S02 - Exhibit 01b2 537-17-115 PH3 DWGs Bid 20240701.pdf

PDF 15 MB Posted

Attached to
Z2DA--537-17-115: SPS Construction Phase 2, 3 &4 Federal contract opportunity
Solicitation number
36C25225B0001
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12

About this file

This is a construction drawing set for Phase 3 of the Sterile Processing Service (SPS) remodel project at Jesse Brown VA Medical Center in Chicago, IL. The drawings detail the renovation work to be performed in the SPS area on the first floor and mechanical room on the third floor of Building 40.

The drawing set includes architectural, fire protection, plumbing, mechanical, electrical, technology and fire alarm plans and details. Key elements include new sterile processing equipment installation, associated mechanical/electrical infrastructure upgrades, and interior renovations to create proper workflow between decontamination, processing, and sterile storage areas. Specific components include installation of medivators, ultrasonic cleaners, pass-through chambers, new HVAC equipment (AHU-2, exhaust fans), electrical distribution panels, lighting, fire alarm devices, security/access control systems, and required plumbing connections. The drawings provide detailed information about equipment layouts, utility connections, ceiling plans, mounting details, and control system specifications necessary for construction. The project maintains required infection control measures and life safety requirements during renovation of an occupied healthcare facility.

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JESSE BROWN

VA HOSPITAL

W TAYLOR ST

W POLK ST

S D

A M

E N

A V

E

W O

G D E N A

V E

1ST FLOOR

AREA

3RD FLOOR

AREA

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

PROJECT SITE MAP PROJECT LOCATION MAP

PROJECT IMAGE

REMODEL STERILE

PROCESSING SERVICE

/1

/2

:4

:0

P

M

G-001-3

SPS REMODEL - COVER

1 5MVK

JESSE BROWN VA MEDICAL CENTER

820 S. DAMEN AVE, CHICAGO IL 60612

06/13/2024

ISSUED FOR CONSTRUCTION

537-17-11518-327

REMODEL STERILE PROCESSING SERVICE

JESSE BROWN VA MEDICAL CENTER

820 S. DAMEN AVE, CHICAGO IL 60612

VA PROJECT #: 537-17-115 APOGEE PROJECT #: 18-327

RMC

DRAWING LIST

GENERAL

G-001-3 SPS REMODEL - COVER 1 5

G-100-3 GENERAL INFORMATION - PHASE 3 2 5

G-101-3 FIRST FLOOR ICRA PLAN - PHASE 3 3 5

G-102-3 ICRA DETAILS 4 5

LS-100-3 FIRST FLOOR LIFE SAFETY PLAN - PHASE 3 5 5

ARCHITECTURAL

A-001-3 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 7

A-101-3 FIRST FLOOR PLAN 2 7

A-102-3 FIRST FLOOR ENLARGED PLAN 3 7

A-103-3 THIRD FLOOR PLAN 4 7

A-111-3 FIRST FLOOR REFLECTED CEILING PLAN 5 7

A-401-3 INTERIOR ELEVATIONS 6 7

A-601-3 SCHEDULES AND DETAILS 7 7

FIRE PROTECTION

FS-001-3 FIRE SUPPRESSION GENERAL INFORMATION - PHASE 3 1 2

FS-101-3 FIRE SUPPRESSION PLANS - PHASE 3 2 2

PLUMBING

P-001-3 PLUMBING GENERAL INFORMATION - PHASE 3 1 4

P-101-3 PLUMBING PLANS - PHASE 3 2 4

P-601-3 PLUMBING SCHEDULES AND DETAILS - PHASE 3 3 4

P-602-3 PLUMBING DETAILS - PHASE 3 4 4

MECHANICAL

M-001-3 MECHANICAL GENERAL INFORMATION - PHASE 3 1 8

MH-101-3 FIRST FLOOR MECHANICAL HVAC PLAN - PHASE 3 2 8

MH-102-3 THIRD FLOOR MECHANICAL HVAC PLANS - PHASE 3 3 8

MP-101-3 MECHANICAL PIPING PLANS - PHASE 3 4 8

M-501-3 MECHANICAL DETAILS - PHASE 3 5 8

M-502-3 MECHANICAL CONTROLS 6 8

M-601-3 MECHANICAL SCHEDULES - PHASE 3 7 8

M-602-3 MECHANICAL SCHEDULES 8 8

ELECTRICAL

E-001-3 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS - PHASE 3 1 7

EP101-3 ELECTRICAL FLOOR POWER PLAN - PHASE 3 2 7

EM101-3 ELECTRICAL FLOOR POWER PLAN - PHASE 3 3 7

EL101-3 ELECTRICAL FLOOR LIGHTING PLAN - PHASE 3 4 7

E-401-3 ELECTRICAL ENLARGEMENTS - PHASE 3 5 7

E-501-3 ELECTRICAL DETAILS - PHASE 3 6 7

E-601-3 ONE LINE DIAGRAM - PHASE 3 7 7

TECHNOLOGY

T-001-3 TECHNOLOGY GENERAL NOTES SYMBOL LEGEND AND ABBREVIATIONS - PHASE 3 1 2

T-101-3 FIRST FLOOR TECHNOLOGY PLAN - PHASE 3 2 2

FIRE ALARM

FA001-3 FIRE ALARM GENERAL NOTES, SYMBOL LEGEND AND RISER - PHASE 3 1 2

FA101-3 FIRST FLOOR FIRE ALARM PLAN - PHASE 3 2 2

PHASE 3: SPS REMODEL

NORTH

PLAN

24514

LICENSED

ARCHITECT

DocuSign Envelope ID: B0CA22F4-B9A3-463C-9AC8-E13FC488A65D

6/14/2024

INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF

PRECAUTIONS FOR CONSTRUCTION AND RENOVATION

INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF

PRECAUTIONS FOR CONSTRUCTION AND RENOVATION WALL SECTION

SYMBOL

INTERIOR ELEVATION

SYMBOL

COLUMN GRID

ELEVATION SYMBOL

REVISION NOTE

ENLARGED DETAIL CALLOUT

ROOM DESIGNATION

SYMBOL

BREAK LINE

ROOF SLOPE

DIRECTION SYMBOL

TYPICAL GRAPHIC SCALE

DETAIL #

PAGE #

DETAIL #

PAGE #

TRUE NORTH ARROW

PROJECT NORTH ARROW

A8.1

EXTERIOR ELEVATION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

A8.1

BUILDING SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

DETAIL SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

WALL GRID

(REPRESENTS

FACE OF EXISTING

WALL)

XX.X

XX.X

ELEVATION

0'-0"

ROOM

NAME

101A

NORTH

PLAN

NORTH

TRUE

0 4 8 16

EXPOSED

PLUMBING AT

BARRIER

FREE

LAVATORIES

SHALL BE

INSULATED.

LEVER OPERATING

CONTROLLED

SOAP DISPENSER

NOTE: SINKS IN COUNTERS TO BE

MOUNTED WITH RIM NO MORE

THAN 2'-10" HIGH AND WITH AT

LEAST 2'-3" KNEE CLEARANCE.

CLEAR

TYPICAL ACCESSIBLE

CLEARANCE AT LAVATORY

TYPICAL ACCESSIBLE

LAVATORY

1'-3" 1'-3"

M

IN

M A

X

M

A X

MIN

8"

M

IN9

M

IN

M

IN

M A

X

17" MIN

NOTE: FIRE

EXTINGUISHERS HAVING

A GROSS WEIGHT NOT

EXCEEDING 40 LB (18.14

KG) SHALL BE INSTALLED

SO THAT THE TOP OF THE

FIRE EXTINGUISHER IS

NOT MORE THAN 5'-0"

(1.53 M) ABOVE THE

FLOOR.

