAN

TEMPORARY ICRA/DUST BARRIER AND LIFE SAFETY

BARRIER.

ACCEPTABLE PRODUCTS:

EDGE-GUARD PANELS

STARC REALWALL.

TEMPORARY CONTAINMENT WALL SYSTEM: ICRA/DUST

BARRIER PLASTIC SHEETS, CONTINUOUS FROM FLOOR TO

CEILING, WITH SEALED JOINTS AT PERIMETER.

BASIS OF DESIGN: ZIPWALL DUST BARRIER SYSTEM.

TEMPORARY ICRA/DUST/BARRIER - PLASTIC SHEET

EXISTING

STRUCTURAL DECK

ABOVE

EXISTING CEILING

PLASTIC SHEET

BARRIER

SEE PLAN

A. THE CONTRACTOR SHALL NOT HAUL DEBRIS

THROUGH PATIENT-CARE AREAS WITHOUT PRIOR

APPROVAL OF THE COR AND THE MEDICAL CENTER.

B. ACTIVITY HAZARD RISK CLASSIFICATIONS OF CLASS

I OR CLASS II SHALL REQUIRE APPROVAL BY THE

FACILITY SAFETY MANAGER AND CONTRACTING

OFFICER REPRESENTATIVE BEFORE BEGINNING

ANY CONSTRUCTION WORK. HAZARD RISK

CLASSIFICATIONS OF CLASS III OR IV SHALL

REQUIRE A PERMIT BEFORE BEGINNING ANY

CONSTRUCTION WORK. INFECTION CONTROL

PERMITS WILL BE ISSUED BY THE FACILITY SAFETY

MANAGER AND CONTRACTING OFFICER

REPRESENTATIVE.

C. INFECTION CONTROL PERMITS SHALL BE POSTED

OUTSIDE THE APPROPRIATE CONSTRUCTION AREA.

MORE THAN ONE PERMIT MAY BE ISSUED, AS WORK

IS LOCATED IN MULTIPLE AREAS.

D. THE REQUIRED INFECTION CONTROL PRECAUTIONS

ARE AS FOLLOWS:

CLASS 1:

• NOTIFY THE COR.

• EXECUTE WORK USING METHODS TO MINIMIZE

RAISING DUST FROM CONSTRUCTION OPERATIONS.

• CEILING TILES: IMMEDIATELY REPLACE ANY CEILING

TILES DISPLACED FOR VISUAL INSPECTION.

• UPON COMPLETION: CLEAN WORK AREA, AND

NOTIFY COR.

CLASS 2:

• NOTIFY THE COR.

• PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE

DUST FROM DISPERSING INTO ATMOSPHERE SUCH

AS WET METHODS OR TOOL MOUNTED DUST

COLLECTORS.

• WATER MIST WORK SURFACES TO CONTROL DUST

WHILE CUTTING.

• SEAL UNUSED DOORS WITH PAINTERS TAPE.

• BLOCK OFF AND SEAL AIR VENTS.

• REMOVE OR ISOLATE HVAC SYSTEM IN AREAS

WHERE WORK IS BEING PERFORMED.

• UPON COMPLETION: WIPE WORK SURFACES WITH

CLEANER/ DISINFECTANT. CONTAIN CONSTRUCTION

WASTE BEFORE TRANSPORT IN TIGHTLY COVERED

CONTAINERS.

CLASS 3:

DURING CONSTRUCTION WORK:

• OBTAIN PERMIT FROM THE COR.

• REMOVE OR ISOLATE HVAC SYSTEM IN AREA

WHERE WORK IS BEING DONE TO PREVENT

CONTAMINATION OF DUCT SYSTEM.

• COMPLETE ALL CRITICAL BARRIERS TO SEAL AREA

FROM NON-WORK AREA OR IMPLEMENT CONTROL

CUBE METHOD (CART WITH PLASTIC COVERING AND

SEALED CONNECTION TO WORK SITE WITH HEPA

VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE

CONSTRUCTION BEGINS. INSTALL CONSTRUCTION

BARRIERS AND CEILING PROTECTION CAREFULLY,

OUTSIDE OF NORMAL WORK HOURS.

