This is a set of construction drawings for Phase 4 of a Sterile Processing Service (SPS) remodeling project at Jesse Brown VA Medical Center in Chicago, IL (VA Project #537-17-115). The drawings detail renovations to the fifth floor, specifically focusing on remodeling the scope processing and storage areas.
The drawings include architectural, fire protection, plumbing, mechanical, electrical, technology and fire alarm plans. Key elements include installation of new HVAC systems with a VAV terminal unit and compressor, replacement of sprinkler heads, installation of new lighting and power distribution, and security/access control systems for the renovated spaces. The scope encompasses both Clean Scope Storage (Room 5490) and Soiled Holding (Room 5491) areas, with specific requirements for maintaining proper air pressure relationships between these spaces. The drawings also detail infection control risk mitigation measures that must be implemented during construction to protect adjacent occupied areas. The documents appear to be issued for construction and dated June 13-14, 2024.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S06 - 09 65 16 Resilient Sheet Flg.pdf | ||
| 36C25225B0001 0004.docx | DOCX document | |
| 36C25225B0001 0003.docx | DOCX document | |
| S04 - 537-17-115 Site visit 02242025.pdf | ||
| 36C25225B0001 0002.docx | DOCX document | |
| S06 - Requirements for Identification and Replacement of A307 Bolts Memo.pdf | ||
| 36C25225B0001 0001.docx | DOCX document | |
| S02 - Exhibit 02c1 - 537-17-115 SOW Att - Contract Progress Repor vha-10-6001a-fill.pdf | ||
| S02 - Exhibit 01b2 537-17-115 PH3 DWGs Bid 20240701.pdf | ||
| S02 - Exhibit 01b1 537-17-115 PH2 DWGs Bid 20240701.pdf | ||
| S02 - Wage Determination 1.10.25.pdf | ||
| S02 - Exhibit 01c1 537-17-115 Specs Vol 1 20240614.pdf | ||
| 36C25225B0001_3.docx | DOCX document | |
| S02 - Exhibit 01c2 537-17-115 Specs Vol 2 20240614.pdf | ||
| S02 - Ex 02c3 - 537-17-115 SOW Att - Subcontractor Payment Summary.xlsx | XLSX spreadsheet | |
| S02 - Exhibit 01a 537-17-115 Construction IFC Narrative.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JESSE BROWN
VA HOSPITAL
W TAYLOR ST
W POLK ST
S D
A M
E N
A V
EW
O
G D
E N
A V
E
5TH FLOOR
AREA
1ST FLOOR
AREA
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP PROJECT LOCATION MAP
PROJECT IMAGE
FIFTH FLOOR REMODEL
/1
/2
:0
:1
P
M
G-001-4
FIFTH FLOOR REMODEL- COVER
1 5MVK
JESSE BROWN VA MEDICAL CENTER
820 S. DAMEN AVE, CHICAGO IL 60612
06/13/2024
ISSUED FOR CONSTRUCTION
537-17-11518-327
REMODEL STERILE PROCESSING SERVICE
JESSE BROWN VA MEDICAL CENTER
820 S. DAMEN AVE, CHICAGO IL 60612
VA PROJECT #: 537-17-115 APOGEE PROJECT #: 18-327
RMC
PHASE 4: FIFTH FLOOR REMODEL
DRAWING LIST
GENERAL
G-001-4 FIFTH FLOOR REMODEL- COVER 1 5
G-100-4 GENERAL INFORMATION - PHASE 4 2 5
G-101-4 ICRA PLAN 3 5
G-102-4 ICRA DETAILS 4 5
LS-100-4 FIFTH FLOOR LIFE SAFETY PLAN 5 5
ARCHITECTURAL
A-001-4 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 4
AD-101-4 FIRST FLOOR DEMOLITION PLAN 2 4
AD-105-4 FIFTH FLOOR DEMOLITION PLAN 3 4
A-105-4 FIFTH FLOOR PLAN AND REFLECTED CEILING PLAN 4 4
FIRE PROTECTION
FS-001-4 FIRE SUPPRESSION GENERAL INFORMATION 1 3
FS-101-4 FIRE SUPPRESSION PLANS- PHASE 4 2 3
FS-102-4 FIRE SUPPRESSION PLANS- PHASE 4 3 3
PLUMBING
P-001-4 PLUMBING GENERAL INFORMATION - PHASE 4 1 2
P-101-4 PLUMBING PLANS- PHASE 4 2 2
MECHANICAL
M-001-4 MECHANICAL GENERAL INFORMATION 1 4
MD-101-4 MECHANICAL DEMOLITION PLANS- PHASE 4 2 4
MH-101-4 MECHANICAL HVAC PLANS- PHASE 4 3 4
MP-101-4 MECHANICAL PIPING PLANS- PHASE 4 4 4
ELECTRICAL
E-001-4 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 4
EP101-4 FIFTH FLOOR ELECTRICAL PLAN - PHASE 4 2 4
EM101-4 ELECTRICAL FIFTH FLOOR POWER PLANS - PHASE 4 3 4
E-501-4 ELECTRICAL DETAILS PHASE 4 4 4
TECHNOLOGY
T-001-4 TECHNOLOGY GENERAL NOTES SYMBOL LEGEND AND ABBREVIATIONS, AND
DETAILS
1 2
T-101-4 FIFTH FLOOR TECHNOLOGY PLAN- PHASE 4 2 2
FIRE ALARM
FA101-4 FIFTH FLOOR FIRE ALARM PLAN- PHASE 4 2 2
NORTH
PLAN
PROJECT LOCATION
24514
LICENSED
ARCHITECT
DocuSign Envelope ID: B0CA22F4-B9A3-463C-9AC8-E13FC488A65D
6/14/2024
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF
PRECAUTIONS FOR CONSTRUCTION AND RENOVATION
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF
PRECAUTIONS FOR CONSTRUCTION AND RENOVATION WALL SECTION
SYMBOL
INTERIOR ELEVATION
SYMBOL
COLUMN GRID
ELEVATION SYMBOL
REVISION NOTE
ENLARGED DETAIL CALLOUT
ROOM DESIGNATION
SYMBOL
BREAK LINE
ROOF SLOPE
DIRECTION SYMBOL
TYPICAL GRAPHIC SCALE
DETAIL #
PAGE #
DETAIL #
PAGE #
TRUE NORTH ARROW
PROJECT NORTH ARROW
A8.1
EXTERIOR ELEVATION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
A8.1
BUILDING SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
DETAIL SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
WALL GRID
(REPRESENTS
FACE OF EXISTING
WALL)
XX.X
XX.X
ELEVATION
0'-0"
ROOM
NAME
101A
NORTH
PLAN
NORTH
TRUE
0 4 8 16
IIILOW Risk Group 1
Class III
Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
I
I
III
MEDIUM Risk Group 2
HIGH Risk Group 3
HIGHEST Risk Group 4 V
V
IV
V
IV
III
IV
II
III
Patient Risk Group Table
Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk
TYPE A
Construction Project Type
Major demolition and construction projects Includes, but is not limited to:
• Removal or replacement of building system component(s).