FIRE EXTINGUISHER

CABINET

ELECTRICAL PANEL

DUPLEX

OUTLET

SWITCH

THERMOSTAT

TELEPHONE

OR DATA

OUTLET

FIRE ALARM

PULL

(3-6" MIN)

(4'-0" MAX)

INTERCOM

STATION

DUPLEX

OUTLET

COMPUTER

TERMINAL

MISC. WALL DEVICES

CLOCK

NURSE

CALL

DOME

LIGHT

CLOCK OUTLET

CLOCK & NURSE CALL DEVICES

MOP BASIN

MOP SHELF

TYPICAL JANITORS CLOSET

2'-0" AT SIDEWALLS

AT COUNTER SINKS

1'-6" AT SIDEWALLS

AT LAVATORY

WALL PROTECTION

'-0

HANDRAIL

OR DOOR FRAME

3" TO CORNERGUARD

CORNER GUARD

'-0

IIILOW Risk Group 1

Class III

Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that

It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation

I

I

III

MEDIUM Risk Group 2

HIGH Risk Group 3

HIGHEST Risk Group 4 V

V

IV

V

IV

III

IV

II

III

Patient Risk Group Table

Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk

TYPE A

Construction Project Type

Major demolition and construction projects Includes, but is not limited to:

• Removal or replacement of building system component(s).

• Removal/installation of drywall partitions.

• Invasive large-scale new building construction.

• Renovation work in two or more rooms.

Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies Includes, but is not limited to:

• Removal of preexisting floor covering, walls, casework or other building components.

• New drywall placement.

• Renovation work in a single room.

• Nonexisting cable pathway or invasive electrical work above ceilings.

• The removal of drywall where a moderate amount of dust and debris is created.

• Dry sanding where a moderate amount of dust and debris is created.

• Work creating significant vibration and/or noise.

• Any activity that cannot be completed in a single work shift.

Small scale, short duration activities which create minimal dust Includes, but is not limited to:

• Work conducted above the ceiling (e.g., prolonged inspection or repair of firewalls and barriers, installation of conduit and/or cabling, and access to mechanical and/or electrical chase spaces).

• Fan shutdown/startup.

• Installation of electrical devices or new flooring that produces minimal dust and debris.

• The removal of drywall where minimal dust and debris is created.

• Controlled sanding activities (e.g., wet or dry sanding) that produce minimal dust and debris.

Inspection and Non-Invasive Activities Includes, but is not limited to:

• Removal of ceiling tile for visual inspection-limited to 1 tile per 50 square feet with limited exposure time.

• Limited building system maintenance (e.g., pneumatic tube station, HVAC system, fire suppression system, electrical and carpentry work to include painting without sanding) that does not create dust or debris.

• Clean plumbing activity limited in nature.

Type of Construction / Project Activity Table

Group 2 Medium Risk

Group 1 Low Risk

• Physical Therapy

• Radiology departments

• All patient waiting rooms

• All outpatient clinics

• Research Areas

• Respiratory Therapy

• Office areas (non-clinical)

• FES/EMS areas

I

Patient Risk Group

TYPE D

TYPE C

TYPE B

TYPE A

Group 4 Highest Risk

Group 3 High Risk

• Emergency Room

• Clinical Laboratories (specimen)

• Same Day Surgery

• Pharmacy

• Nutrition and Food

Service/Canteen

• Procedural Areas (GI)

• Inpatient Mental Health

• Any area caring for immunocompromised patients

• Cardiac Cath Lab/IR

• Central Sterile Supply

• Sterile Processing Service

• Intensive Care Units

IIII

TYPE DTYPE CTYPE B

Class IVor control procedures are necessary.

C

LA

S S

IV

During Construction Project Upon Completion of Project

1. Includes all activities required by Class III

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management

Maintenance and Engineering department before construction begins.

3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.

4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.

5. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).

6. Containment units or environmental containment units (ECUs) approved for Class IV precautions in small areas totally contained by the unit and that has HEPA-filtered exhaust air.

7. Remove or isolate return air diffusers to avoid dust entering the HVAC system.

8. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.

9. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.

10. Maintain negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.

11. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.

12. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is not acceptable.

13. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.

14. Contain all trash and debris in the work area.

15. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.

16. Worker clothing must be clean and free of visible dust before leaving the work area.

HEPA vacuuming of clothing or use of cover suites is acceptable.

17. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be immediately changed.

18. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.

19. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.

• Medical/Surgical Units

• Negative pressure isolation rooms

• Outpatient Chemotherapy

Areas

• Operating rooms

• Post Anesthesia Care Unit

• Dialysis

• Dental

C

LA

S S

V

1. Includes all activities required by Class IV

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management

Maintenance and Engineering department before construction begins.

3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.

4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.

5. Seal all penetrations in containment barriers, anteroom barriers, including floors and ceiling using approved materials (UL schedule firestop if applicable for barrier type).

6. Construct anteroom large enough for equipment staging, cart cleaning, workers. The anteroom must be constructed adjacent to entrance of construction work area.

7. Personnel will be required to wear coveralls at all times during Class V work activities.

Coveralls must be removed before leaving the anteroom.

8. Remove or isolate return air diffusers to avoid dust entering the HVAC system.

9. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.

10. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.

11. Maintain negative pressurization of the entire workspace using HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.

12. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.

13. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (bathroom exhaust) is not acceptable.

14. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.

15. Contain all trash and debris in the work area.

16. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.

17. Worker clothing must be clean and free of visible dust before leaving the work area anteroom.

18. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area).

Damaged shoe covers must be immediately changed.

19. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.

20. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.

Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.

Work Area Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

Removal of Critical Barriers:

1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.

2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:

1. Carefully remove screws and painter tape.

2. If dust will be generated during screw removal, use hand-held HEPA vacuum.

3. Drywall cutting is prohibited during removal process.

4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.

5. Use a plastic barrier to enclose area if dust could be generated.

Negative Air Requirements:

1. The use of negative air must be designed to remove contaminates from the work area.

2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.

HVAC systems:

1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.

2. Verify that HVAC systems are clean and operational.

3. Verify the HVAC systems meets original airflow and air exchange design specifications.

It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation

During Construction Project

C

LA

S S

I

Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

HVAC Systems:

1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.

2. Verify the HVAC systems meet original airflow and air exchange design specifications.

Upon Completion of Project

1. Execute work by methods to minimize raising dust from construction operations.

2. Perform noninvasive work activity as to not block or interrupt patient care.

3. Perform noninvasive work activities in areas that are not directly occupied with patients.

4. Perform noninvasive work activity in a manner that does not create dust.

5. Immediately replace any displaced ceiling tile before leaving the area and/or at end of noninvasive work activity.

C

LA

S S

II

Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

HVAC Systems:

1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.

2. Verify the HVAC systems meet original airflow and air exchange design specifications.

1. Includes all activities required by Class I

2. Perform only limited dust work and/or activities designed for basic facilities and engineering work.

3. Perform limited dust and invasive work following standing precautions procedures approved by the organization.

4. This Class of Precautions must never be used for construction or renovation activities.

5. Provide active means to prevent airborne dust from dispersing into atmosphere.

6. Water mist work surfaces to control dust while cutting.

7. Seal unused doors with duct tape.

8. Block off and seal air vents.

9. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.

10. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.

Work Area Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

Removal of Critical Barriers:

1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.

2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:

1. Carefully remove screws and painter tape.

2. If dust will be generated during screw removal, use hand-held HEPA vacuum.

3. Drywall cutting is prohibited during removal process.

4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.

5. Use a plastic barrier to enclose area if dust could be generated.

Negative Air Requirements:

1. The use of negative air must be designed to remove contaminates from the work area.

2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.

HVAC systems:

1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.

2. Verify that HVAC systems are clean and operational.

3. Verify the HVAC systems meets original airflow and air exchange design specifications.

CONSTRUCTION ACTIVITIES SHALL BE CLASSIFIED AS FOLLOWS UNLESS NOTED OTHERWISE:

1. INSTALLATION OF CABLE TRAY IN CORRIDOR CEILINGS SHALL BE CONSIDERED CONSTRUCITON ACTIVITY TYPE B.

2. ALL CONDUIT SPECIFIED TO BE INSTALLED IN WALL SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE C.

3. CONSTRUCTION OF NEW ROOMS SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE D.

4. INSTALLATION OF NEW DOORS TO OR FROM EXISTING SPACES SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE C.

C

LA

S S

II

I

1. Includes all activities required by Class II

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities

Management Maintenance and Engineering department before construction begins.

3. Provide active means to prevent airborne dust dispersion into the occupied areas.

4. Means for controlling minimal dust dispersion may include hand-held HEPA vacuum devices, polyethylene plastic containment, or isolation of work area by closing room door.

5. Remove or isolate return air diffusers to avoid dust from entering the HVAC system.

6. Remove or isolate the supply air diffusers to avoid positive pressurization of the space,

7. If work area is contained, then it must be neutrally to negatively pressurized at all times.

8. Seal all doors with tape that will not leave residue.

9. Contain all trash and debris in the work area.

10. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.

11. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.

12. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces.

13. Clean construction area at the end of each shift by damp mopping or HEPA Vacuum.

For Type C activities, follow procedures for Class IV.

Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

HVAC Systems:

1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.

2. Verify the HVAC systems meet original airflow and air exchange design specifications.

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

REMODEL STERILE

PROCESSING SERVICE

/1

/2

:1

:5

P

M

G-100-3

GENERAL INFORMATION - PHASE 3

2 5MVK

JESSE BROWN VA MEDICAL CENTER

820 S. DAMEN AVE, CHICAGO IL 60612

06/13/2024

ISSUED FOR CONSTRUCTION

537-17-11518-327

RMC

GENERAL SYMBOL LEGEND

APPLICABLE CODES AND STANDARDS

Scale: 3/8" = 1'-0"

STANDARD MOUNTING HEIGHTS1

NFPA 10, STANDARD FOR PORTABLE FIRE EXTINGUISHERS, 2018

NFPA 13, INSTALLATION OF SPRINKLER SYSTEMS, 2016

NFPA 70, NATIONAL ELECTRICAL CODE (NEC), 2023

NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE, 2022

NFPA 80, STANDARD FOR FIRE DOORS AND OTHER OPENING PROTECTIVES, 2019

NFPA 90A: STANDARD FOR THE INSTALLATION OF AIR CONDITIONING & VENTILATING SYSTEMS, 2018

NFPA 99, HEALTH CARE FACILITIES CODE, 2018

NFPA 101, LIFE SAFETY CODE, 2018

PG 18-13: VA BARRIER FREE DESIGN STANDARD, 2024

PG 18-12: 285: STERILE PROCESSING SERVICE, 2022

ASHRAE 90.1, 2022

ASHRAE 170, VENTILATION OF HEALTH CARE FACILITIES, 2021

DEPARTMENT OF VETERANS AFFAIRS: FIRE PROTECTION DESIGN MANUAL, 2023

DEPARTMENT OF VETERANS AFFAIRS: PLUMBING DESIGN MANUAL, 2024

DEPARTMENT OF VETERANS AFFAIRS: HVAC DESIGN MANUAL, 2024

DEPARTMENT OF VETERANS AFFAIRS: ELECTRICAL DESIGN MANUAL, 2019

DEPARTMENT OF VETERANS AFFAIRS: LIGHTING DESIGN MANUAL, 2021

DEPARTMENT OF VETERANS AFFAIRS: TELECOMMUNICATIONS DESIGN MANUAL, 2016

OVERALL PHASE SUMMARY

PHASE 1: INSTALLATION OF TEMPORARY SPS MOBILE TRAILER AND ACCESS CORRIDOR (NOT IN CONTRACT, ALREADY COMPLETED).

PHASE 2: INTERIOR DEMOLITION WITHIN SPS AREA (FIRST FLOOR) AND MECHANICAL ROOM (THIRD FLOOR).

PHASE 3: NEW CONSTRUCTION WITHIN SPS AREA (FIRST FLOOR) AND MECHANICAL ROOM (THIRD FLOOR).

PHASE 4: INTERIOR DEMOLITION AND NEW WORK AT EXISTING SCOPE PROCESSING AND STORAGE AREA (FIFTH FLOOR).

THIS PHASE ALSO INCLUDES THE DEMOLITION OF THE TEMPORARY SPS TRAILER ACCESS CORRIDOR THAT WAS CONSTRUCTED IN PHASE 1.

DocuSign Envelope ID: 5C2FFA19-F1BC-408D-8005-D330D0E23A4A

6/13/2024

UP

S SS

ETO

SERVICE

STAFF

LOUNGE

ETO

ROOM

1639A

STAFF

OFFICE

OFFICE

1642A

CHIEF

OFFICE

SPS

PREPARATION

STAFF

TOILET

1645A

STAFF

LOCKERS

STAFF

LOCKERS

STAFF

TOILET

1643A

CLEAN

RECEIVING

BREAK-OUT

STERILE

SUPPLY

STOR. &

DIST.

ELEV

LOBBY

CART

STAGING

AREA

STERILE

SUPPLY

STOR. &

DIST.

ELECT.

ROOM

16E3

ELEVATOR

MACHINE

ROOM

STAIR 11

ELEV

P25

CORRIDOR

SOILED

RECEIVING

DECONTAM

STAFF

TOILET

1627A

STAFF

LOCKERS

- FEMALE

16H5

STAFF

LOCKERS

- MALE

STAFF

TOILET

SCOPE

DECONTAM

STAFF

PPE

EXISTING

ROOM

FD

FD

ANTE

ROOM

9'-0"

CONSTRUCTION

ENTRANCE #1 (FOR

MODIFICATION WORK).

ANTE

ROOM

CONSTRUCTION

ENTRANCE #2

CONSTRUCTION

ENTRANCE #3

CONSTRUCTION

AREA #3

CONSTRUCTION

AREA #2

CONSTRUCTION

AREA #1

B

C

C.5

D

D.9

E

E.5

F

G

18X13X12X11X10 X14

2 HOUR FIRE SEPARATION

1 HOUR FIRE SEPARATION

SMOKE RATED

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

REMODEL STERILE

PROCESSING SERVICE

/1

/2

:1

:5

P

M

G-101-3

FIRST FLOOR ICRA PLAN - PHASE 3

3 5MVK

JESSE BROWN VA MEDICAL CENTER

820 S. DAMEN AVE, CHICAGO IL 60612

06/13/2024

ISSUED FOR CONSTRUCTION

537-17-11518-327

RMC

N

KEY PLAN

SCALE: NO SCALE

0 4 8 16

NORTH

PLAN

01 ICRA/LIFE SAFETY BARRIER

SEE DETAIL ON SHEET G-102-3

02 PLASTIC SHEET BARRIER. SEE DETAIL ON

SHEET G-102-3

03 ZIPPERED ENTRY

04 NEGATIVE AIR MACHINE. SEE SHEET G-102-3

05 TEMPORARILY LOCK AND SEAL DOOR

DURING CONSTRUCTION.