• MAINTAIN NEGATIVE AIR PRESSURE, 0.01 INCHES OF

WATER GAUGE, WITHIN WORK SITE UTILIZING HEPA

EQUIPPED AIR FILTRATION UNITS AND

CONTINUOUSLY MONITORED WITH A DIGITAL

DISPLAY, RECORDING AND ALARM INSTRUMENT,

WHICH MUST BE CALIBRATED ON INSTALLATION,

MAINTAINED WITH PERIODIC CALIBRATION AND

MONITORED BY THE CONTRACTOR.

• CONTAIN CONSTRUCTION WASTE BEFORE

TRANSPORT IN TIGHTLY COVERED CONTAINERS.

• COVER TRANSPORT RECEPTACLES OR CARTS.

TAPE COVERING UNLESS SOLID LID.

UPON COMPLETION:

• DO NOT REMOVE BARRIERS FROM WORK AREA

UNTIL COMPLETED PROJECT THOROUGHLY

CLEANED, AND IS INSPECTED BY THE CONTRACTING

OFFICER REPRESENTATIVE AND BY THE VA

ENVIRONMENTAL SERVICES DEPARTMENT.

• REMOVE CONSTRUCTION BARRIERS AND CEILING

PROTECTION CAREFULLY TO MINIMIZE SPREADING

OF DIRT AND DEBRIS ASSOCIATED WITH

CONSTRUCTION, OUTSIDE OF NORMAL WORK

HOURS.

• VACUUM WORK AREA WITH HEPA FILTERED

VACUUMS.

• WET MOP AREA WITH CLEANER/DISINFECTANT.

• UPON COMPLETION, RESTORE HVAC SYSTEM

WHERE WORK WAS PERFORMED.

• RETURN PERMIT TO THE COR.

CLASS 4:

DURING CONSTRUCTION WORK:

• OBTAIN PERMIT FROM THE COR.

• ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS

BEING DONE TO PREVENT CONTAMINATION OF

DUCT SYSTEM.

• COMPLETE ALL CRITICAL BARRIERS TO SEAL AREA

FROM NON-WORK AREA OR IMPLEMENT CONTROL

CUBE METHOD (CART WITH PLASTIC COVERING AND

SEALED CONNECTION TO WORK SITE WITH HEPA

VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE

CONSTRUCTION BEGINS. INSTALL CONSTRUCTION

BARRIERS AND CEILING PROTECTION CAREFULLY,

OUTSIDE OF NORMAL WORK HOURS.

• MAINTAIN NEGATIVE AIR PRESSURE, 0.01 INCHES OF

WATER GAUGE, WITHIN WORK SITE UTILIZING HEPA

EQUIPPED AIR FILTRATION UNITS AND

CONTINUOUSLY MONITORED WITH A DIGITAL

DISPLAY, RECORDING AND ALARM INSTRUMENT,

WHICH MUST BE CALIBRATED ON INSTALLATION,

MAINTAINED WITH PERIODIC CALIBRATION AND

MONITORED BY THE CONTRACTOR.

• SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES.

• CONSTRUCT ANTEROOM AND REQUIRE ALL

PERSONNEL TO PASS THROUGH THIS ROOM SO

THEY CAN BE VACUUMED USING A HEPA VACUUM

CLEANER BEFORE LEAVING WORK SITE OR THEY

CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE

REMOVED EACH TIME THEY LEAVE WORK SITE.

• ALL PERSONNEL ENTERING WORK SITE ARE

REQUIRED TO WEAR SHOE COVERS. SHOE COVERS

MUST BE CHANGED EACH TIME THE WORKER EXITS

THE WORK AREA.

UPON COMPLETION:

• DO NOT REMOVE BARRIERS FROM WORK AREA

UNTIL COMPLETED PROJECT THOROUGHLY

CLEANED, AND IS INSPECTED BY THE CONTRACTING

OFFICER REPRESENTATIVE AND BY THE VA

ENVIRONMENTAL SERVICES DEPARTMENT.

• REMOVE CONSTRUCTION BARRIERS AND CEILING

PROTECTION CAREFULLY TO MINIMIZE SPREADING

OF DIRT AND DEBRIS ASSOCIATED WITH

CONSTRUCTION, OUTSIDE OF NORMAL WORK

HOURS.

• CONTAIN CONSTRUCTION WASTE BEFORE

TRANSPORT IN TIGHTLY COVERED CONTAINERS.