• Removal/installation of drywall partitions.
• Invasive large-scale new building construction.
• Renovation work in two or more rooms.
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies Includes, but is not limited to:
• Removal of preexisting floor covering, walls, casework or other building components.
• New drywall placement.
• Renovation work in a single room.
• Nonexisting cable pathway or invasive electrical work above ceilings.
• The removal of drywall where a moderate amount of dust and debris is created.
• Dry sanding where a moderate amount of dust and debris is created.
• Work creating significant vibration and/or noise.
• Any activity that cannot be completed in a single work shift.
Small scale, short duration activities which create minimal dust Includes, but is not limited to:
• Work conducted above the ceiling (e.g., prolonged inspection or repair of firewalls and barriers, installation of conduit and/or cabling, and access to mechanical and/or electrical chase spaces).
• Fan shutdown/startup.
• Installation of electrical devices or new flooring that produces minimal dust and debris.
• The removal of drywall where minimal dust and debris is created.
• Controlled sanding activities (e.g., wet or dry sanding) that produce minimal dust and debris.
Inspection and Non-Invasive Activities Includes, but is not limited to:
• Removal of ceiling tile for visual inspection-limited to 1 tile per 50 square feet with limited exposure time.
• Limited building system maintenance (e.g., pneumatic tube station, HVAC system, fire suppression system, electrical and carpentry work to include painting without sanding) that does not create dust or debris.
• Clean plumbing activity limited in nature.
Type of Construction / Project Activity Table
Group 2 Medium Risk
Group 1 Low Risk
• Physical Therapy
• Radiology departments
• All patient waiting rooms
• All outpatient clinics
• Research Areas
• Respiratory Therapy
• Office areas (non-clinical)
• FES/EMS areas
I
Patient Risk Group
TYPE D
TYPE C
TYPE B
TYPE A
Group 4 Highest Risk
Group 3 High Risk
• Emergency Room
• Clinical Laboratories (specimen)
• Same Day Surgery
• Pharmacy
• Nutrition and Food
Service/Canteen
• Procedural Areas (GI)
• Inpatient Mental Health
• Any area caring for immunocompromised patients
• Cardiac Cath Lab/IR
• Central Sterile Supply
• Sterile Processing Service
• Intensive Care Units
IIII
TYPE DTYPE CTYPE B
Class IVor control procedures are necessary.
C
LA
S
S
IV
During Construction Project Upon Completion of Project
1. Includes all activities required by Class III
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management
Maintenance and Engineering department before construction begins.
3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.
4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.
5. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).
6. Containment units or environmental containment units (ECUs) approved for Class IV precautions in small areas totally contained by the unit and that has HEPA-filtered exhaust air.
7. Remove or isolate return air diffusers to avoid dust entering the HVAC system.
8. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.
9. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.
10. Maintain negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.
11. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.
12. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is not acceptable.
13. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.
14. Contain all trash and debris in the work area.
15. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
16. Worker clothing must be clean and free of visible dust before leaving the work area.
HEPA vacuuming of clothing or use of cover suites is acceptable.
17. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be immediately changed.
18. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
19. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.
• Medical/Surgical Units
• Negative pressure isolation rooms
• Outpatient Chemotherapy
Areas
• Operating rooms
• Post Anesthesia Care Unit
• Dialysis
• Dental
C
LA
S S
V
1. Includes all activities required by Class IV
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management
Maintenance and Engineering department before construction begins.
3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.
4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.
5. Seal all penetrations in containment barriers, anteroom barriers, including floors and ceiling using approved materials (UL schedule firestop if applicable for barrier type).
6. Construct anteroom large enough for equipment staging, cart cleaning, workers. The anteroom must be constructed adjacent to entrance of construction work area.
7. Personnel will be required to wear coveralls at all times during Class V work activities.
Coveralls must be removed before leaving the anteroom.
8. Remove or isolate return air diffusers to avoid dust entering the HVAC system.
9. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.
10. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.
11. Maintain negative pressurization of the entire workspace using HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.
12. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.
13. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (bathroom exhaust) is not acceptable.
14. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.
15. Contain all trash and debris in the work area.
16. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
17. Worker clothing must be clean and free of visible dust before leaving the work area anteroom.
18. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area).
Damaged shoe covers must be immediately changed.
19. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
20. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.
Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.
Work Area Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
Removal of Critical Barriers:
1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.
2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
1. Carefully remove screws and painter tape.
2. If dust will be generated during screw removal, use hand-held HEPA vacuum.
3. Drywall cutting is prohibited during removal process.
4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.
5. Use a plastic barrier to enclose area if dust could be generated.
Negative Air Requirements:
1. The use of negative air must be designed to remove contaminates from the work area.
2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
HVAC systems:
1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.
2. Verify that HVAC systems are clean and operational.
3. Verify the HVAC systems meets original airflow and air exchange design specifications.
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
During Construction Project
C
LA
S S
I
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
Upon Completion of Project
1. Execute work by methods to minimize raising dust from construction operations.
2. Perform noninvasive work activity as to not block or interrupt patient care.
3. Perform noninvasive work activities in areas that are not directly occupied with patients.
4. Perform noninvasive work activity in a manner that does not create dust.
5. Immediately replace any displaced ceiling tile before leaving the area and/or at end of noninvasive work activity.
C
LA
S S
II
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
1. Includes all activities required by Class I
2. Perform only limited dust work and/or activities designed for basic facilities and engineering work.
3. Perform limited dust and invasive work following standing precautions procedures approved by the organization.
4. This Class of Precautions must never be used for construction or renovation activities.
5. Provide active means to prevent airborne dust from dispersing into atmosphere.
6. Water mist work surfaces to control dust while cutting.
7. Seal unused doors with duct tape.
8. Block off and seal air vents.
9. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.
10. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.
Work Area Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
Removal of Critical Barriers:
1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.
2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
1. Carefully remove screws and painter tape.
2. If dust will be generated during screw removal, use hand-held HEPA vacuum.
3. Drywall cutting is prohibited during removal process.
4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.
5. Use a plastic barrier to enclose area if dust could be generated.
Negative Air Requirements:
1. The use of negative air must be designed to remove contaminates from the work area.
2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
HVAC systems:
1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.
2. Verify that HVAC systems are clean and operational.
3. Verify the HVAC systems meets original airflow and air exchange design specifications.
CONSTRUCTION ACTIVITIES SHALL BE CLASSIFIED AS FOLLOWS UNLESS NOTED OTHERWISE:
1. INSTALLATION OF CABLE TRAY IN CORRIDOR CEILINGS SHALL BE CONSIDERED CONSTRUCITON ACTIVITY TYPE B.
2. ALL CONDUIT SPECIFIED TO BE INSTALLED IN WALL SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE C.
3. CONSTRUCTION OF NEW ROOMS SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE D.
4. INSTALLATION OF NEW DOORS TO OR FROM EXISTING SPACES SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE C.
C
LA
S S
II
I
1. Includes all activities required by Class II
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Provide active means to prevent airborne dust dispersion into the occupied areas.