06 FLOOR STICKY MATS

Scale: 1/8" = 1'-0"

FIRST FLOOR ICRA PLAN - PHASE 3

WALL RATING LEGEND

A. SEE SHEET G-102-3 FOR INFECTION CONTROL NOTES.

OUTSIDE OF BUILDING

MONTHLY CHANGED HEPA

FILTER

HEPA NEGATIVE

AIR UNIT

WEEKLY CHANGED (OR MORE AS

NEEDED) PRE FILTER

FIRE RATED PLYWOOD

F L E

X D

U C

T

SUPPLY DUCTS EITHER KEEP

RUNNING OR COVER WHEN

RUNNING TO KEEP DUST OUT.

TAPE ALL SERVICES

TO PROTECT AGAINST

CONTAMINATION

A

O

V

FIRE EXTINGUISHER ON PORTABLE

FLOOR BRACKET (ILSM MAY REQUIRE

MORE THAN ONE)

SUSPENDED PLASTIC ZIPPER

WALL CURTAIN BARRIER

INDICATOR SHALL BE AT -0.01 OR

GREATER (VERIFY DAILY). IF NOT

VERIFY ALL OPENINGS SUCH AS DOOR

ARE CLOSED AND/OR CHANGE OUT

NEGATIVE AIR PRE-FILTER

PROVIDE STICKY MATS

(CHANGED END OF SHIFT

OR MORE IF NECESSARY

TO MAINTAIN CLEANLINESS)

POST ICRA ILSM FIRE

INSPECTION SHEETS

VISIBLE TO PUBLIC

COVER ALL RETURNS AT THE

GRATE/DIFFUSERS

OPTIONAL EXHAUST DUCTS

(COVER THE GRATES AND THE DIFFUSERS)

A

E

A

DOOR OPENING

VENT TO OUTSIDE

ROUTE TO BE

APPROVED BY OWNER

HEATED DETECTOR CUT-OFF

BASIS OF DESIGN: HEPA

NEGATIVE AIR UNIT INTEGRAL

WITH EDGEGUARD BARRIER

SYSTEM.

FIRE RATED PLYWOOD (TEMP.

REMOVE GLASS PANEL)

EXISTING WINDOW FRAME

ICRA BARRIER ICRA BARRIER

ADJUSTS FROM

7'-8" TO 10'-0" A.F.F

EXISTING CEILING

EXISTING CONCRETE SLAB FLOORING

FINISHED FLOORING TO BE

KEPT CLEAN. FLOORS NOT

BEING REPLACED MUST BE

PROTECTED. COVER WITH

ROSIN PAPER/ FIRE RATED

PLYWOOD.

PROJECT:

PRIME CONTRACTOR:

SUB CONTRACTOR:

EMERGENCY CONTACT NO.:

BARRIER INSTALLATION DATE:

BARRIER EXPIRATION DATE:

ILSM TEMPORARY BARRIER TAG

ICRA, ILSM, FIRE WATCH AND

MISC. FORMS

PAPER

CADDY

1'-5"

ILSM SIGNAGE

• THIS EXIT IS CLOSED AND LEADS TO A

CONSTRUCTION AREA

• PLEASE USE ALTERNATE EXITS AS MARKED

INTERIM LIFE SAFETY MEASURES IN EFFECT FOR THE

STERILE PROCESSING SUITE REMODEL PROJECT

A. THE CONTRACTOR SHALL NOT HAUL DEBRIS

THROUGH PATIENT-CARE AREAS WITHOUT PRIOR

APPROVAL OF THE COR AND THE MEDICAL CENTER.

B. ACTIVITY HAZARD RISK CLASSIFICATIONS OF CLASS

I OR CLASS II SHALL REQUIRE APPROVAL BY THE

FACILITY SAFETY MANAGER AND CONTRACTING

OFFICER REPRESENTATIVE BEFORE BEGINNING

ANY CONSTRUCTION WORK. HAZARD RISK

CLASSIFICATIONS OF CLASS III OR IV SHALL

REQUIRE A PERMIT BEFORE BEGINNING ANY

CONSTRUCTION WORK. INFECTION CONTROL

PERMITS WILL BE ISSUED BY THE FACILITY SAFETY

MANAGER AND CONTRACTING OFFICER

REPRESENTATIVE.

C. INFECTION CONTROL PERMITS SHALL BE POSTED

OUTSIDE THE APPROPRIATE CONSTRUCTION AREA.

MORE THAN ONE PERMIT MAY BE ISSUED, AS WORK

IS LOCATED IN MULTIPLE AREAS.

D. THE REQUIRED INFECTION CONTROL PRECAUTIONS

ARE AS FOLLOWS:

CLASS 1:

• NOTIFY THE COR.

• EXECUTE WORK USING METHODS TO MINIMIZE

RAISING DUST FROM CONSTRUCTION OPERATIONS.

• CEILING TILES: IMMEDIATELY REPLACE ANY CEILING

TILES DISPLACED FOR VISUAL INSPECTION.

• UPON COMPLETION: CLEAN WORK AREA, AND

NOTIFY COR.

CLASS 2:

• NOTIFY THE COR.

• PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE

DUST FROM DISPERSING INTO ATMOSPHERE SUCH

AS WET METHODS OR TOOL MOUNTED DUST

COLLECTORS.

• WATER MIST WORK SURFACES TO CONTROL DUST

WHILE CUTTING.

• SEAL UNUSED DOORS WITH PAINTERS TAPE.

• BLOCK OFF AND SEAL AIR VENTS.

• REMOVE OR ISOLATE HVAC SYSTEM IN AREAS

WHERE WORK IS BEING PERFORMED.

• UPON COMPLETION: WIPE WORK SURFACES WITH

CLEANER/ DISINFECTANT. CONTAIN CONSTRUCTION

WASTE BEFORE TRANSPORT IN TIGHTLY COVERED

CONTAINERS.

CLASS 3:

DURING CONSTRUCTION WORK:

• OBTAIN PERMIT FROM THE COR.

• REMOVE OR ISOLATE HVAC SYSTEM IN AREA

WHERE WORK IS BEING DONE TO PREVENT

CONTAMINATION OF DUCT SYSTEM.

• COMPLETE ALL CRITICAL BARRIERS TO SEAL AREA

FROM NON-WORK AREA OR IMPLEMENT CONTROL

CUBE METHOD (CART WITH PLASTIC COVERING AND

SEALED CONNECTION TO WORK SITE WITH HEPA

VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE

CONSTRUCTION BEGINS. INSTALL CONSTRUCTION

BARRIERS AND CEILING PROTECTION CAREFULLY,

OUTSIDE OF NORMAL WORK HOURS.

• MAINTAIN NEGATIVE AIR PRESSURE, 0.01 INCHES OF

WATER GAUGE, WITHIN WORK SITE UTILIZING HEPA

EQUIPPED AIR FILTRATION UNITS AND

CONTINUOUSLY MONITORED WITH A DIGITAL

DISPLAY, RECORDING AND ALARM INSTRUMENT,

WHICH MUST BE CALIBRATED ON INSTALLATION,

MAINTAINED WITH PERIODIC CALIBRATION AND

MONITORED BY THE CONTRACTOR.