• COVER TRANSPORT RECEPTACLES OR CARTS.

TAPE COVERING UNLESS SOLID LID.

• VACUUM WORK AREA WITH HEPA FILTERED

VACUUMS.

• WET MOP AREA WITH CLEANER/DISINFECTANT.

• UPON COMPLETION, RESTORE HVAC SYSTEM

WHERE WORK WAS PERFORMED.

• RETURN PERMIT TO THE COR.

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

FIFTH FLOOR REMODEL

/1

/2

:5

:1

P

M

G-102-4

ICRA DETAILS

4 5MVK

JESSE BROWN VA MEDICAL CENTER

820 S. DAMEN AVE, CHICAGO IL 60612

06/13/2024

ISSUED FOR CONSTRUCTION

537-17-11518-327

RMC

Scale: 1/2" = 1'-0"

ICRA TYPICAL CONSTRUCTION PLAN LAYOUT_4

Scale: 1/2" = 1'-0"

CROSS SECTION A_4

Scale: 6" = 1'-0"

ILSM SIGNAGE_4

Scale: 12" = 1'-0"

ILSM TEMPORARY BARRIER TAG_4

Scale: 3/4" = 1'-0"

TEMP DUST AND INFECTION CONTROL BARRIER TYPES_4

S SS

OO

SOILED

HOLDING

PROCEDURE

ROOM 2

PROCEDURE

ROOM 3

SUPPLY

CORRIDOR

PROCEDURE

ROOM 4

MECHANICAL

ROOM

PROCEDURE

ROOM 1

PROCEDURE

ROOM 5

STAIR

DN

F

T T

O E

X

IT

E N

C L

O S

U R

E

EQUIPMENT

ROOM

CLEAN

SCOPE

STORAGE

2 HOUR FIRE SEPARATION

1 HOUR FIRE SEPARATION

SMOKE RATED

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

FIFTH FLOOR REMODEL

/1

/2

:5

:1

P

M

LS-100-4

FIFTH FLOOR LIFE SAFETY PLAN

5 5MK

JESSE BROWN VA MEDICAL CENTER

820 S. DAMEN AVE, CHICAGO IL 60612

06/13/2024

ISSUED FOR CONSTRUCTION

537-17-11518-327

RMC

N

KEY PLAN

SCALE: NO SCALE

Scale: 1/4" = 1'-0"

FIFTH FLOOR PLAN LIFE SAFETY

SEE SHEET G-100-4 FOR LIST OF APPLICABLE

CODES AND STANDARDS

AREA OF RENOVATION WORK

AREA OF MODIFICATION WORK

A

SEE SHEET A-001-4 FOR GENERAL NOTESB

THIS PROJECT OCCURS IN BUILDING 1, LEVEL 5,

NORTH WING (DAMEN BUILDING). BUILDING 1 IS

AN AMBULATORY HEALTHCARE OCCUPANCY.

C

THIS PROJECT DOES NOT IMPACT THE LIFE

SAFETY SYSTEMS OF THE EXISTING BUILDING.

D

WALL RATING LEGEND

DEMOLITION NOTES

1. KEY NOTES AND DRAWINGS ARE INTENDED TO GRAPHICALLY REPRESENT

GENERAL WORK AND DO NOT PORTRAY FULL SCOPE OF THE PROJECT. SEE

SPECIFICATIONS FOR DETAILED REQUIREMENTS.

2. REMOVE EXISTING CONSTRUCTION AS DESIGNATED HEREIN AND CLEAR AREA

OF DEBRIS PRIOR TO PROCEEDING WITH NEW CONSTRUCTION.

3. EXISTING EQUIPMENT REMOVED SHALL BE PROPERLY DISPOSED OFF MEDICAL

CENTER GROUNDS.

4. PATCH WALL OPENING SHALL MATCH THE INTEGRITY OF ADJACENT

CONSTRUCTION UNLESS INDICATED OTHERWISE.

5. NOTIFY COR OF ANY DEMOLITION REQUIRED AND NOT INDICATED FOR

INSTALLATION OF ELECTRICAL OR DATA ITEMS. AFTER SUCH DEMOLITION AND

INSTALLATION, PATCH OR REPLACE MATERIALS AND FINISHES TO MATCH

EXISTING.