4. Means for controlling minimal dust dispersion may include hand-held HEPA vacuum devices, polyethylene plastic containment, or isolation of work area by closing room door.
5. Remove or isolate return air diffusers to avoid dust from entering the HVAC system.
6. Remove or isolate the supply air diffusers to avoid positive pressurization of the space,
7. If work area is contained, then it must be neutrally to negatively pressurized at all times.
8. Seal all doors with tape that will not leave residue.
9. Contain all trash and debris in the work area.
10. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
11. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
12. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces.
13. Clean construction area at the end of each shift by damp mopping or HEPA Vacuum.
For Type C activities, follow procedures for Class IV.
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
FIFTH FLOOR REMODEL
/1
/2
:5
:1
P
M
G-100-4
GENERAL INFORMATION - PHASE 4
2 5MVK
JESSE BROWN VA MEDICAL CENTER
820 S. DAMEN AVE, CHICAGO IL 60612
06/13/2024
ISSUED FOR CONSTRUCTION
537-17-11518-327
RMC
GENERAL SYMBOL LEGEND
APPLICABLE CODES AND STANDARDS
NFPA 10, STANDARD FOR PORTABLE FIRE EXTINGUISHERS, 2018
NFPA 13, INSTALLATION OF SPRINKLER SYSTEMS, 2016
NFPA 70, NATIONAL ELECTRICAL CODE (NEC), 2023
NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE, 2022
NFPA 80, STANDARD FOR FIRE DOORS AND OTHER OPENING PROTECTIVES, 2019
NFPA 90A: STANDARD FOR THE INSTALLATION OF AIR CONDITIONING & VENTILATING SYSTEMS, 2018
NFPA 99, HEALTH CARE FACILITIES CODE, 2018
NFPA 101, LIFE SAFETY CODE, 2018
PG 18-13: VA BARRIER FREE DESIGN STANDARD, 2024
PG 18-12: 285: STERILE PROCESSING SERVICE, 2022
ASHRAE 90.1, 2022
ASHRAE 170, VENTILATION OF HEALTH CARE FACILITIES, 2021
DEPARTMENT OF VETERANS AFFAIRS: FIRE PROTECTION DESIGN MANUAL, 2023
DEPARTMENT OF VETERANS AFFAIRS: PLUMBING DESIGN MANUAL, 2024
DEPARTMENT OF VETERANS AFFAIRS: HVAC DESIGN MANUAL, 2024
DEPARTMENT OF VETERANS AFFAIRS: ELECTRICAL DESIGN MANUAL, 2019
DEPARTMENT OF VETERANS AFFAIRS: LIGHTING DESIGN MANUAL, 2021
DEPARTMENT OF VETERANS AFFAIRS: TELECOMMUNICATIONS DESIGN MANUAL, 2016
Scale: 12" = 1'-0"
ICRA RISK ASSESSMENT - PHASE 4
OVERALL PHASE SUMMARY
PHASE 1: INSTALLATION OF TEMPORARY SPS MOBILE TRAILER AND ACCESS CORRIDOR (NOT IN CONTRACT, ALREADY COMPLETED).
PHASE 2: INTERIOR DEMOLITION WITHIN SPS AREA (FIRST FLOOR) AND MECHANICAL ROOM (THIRD FLOOR).
PHASE 3: NEW CONSTRUCTION WITHIN SPS AREA (FIRST FLOOR) AND MECHANICAL ROOM (THIRD FLOOR).
PHASE 4: INTERIOR DEMOLITION AND NEW WORK AT EXISTING SCOPE PROCESSING AND STORAGE AREA (FIFTH FLOOR).
THIS PHASE ALSO INCLUDES THE DEMOLITION OF THE TEMPORARY SPS TRAILER ACCESS CORRIDOR THAT WAS CONSTRUCTED IN PHASE 1.
DocuSign Envelope ID: 5C2FFA19-F1BC-408D-8005-D330D0E23A4A
6/13/2024
S SS
NN
OO
CLEAN
SCOPE
STORAGE
SOILED
HOLDING
PROCEDURE
ROOM 2
PROCEDURE
ROOM 3
SUPPLY
CORRIDOR
PROCEDURE
ROOM 4
MECHANICAL
ROOM
PROCEDURE
ROOM 1
PROCEDURE
ROOM 5
STAIR
5'-0" 03
EQUIPMENT
ROOM
NN
OO
PROCEDURE
ROOM 3
PROCEDURE
ROOM 2
SUPPLY
MECHANICAL
ROOM
SOILED
HOLDING
CORRIDOR
PROCEDURE
ROOM 4
PROCEDURE
ROOM 1
PROCEDURE
ROOM 5
STAIR
5'-0"
PROCEDURE
ROOM
EQUIPMENT
ROOM
2 HOUR FIRE SEPARATION
1 HOUR FIRE SEPARATION
SMOKE RATED
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
FIFTH FLOOR REMODEL
/1
/2
:5
:1
P
M
G-101-4
ICRA PLAN
3 5MVK
JESSE BROWN VA MEDICAL CENTER
820 S. DAMEN AVE, CHICAGO IL 60612
06/13/2024
ISSUED FOR CONSTRUCTION
537-17-11518-327
RMC
Scale: 1/4" = 1'-0"
FIFTH FLOOR PLAN ICRA 0 2 4 8
NORTH
PLAN
N
KEY PLAN
SCALE: NO SCALE
01 1 HOUR RATED ICRA/LIFE SAFETY
BARRIER.
Scale: 1/4" = 1'-0"
FIFTH FLOOR DEMOLITION- ICRA PLAN 0 2 4 8
NORTH
PLAN
WALL RATING LEGEND
02 FLOOR STICKY MAT.
HEPA FILTERATION/NEGATIVE AIR MACHINE.
BASIS OF DESIGN: HEPACART OMNIAIRE
NEGATIVE AIR MACHINE.
AREA OF MINOR RENOVATION WORK
AREA OF MODIFICATION WORK
A. SEE SHEET G-102-4 FOR INFECTION CONTROL NOTES.
OUTSIDE OF BUILDING
MONTHLY CHANGED HEPA
FILTER
HEPA NEGATIVE
AIR UNIT
WEEKLY CHANGED (OR MORE AS
NEEDED) PRE FILTER
FIRE RATED PLYWOOD
F L E
X D
U C
T
SUPPLY DUCTS EITHER KEEP
RUNNING OR COVER WHEN
RUNNING TO KEEP DUST OUT.
TAPE ALL SERVICES
TO PROTECT AGAINST
CONTAMINATION
A
O
V
FIRE EXTINGUISHER ON PORTABLE
FLOOR BRACKET (ILSM MAY REQUIRE
MORE THAN ONE)
SUSPENDED PLASTIC ZIPPER
WALL CURTAIN BARRIER
INDICATOR SHALL BE AT -0.01 OR
GREATER (VERIFY DAILY). IF NOT
VERIFY ALL OPENINGS SUCH AS DOOR
ARE CLOSED AND/OR CHANGE OUT
NEGATIVE AIR PRE-FILTER
PROVIDE STICKY MATS
(CHANGED END OF SHIFT
OR MORE IF NECESSARY
TO MAINTAIN CLEANLINESS)
POST ICRA ILSM FIRE
INSPECTION SHEETS
VISIBLE TO PUBLIC
COVER ALL RETURNS AT THE
GRATE/DIFFUSERS
OPTIONAL EXHAUST DUCTS
(COVER THE GRATES AND THE DIFFUSERS)
A
E
A
DOOR OPENING
VENT TO OUTSIDE
ROUTE TO BE
APPROVED BY OWNER
HEATED DETECTOR CUT-OFF
BASIS OF DESIGN: HEPA
NEGATIVE AIR UNIT INTEGRAL
WITH EDGEGUARD BARRIER
SYSTEM.
FIRE RATED PLYWOOD (TEMP.
REMOVE GLASS PANEL)
EXISTING WINDOW FRAME
ICRA BARRIER ICRA BARRIER
ADJUSTS FROM
7'-8" TO 10'-0" A.F.F
EXISTING CEILING
EXISTING CONCRETE SLAB FLOORING
FINISHED FLOORING TO BE
KEPT CLEAN. FLOORS NOT
BEING REPLACED MUST BE
PROTECTED. COVER WITH
ROSIN PAPER/ FIRE RATED
PLYWOOD.
ICRA, ILSM, FIRE WATCH AND
MISC. FORMS
PAPER
CADDY
1'-5"
ILSM SIGNAGE
• THIS EXIT IS CLOSED AND LEADS TO A
CONSTRUCTION AREA
• PLEASE USE ALTERNATE EXITS AS MARKED
INTERIM LIFE SAFETY MEASURES IN EFFECT FOR THE
STERILE PROCESSING SUITE REMODEL PROJECT
PROJECT:
PRIME CONTRACTOR:
SUB CONTRACTOR:
EMERGENCY CONTACT NO.:
BARRIER INSTALLATION DATE:
BARRIER EXPIRATION DATE:
ILSM TEMPORARY BARRIER TAG
TEMPORARY ICRA/DUST/LIFE SAFETY BARRIER
EXISTING
STRUCTURAL DECK
ABOVE
EXISTING CEILING
MODULAR PANELS
SEE PLAN
TEMPORARY ICRA/DUST BARRIER AND LIFE SAFETY
BARRIER.
ACCEPTABLE PRODUCTS:
EDGE-GUARD PANELS
STARC REALWALL.
TEMPORARY CONTAINMENT WALL SYSTEM: ICRA/DUST
BARRIER PLASTIC SHEETS, CONTINUOUS FROM FLOOR TO
CEILING, WITH SEALED JOINTS AT PERIMETER.
BASIS OF DESIGN: ZIPWALL DUST BARRIER SYSTEM.
TEMPORARY ICRA/DUST/BARRIER - PLASTIC SHEET
EXISTING
STRUCTURAL DECK
ABOVE
EXISTING CEILING
PLASTIC SHEET
BARRIER
SEE PLAN
A. THE CONTRACTOR SHALL NOT HAUL DEBRIS
THROUGH PATIENT-CARE AREAS WITHOUT PRIOR
APPROVAL OF THE COR AND THE MEDICAL CENTER.
B. ACTIVITY HAZARD RISK CLASSIFICATIONS OF CLASS
I OR CLASS II SHALL REQUIRE APPROVAL BY THE
FACILITY SAFETY MANAGER AND CONTRACTING
OFFICER REPRESENTATIVE BEFORE BEGINNING
ANY CONSTRUCTION WORK. HAZARD RISK
CLASSIFICATIONS OF CLASS III OR IV SHALL
REQUIRE A PERMIT BEFORE BEGINNING ANY
CONSTRUCTION WORK. INFECTION CONTROL
PERMITS WILL BE ISSUED BY THE FACILITY SAFETY
MANAGER AND CONTRACTING OFFICER
REPRESENTATIVE.
C. INFECTION CONTROL PERMITS SHALL BE POSTED
OUTSIDE THE APPROPRIATE CONSTRUCTION AREA.
MORE THAN ONE PERMIT MAY BE ISSUED, AS WORK
IS LOCATED IN MULTIPLE AREAS.
D. THE REQUIRED INFECTION CONTROL PRECAUTIONS
ARE AS FOLLOWS:
CLASS 1:
• NOTIFY THE COR.
• EXECUTE WORK USING METHODS TO MINIMIZE
RAISING DUST FROM CONSTRUCTION OPERATIONS.
• CEILING TILES: IMMEDIATELY REPLACE ANY CEILING
TILES DISPLACED FOR VISUAL INSPECTION.
• UPON COMPLETION: CLEAN WORK AREA, AND
NOTIFY COR.
CLASS 2:
• NOTIFY THE COR.
• PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE
DUST FROM DISPERSING INTO ATMOSPHERE SUCH
AS WET METHODS OR TOOL MOUNTED DUST
COLLECTORS.
• WATER MIST WORK SURFACES TO CONTROL DUST
WHILE CUTTING.
• SEAL UNUSED DOORS WITH PAINTERS TAPE.
• BLOCK OFF AND SEAL AIR VENTS.
• REMOVE OR ISOLATE HVAC SYSTEM IN AREAS
WHERE WORK IS BEING PERFORMED.
• UPON COMPLETION: WIPE WORK SURFACES WITH
CLEANER/ DISINFECTANT. CONTAIN CONSTRUCTION
WASTE BEFORE TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
CLASS 3:
DURING CONSTRUCTION WORK:
• OBTAIN PERMIT FROM THE COR.
• REMOVE OR ISOLATE HVAC SYSTEM IN AREA
WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
• COMPLETE ALL CRITICAL BARRIERS TO SEAL AREA
FROM NON-WORK AREA OR IMPLEMENT CONTROL
CUBE METHOD (CART WITH PLASTIC COVERING AND
SEALED CONNECTION TO WORK SITE WITH HEPA
VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE
CONSTRUCTION BEGINS. INSTALL CONSTRUCTION
BARRIERS AND CEILING PROTECTION CAREFULLY,
OUTSIDE OF NORMAL WORK HOURS.
• MAINTAIN NEGATIVE AIR PRESSURE, 0.01 INCHES OF
WATER GAUGE, WITHIN WORK SITE UTILIZING HEPA
EQUIPPED AIR FILTRATION UNITS AND
CONTINUOUSLY MONITORED WITH A DIGITAL
DISPLAY, RECORDING AND ALARM INSTRUMENT,
WHICH MUST BE CALIBRATED ON INSTALLATION,
MAINTAINED WITH PERIODIC CALIBRATION AND
MONITORED BY THE CONTRACTOR.
• CONTAIN CONSTRUCTION WASTE BEFORE
TRANSPORT IN TIGHTLY COVERED CONTAINERS.
• COVER TRANSPORT RECEPTACLES OR CARTS.
TAPE COVERING UNLESS SOLID LID.
UPON COMPLETION:
• DO NOT REMOVE BARRIERS FROM WORK AREA
UNTIL COMPLETED PROJECT THOROUGHLY
CLEANED, AND IS INSPECTED BY THE CONTRACTING
OFFICER REPRESENTATIVE AND BY THE VA
ENVIRONMENTAL SERVICES DEPARTMENT.
• REMOVE CONSTRUCTION BARRIERS AND CEILING
PROTECTION CAREFULLY TO MINIMIZE SPREADING
OF DIRT AND DEBRIS ASSOCIATED WITH
CONSTRUCTION, OUTSIDE OF NORMAL WORK
HOURS.
• VACUUM WORK AREA WITH HEPA FILTERED
VACUUMS.
• WET MOP AREA WITH CLEANER/DISINFECTANT.
• UPON COMPLETION, RESTORE HVAC SYSTEM
WHERE WORK WAS PERFORMED.
• RETURN PERMIT TO THE COR.
CLASS 4:
DURING CONSTRUCTION WORK:
• OBTAIN PERMIT FROM THE COR.
• ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS
BEING DONE TO PREVENT CONTAMINATION OF
DUCT SYSTEM.
• COMPLETE ALL CRITICAL BARRIERS TO SEAL AREA
FROM NON-WORK AREA OR IMPLEMENT CONTROL
CUBE METHOD (CART WITH PLASTIC COVERING AND
SEALED CONNECTION TO WORK SITE WITH HEPA
VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE
CONSTRUCTION BEGINS. INSTALL CONSTRUCTION
BARRIERS AND CEILING PROTECTION CAREFULLY,
OUTSIDE OF NORMAL WORK HOURS.
• MAINTAIN NEGATIVE AIR PRESSURE, 0.01 INCHES OF
WATER GAUGE, WITHIN WORK SITE UTILIZING HEPA
EQUIPPED AIR FILTRATION UNITS AND
CONTINUOUSLY MONITORED WITH A DIGITAL
DISPLAY, RECORDING AND ALARM INSTRUMENT,
WHICH MUST BE CALIBRATED ON INSTALLATION,
MAINTAINED WITH PERIODIC CALIBRATION AND
MONITORED BY THE CONTRACTOR.
• SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES.
• CONSTRUCT ANTEROOM AND REQUIRE ALL
PERSONNEL TO PASS THROUGH THIS ROOM SO
THEY CAN BE VACUUMED USING A HEPA VACUUM
CLEANER BEFORE LEAVING WORK SITE OR THEY
CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE
REMOVED EACH TIME THEY LEAVE WORK SITE.
• ALL PERSONNEL ENTERING WORK SITE ARE
REQUIRED TO WEAR SHOE COVERS. SHOE COVERS
MUST BE CHANGED EACH TIME THE WORKER EXITS
THE WORK AREA.
UPON COMPLETION:
• DO NOT REMOVE BARRIERS FROM WORK AREA
UNTIL COMPLETED PROJECT THOROUGHLY
CLEANED, AND IS INSPECTED BY THE CONTRACTING
OFFICER REPRESENTATIVE AND BY THE VA
ENVIRONMENTAL SERVICES DEPARTMENT.
• REMOVE CONSTRUCTION BARRIERS AND CEILING
PROTECTION CAREFULLY TO MINIMIZE SPREADING
OF DIRT AND DEBRIS ASSOCIATED WITH
CONSTRUCTION, OUTSIDE OF NORMAL WORK
HOURS.
• CONTAIN CONSTRUCTION WASTE BEFORE
TRANSPORT IN TIGHTLY COVERED CONTAINERS.
• COVER TRANSPORT RECEPTACLES OR CARTS.
TAPE COVERING UNLESS SOLID LID.
• VACUUM WORK AREA WITH HEPA FILTERED
VACUUMS.
• WET MOP AREA WITH CLEANER/DISINFECTANT.
• UPON COMPLETION, RESTORE HVAC SYSTEM
WHERE WORK WAS PERFORMED.
• RETURN PERMIT TO THE COR.
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
FIFTH FLOOR REMODEL
/1
/2
:5
:1
P
M
G-102-4
ICRA DETAILS
4 5MVK
JESSE BROWN VA MEDICAL CENTER
820 S. DAMEN AVE, CHICAGO IL 60612
06/13/2024
ISSUED FOR CONSTRUCTION
537-17-11518-327
RMC
Scale: 1/2" = 1'-0"
ICRA TYPICAL CONSTRUCTION PLAN LAYOUT_4
Scale: 1/2" = 1'-0"
CROSS SECTION A_4
Scale: 6" = 1'-0"
ILSM SIGNAGE_4
Scale: 12" = 1'-0"
ILSM TEMPORARY BARRIER TAG_4
Scale: 3/4" = 1'-0"
TEMP DUST AND INFECTION CONTROL BARRIER TYPES_4
S SS
OO
SOILED
HOLDING
PROCEDURE
ROOM 2
PROCEDURE
ROOM 3
SUPPLY
CORRIDOR
PROCEDURE
ROOM 4
MECHANICAL
ROOM
PROCEDURE
ROOM 1
PROCEDURE
ROOM 5
STAIR
DN
F
T T
O E
X
IT
E N
C L
O S
U R
E
EQUIPMENT
ROOM
CLEAN
SCOPE
STORAGE
2 HOUR FIRE SEPARATION
1 HOUR FIRE SEPARATION
SMOKE RATED
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
FIFTH FLOOR REMODEL
/1
/2
:5
:1
P
M
LS-100-4
FIFTH FLOOR LIFE SAFETY PLAN
5 5MK
JESSE BROWN VA MEDICAL CENTER
820 S. DAMEN AVE, CHICAGO IL 60612
06/13/2024
ISSUED FOR CONSTRUCTION
537-17-11518-327
RMC
N
KEY PLAN
SCALE: NO SCALE
Scale: 1/4" = 1'-0"
FIFTH FLOOR PLAN LIFE SAFETY
SEE SHEET G-100-4 FOR LIST OF APPLICABLE
CODES AND STANDARDS
AREA OF RENOVATION WORK
AREA OF MODIFICATION WORK
A
SEE SHEET A-001-4 FOR GENERAL NOTESB
THIS PROJECT OCCURS IN BUILDING 1, LEVEL 5,
NORTH WING (DAMEN BUILDING). BUILDING 1 IS
AN AMBULATORY HEALTHCARE OCCUPANCY.
C
THIS PROJECT DOES NOT IMPACT THE LIFE
SAFETY SYSTEMS OF THE EXISTING BUILDING.
D
WALL RATING LEGEND
DEMOLITION NOTES
1. KEY NOTES AND DRAWINGS ARE INTENDED TO GRAPHICALLY REPRESENT
GENERAL WORK AND DO NOT PORTRAY FULL SCOPE OF THE PROJECT. SEE
SPECIFICATIONS FOR DETAILED REQUIREMENTS.
2. REMOVE EXISTING CONSTRUCTION AS DESIGNATED HEREIN AND CLEAR AREA
OF DEBRIS PRIOR TO PROCEEDING WITH NEW CONSTRUCTION.
3. EXISTING EQUIPMENT REMOVED SHALL BE PROPERLY DISPOSED OFF MEDICAL
CENTER GROUNDS.
4. PATCH WALL OPENING SHALL MATCH THE INTEGRITY OF ADJACENT
CONSTRUCTION UNLESS INDICATED OTHERWISE.
5. NOTIFY COR OF ANY DEMOLITION REQUIRED AND NOT INDICATED FOR
INSTALLATION OF ELECTRICAL OR DATA ITEMS. AFTER SUCH DEMOLITION AND
INSTALLATION, PATCH OR REPLACE MATERIALS AND FINISHES TO MATCH
EXISTING.
6. THE INFORMATION CONTAINED IN THESE DEMOLITION DOCUMENTS DEFINES
GENERAL SCOPE ONLY AND DOES NOT RELIEVE THE CONTRACTOR OF THE
RESPONSIBILITY OF PROVIDING ALL DEMOLITION REQUIRED FOR THE
COMPLETION OF THE PROJECT.
7. REFER TO THE ELECTRICAL DRAWINGS FOR FURTHER INFORMATION
REGARDING DEMOLITION OF ELECTRICAL SYSTEMS.
8. BEFORE THE START OF WORK, IDENTIFY ANY REQUIRED DEMOLITION BEYOND
THE IDENTIFIED PROJECT SCOPE WHETHER ABOVE, BELOW OR OUTSIDE
PROJECT AREA. NOTIFY AND COORDINATE WITH THE COR, PROVIDE
DEMOLITION OF THESE AREAS AND PATCH THE SAME AS A PART OF THE
SCOPE OF THE PROJECT.
9. ALL DEMOLITION WORK SHALL BE PERFORMED WITH DUE CARE AND
DILIGENCE IN ORDER TO PREVENT ARBITRARY DAMAGE OR INTERRUPTION OF
SERVICE OR CONCEALED UTILITIES INTENDED TO REMAIN IN SERVICE.
DISCOVERY OF UTILITIES OR CONDITIONS LOCATED DIFFERENTLY FROM THAT
INDICATED OR THAT ARE NOT IDENTIFIED. SHALL BE REPORTED TO THE
CONTRACTING OFFICER.
GENERAL NOTES
1. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF THE DESIGNER AS TO THE LIMITATIONS OF THE WORK AREA IN AN OCCUPIED AREA. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY AGREEMENT BETWEEN THE COR AND
CONTRACTOR BEFORE THE START OF THE WORK.
2. DRAWINGS ARE PREPARED USING DIMENSIONS AND PRODUCT DRAWINGS ARE PREPARED USING DIMENSIONS AND PRODUCT AND DETAILS FOR SPECIFIC PRODUCTS MAY CHANGE BEFORE THEY ARE AND DETAILS FOR SPECIFIC PRODUCTS MAY CHANGE BEFORE THEY ARE ACTUALLY INCORPORATED INTO THE WORK, AND PRODUCTS BY OTHER MANUFACTURERS ARE ALSO ACCEPTABLE. THEREFORE, ACTUAL INSTALLATION DETAILS AND DIMENSIONS MAY DIFFER FROM THOSE SHOWN. CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE INCORPORATED IN THE WORK (INCLUDING THICKNESS FOR RECESSED OR SEMI-RECESSED PRODUCTS) AND IS RESPONSIBLE FOR ACCOMMODATING AND COORDINATING CHANGES TO OTHER MATERIALS OR PRODUCTS THAT ARE NECESSARY BECAUSE OF THESE DIFFERENCES.
3. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS USED ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS, OR OF THE DRAWINGS AND SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO BE CONSTRUCTED AS A COMPLETE, INTEGRATED AND UNIFIED WHOLE.
4. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE COR PRIOR TO BIDDING. WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR INTENT CANNOT BE REASONABLY INFERRED, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR GREATER
QUANTITY OF WORK.
5. USE OF THE WORD "VERIFY" POINTS OUT A SITUATION WHICH MUST BE CONFIRMED PRIOR TO PROCEEDING WITH THE WORK, FABRICATION OF EQUIPMENT, OR ORDERING MATERIAL. NOTIFY THE COR OF ANY
DISCREPANCY DISCOVERED.
6. THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY SHOULD DISCREPANCIES BE FOUND IN THE
DRAWINGS AND SPECIFICATIONS.
7. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS AND DIMENSIONS AS THEY RELATE TO THIS PROJECT. SHOULD DISCREPANCIES EXIST BETWEEN THE WORK INDICATED AND ACTUAL FIELD
CONDITIONS NOTIFY THE COR PRIOR TO PROCEEDING WITH THE WORK.
8. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL OR DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL
GOVERN.
9. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION.
10. THE CONTRACTOR AND SUBCONTRACTORS INVOLVED IN THIS PROJECT SHALL BE RESPONSIBLE FOR DESIGNING AND INSTALLING THEIR RESPECTIVE WORK AND SYSTEMS TO MEET ALL APPLICABLE FEDERAL, STATE, AND LOCAL CODES, LAWS, SAFETY REGULATIONS, HAZARDOUS WASTE LAWS, ETC. THE CONTRACTOR
SHALL FURNISH ALL NECESSARY PERMITS.
11. THE CONTRACTOR SHALL REVIEW THE DRAWINGS AND UNDERSTAND THE SCOPE OF THE DRAWINGS TO BE THE FOLLOWING: THESE CONSTRUCTION DOCUMENTS (DRAWINGS, SPECIFICATIONS, ADDENDA, ETC.)
INDICATE THE GENERAL SCOPE OF THE PROJECT IN TERMS OF ARCHITECTURAL DESIGN CONCEPTS, THE DIMENSIONS OF THE BUILDING, THE MAJOR ARCHITECTURAL ELEMENTS, AND THE MAJOR STRUCTURAL, MECHANICAL, ELECTRICAL, AND DATA SYSTEMS. THE DOCUMENTS DO NOT AND ARE NOT INTENDED TO INDICATE OR DESCRIBE IN DETAIL ALL THE NECESSARY WORK REQUIRED FOR FULL PERFORMANCE OF, AND COMPLETION OF THE REQUIREMENTS OF THE CONTRACT. ON THE BASIS OF THE GENERAL SCOPE INDICATED IN THESE DOCUMENTS, THE TRADE CONTRACTORS SHALL FURNISH ALL ITEMS REQUIRED FOR THE PROPER EXECUTION AND COMPLETION OF THEIR WORK. ALL WORK SHALL BE COMPLETE IN EVERY DETAIL AND THE CONTRACTORS SHALL PROVIDE A ONE YEAR WARRANTY FOR THEIR WORK UNLESS A LONGER WARRANTY IS
INDICATED IN THE SPECIFICATIONS.
12. CONTRACTORS SHALL FOLLOW AND OBEY ALL FEDERAL, STATE AND LOCAL CODES, LAWS, SAFETY
REGULATIONS AND HAZARDOUS WASTE LAWS, ETC.
AFF ABOVE FINISHED FLOOR
ACT ACOUSTIC(AL) TILE
ALT ALTERNATE
AL ALUMINUM
APPROX APPROXIMATE(LY)
CLR CLEAR
CPT CARPET
DIM DIMENSION
EL ELEVATION
ELEV ELEVATOR
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FFE FINISH FLOOR ELEVATION
FEC FIRE EXTINGUISHER CABINET
FIN FINISH
FLR FLOOR
FRMG FRAMING
FT FOOT/FEET
GC GENERAL CONTRACTOR
GA GAUGE
GALV GALVANIZED
GEN GENERAL
GYP GYPSUM
HAC HOUSEKEEPING CLOSET
HM HOLLOW METAL
HDWR HARDWARE
HOR HORIZONTAL
HT HEIGHT
IN INCH
INT INTERIOR
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTD MOUNTED
MTL METAL
N NORTH
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NOM NOMINAL
OD OUTSIDE DIAMETER
O TO O OUT TO OUT
OPNG OPENING
OPP OPPOSITE
OVHD OVERHEAD
PNT PAINT
PTD PAINTED
SF SQUARE FEET
SS STAINLESS STEEL
SIM SIMILAR
SPEC SPECIFICATIONS
STL STEEL
T/O TOP OF
TYP TYPICAL
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
WALL TYPE
DOOR NUMBER TYPICAL KEYNOTE
CEILING/ SOFFIT
HEIGHT
MATL
1'-0"
-1
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
FIFTH FLOOR REMODEL
/1
/2
:3
:5
P
M
A-001-4
ARCHITECTURAL SYMBOLS,
ABBREVIATIONS AND NOTES
1 4MVK
JESSE BROWN VA MEDICAL CENTER
820 S. DAMEN AVE, CHICAGO IL 60612
06/13/2024
ISSUED FOR CONSTRUCTION
537-17-11518-327
RMC
ABBREVIATIONS 004
ARCHITECTURAL SYMBOL LEGEND 004
CORRIDOR
1R-102
1R-106
TEMPORARY
CORRIDOR
MECH
TEMPORARY
CORRIDOR
1R-106
U P
UP
STAIR 1
STAIR 2
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
FIFTH FLOOR REMODEL
/1
/2
:3
:5
P
M
AD-101-4
FIRST FLOOR DEMOLITION PLAN
2 4MVK
JESSE BROWN VA MEDICAL CENTER
820 S. DAMEN AVE, CHICAGO IL 60612
06/13/2024
ISSUED FOR CONSTRUCTION
537-17-11518-327
RMC
N
KEY PLAN
SCALE: NO SCALE
0 2 4 8
NORTH
PLAN
A. SEE SHEET A-001- 4 FOR GENERAL NOTES.
B. DEMOLITION THIS SHEET IS TO OCCUR AFTER THE
SPS RENOVATION IS COMPLETE, AND THE MOBILE SPS
TRAILOR HAS BEEN MOVED FROM THE SITE AND IS NO
LONGER IN USE.
Scale: 1/8" = 1'-0"
TEMPORARY SPS - DEMO FLOOR PLAN
01 REMOVE EXISTING TEMPORARY ACCESS
CORRIDOR TO MOBILE TRAILOR
02 REMOVE TEMPORARY STAIR
OO
PROCEDURE
ROOM 1
MECHANICAL
ROOM
SOILED
HOLDING
SUPPLY
PROCEDURE
ROOM 2
PROCEDURE
ROOM 3
PROCEDURE
ROOM 4
PROCEDURE
ROOM 5
CORRIDOR
SCOPE
REPROCESSING
ROOM
SCOPE
STORAGE
ROOM
NN
OO
PROCEDURE
ROOM 3
PROCEDURE
ROOM 2
SUPPLY
MECHANICAL
ROOM
SOILED
HOLDING
CORRIDOR
PROCEDURE
ROOM 4
PROCEDURE
ROOM 1
11 09 12
SCOPE
REPROCESSING
ROOM
SCOPE
STORAGE
ROOM
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
FIFTH FLOOR REMODEL
/1
/2
:3
:5
P
M
AD-105-4
FIFTH FLOOR DEMOLITION PLAN
3 4MVK
JESSE BROWN VA MEDICAL CENTER
820 S. DAMEN AVE, CHICAGO IL 60612
06/13/2024
ISSUED FOR CONSTRUCTION
537-17-11518-327
RMC
Scale: 1/4" = 1'-0"
FIFTH FLOOR DEMOLITION CEILING PLAN
N
KEY PLAN
SCALE: NO SCALE
Scale: 1/4" = 1'-0"
FIFTH FLOOR DEMOLITION PLAN
02 REMOVE ALL CASEWORK, EQUIPMENT,
AND FIXTURES, AND FINISH FLOORS THIS
ROOM.
03 REMOVE CEILING PANELS THIS
ROOM.GRID TO REMAIN.
04 REMOVE EXISTING SCOPE STORAGE
CABINETS AND SALVAGE FOR
REINSTALLATION INTO NEW SPACE
06 REMOVE WALL-MOUNTED SHELVING
07 REMOVE PLUMBING AND PIPING ALONG
THESE WALLS. SEE MECH DRAWINGS.
09 EXISTING MEDIVATOR, COMPRESSOR,
AND WATER HEATER. RELOCATE AND
REINSTALL IN NEW FIRST FLOOR ROOM
1578A SCOPE REPROCESSING.
10 REMOVE EXISTING SINK AND CASEWORK
AND UPPER SHELVING.
11 REMOVE EXISTING WALL-MOUNTED
SHELF
12 REMOVE EXISTING EQUIPMENT AND TURN
OVER TO OWNER.
13 REMOVE EXISTING SCOPE TUBE
STORAGE SHELF AND REINSTALL IN
ROOM 1578A SCOPE REPROCESSING.
14 REMOVE EXISTING EYE WASH FIXTURE
AND TURN OVER TO OWNER. SEE
MECHANICAL.
0 2 4 8
NORTH
PLAN
0 2 4 8
NORTH
PLAN
A. SEE SHEET A-001-2 FOR GENERAL NOTES.
CLEAN
SCOPE
STORAGE
SOILED
HOLDING
PROCEDURE
ROOM 2
PROCEDURE
ROOM 3
SUPPLY
CORRIDOR
PROCEDURE
ROOM 4
MECHANICAL
ROOM
PROCEDURE
ROOM 1
M3160 M3160 M3160
M3160 M3160 M3160
EQUIPMENT
ROOM
M3160
REFLECTED CEILING PLAN
LEGEND
SUPPLY DIFFUSER
CEILING CONTRACTOR TO MEASURE EACH CEILING
AREA AND ESTABLISH A CEILING LAYOUT TO BALANCE
BORDER WIDTHS AT OPPOSITE EDGES OF EACH
ROOM. AVOID USE OF LESS-THAN 6" TILES.
2'x4' LAY-IN LED
1. REFERENCE ROOM FINISH SCHEDULE , FINISH MATERIAL LEGEND AND SPECIFICATION 09 06 00 SCHEDULE OF
FINISHES FOR MORE INFORMATION.
2. REFERENCE REFLECTED CEILING PLAN FOR ADDITIONAL CEILING INFO.
3. PREPARE ALL FLOOR AND WALL CONSTRUCTION, NEW AND/OR EXISTING, TO RECEIVE NEW FINISHES IN ACCORDANCE WITH MANUFACTURER’S RECOMMENDED INSTALLATION METHODS AND MATERIALS FOR ALL
FINISHES.
4. PRIOR TO INSTALLATION OF NEW FINISHES, CONTRACTOR SHALL INSPECT ALL SUBSTRATES. IF A SUBSTRATE IS DEEMED UNACCEPTABLE, THE CONTRACTOR SHALL TAKE THE NECESSARY STEPS TO RECTIFY THE SITUATION OR CONTACT THE COR WITH THE CONCERN. PROCEEDING WITH THE INSTALLATION OF FINISHES
WILL BE INDICATION THAT THE INSTALLER / FINISHER ACCEPTS CONDITION OF SUBSTRATE.
5. USE MANUFACTURER'S RECOMMENDED INSTALLATION METHODS AND MATERIALS FOR ALL FINISHES.
6. ALL NECESSARY TILE FLOORING UNDERLAYMENT TO BE PROVIDED AND INSTALLED BY FLOORING CONTRACTOR. ALL SETTING AND UNDERLAYMENT SYSTEMS TO BE FROM SAME MANUFACTURER AND
APPROVED BY FLOORING MANUFACTURER.
7. ALL FLOORING TRANSITIONS SHALL COMPLY WITH ADA GUIDELINES. FLOORING CONTRACTOR TO SUBMIT A DIAGRAM SHOWING FLOORING TRANSITION LOCATIONS FOR DESIGNERS APPROVAL PRIOR TO INSTALLATION.
8. ALL FLOOR TRANSITIONS BETWEEN DISALIKE MATERIALS SHALL BE ANODIZED ALUMINUM METAL TRIM AND TO
BE LOCATED AT CENTERLINE OF DOOR WHEN IN CLOSED POSITION
9. ALIGN FLOORING TRANSITIONS WITH FINISH BASE EXCEPT AT DOORS, UNLESS NOTED OTHERWISE.
10. FINISH LEVEL OF GYP. BD. WALLS AND SOFFITS TO BE LEVEL 4, UNLESS NOTED OTHERWISE.
11. ALL PAINTED WALLS TO BE PAINTED P-1, UNLESS NOTED OTHERWISE.
12. ALL PAINTED SURFACES SHALL RECEIVE A MINIMUM OF (1) ONE BASE COAT AND (2) TWO FINISH COATS.
13. PAINTED SHEEN LEVEL TO BE EGG-SHELL FOR ALL WALLS, U.N.O. SHEEN FOR ALL WET AREA WALLS, METAL
DOORS AND METAL FRAMES TO BE SEMI-GLOSS.
1. REFER TO MECHANICAL, ELECTRICAL, PLUMBING, TEL-COM AND LOW VOLTAGE DRAWINGS FOR ADDITIONAL
REQUIRED UTILITY CONNECTIONS AND LOCATIONS.
2. FURNITURE, FIXTURES AND EQUIPMENT SHOWN ON PLANS AND SCHEDULES ARE FOR
COORDINATION AND SPACIAL PURPOSES ONLY, NOT TO BE USED FOR ACTIVATION PURCHASING
3. ITEM TAGS INCLUDE ACQUISITION AND INSTALLATION RESPONSIBILITIES (ACQ.), DENOTED AS FOLLOWS:
PROCEDURE
ROOM 1
MECHANICAL
ROOM
SOILED
HOLDING
SUPPLY
PROCEDURE
ROOM 2
PROCEDURE
ROOM 3
PROCEDURE
ROOM 4
PROCEDURE
ROOM 5
CORRIDOR
CLEAN SCOPE
STORAGE
EQUIPMENT
ROOM
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
FIFTH FLOOR REMODEL
/1
/2
:3
:5
P
M
A-105-4
FIFTH FLOOR PLAN AND REFLECTED
CEILING PLAN
4 4MVK
JESSE BROWN VA MEDICAL CENTER
820 S. DAMEN AVE, CHICAGO IL 60612
06/13/2024
ISSUED FOR CONSTRUCTION
537-17-11518-327
RMC
N
KEY PLAN
SCALE: NO SCALE
Scale: 1/4" = 1'-0"
FIFTH FLOOR PLAN
A SEE SHEET A-001-4 FOR GENERAL CONSTRUCTION NOTES.
Specialty Equipment Schedule 5th Floor
Type Mark Description Manufacturer Model Comments
M3160 SINGLE-SIDED SCOPE CABINET ENDODRY FURNISHED BY OWNER, INSTALLED BY CONTRACTOR
01 NO CEILING WORK THIS ROOM
02 INSTALL NEW ACOUSTICAL CEILING
PANELS IN EXISTING GRID.
03 PATCH HOLES IN WALLS THIS ROOM DUE
TO DEMOLITION. MATCH EXISTING
ADJACENT CONDITIONS. PAINT UPPER
PORTION OF WALLS (ABOVE TILE)
WITH SC-1 (HIGH BUILD GLAZED SPECIAL
COATING.)
04 PATCH ANY OPENINGS IN FLOOR THAT
REMAIN AFTER DEMOLITION.
05 SOUND-ABSORBING WALL PANELS
0 2 4 8
NORTH
PLAN
0 2 4 8
NORTH
PLAN
ROOM FINISH SCHEDULE
ROOM NO. NAME FLOOR BASE
WALLS CEILING
REMARKS
EAST NORTH SOUTH WEST
FINMAT/FIN MAT/FIN MAT/FIN MAT/FIN
P-1 ELEV
P-2 ELEV
P-3 ELEV
5490 CLEAN SCOPE
STORAGE
WSF-1 WSF-1 EP-1/HIW-1 EP-1/HIW-1 EP-1/HIW-1 EP-1/HIW-1 ACT-2 HIW-1- 4'-0"H WAINSCOT PERIMETER OF ROOM WITH EP-1
ABOVE
5491 SOILED HOLDING EXISTING EXISTING RESW-1/EP-1 RESW-1/EP-1 RESW-1/EP-1 RESW-1/EP-1 EXISTING
5492 EQUIPMENT ROOM WSF-1 WSF-1 EP-1/HIW-1 EP-1/HIW-1 EP-1/HIW-1 EP-1/HIW-1 ACT-2 HIW-1- 4'-0"H WAINSCOT PERIMETER OF ROOM WITH EP-1
ABOVE
FINISH GENERAL NOTES
EQUIPMENT GENERAL NOTES
Scale: 1/4" = 1'-0"
FIFTH FLOOR CEILING PLAN
FIRE PROTECTION GENERAL NOTES
A. THE FIRE PROTECTION CONTRACTOR SHOULD USE NFPA-13 (CURRENT EDITION), CHAPTER 23, “PLANS AND CALCULATIONS” AS A GUIDELINE WHEN PREPARING SUBMITTALS FOR REVIEW.