• CONTAIN CONSTRUCTION WASTE BEFORE

TRANSPORT IN TIGHTLY COVERED CONTAINERS.

• COVER TRANSPORT RECEPTACLES OR CARTS.

TAPE COVERING UNLESS SOLID LID.

UPON COMPLETION:

• DO NOT REMOVE BARRIERS FROM WORK AREA

UNTIL COMPLETED PROJECT THOROUGHLY

CLEANED, AND IS INSPECTED BY THE CONTRACTING

OFFICER REPRESENTATIVE AND BY THE VA

ENVIRONMENTAL SERVICES DEPARTMENT.

• REMOVE CONSTRUCTION BARRIERS AND CEILING

PROTECTION CAREFULLY TO MINIMIZE SPREADING

OF DIRT AND DEBRIS ASSOCIATED WITH

CONSTRUCTION, OUTSIDE OF NORMAL WORK

HOURS.

• VACUUM WORK AREA WITH HEPA FILTERED

VACUUMS.

• WET MOP AREA WITH CLEANER/DISINFECTANT.

• UPON COMPLETION, RESTORE HVAC SYSTEM

WHERE WORK WAS PERFORMED.

• RETURN PERMIT TO THE COR.

CLASS 4:

DURING CONSTRUCTION WORK:

• OBTAIN PERMIT FROM THE COR.

• ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS

BEING DONE TO PREVENT CONTAMINATION OF

DUCT SYSTEM.

• COMPLETE ALL CRITICAL BARRIERS TO SEAL AREA

FROM NON-WORK AREA OR IMPLEMENT CONTROL

CUBE METHOD (CART WITH PLASTIC COVERING AND

SEALED CONNECTION TO WORK SITE WITH HEPA

VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE

CONSTRUCTION BEGINS. INSTALL CONSTRUCTION

BARRIERS AND CEILING PROTECTION CAREFULLY,

OUTSIDE OF NORMAL WORK HOURS.

• MAINTAIN NEGATIVE AIR PRESSURE, 0.01 INCHES OF

WATER GAUGE, WITHIN WORK SITE UTILIZING HEPA

EQUIPPED AIR FILTRATION UNITS AND

CONTINUOUSLY MONITORED WITH A DIGITAL

DISPLAY, RECORDING AND ALARM INSTRUMENT,

WHICH MUST BE CALIBRATED ON INSTALLATION,

MAINTAINED WITH PERIODIC CALIBRATION AND

MONITORED BY THE CONTRACTOR.

• SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES.

• CONSTRUCT ANTEROOM AND REQUIRE ALL

PERSONNEL TO PASS THROUGH THIS ROOM SO

THEY CAN BE VACUUMED USING A HEPA VACUUM

CLEANER BEFORE LEAVING WORK SITE OR THEY

CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE

REMOVED EACH TIME THEY LEAVE WORK SITE.

• ALL PERSONNEL ENTERING WORK SITE ARE

REQUIRED TO WEAR SHOE COVERS. SHOE COVERS

MUST BE CHANGED EACH TIME THE WORKER EXITS

THE WORK AREA.

UPON COMPLETION:

• DO NOT REMOVE BARRIERS FROM WORK AREA

UNTIL COMPLETED PROJECT THOROUGHLY

CLEANED, AND IS INSPECTED BY THE CONTRACTING

OFFICER REPRESENTATIVE AND BY THE VA

ENVIRONMENTAL SERVICES DEPARTMENT.

• REMOVE CONSTRUCTION BARRIERS AND CEILING

PROTECTION CAREFULLY TO MINIMIZE SPREADING

OF DIRT AND DEBRIS ASSOCIATED WITH

CONSTRUCTION, OUTSIDE OF NORMAL WORK

HOURS.

• CONTAIN CONSTRUCTION WASTE BEFORE

TRANSPORT IN TIGHTLY COVERED CONTAINERS.

• COVER TRANSPORT RECEPTACLES OR CARTS.

TAPE COVERING UNLESS SOLID LID.

• VACUUM WORK AREA WITH HEPA FILTERED

VACUUMS.

• WET MOP AREA WITH CLEANER/DISINFECTANT.

• UPON COMPLETION, RESTORE HVAC SYSTEM

WHERE WORK WAS PERFORMED.

• RETURN PERMIT TO THE COR.

TEMPORARY ICRA/DUST/LIFE SAFETY BARRIER

EXISTING

STRUCTURAL DECK

ABOVE

EXISTING CEILING

MODULAR PANELS

SEE PLAN

TEMPORARY ICRA/DUST BARRIER AND LIFE SAFETY

BARRIER.

ACCEPTABLE PRODUCTS:

EDGE-GUARD PANELS

STARC REALWALL.

TEMPORARY CONTAINMENT WALL SYSTEM: ICRA/DUST

BARRIER PLASTIC SHEETS, CONTINUOUS FROM FLOOR TO

CEILING, WITH SEALED JOINTS AT PERIMETER.

BASIS OF DESIGN: ZIPWALL DUST BARRIER SYSTEM.

TEMPORARY ICRA/DUST/BARRIER - PLASTIC SHEET

EXISTING

STRUCTURAL DECK

ABOVE

EXISTING CEILING

PLASTIC SHEET

BARRIER

SEE PLAN

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

REMODEL STERILE

PROCESSING SERVICE

/1

/2

:1

:5

P

M

G-102-3

ICRA DETAILS

4 5MVK

JESSE BROWN VA MEDICAL CENTER

820 S. DAMEN AVE, CHICAGO IL 60612

06/13/2024

ISSUED FOR CONSTRUCTION

537-17-11518-327

RMC

Scale: 1/2" = 1'-0"

ICRA TYPICAL CONSTRUCTION PLAN LAYOUT_3

Scale: 1/2" = 1'-0"

CROSS SECTION A_3

Scale: 12" = 1'-0"

ILSM TEMPORARY BARRIER TAG_3

Scale: 6" = 1'-0"

ILSM SIGNAGE_3

Scale: 3/4" = 1'-0"

TEMP DUST AND INFECTION CONTROL BARRIER TYPES_3

E

13.1

C.5

12.111.1 14.1 16

B

C

C1

D

A

F

G

D

C

B

A.5

A

D.9

X

E.5

DN

UP

U P

UP

46.597°

T O

G R

ID

D

EXIST

ROOM

EXIST

ROOM

EXIST

ROOM

EXIST

ROOM

EXIST

ROOM

EXIST

ROOM EXIST

ROOM

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

WP 1

WP 2

WP 4

WP 3

WP 5

1R-121

1R-122 1R-123

1R-124 1R-125

1R-126 1R-127

1R-112

1R-111

1R-101

1R-102

1 _ 4

'-4

'-4

'-8

'-4

'-0

116' -6"

30'-6"

28'-8"

28'-8"

28'-8"

26'-5 3_ 8 "

26'-5 3_ 8 "

26'-5 3_

1 _ 4

'-3

R96'-6 3__

R138'-2 7__

21.344°

'-6

'-0

T O

G R

ID

D

.0

18.1°

9'-0"29'-6 5__

28'-8" 28'-7

3__

" 28'-7 3__

" 30'-11

1_

" 29'-6 5__

4.0°

28'-8"

28'-8"

28'-8"

28'-8"

31'-0"

L

L

L

L

L

L

L

L

S

S S

S

S

S

S

S

S

S

S

S

S S

S S

S

L

L

L

L

L

L

L

L

L

L

L

L

L

L

S

S

S

FRS

FRS

S

L

CONNECTING

CORRIDOR

INFORMATION

DESK

TRANSPORT

WAITING

SEATING

GAS

CYLINDER

STORAGE

HAC

FIRE

COMMAND

CENTER

CART

WASH

CONNECTOR

REGIST.