6. THE INFORMATION CONTAINED IN THESE DEMOLITION DOCUMENTS DEFINES

GENERAL SCOPE ONLY AND DOES NOT RELIEVE THE CONTRACTOR OF THE

RESPONSIBILITY OF PROVIDING ALL DEMOLITION REQUIRED FOR THE

COMPLETION OF THE PROJECT.

7. REFER TO THE ELECTRICAL DRAWINGS FOR FURTHER INFORMATION

REGARDING DEMOLITION OF ELECTRICAL SYSTEMS.

8. BEFORE THE START OF WORK, IDENTIFY ANY REQUIRED DEMOLITION BEYOND

THE IDENTIFIED PROJECT SCOPE WHETHER ABOVE, BELOW OR OUTSIDE

PROJECT AREA. NOTIFY AND COORDINATE WITH THE COR, PROVIDE

DEMOLITION OF THESE AREAS AND PATCH THE SAME AS A PART OF THE

SCOPE OF THE PROJECT.

9. ALL DEMOLITION WORK SHALL BE PERFORMED WITH DUE CARE AND

DILIGENCE IN ORDER TO PREVENT ARBITRARY DAMAGE OR INTERRUPTION OF

SERVICE OR CONCEALED UTILITIES INTENDED TO REMAIN IN SERVICE.

DISCOVERY OF UTILITIES OR CONDITIONS LOCATED DIFFERENTLY FROM THAT

INDICATED OR THAT ARE NOT IDENTIFIED. SHALL BE REPORTED TO THE

CONTRACTING OFFICER.

GENERAL NOTES

1. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF THE DESIGNER AS TO THE LIMITATIONS OF THE WORK AREA IN AN OCCUPIED AREA. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY AGREEMENT BETWEEN THE COR AND

CONTRACTOR BEFORE THE START OF THE WORK.

2. DRAWINGS ARE PREPARED USING DIMENSIONS AND PRODUCT DRAWINGS ARE PREPARED USING DIMENSIONS AND PRODUCT AND DETAILS FOR SPECIFIC PRODUCTS MAY CHANGE BEFORE THEY ARE AND DETAILS FOR SPECIFIC PRODUCTS MAY CHANGE BEFORE THEY ARE ACTUALLY INCORPORATED INTO THE WORK, AND PRODUCTS BY OTHER MANUFACTURERS ARE ALSO ACCEPTABLE. THEREFORE, ACTUAL INSTALLATION DETAILS AND DIMENSIONS MAY DIFFER FROM THOSE SHOWN. CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE INCORPORATED IN THE WORK (INCLUDING THICKNESS FOR RECESSED OR SEMI-RECESSED PRODUCTS) AND IS RESPONSIBLE FOR ACCOMMODATING AND COORDINATING CHANGES TO OTHER MATERIALS OR PRODUCTS THAT ARE NECESSARY BECAUSE OF THESE DIFFERENCES.

3. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS USED ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS, OR OF THE DRAWINGS AND SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO BE CONSTRUCTED AS A COMPLETE, INTEGRATED AND UNIFIED WHOLE.

4. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE COR PRIOR TO BIDDING. WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR INTENT CANNOT BE REASONABLY INFERRED, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR GREATER

QUANTITY OF WORK.

5. USE OF THE WORD "VERIFY" POINTS OUT A SITUATION WHICH MUST BE CONFIRMED PRIOR TO PROCEEDING WITH THE WORK, FABRICATION OF EQUIPMENT, OR ORDERING MATERIAL. NOTIFY THE COR OF ANY

DISCREPANCY DISCOVERED.

6. THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY SHOULD DISCREPANCIES BE FOUND IN THE

DRAWINGS AND SPECIFICATIONS.

7. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS AND DIMENSIONS AS THEY RELATE TO THIS PROJECT. SHOULD DISCREPANCIES EXIST BETWEEN THE WORK INDICATED AND ACTUAL FIELD

CONDITIONS NOTIFY THE COR PRIOR TO PROCEEDING WITH THE WORK.

8. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL OR DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL

GOVERN.

9. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION.