SURG. RECEPT.

CLEAN

SUPPLY

HAC

HAC

HAC

ELECT.

ROOM

ELECT.

ROOM

ELECT.

ROOM

ELEVATOR

MACHINE

ROOM

SOILED

RECEIVING/

DECONTAM

STAFF

TOILET

STAFF

LOCKERS

STAFF

LOUNGE

STAFF

TOILET

STAFF

LOCKERS

PREPARATION

CART

STAGING

AREA

STERILE

SUPPLY

STOR.&DIST.

STAFF

LOUNGE

STAFF

TOILET

STAFF

TOILET

CLEAN

RECEIVING

BREAK-OUT

STAFF

LOCKERS

STAFF

LOCKERS

SPD

CHIEF

OFFICE

SPD

STAFF

OFFICE

BLESSED

SACRAMENT

SACRISTY

CHAPEL

VESTIBULE

ESCORT

WAITING

ROOM

CHAPLAIN

CONF.

ROOM

CHAPLAIN

OFFICE

CORRIDOR

PUBLIC

TOILETS

PUBLIC

TOILETS

PATIENT

CLOTHING

ROOM

DRESSING

VESTIBULE

LINEN

CHUTE

ROOM

COMM.

ROOM

SHOWER

TOILETS

SHOWER

TOILETS

VESTIBULEVESTIBULE

STAFF

LOCKERS

STAFF

LOCKERS

INTERVIEW

CONSULTATION

ROOM

CONSULTATION

ROOM

SURGERY

FAMILY

WAITING

ELEV.

MACHINE

ROOM

MINOR

PROCEDURES

VESTIBULE

CLEAN

SUPPLY

OFFICE

NOURISHMENT

STATION

PAT

TOILET

CONF

ROOM

SOILED

UTILITY

NURSE

STATION

STAFF

TOILET

STAFF

LOUNGE

LOBBY

VESTIBULE

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

ELEV

LOBBY

CORRIDOR

CORRIDOR

ELEV

LOBBY

ELEV

LOBBY

CORRIDOR

ELEV

ELEV

ELEV

ELEVELEV

ELEVELEVELEV

ELEV

ELEV

ETO

ROOM

HAC

PAT

CLOTHING

CLOSET

TELEPHONE

ALCOVE

CLEAN

LINEN

SECURED

ITEMS

VENDING

MACHINES

HOLDING

ROOM

HOLDING

ROOM

HOLDING

ROOM

HOLDING

ROOM

HOLDING

ROOM

HOLDING

ROOM

HOLDING

ROOM

HOLDING

ROOM

HOLDING

ROOM

HOLDING

ROOM

HOLDING

ROOM

HOLDING

ROOM

HOLDING

ROOM

HOLDING

ROOM

MINOR

PROCEDURE

EQUIPMENT

STORAGE

STORAGE

CLOSET

WARD

EQUIPMENT

STORAGE

EXISTING

ROOM

EXISTING

ROOM

EXISTING

ROOM

EXISTING

ROOM

EXISTING

ROOM

EXISTING

ROOM

CORRIDOR

ALCOVE

MANUAL

EQUIPMENT

WASH

PAT

TOILET

PAT

TOILET

RECYCLING

EMS

FIRE

PUMP

ROOM

MECH

PUMP

ROOM

MED

ROOM

VEST

VEST

VEST

WHEELCHAIR

WASH

EQUIPMENT

STORAGE

STAIR 8

STAIR 10

STAIR 9

EGRESS

VEST.

ETO

SERVICE

C1-010

C1-014A

C1-015A

C1-016A

1B-105

1B-106A

1D-108A

1C-107C

C1-014

1A-139

1A-123

1A-100

1C-104C

1C-107B

1A-112A

1B-108

1C-108A 1C-108

1C-107A 1C-106A

1C-106

1C-105B

1C-105A

1C-105

1C-104B

1C-104A

1C-104

1C-101B

1C-102A

1C-101A

1C-103 1C-102

1C-101

1C-100A1C-100

1D-109D

1D-109C

1D-109B

1D-109

1D-108

1D-106

1D-105

C1-018

1D-102

1D-101

1B-104

1B-103A

1B-103 1B-101

1B-100

1A-103C

1A-103B

1A-102C

1A-102B

1A-102A1A-103A

1A-103

1A-102

1A-140

1A-137

1A-136

1A-135

1A-134

1A-130

1A-128

1A-127

1A-126

1A-122

1A-120

1A-118

1A-112

1A-107

1A-101A

1A-101

C1-016

C1-015

C1-013

C1-012

C1-011

C1-009

C1-008

C1-007

C1-006

C1-004

C1-003

C1-001

C1-002

S-7

S-6

P-3 P-2P-1

S-3S-2S-1

S-5

S-4

1C-104D

1D-100A

C1-006A

1D-100

1A-132

1C-104E

1D-104

1A-105

1A-106

1A-108

1A-109

1A-113

1A-111

1A-115

1A-117

1A-119

1A-121

1A-124

1A-116

1A-114

1A-110

1A-129

1A-133

C1-006B

1R-105

1R-103 1R-104

1R-106

1R-107

1R-108

1R-109

1R-110

C1-006C

1C-107D

1A-131 1A-104

1B-102

1B-106

1D-110

1D-111

1A-125

1A-138

1A-103D

1A-102D

1D-107

1D-109A

ST-8

ST-10

ST-9

C1-005

1C-101C

UP

UP

S S

S S

S S

S SS

BUILDING 40

BUILDING 1

2 HOUR FIRE

BARRIER

BETWEEN

BUILDINGS

2 HOUR FIRE SEPARATION

1 HOUR FIRE SEPARATION

SMOKE RATED

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

REMODEL STERILE

PROCESSING SERVICE

/1

/2

:1

:5

P

M

LS-100-3

FIRST FLOOR LIFE SAFETY PLAN -

PHASE 3

5 5MVK

JESSE BROWN VA MEDICAL CENTER

820 S. DAMEN AVE, CHICAGO IL 60612

06/13/2024

ISSUED FOR CONSTRUCTION

537-17-11518-327

RMC

N

KEY PLAN

SCALE: NO SCALE

Scale: 1" = 20'-0"

FIRST FLOOR LIFE SAFETY PLAN 0 4 8 16

NORTH

PLAN

WALL RATING LEGEND

A. SEE SHEET A-001-3 FOR GENERAL NOTES.

EXISTING BUILDING 40:

NFPA 101 OCCUPANCY CLASSIFICATION:

AMBULATORY HEALTH CARE

EXISTING BUILDING 1:

NFPA 101 OCCUPANCY CLASSIFICATION:

AMBULATORY HEALTH CARE

CODE OVERVIEW

AFF ABOVE FINISHED FLOOR

ACT ACOUSTIC(AL) TILE

ALT ALTERNATE

AL ALUMINUM

APPROX APPROXIMATE(LY)

CLR CLEAR

CPT CARPET

DIM DIMENSION

EL ELEVATION

ELEV ELEVATOR

EQ EQUAL

EQUIP EQUIPMENT

EXIST EXISTING

FD FLOOR DRAIN

FE FIRE EXTINGUISHER

FFE FINISH FLOOR ELEVATION

FEC FIRE EXTINGUISHER CABINET

FIN FINISH

FLR FLOOR

FRMG FRAMING

FT FOOT/FEET

GC GENERAL CONTRACTOR

GA GAUGE

GALV GALVANIZED

GEN GENERAL

GYP GYPSUM

HAC HOUSEKEEPING CLOSET

HM HOLLOW METAL

HDWR HARDWARE

HOR HORIZONTAL

HT HEIGHT

IN INCH

INT INTERIOR

MAX MAXIMUM

MECH MECHANICAL

MFR MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

MTD MOUNTED

MTL METAL

N NORTH

NIC NOT IN CONTRACT

NTS NOT TO SCALE

NOM NOMINAL

OFCI OWNER FURNISHED, CONTRACTOR INSTALLED

O TO O OUT TO OUT

OPNG OPENING

OPP OPPOSITE

OVHD OVERHEAD

PNT PAINT

PTD PAINTED

SF SQUARE FEET

SS STAINLESS STEEL

SIM SIMILAR

SPEC SPECIFICATIONS

STL STEEL

T/O TOP OF

TYP TYPICAL

VCT VINYL COMPOSITION TILE

VIF VERIFY IN FIELD

WALL TYPE

DOOR NUMBER TYPICAL KEYNOTE

CEILING/ SOFFIT

HEIGHT

MATL

1'-0"

-1

GENERAL NOTES

1. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF THE DESIGNER AS TO THE LIMITATIONS OF THE WORK AREA IN AN OCCUPIED AREA. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY AGREEMENT BETWEEN THE COR AND

CONTRACTOR BEFORE THE START OF THE WORK.

2. DRAWINGS ARE PREPARED USING DIMENSIONS AND PRODUCT DETAILS FOR SPECIFIC PRODUCTS, WHICH MAY CHANGE BEFORE THEY ARE ACTUALLY INCORPORATED INTO THE WORK, AND PRODUCTS BY OTHER MANUFACTURERS ARE ALSO ACCEPTABLE. THEREFORE, ACTUAL INSTALLATION DETAILS AND DIMENSIONS MAY DIFFER FROM THOSE SHOWN. CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE INCORPORATED IN THE WORK (INCLUDING THICKNESS FOR RECESSED OR SEMI-RECESSED

PRODUCTS) AND IS RESPONSIBLE FOR ACCOMMODATING AND COORDINATING CHANGES TO OTHER

MATERIALS OR PRODUCTS THAT ARE NECESSARY BECAUSE OF THESE DIFFERENCES.

3. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS USED ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS, OR OF THE DRAWINGS AND SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO BE CONSTRUCTED AS A COMPLETE, INTEGRATED AND UNIFIED WHOLE.

4. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE COR PRIOR TO BIDDING. WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR INTENT CANNOT BE REASONABLY INFERRED, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR GREATER

QUANTITY OF WORK.

5. USE OF THE WORD "VERIFY" POINTS OUT A SITUATION WHICH MUST BE CONFIRMED PRIOR TO PROCEEDING WITH THE WORK, FABRICATION OF EQUIPMENT, OR ORDERING MATERIAL. NOTIFY THE COR OF ANY

DISCREPANCY DISCOVERED.

6. THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY SHOULD DISCREPANCIES BE FOUND IN THE

DRAWINGS AND SPECIFICATIONS.

7. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS AND DIMENSIONS AS THEY RELATE TO THIS PROJECT. SHOULD DISCREPANCIES EXIST BETWEEN THE WORK INDICATED AND ACTUAL FIELD

CONDITIONS NOTIFY THE COR PRIOR TO PROCEEDING WITH THE WORK.

8. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL OR DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL

GOVERN.

9. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION.

10. THE CONTRACTOR AND SUBCONTRACTORS INVOLVED IN THIS PROJECT SHALL BE RESPONSIBLE FOR DESIGNING AND INSTALLING THEIR RESPECTIVE WORK AND SYSTEMS TO MEET ALL APPLICABLE FEDERAL, STATE, AND LOCAL CODES, LAWS, SAFETY REGULATIONS, HAZARDOUS WASTE LAWS, ETC. THE CONTRACTOR

SHALL FURNISH ALL NECESSARY PERMITS.

11. THE CONTRACTOR SHALL REVIEW THE DRAWINGS AND UNDERSTAND THE SCOPE OF THE DRAWINGS TO BE THE FOLLOWING: THESE CONSTRUCTION DOCUMENTS (DRAWINGS, SPECIFICATIONS, ADDENDA, ETC.)

INDICATE THE GENERAL SCOPE OF THE PROJECT IN TERMS OF ARCHITECTURAL DESIGN CONCEPTS, THE DIMENSIONS OF THE BUILDING, THE MAJOR ARCHITECTURAL ELEMENTS, AND THE MAJOR STRUCTURAL, MECHANICAL, ELECTRICAL, AND DATA SYSTEMS. THE DOCUMENTS DO NOT AND ARE NOT INTENDED TO INDICATE OR DESCRIBE IN DETAIL ALL THE NECESSARY WORK REQUIRED FOR FULL PERFORMANCE OF, AND COMPLETION OF THE REQUIREMENTS OF THE CONTRACT. ON THE BASIS OF THE GENERAL SCOPE INDICATED IN THESE DOCUMENTS, THE TRADE CONTRACTORS SHALL FURNISH ALL ITEMS REQUIRED FOR THE PROPER EXECUTION AND COMPLETION OF THEIR WORK. ALL WORK SHALL BE COMPLETE IN EVERY DETAIL AND THE CONTRACTORS SHALL PROVIDE A ONE YEAR WARRANTY FOR THEIR WORK UNLESS A LONGER WARRANTY IS

INDICATED IN THE SPECIFICATIONS.

12. CONTRACTORS SHALL FOLLOW AND OBEY ALL FEDERAL, STATE AND LOCAL CODES, LAWS, SAFETY

REGULATIONS AND HAZARDOUS WASTE LAWS, ETC.

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

REMODEL STERILE

PROCESSING SERVICE

/1

/2

:2

:0

P

M

A-001-3

ARCHITECTURAL SYMBOLS,

ABBREVIATIONS AND NOTES

1 7MVK

JESSE BROWN VA MEDICAL CENTER

820 S. DAMEN AVE, CHICAGO IL 60612

06/13/2024

ISSUED FOR CONSTRUCTION

537-17-11518-327

RMC

ABBREVIATIONS 003

ARCHITECTURAL SYMBOL LEGEND 003

UP

S SS

SCOPE

REPROCESSING/HLD

1578A

ANTE ROOM

344 SF

SCOPE

DECONTAM

SCOPE

STAGING

ROOM

SOILED

RECEIVING

DECONTAM

STAFF

LOUNGE

ETO

ROOM

1639A

ETO

SERVICE

STAFF

TOILET

1645A

CLEAN

RECEIVING

BREAK-OUT

STAFF

LOCKERS

STAFF

LOCKERS

STAFF

TOILET

1643A

STERILE

SUPPLY

STOR. &

DIST.

CART

STAGING

AREA

ELECT.