10. THE CONTRACTOR AND SUBCONTRACTORS INVOLVED IN THIS PROJECT SHALL BE RESPONSIBLE FOR DESIGNING AND INSTALLING THEIR RESPECTIVE WORK AND SYSTEMS TO MEET ALL APPLICABLE FEDERAL, STATE, AND LOCAL CODES, LAWS, SAFETY REGULATIONS, HAZARDOUS WASTE LAWS, ETC. THE CONTRACTOR

SHALL FURNISH ALL NECESSARY PERMITS.

11. THE CONTRACTOR SHALL REVIEW THE DRAWINGS AND UNDERSTAND THE SCOPE OF THE DRAWINGS TO BE THE FOLLOWING: THESE CONSTRUCTION DOCUMENTS (DRAWINGS, SPECIFICATIONS, ADDENDA, ETC.)

INDICATE THE GENERAL SCOPE OF THE PROJECT IN TERMS OF ARCHITECTURAL DESIGN CONCEPTS, THE DIMENSIONS OF THE BUILDING, THE MAJOR ARCHITECTURAL ELEMENTS, AND THE MAJOR STRUCTURAL, MECHANICAL, ELECTRICAL, AND DATA SYSTEMS. THE DOCUMENTS DO NOT AND ARE NOT INTENDED TO INDICATE OR DESCRIBE IN DETAIL ALL THE NECESSARY WORK REQUIRED FOR FULL PERFORMANCE OF, AND COMPLETION OF THE REQUIREMENTS OF THE CONTRACT. ON THE BASIS OF THE GENERAL SCOPE INDICATED IN THESE DOCUMENTS, THE TRADE CONTRACTORS SHALL FURNISH ALL ITEMS REQUIRED FOR THE PROPER EXECUTION AND COMPLETION OF THEIR WORK. ALL WORK SHALL BE COMPLETE IN EVERY DETAIL AND THE CONTRACTORS SHALL PROVIDE A ONE YEAR WARRANTY FOR THEIR WORK UNLESS A LONGER WARRANTY IS

INDICATED IN THE SPECIFICATIONS.

12. CONTRACTORS SHALL FOLLOW AND OBEY ALL FEDERAL, STATE AND LOCAL CODES, LAWS, SAFETY

REGULATIONS AND HAZARDOUS WASTE LAWS, ETC.

AFF ABOVE FINISHED FLOOR

ACT ACOUSTIC(AL) TILE

ALT ALTERNATE

AL ALUMINUM

APPROX APPROXIMATE(LY)

CLR CLEAR

CPT CARPET

DIM DIMENSION

EL ELEVATION

ELEV ELEVATOR

EQ EQUAL

EQUIP EQUIPMENT

EXIST EXISTING

FD FLOOR DRAIN

FE FIRE EXTINGUISHER

FFE FINISH FLOOR ELEVATION

FEC FIRE EXTINGUISHER CABINET

FIN FINISH

FLR FLOOR

FRMG FRAMING

FT FOOT/FEET

GC GENERAL CONTRACTOR

GA GAUGE

GALV GALVANIZED

GEN GENERAL

GYP GYPSUM

HAC HOUSEKEEPING CLOSET

HM HOLLOW METAL

HDWR HARDWARE

HOR HORIZONTAL

HT HEIGHT

IN INCH

INT INTERIOR

MAX MAXIMUM

MECH MECHANICAL

MFR MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

MTD MOUNTED

MTL METAL

N NORTH

NIC NOT IN CONTRACT

NTS NOT TO SCALE

NOM NOMINAL

OD OUTSIDE DIAMETER

O TO O OUT TO OUT

OPNG OPENING

OPP OPPOSITE

OVHD OVERHEAD

PNT PAINT

PTD PAINTED

SF SQUARE FEET

SS STAINLESS STEEL

SIM SIMILAR

SPEC SPECIFICATIONS

STL STEEL

T/O TOP OF

TYP TYPICAL

VCT VINYL COMPOSITION TILE

VIF VERIFY IN FIELD

WALL TYPE

DOOR NUMBER TYPICAL KEYNOTE

CEILING/ SOFFIT

HEIGHT

MATL

1'-0"

-1

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

FIFTH FLOOR REMODEL

/1

/2

:3

:5

P

M

A-001-4

ARCHITECTURAL SYMBOLS,

ABBREVIATIONS AND NOTES

1 4MVK

JESSE BROWN VA MEDICAL CENTER

820 S. DAMEN AVE, CHICAGO IL 60612

06/13/2024

ISSUED FOR CONSTRUCTION

537-17-11518-327

RMC

ABBREVIATIONS 004

ARCHITECTURAL SYMBOL LEGEND 004

CORRIDOR

1R-102

1R-106

TEMPORARY

CORRIDOR

MECH

TEMPORARY

CORRIDOR

1R-106

U P

UP

STAIR 1

STAIR 2

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

FIFTH FLOOR REMODEL

/1

/2

:3

:5

P

M

AD-101-4

FIRST FLOOR DEMOLITION PLAN

2 4MVK

JESSE BROWN VA MEDICAL CENTER

820 S. DAMEN AVE, CHICAGO IL 60612

06/13/2024

ISSUED FOR CONSTRUCTION

537-17-11518-327

RMC

N

KEY PLAN

SCALE: NO SCALE

0 2 4 8

NORTH

PLAN

A. SEE SHEET A-001- 4 FOR GENERAL NOTES.

B. DEMOLITION THIS SHEET IS TO OCCUR AFTER THE

SPS RENOVATION IS COMPLETE, AND THE MOBILE SPS

TRAILOR HAS BEEN MOVED FROM THE SITE AND IS NO

LONGER IN USE.

Scale: 1/8" = 1'-0"

TEMPORARY SPS - DEMO FLOOR PLAN

01 REMOVE EXISTING TEMPORARY ACCESS

CORRIDOR TO MOBILE TRAILOR

02 REMOVE TEMPORARY STAIR

OO

PROCEDURE

ROOM 1

MECHANICAL

ROOM

SOILED

HOLDING

SUPPLY

PROCEDURE

ROOM 2

PROCEDURE

ROOM 3

PROCEDURE

ROOM 4

PROCEDURE

ROOM 5

CORRIDOR

SCOPE

REPROCESSING

ROOM

SCOPE

STORAGE

ROOM

NN

OO

PROCEDURE

ROOM 3

PROCEDURE

ROOM 2

SUPPLY

MECHANICAL

ROOM

SOILED

HOLDING

CORRIDOR

PROCEDURE

ROOM 4

PROCEDURE

ROOM 1

11 09 12

SCOPE

REPROCESSING

ROOM

SCOPE

STORAGE

ROOM

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

FIFTH FLOOR REMODEL

/1

/2

:3

:5

P

M

AD-105-4

FIFTH FLOOR DEMOLITION PLAN

3 4MVK

JESSE BROWN VA MEDICAL CENTER

820 S. DAMEN AVE, CHICAGO IL 60612

06/13/2024

ISSUED FOR CONSTRUCTION

537-17-11518-327

RMC

Scale: 1/4" = 1'-0"

FIFTH FLOOR DEMOLITION CEILING PLAN

N

KEY PLAN

SCALE: NO SCALE

Scale: 1/4" = 1'-0"

FIFTH FLOOR DEMOLITION PLAN

02 REMOVE ALL CASEWORK, EQUIPMENT,

AND FIXTURES, AND FINISH FLOORS THIS

ROOM.

03 REMOVE CEILING PANELS THIS

ROOM.GRID TO REMAIN.

04 REMOVE EXISTING SCOPE STORAGE

CABINETS AND SALVAGE FOR

REINSTALLATION INTO NEW SPACE

06 REMOVE WALL-MOUNTED SHELVING

07 REMOVE PLUMBING AND PIPING ALONG

THESE WALLS. SEE MECH DRAWINGS.

09 EXISTING MEDIVATOR, COMPRESSOR,

AND WATER HEATER. RELOCATE AND

REINSTALL IN NEW FIRST FLOOR ROOM

1578A SCOPE REPROCESSING.

10 REMOVE EXISTING SINK AND CASEWORK

AND UPPER SHELVING.

11 REMOVE EXISTING WALL-MOUNTED

SHELF

12 REMOVE EXISTING EQUIPMENT AND TURN

OVER TO OWNER.

13 REMOVE EXISTING SCOPE TUBE

STORAGE SHELF AND REINSTALL IN

ROOM 1578A SCOPE REPROCESSING.

14 REMOVE EXISTING EYE WASH FIXTURE

AND TURN OVER TO OWNER. SEE

MECHANICAL.

0 2 4 8

NORTH

PLAN

0 2 4 8

NORTH

PLAN

A. SEE SHEET A-001-2 FOR GENERAL NOTES.

CLEAN

SCOPE

STORAGE

SOILED

HOLDING

PROCEDURE

ROOM 2

PROCEDURE

ROOM 3

SUPPLY

CORRIDOR

PROCEDURE

ROOM 4

MECHANICAL

ROOM

PROCEDURE

ROOM 1

M3160 M3160 M3160

M3160 M3160 M3160

EQUIPMENT

ROOM

M3160

REFLECTED CEILING PLAN

LEGEND

SUPPLY DIFFUSER

CEILING CONTRACTOR TO MEASURE EACH CEILING

AREA AND ESTABLISH A CEILING LAYOUT TO BALANCE

BORDER WIDTHS AT OPPOSITE EDGES OF EACH

ROOM. AVOID USE OF LESS-THAN 6" TILES.

2'x4' LAY-IN LED

1. REFERENCE ROOM FINISH SCHEDULE , FINISH MATERIAL LEGEND AND SPECIFICATION 09 06 00 SCHEDULE OF

FINISHES FOR MORE INFORMATION.

2. REFERENCE REFLECTED CEILING PLAN FOR ADDITIONAL CEILING INFO.

3. PREPARE ALL FLOOR AND WALL CONSTRUCTION, NEW AND/OR EXISTING, TO RECEIVE NEW FINISHES IN ACCORDANCE WITH MANUFACTURER’S RECOMMENDED INSTALLATION METHODS AND MATERIALS FOR ALL

FINISHES.

4. PRIOR TO INSTALLATION OF NEW FINISHES, CONTRACTOR SHALL INSPECT ALL SUBSTRATES. IF A SUBSTRATE IS DEEMED UNACCEPTABLE, THE CONTRACTOR SHALL TAKE THE NECESSARY STEPS TO RECTIFY THE SITUATION OR CONTACT THE COR WITH THE CONCERN. PROCEEDING WITH THE INSTALLATION OF FINISHES

WILL BE INDICATION THAT THE INSTALLER / FINISHER ACCEPTS CONDITION OF SUBSTRATE.

5. USE MANUFACTURER'S RECOMMENDED INSTALLATION METHODS AND MATERIALS FOR ALL FINISHES.

6. ALL NECESSARY TILE FLOORING UNDERLAYMENT TO BE PROVIDED AND INSTALLED BY FLOORING CONTRACTOR. ALL SETTING AND UNDERLAYMENT SYSTEMS TO BE FROM SAME MANUFACTURER AND

APPROVED BY FLOORING MANUFACTURER.

7. ALL FLOORING TRANSITIONS SHALL COMPLY WITH ADA GUIDELINES. FLOORING CONTRACTOR TO SUBMIT A DIAGRAM SHOWING FLOORING TRANSITION LOCATIONS FOR DESIGNERS APPROVAL PRIOR TO INSTALLATION.

8. ALL FLOOR TRANSITIONS BETWEEN DISALIKE MATERIALS SHALL BE ANODIZED ALUMINUM METAL TRIM AND TO

BE LOCATED AT CENTERLINE OF DOOR WHEN IN CLOSED POSITION

9. ALIGN FLOORING TRANSITIONS WITH FINISH BASE EXCEPT AT DOORS, UNLESS NOTED OTHERWISE.

10. FINISH LEVEL OF GYP. BD. WALLS AND SOFFITS TO BE LEVEL 4, UNLESS NOTED OTHERWISE.

11. ALL PAINTED WALLS TO BE PAINTED P-1, UNLESS NOTED OTHERWISE.

12. ALL PAINTED SURFACES SHALL RECEIVE A MINIMUM OF (1) ONE BASE COAT AND (2) TWO FINISH COATS.

13. PAINTED SHEEN LEVEL TO BE EGG-SHELL FOR ALL WALLS, U.N.O. SHEEN FOR ALL WET AREA WALLS, METAL

DOORS AND METAL FRAMES TO BE SEMI-GLOSS.

1. REFER TO MECHANICAL, ELECTRICAL, PLUMBING, TEL-COM AND LOW VOLTAGE DRAWINGS FOR ADDITIONAL

REQUIRED UTILITY CONNECTIONS AND LOCATIONS.

2. FURNITURE, FIXTURES AND EQUIPMENT SHOWN ON PLANS AND SCHEDULES ARE FOR

COORDINATION AND SPACIAL PURPOSES ONLY, NOT TO BE USED FOR ACTIVATION PURCHASING

3. ITEM TAGS INCLUDE ACQUISITION AND INSTALLATION RESPONSIBILITIES (ACQ.), DENOTED AS FOLLOWS:

PROCEDURE

ROOM 1

MECHANICAL

ROOM

SOILED

HOLDING

SUPPLY

PROCEDURE

ROOM 2

PROCEDURE

ROOM 3

PROCEDURE

ROOM 4

PROCEDURE

ROOM 5

CORRIDOR

CLEAN SCOPE

STORAGE

EQUIPMENT

ROOM

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

FIFTH FLOOR REMODEL

/1

/2

:3

:5

P

M

A-105-4

FIFTH FLOOR PLAN AND REFLECTED

CEILING PLAN

4 4MVK

JESSE BROWN VA MEDICAL CENTER

820 S. DAMEN AVE, CHICAGO IL 60612

06/13/2024

ISSUED FOR CONSTRUCTION

537-17-11518-327

RMC

N

KEY PLAN

SCALE: NO SCALE

Scale: 1/4" = 1'-0"

FIFTH FLOOR PLAN

A SEE SHEET A-001-4 FOR GENERAL CONSTRUCTION NOTES.

Specialty Equipment Schedule 5th Floor

Type Mark Description Manufacturer Model Comments

M3160 SINGLE-SIDED SCOPE CABINET ENDODRY FURNISHED BY OWNER, INSTALLED BY CONTRACTOR

01 NO CEILING WORK THIS ROOM

02 INSTALL NEW ACOUSTICAL CEILING

PANELS IN EXISTING GRID.

03 PATCH HOLES IN WALLS THIS ROOM DUE

TO DEMOLITION. MATCH EXISTING

ADJACENT CONDITIONS. PAINT UPPER

PORTION OF WALLS (ABOVE TILE)

WITH SC-1 (HIGH BUILD GLAZED SPECIAL

COATING.)

04 PATCH ANY OPENINGS IN FLOOR THAT

REMAIN AFTER DEMOLITION.

05 SOUND-ABSORBING WALL PANELS

0 2 4 8

NORTH

PLAN

0 2 4 8

NORTH

PLAN

ROOM FINISH SCHEDULE

ROOM NO. NAME FLOOR BASE

WALLS CEILING

REMARKS

EAST NORTH SOUTH WEST

FINMAT/FIN MAT/FIN MAT/FIN MAT/FIN

P-1 ELEV

P-2 ELEV

P-3 ELEV

5490 CLEAN SCOPE

STORAGE

WSF-1 WSF-1 EP-1/HIW-1 EP-1/HIW-1 EP-1/HIW-1 EP-1/HIW-1 ACT-2 HIW-1- 4'-0"H WAINSCOT PERIMETER OF ROOM WITH EP-1

ABOVE

5491 SOILED HOLDING EXISTING EXISTING RESW-1/EP-1 RESW-1/EP-1 RESW-1/EP-1 RESW-1/EP-1 EXISTING

5492 EQUIPMENT ROOM WSF-1 WSF-1 EP-1/HIW-1 EP-1/HIW-1 EP-1/HIW-1 EP-1/HIW-1 ACT-2 HIW-1- 4'-0"H WAINSCOT PERIMETER OF ROOM WITH EP-1

ABOVE

FINISH GENERAL NOTES

EQUIPMENT GENERAL NOTES

Scale: 1/4" = 1'-0"

FIFTH FLOOR CEILING PLAN

FIRE PROTECTION GENERAL NOTES

A. THE FIRE PROTECTION CONTRACTOR SHOULD USE NFPA-13 (CURRENT EDITION), CHAPTER 23, “PLANS AND CALCULATIONS” AS A GUIDELINE WHEN PREPARING SUBMITTALS FOR REVIEW.

This is the start of the file's text. The full file is on GovTribe.