ROOM

16E3

ELEV

P25

STAIR 11

CORRIDOR

STAFF

TOILET

STAFF

LOCKERS

- MALE

STAFF

LOCKERS

- FEMALE

STAFF

TOILET

1627A

ANTE

ROOM

16H5

SPS

PREPARATION

CHIEF

OFFICE

ELEVATOR

MACHINE

ROOM

STAFF

PPE

EXISTING

ROOM

HAC

16H1

A-102-3

A

A

A

A

A

HAC

1628A 1628A

ALIGN

ALIGN

ALIGN

13'-0"

B1

B1

B

C

C.5

D

D.9

E

E.5

F

G

18X13X12X11X10 X14

A

6'-10"

1 1

ELEV

LOBBY

STAFF

OFFICE

OFFICE

1642A

EXISTING DOOR

NEW DOOR

NO WORK THIS AREA

WORK IN THIS AREA CONSISTS OF

MINOR RENOVATION:

REPLACEMENT OF LIGHT

FIXTURES. SEE ELECTRICAL.

2 HOUR FIRE SEPARATION

1 HOUR FIRE SEPARATION

SMOKE RATED

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

REMODEL STERILE

PROCESSING SERVICE

/1

/2

:2

:0

P

M

A-101-3

FIRST FLOOR PLAN

2 7MVK

JESSE BROWN VA MEDICAL CENTER

820 S. DAMEN AVE, CHICAGO IL 60612

06/13/2024

ISSUED FOR CONSTRUCTION

537-17-11518-327

RMC

Scale: 3/16" = 1'-0"

FIRST FLOOR PLAN 0 42 8

NORTH

PLAN

N

KEY PLAN

SCALE: NO SCALE

A. SEE SHEET A-001-3 FOR GENERAL

CONSTRUCTION NOTES.

B. SEE SHEET A-601-3 FOR PARTITION TYPES.

C. FIRE-SEAL ALL PENETRATIONS THROUGH

WALLS AND FLOORS WITH UL LISTED FIRE-

RATED MATERIALS AND SYSTEMS TO ACHIEVE

A RATED ASSEMBLY EQUIVALENT OR BETTER

THAN THAT REQUIRED.

D. CONTRACTOR RESPONSIBLE TO PROVIDE

SHEET METAL BACKING FOR ATTACHMENT OF

ALL WALL MOUNTED ITEMS. USE AS BASIS OF

DESIGN: STEELTEC EXTRA STRENGTH

BACKING, 600 ESB 050 16-54-10 G, OR

APPROVED COLD-FORMED EQUAL.

E. DEMOLITION FOR THIS AREA IS IN THE PHASE 2

DOCUMENT PACKAGE.

LEGEND

WALL RATING LEGEND

01 STAINLESS STEEL CORNER GUARDS,

4'-0" HIGH

02 PATCH AND WALL IN THIS AREA AS

REQUIRED TO MATCH EXISTING ADJACENT

CONDITIONS. PAINT ENTIRE WALL P-2.

03 PROVIDE NEW HANDRAIL TO MATCH

EXISTING ADJACENT HANDRAIL.

04 ADD BUMBER RAIL BR-2 TO ALL NEW

WALLS TO MATCH EXISITING STYLE,

HIGHT, MOUNTING LOCATION AND COLOR

1578A

SCOPE

REPROCESSING/HLD

ANTE

ROOM

SCOPE

DECONTAM

SOILED

RECEIVING

DECONTAM

S0555 S0555 S0555

S0555

A A

F0535

A1195-3

A

A

A

B

S2635

S2636

S0556

S0556

S0556

17 SF

HAC

1628A

95 SF

ANTE

ROOM

16H5

A-401-3 1

A-401-3 11

A-401-3 9

A-401-3

1628A

M3161 M3161

S0940

M1803

A

A1195-3

K1910

A5020A

A5020A

CW100

M1803

M1803

B

B

/2

2'-4"

B

A B

B

B

B

2'-4"

CHIEF OFFICE

W1

W2

B

A1195-3

A-401-3

A-401-3

A-401-38

A1195-3

C.5

D

D.9

E

E.5

F

G

18X13 X14

STAFF PPE

S1905

B

7'-0" 1'-3"

M

M

A A

S0941

S0555

SCOPE

STAGING

ROOM

M3161

M3161

9'-5"

4'-6" 4'-6" 4'-6" 4'-6"

6'-0"

B1

B1

B1

B

B1

F0535 F0535

A1195-2

A -1

A

A

B1

B1 B1

B1

B1

3'-10"

A

6'-2"

C

1. REFER TO MECHANICAL, ELECTRICAL, PLUMBING, TEL-COM AND LOW VOLTAGE DRAWINGS FOR ADDITIONAL

REQUIRED UTILITY CONNECTIONS AND LOCATIONS.

2. FURNITURE, FIXTURES AND EQUIPMENT SHOWN ON PLANS AND SCHEDULES ARE FOR

COORDINATION AND SPACIAL PURPOSES ONLY, NOT TO BE USED FOR ACTIVATION PURCHASING

3. ITEM TAGS INCLUDE ACQUISITION AND INSTALLATION RESPONSIBILITIES (ACQ.), DENOTED AS FOLLOWS:

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

REMODEL STERILE

PROCESSING SERVICE

/1

/2

:2

:0

P

M

A-102-3

FIRST FLOOR ENLARGED PLAN

3 7MVK

JESSE BROWN VA MEDICAL CENTER

820 S. DAMEN AVE, CHICAGO IL 60612

06/13/2024

ISSUED FOR CONSTRUCTION

537-17-11518-327

RMC

Scale: 1/4" = 1'-0"

FIRST FLOOR ENLARGED PLAN 0 4 8 16

NORTH

PLAN

N

KEY PLAN

SCALE: NO SCALE

A. SEE SHEET A-001-3 FOR GENERAL

CONSTRUCTION NOTES.

B. SEE SHEET A-601-3 FOR PARTITION TYPES.

C. PROVIDE SHEET METAL BACKING IN WALL

BEHIND ALL WALL-MOUNTED ITEMS.

D. FIRE-SEAL ALL PENETRATIONS THROUGH

WALLS AND FLOORS WITH UL LISTED FIRE-

RATED MATERIALS AND SYSTEMS TO

ACHIEVE A RATED ASSEMBLY EQUIVALENT

OR BETTER THAN THAT REQUIRED.

E. CONTRACTOR RESPONSIBLE TO PROVIDE

BLOCKING FOR ATTACHMENT OF ALL WALL

MOUNTED ITEMS. BLOCKING NOT SHOWN

ON INTERIOR ELEVATIONS. AT ALL

LOCATIONS WHERE BLOCKING IS REQUIRED

TO SECURE ITEMS, USE AS BASIS OF

DESIGN: STEELTEC EXTRA STRENGTH

BACKING, 600 ESB 050 16-54-10 G, OR

APPROVED COLD-FORMED EQUAL. INSTALL

BLOCKING AT 16" O.C.

F. PATCH ALL OPENINGS/HOLES IN FLOOR

SLAB RESULTING FROM PLUMBING

DEMOLITION.

Specialty Equipment Schedule

Type Mark Description Manufacturer Model Comments

A1195-1 STAINLESS STEEL 1 SINK CLEANUP COUNTER CONTINENTAL METAL

PRODUCTS

WS1-60

A1195-2 STAINLESS STEEL 2 SINK CLEANUP COUNTER STERIS FURNISHED BY OWNER, INSTALLED BY CONTRACTOR

A1195-3 STAINLESS STEEL 3 SINK CLEANUP COUNTER STERIS FURNISHED BY OWNER, INSTALLED BY CONTRACTOR

A502…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .