S02 - Exhibit 01b2 537-17-115 PH3 DWGs Bid 20240701.pdf
PDF 15 MB Posted
- Attached to
- Z2DA--537-17-115: SPS Construction Phase 2, 3 &4 Federal contract opportunity
- Solicitation number
- 36C25225B0001
About this file
This is a construction drawing set for Phase 3 of the Sterile Processing Service (SPS) remodel project at Jesse Brown VA Medical Center in Chicago, IL. The drawings detail the renovation work to be performed in the SPS area on the first floor and mechanical room on the third floor of Building 40.
The drawing set includes architectural, fire protection, plumbing, mechanical, electrical, technology and fire alarm plans and details. Key elements include new sterile processing equipment installation, associated mechanical/electrical infrastructure upgrades, and interior renovations to create proper workflow between decontamination, processing, and sterile storage areas. Specific components include installation of medivators, ultrasonic cleaners, pass-through chambers, new HVAC equipment (AHU-2, exhaust fans), electrical distribution panels, lighting, fire alarm devices, security/access control systems, and required plumbing connections. The drawings provide detailed information about equipment layouts, utility connections, ceiling plans, mounting details, and control system specifications necessary for construction. The project maintains required infection control measures and life safety requirements during renovation of an occupied healthcare facility.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25225B0001 0004.docx | DOCX document | |
| S06 - 09 65 16 Resilient Sheet Flg.pdf | ||
| 36C25225B0001 0003.docx | DOCX document | |
| 36C25225B0001 0002.docx | DOCX document | |
| S04 - 537-17-115 Site visit 02242025.pdf | ||
| S06 - Requirements for Identification and Replacement of A307 Bolts Memo.pdf | ||
| 36C25225B0001 0001.docx | DOCX document | |
| S02 - Exhibit 02c1 - 537-17-115 SOW Att - Contract Progress Repor vha-10-6001a-fill.pdf | ||
| S02 - Wage Determination 1.10.25.pdf | ||
| S02 - Exhibit 01c1 537-17-115 Specs Vol 1 20240614.pdf | ||
| S02 - Exhibit 01b3 537-17-115 PH4 DWGs Bid 20240701.pdf | ||
| 36C25225B0001_3.docx | DOCX document | |
| S02 - Exhibit 01c2 537-17-115 Specs Vol 2 20240614.pdf | ||
| S02 - Ex 02c3 - 537-17-115 SOW Att - Subcontractor Payment Summary.xlsx | XLSX spreadsheet | |
| S02 - Exhibit 01a 537-17-115 Construction IFC Narrative.pdf | ||
| S02 - Exhibit 01b1 537-17-115 PH2 DWGs Bid 20240701.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JESSE BROWN
VA HOSPITAL
W TAYLOR ST
W POLK ST
S D
A M
E N
A V
E
W O
G D E N A
V E
1ST FLOOR
AREA
3RD FLOOR
AREA
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP PROJECT LOCATION MAP
PROJECT IMAGE
REMODEL STERILE
PROCESSING SERVICE
/1
/2
:4
:0
P
M
G-001-3
SPS REMODEL - COVER
1 5MVK
JESSE BROWN VA MEDICAL CENTER
820 S. DAMEN AVE, CHICAGO IL 60612
06/13/2024
ISSUED FOR CONSTRUCTION
537-17-11518-327
REMODEL STERILE PROCESSING SERVICE
JESSE BROWN VA MEDICAL CENTER
820 S. DAMEN AVE, CHICAGO IL 60612
VA PROJECT #: 537-17-115 APOGEE PROJECT #: 18-327
RMC
DRAWING LIST
GENERAL
G-001-3 SPS REMODEL - COVER 1 5
G-100-3 GENERAL INFORMATION - PHASE 3 2 5
G-101-3 FIRST FLOOR ICRA PLAN - PHASE 3 3 5
G-102-3 ICRA DETAILS 4 5
LS-100-3 FIRST FLOOR LIFE SAFETY PLAN - PHASE 3 5 5
ARCHITECTURAL
A-001-3 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 7
A-101-3 FIRST FLOOR PLAN 2 7
A-102-3 FIRST FLOOR ENLARGED PLAN 3 7
A-103-3 THIRD FLOOR PLAN 4 7
A-111-3 FIRST FLOOR REFLECTED CEILING PLAN 5 7
A-401-3 INTERIOR ELEVATIONS 6 7
A-601-3 SCHEDULES AND DETAILS 7 7
FIRE PROTECTION
FS-001-3 FIRE SUPPRESSION GENERAL INFORMATION - PHASE 3 1 2
FS-101-3 FIRE SUPPRESSION PLANS - PHASE 3 2 2
PLUMBING
P-001-3 PLUMBING GENERAL INFORMATION - PHASE 3 1 4
P-101-3 PLUMBING PLANS - PHASE 3 2 4
P-601-3 PLUMBING SCHEDULES AND DETAILS - PHASE 3 3 4
P-602-3 PLUMBING DETAILS - PHASE 3 4 4
MECHANICAL
M-001-3 MECHANICAL GENERAL INFORMATION - PHASE 3 1 8
MH-101-3 FIRST FLOOR MECHANICAL HVAC PLAN - PHASE 3 2 8
MH-102-3 THIRD FLOOR MECHANICAL HVAC PLANS - PHASE 3 3 8
MP-101-3 MECHANICAL PIPING PLANS - PHASE 3 4 8
M-501-3 MECHANICAL DETAILS - PHASE 3 5 8
M-502-3 MECHANICAL CONTROLS 6 8
M-601-3 MECHANICAL SCHEDULES - PHASE 3 7 8
M-602-3 MECHANICAL SCHEDULES 8 8
ELECTRICAL
E-001-3 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS - PHASE 3 1 7
EP101-3 ELECTRICAL FLOOR POWER PLAN - PHASE 3 2 7
EM101-3 ELECTRICAL FLOOR POWER PLAN - PHASE 3 3 7
EL101-3 ELECTRICAL FLOOR LIGHTING PLAN - PHASE 3 4 7
E-401-3 ELECTRICAL ENLARGEMENTS - PHASE 3 5 7
E-501-3 ELECTRICAL DETAILS - PHASE 3 6 7
E-601-3 ONE LINE DIAGRAM - PHASE 3 7 7
TECHNOLOGY
T-001-3 TECHNOLOGY GENERAL NOTES SYMBOL LEGEND AND ABBREVIATIONS - PHASE 3 1 2
T-101-3 FIRST FLOOR TECHNOLOGY PLAN - PHASE 3 2 2
FIRE ALARM
FA001-3 FIRE ALARM GENERAL NOTES, SYMBOL LEGEND AND RISER - PHASE 3 1 2
FA101-3 FIRST FLOOR FIRE ALARM PLAN - PHASE 3 2 2
PHASE 3: SPS REMODEL
NORTH
PLAN
24514
LICENSED
ARCHITECT
DocuSign Envelope ID: B0CA22F4-B9A3-463C-9AC8-E13FC488A65D
6/14/2024
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF
PRECAUTIONS FOR CONSTRUCTION AND RENOVATION
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF
PRECAUTIONS FOR CONSTRUCTION AND RENOVATION WALL SECTION
SYMBOL
INTERIOR ELEVATION
SYMBOL
COLUMN GRID
ELEVATION SYMBOL
REVISION NOTE
ENLARGED DETAIL CALLOUT
ROOM DESIGNATION
SYMBOL
BREAK LINE
ROOF SLOPE
DIRECTION SYMBOL
TYPICAL GRAPHIC SCALE
DETAIL #
PAGE #
DETAIL #
PAGE #
TRUE NORTH ARROW
PROJECT NORTH ARROW
A8.1
EXTERIOR ELEVATION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
A8.1
BUILDING SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
DETAIL SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
WALL GRID
(REPRESENTS
FACE OF EXISTING
WALL)
XX.X
XX.X
ELEVATION
0'-0"
ROOM
NAME
101A
NORTH
PLAN
NORTH
TRUE
0 4 8 16
EXPOSED
PLUMBING AT
BARRIER
FREE
LAVATORIES
SHALL BE
INSULATED.
LEVER OPERATING
CONTROLLED
SOAP DISPENSER
NOTE: SINKS IN COUNTERS TO BE
MOUNTED WITH RIM NO MORE
THAN 2'-10" HIGH AND WITH AT
LEAST 2'-3" KNEE CLEARANCE.
CLEAR
TYPICAL ACCESSIBLE
CLEARANCE AT LAVATORY
TYPICAL ACCESSIBLE
LAVATORY
1'-3" 1'-3"
M
IN
M A
X
M
A X
MIN
8"
M
IN9
M
IN
M
IN
M A
X
17" MIN
NOTE: FIRE
EXTINGUISHERS HAVING
A GROSS WEIGHT NOT
EXCEEDING 40 LB (18.14
KG) SHALL BE INSTALLED
SO THAT THE TOP OF THE
FIRE EXTINGUISHER IS
NOT MORE THAN 5'-0"
(1.53 M) ABOVE THE
FLOOR.
FIRE EXTINGUISHER
CABINET
ELECTRICAL PANEL
DUPLEX
OUTLET
SWITCH
THERMOSTAT
TELEPHONE
OR DATA
OUTLET
FIRE ALARM
PULL
(3-6" MIN)
(4'-0" MAX)
INTERCOM
STATION
DUPLEX
OUTLET
COMPUTER
TERMINAL
MISC. WALL DEVICES
CLOCK
NURSE
CALL
DOME
LIGHT
CLOCK OUTLET
CLOCK & NURSE CALL DEVICES
MOP BASIN
MOP SHELF
TYPICAL JANITORS CLOSET
2'-0" AT SIDEWALLS
AT COUNTER SINKS
1'-6" AT SIDEWALLS
AT LAVATORY
WALL PROTECTION
'-0
HANDRAIL
OR DOOR FRAME
3" TO CORNERGUARD
CORNER GUARD
'-0
IIILOW Risk Group 1
Class III
Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
I
I
III
MEDIUM Risk Group 2
HIGH Risk Group 3
HIGHEST Risk Group 4 V
V
IV
V
IV
III
IV
II
III
Patient Risk Group Table
Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk
TYPE A
Construction Project Type
Major demolition and construction projects Includes, but is not limited to:
• Removal or replacement of building system component(s).
• Removal/installation of drywall partitions.
• Invasive large-scale new building construction.
• Renovation work in two or more rooms.
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies Includes, but is not limited to:
• Removal of preexisting floor covering, walls, casework or other building components.
• New drywall placement.
• Renovation work in a single room.
• Nonexisting cable pathway or invasive electrical work above ceilings.
• The removal of drywall where a moderate amount of dust and debris is created.
• Dry sanding where a moderate amount of dust and debris is created.
• Work creating significant vibration and/or noise.
• Any activity that cannot be completed in a single work shift.
Small scale, short duration activities which create minimal dust Includes, but is not limited to:
• Work conducted above the ceiling (e.g., prolonged inspection or repair of firewalls and barriers, installation of conduit and/or cabling, and access to mechanical and/or electrical chase spaces).
• Fan shutdown/startup.
• Installation of electrical devices or new flooring that produces minimal dust and debris.
• The removal of drywall where minimal dust and debris is created.
• Controlled sanding activities (e.g., wet or dry sanding) that produce minimal dust and debris.
Inspection and Non-Invasive Activities Includes, but is not limited to:
• Removal of ceiling tile for visual inspection-limited to 1 tile per 50 square feet with limited exposure time.
• Limited building system maintenance (e.g., pneumatic tube station, HVAC system, fire suppression system, electrical and carpentry work to include painting without sanding) that does not create dust or debris.
• Clean plumbing activity limited in nature.
Type of Construction / Project Activity Table
Group 2 Medium Risk
Group 1 Low Risk
• Physical Therapy
• Radiology departments
• All patient waiting rooms
• All outpatient clinics
• Research Areas
• Respiratory Therapy
• Office areas (non-clinical)
• FES/EMS areas
I
Patient Risk Group
TYPE D
TYPE C
TYPE B
TYPE A
Group 4 Highest Risk
Group 3 High Risk
• Emergency Room
• Clinical Laboratories (specimen)
• Same Day Surgery
• Pharmacy
• Nutrition and Food
Service/Canteen
• Procedural Areas (GI)
• Inpatient Mental Health
• Any area caring for immunocompromised patients
• Cardiac Cath Lab/IR
• Central Sterile Supply
• Sterile Processing Service
• Intensive Care Units
IIII
TYPE DTYPE CTYPE B
Class IVor control procedures are necessary.
C
LA
S S
IV
During Construction Project Upon Completion of Project
1. Includes all activities required by Class III
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management
Maintenance and Engineering department before construction begins.
3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.
4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.
5. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).
6. Containment units or environmental containment units (ECUs) approved for Class IV precautions in small areas totally contained by the unit and that has HEPA-filtered exhaust air.
7. Remove or isolate return air diffusers to avoid dust entering the HVAC system.
8. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.
9. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.
10. Maintain negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.
11. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.
12. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is not acceptable.
13. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.
14. Contain all trash and debris in the work area.
15. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
16. Worker clothing must be clean and free of visible dust before leaving the work area.
HEPA vacuuming of clothing or use of cover suites is acceptable.
17. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be immediately changed.
18. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
19. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.
• Medical/Surgical Units
• Negative pressure isolation rooms
• Outpatient Chemotherapy
Areas
• Operating rooms
• Post Anesthesia Care Unit
• Dialysis
• Dental
C
LA
S S
V
1. Includes all activities required by Class IV
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management
Maintenance and Engineering department before construction begins.
3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.
4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.
5. Seal all penetrations in containment barriers, anteroom barriers, including floors and ceiling using approved materials (UL schedule firestop if applicable for barrier type).
6. Construct anteroom large enough for equipment staging, cart cleaning, workers. The anteroom must be constructed adjacent to entrance of construction work area.
7. Personnel will be required to wear coveralls at all times during Class V work activities.
Coveralls must be removed before leaving the anteroom.
8. Remove or isolate return air diffusers to avoid dust entering the HVAC system.
9. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.
10. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.
11. Maintain negative pressurization of the entire workspace using HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.
12. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.
13. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (bathroom exhaust) is not acceptable.
14. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.
15. Contain all trash and debris in the work area.
16. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
17. Worker clothing must be clean and free of visible dust before leaving the work area anteroom.
18. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area).
Damaged shoe covers must be immediately changed.
19. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
20. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.
Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.
Work Area Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
Removal of Critical Barriers:
1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.
2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
1. Carefully remove screws and painter tape.
2. If dust will be generated during screw removal, use hand-held HEPA vacuum.
3. Drywall cutting is prohibited during removal process.
4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.
5. Use a plastic barrier to enclose area if dust could be generated.
Negative Air Requirements:
1. The use of negative air must be designed to remove contaminates from the work area.
2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
HVAC systems:
1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.
2. Verify that HVAC systems are clean and operational.
3. Verify the HVAC systems meets original airflow and air exchange design specifications.
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
During Construction Project
C
LA
S S
I
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
Upon Completion of Project
1. Execute work by methods to minimize raising dust from construction operations.
2. Perform noninvasive work activity as to not block or interrupt patient care.
3. Perform noninvasive work activities in areas that are not directly occupied with patients.
4. Perform noninvasive work activity in a manner that does not create dust.
5. Immediately replace any displaced ceiling tile before leaving the area and/or at end of noninvasive work activity.
C
LA
S S
II
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
1. Includes all activities required by Class I
2. Perform only limited dust work and/or activities designed for basic facilities and engineering work.
3. Perform limited dust and invasive work following standing precautions procedures approved by the organization.
4. This Class of Precautions must never be used for construction or renovation activities.
5. Provide active means to prevent airborne dust from dispersing into atmosphere.
6. Water mist work surfaces to control dust while cutting.
7. Seal unused doors with duct tape.
8. Block off and seal air vents.
9. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.
10. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.
Work Area Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
Removal of Critical Barriers:
1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.
2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
1. Carefully remove screws and painter tape.
2. If dust will be generated during screw removal, use hand-held HEPA vacuum.
3. Drywall cutting is prohibited during removal process.
4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.
5. Use a plastic barrier to enclose area if dust could be generated.
Negative Air Requirements:
1. The use of negative air must be designed to remove contaminates from the work area.
2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
HVAC systems:
1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.
2. Verify that HVAC systems are clean and operational.
3. Verify the HVAC systems meets original airflow and air exchange design specifications.
CONSTRUCTION ACTIVITIES SHALL BE CLASSIFIED AS FOLLOWS UNLESS NOTED OTHERWISE:
1. INSTALLATION OF CABLE TRAY IN CORRIDOR CEILINGS SHALL BE CONSIDERED CONSTRUCITON ACTIVITY TYPE B.
2. ALL CONDUIT SPECIFIED TO BE INSTALLED IN WALL SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE C.
3. CONSTRUCTION OF NEW ROOMS SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE D.
4. INSTALLATION OF NEW DOORS TO OR FROM EXISTING SPACES SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE C.
C
LA
S S
II
I
1. Includes all activities required by Class II
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Provide active means to prevent airborne dust dispersion into the occupied areas.
4. Means for controlling minimal dust dispersion may include hand-held HEPA vacuum devices, polyethylene plastic containment, or isolation of work area by closing room door.
5. Remove or isolate return air diffusers to avoid dust from entering the HVAC system.
6. Remove or isolate the supply air diffusers to avoid positive pressurization of the space,
7. If work area is contained, then it must be neutrally to negatively pressurized at all times.
8. Seal all doors with tape that will not leave residue.
9. Contain all trash and debris in the work area.
10. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
11. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
12. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces.
13. Clean construction area at the end of each shift by damp mopping or HEPA Vacuum.
For Type C activities, follow procedures for Class IV.
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
REMODEL STERILE
PROCESSING SERVICE
/1
/2
:1
:5
P
M
G-100-3
GENERAL INFORMATION - PHASE 3
2 5MVK
JESSE BROWN VA MEDICAL CENTER
820 S. DAMEN AVE, CHICAGO IL 60612
06/13/2024
ISSUED FOR CONSTRUCTION
537-17-11518-327
RMC
GENERAL SYMBOL LEGEND
APPLICABLE CODES AND STANDARDS
Scale: 3/8" = 1'-0"
STANDARD MOUNTING HEIGHTS1
NFPA 10, STANDARD FOR PORTABLE FIRE EXTINGUISHERS, 2018
NFPA 13, INSTALLATION OF SPRINKLER SYSTEMS, 2016
NFPA 70, NATIONAL ELECTRICAL CODE (NEC), 2023
NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE, 2022
NFPA 80, STANDARD FOR FIRE DOORS AND OTHER OPENING PROTECTIVES, 2019
NFPA 90A: STANDARD FOR THE INSTALLATION OF AIR CONDITIONING & VENTILATING SYSTEMS, 2018
NFPA 99, HEALTH CARE FACILITIES CODE, 2018
NFPA 101, LIFE SAFETY CODE, 2018
PG 18-13: VA BARRIER FREE DESIGN STANDARD, 2024
PG 18-12: 285: STERILE PROCESSING SERVICE, 2022
ASHRAE 90.1, 2022
ASHRAE 170, VENTILATION OF HEALTH CARE FACILITIES, 2021
DEPARTMENT OF VETERANS AFFAIRS: FIRE PROTECTION DESIGN MANUAL, 2023
DEPARTMENT OF VETERANS AFFAIRS: PLUMBING DESIGN MANUAL, 2024
DEPARTMENT OF VETERANS AFFAIRS: HVAC DESIGN MANUAL, 2024
DEPARTMENT OF VETERANS AFFAIRS: ELECTRICAL DESIGN MANUAL, 2019
DEPARTMENT OF VETERANS AFFAIRS: LIGHTING DESIGN MANUAL, 2021
DEPARTMENT OF VETERANS AFFAIRS: TELECOMMUNICATIONS DESIGN MANUAL, 2016
OVERALL PHASE SUMMARY
PHASE 1: INSTALLATION OF TEMPORARY SPS MOBILE TRAILER AND ACCESS CORRIDOR (NOT IN CONTRACT, ALREADY COMPLETED).
PHASE 2: INTERIOR DEMOLITION WITHIN SPS AREA (FIRST FLOOR) AND MECHANICAL ROOM (THIRD FLOOR).
PHASE 3: NEW CONSTRUCTION WITHIN SPS AREA (FIRST FLOOR) AND MECHANICAL ROOM (THIRD FLOOR).
PHASE 4: INTERIOR DEMOLITION AND NEW WORK AT EXISTING SCOPE PROCESSING AND STORAGE AREA (FIFTH FLOOR).
THIS PHASE ALSO INCLUDES THE DEMOLITION OF THE TEMPORARY SPS TRAILER ACCESS CORRIDOR THAT WAS CONSTRUCTED IN PHASE 1.
DocuSign Envelope ID: 5C2FFA19-F1BC-408D-8005-D330D0E23A4A
6/13/2024
UP
S SS
ETO
SERVICE
STAFF
LOUNGE
ETO
ROOM
1639A
STAFF
OFFICE
OFFICE
1642A
CHIEF
OFFICE
SPS
PREPARATION
STAFF
TOILET
1645A
STAFF
LOCKERS
STAFF
LOCKERS
STAFF
TOILET
1643A
CLEAN
RECEIVING
BREAK-OUT
STERILE
SUPPLY
STOR. &
DIST.
ELEV
LOBBY
CART
STAGING
AREA
STERILE
SUPPLY
STOR. &
DIST.
ELECT.
ROOM
16E3
ELEVATOR
MACHINE
ROOM
STAIR 11
ELEV
P25
CORRIDOR
SOILED
RECEIVING
DECONTAM
STAFF
TOILET
1627A
STAFF
LOCKERS
- FEMALE
16H5
STAFF
LOCKERS
- MALE
STAFF
TOILET
SCOPE
DECONTAM
STAFF
PPE
EXISTING
ROOM
FD
FD
ANTE
ROOM
9'-0"
CONSTRUCTION
ENTRANCE #1 (FOR
MODIFICATION WORK).
ANTE
ROOM
CONSTRUCTION
ENTRANCE #2
CONSTRUCTION
ENTRANCE #3
CONSTRUCTION
AREA #3
CONSTRUCTION
AREA #2
CONSTRUCTION
AREA #1
B
C
C.5
D
D.9
E
E.5
F
G
18X13X12X11X10 X14
2 HOUR FIRE SEPARATION
1 HOUR FIRE SEPARATION
SMOKE RATED
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
REMODEL STERILE
PROCESSING SERVICE
/1
/2
:1
:5
P
M
G-101-3
FIRST FLOOR ICRA PLAN - PHASE 3
3 5MVK
JESSE BROWN VA MEDICAL CENTER
820 S. DAMEN AVE, CHICAGO IL 60612
06/13/2024
ISSUED FOR CONSTRUCTION
537-17-11518-327
RMC
N
KEY PLAN
SCALE: NO SCALE
0 4 8 16
NORTH
PLAN
01 ICRA/LIFE SAFETY BARRIER
SEE DETAIL ON SHEET G-102-3
02 PLASTIC SHEET BARRIER. SEE DETAIL ON
SHEET G-102-3
03 ZIPPERED ENTRY
04 NEGATIVE AIR MACHINE. SEE SHEET G-102-3
05 TEMPORARILY LOCK AND SEAL DOOR
DURING CONSTRUCTION.
06 FLOOR STICKY MATS
Scale: 1/8" = 1'-0"
FIRST FLOOR ICRA PLAN - PHASE 3
WALL RATING LEGEND
A. SEE SHEET G-102-3 FOR INFECTION CONTROL NOTES.
OUTSIDE OF BUILDING
MONTHLY CHANGED HEPA
FILTER
HEPA NEGATIVE
AIR UNIT
WEEKLY CHANGED (OR MORE AS
NEEDED) PRE FILTER
FIRE RATED PLYWOOD
F L E
X D
U C
T
SUPPLY DUCTS EITHER KEEP
RUNNING OR COVER WHEN
RUNNING TO KEEP DUST OUT.
TAPE ALL SERVICES
TO PROTECT AGAINST
CONTAMINATION
A
O
V
FIRE EXTINGUISHER ON PORTABLE
FLOOR BRACKET (ILSM MAY REQUIRE
MORE THAN ONE)
SUSPENDED PLASTIC ZIPPER
WALL CURTAIN BARRIER
INDICATOR SHALL BE AT -0.01 OR
GREATER (VERIFY DAILY). IF NOT
VERIFY ALL OPENINGS SUCH AS DOOR
ARE CLOSED AND/OR CHANGE OUT
NEGATIVE AIR PRE-FILTER
PROVIDE STICKY MATS
(CHANGED END OF SHIFT
OR MORE IF NECESSARY
TO MAINTAIN CLEANLINESS)
POST ICRA ILSM FIRE
INSPECTION SHEETS
VISIBLE TO PUBLIC
COVER ALL RETURNS AT THE
GRATE/DIFFUSERS
OPTIONAL EXHAUST DUCTS
(COVER THE GRATES AND THE DIFFUSERS)
A
E
A
DOOR OPENING
VENT TO OUTSIDE
ROUTE TO BE
APPROVED BY OWNER
HEATED DETECTOR CUT-OFF
BASIS OF DESIGN: HEPA
NEGATIVE AIR UNIT INTEGRAL
WITH EDGEGUARD BARRIER
SYSTEM.
FIRE RATED PLYWOOD (TEMP.
REMOVE GLASS PANEL)
EXISTING WINDOW FRAME
ICRA BARRIER ICRA BARRIER
ADJUSTS FROM
7'-8" TO 10'-0" A.F.F
EXISTING CEILING
EXISTING CONCRETE SLAB FLOORING
FINISHED FLOORING TO BE
KEPT CLEAN. FLOORS NOT
BEING REPLACED MUST BE
PROTECTED. COVER WITH
ROSIN PAPER/ FIRE RATED
PLYWOOD.
PROJECT:
PRIME CONTRACTOR:
SUB CONTRACTOR:
EMERGENCY CONTACT NO.:
BARRIER INSTALLATION DATE:
BARRIER EXPIRATION DATE:
ILSM TEMPORARY BARRIER TAG
ICRA, ILSM, FIRE WATCH AND
MISC. FORMS
PAPER
CADDY
1'-5"
ILSM SIGNAGE
• THIS EXIT IS CLOSED AND LEADS TO A
CONSTRUCTION AREA
• PLEASE USE ALTERNATE EXITS AS MARKED
INTERIM LIFE SAFETY MEASURES IN EFFECT FOR THE
STERILE PROCESSING SUITE REMODEL PROJECT
A. THE CONTRACTOR SHALL NOT HAUL DEBRIS
THROUGH PATIENT-CARE AREAS WITHOUT PRIOR
APPROVAL OF THE COR AND THE MEDICAL CENTER.
B. ACTIVITY HAZARD RISK CLASSIFICATIONS OF CLASS
I OR CLASS II SHALL REQUIRE APPROVAL BY THE
FACILITY SAFETY MANAGER AND CONTRACTING
OFFICER REPRESENTATIVE BEFORE BEGINNING
ANY CONSTRUCTION WORK. HAZARD RISK
CLASSIFICATIONS OF CLASS III OR IV SHALL
REQUIRE A PERMIT BEFORE BEGINNING ANY
CONSTRUCTION WORK. INFECTION CONTROL
PERMITS WILL BE ISSUED BY THE FACILITY SAFETY
MANAGER AND CONTRACTING OFFICER
REPRESENTATIVE.
C. INFECTION CONTROL PERMITS SHALL BE POSTED
OUTSIDE THE APPROPRIATE CONSTRUCTION AREA.
MORE THAN ONE PERMIT MAY BE ISSUED, AS WORK
IS LOCATED IN MULTIPLE AREAS.
D. THE REQUIRED INFECTION CONTROL PRECAUTIONS
ARE AS FOLLOWS:
CLASS 1:
• NOTIFY THE COR.
• EXECUTE WORK USING METHODS TO MINIMIZE
RAISING DUST FROM CONSTRUCTION OPERATIONS.
• CEILING TILES: IMMEDIATELY REPLACE ANY CEILING
TILES DISPLACED FOR VISUAL INSPECTION.
• UPON COMPLETION: CLEAN WORK AREA, AND
NOTIFY COR.
CLASS 2:
• NOTIFY THE COR.
• PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE
DUST FROM DISPERSING INTO ATMOSPHERE SUCH
AS WET METHODS OR TOOL MOUNTED DUST
COLLECTORS.
• WATER MIST WORK SURFACES TO CONTROL DUST
WHILE CUTTING.
• SEAL UNUSED DOORS WITH PAINTERS TAPE.
• BLOCK OFF AND SEAL AIR VENTS.
• REMOVE OR ISOLATE HVAC SYSTEM IN AREAS
WHERE WORK IS BEING PERFORMED.
• UPON COMPLETION: WIPE WORK SURFACES WITH
CLEANER/ DISINFECTANT. CONTAIN CONSTRUCTION
WASTE BEFORE TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
CLASS 3:
DURING CONSTRUCTION WORK:
• OBTAIN PERMIT FROM THE COR.
• REMOVE OR ISOLATE HVAC SYSTEM IN AREA
WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
• COMPLETE ALL CRITICAL BARRIERS TO SEAL AREA
FROM NON-WORK AREA OR IMPLEMENT CONTROL
CUBE METHOD (CART WITH PLASTIC COVERING AND
SEALED CONNECTION TO WORK SITE WITH HEPA
VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE
CONSTRUCTION BEGINS. INSTALL CONSTRUCTION
BARRIERS AND CEILING PROTECTION CAREFULLY,
OUTSIDE OF NORMAL WORK HOURS.
• MAINTAIN NEGATIVE AIR PRESSURE, 0.01 INCHES OF
WATER GAUGE, WITHIN WORK SITE UTILIZING HEPA
EQUIPPED AIR FILTRATION UNITS AND
CONTINUOUSLY MONITORED WITH A DIGITAL
DISPLAY, RECORDING AND ALARM INSTRUMENT,
WHICH MUST BE CALIBRATED ON INSTALLATION,
MAINTAINED WITH PERIODIC CALIBRATION AND
MONITORED BY THE CONTRACTOR.
• CONTAIN CONSTRUCTION WASTE BEFORE
TRANSPORT IN TIGHTLY COVERED CONTAINERS.
• COVER TRANSPORT RECEPTACLES OR CARTS.
TAPE COVERING UNLESS SOLID LID.
UPON COMPLETION:
• DO NOT REMOVE BARRIERS FROM WORK AREA
UNTIL COMPLETED PROJECT THOROUGHLY
CLEANED, AND IS INSPECTED BY THE CONTRACTING
OFFICER REPRESENTATIVE AND BY THE VA
ENVIRONMENTAL SERVICES DEPARTMENT.
• REMOVE CONSTRUCTION BARRIERS AND CEILING
PROTECTION CAREFULLY TO MINIMIZE SPREADING
OF DIRT AND DEBRIS ASSOCIATED WITH
CONSTRUCTION, OUTSIDE OF NORMAL WORK
HOURS.
• VACUUM WORK AREA WITH HEPA FILTERED
VACUUMS.
• WET MOP AREA WITH CLEANER/DISINFECTANT.
• UPON COMPLETION, RESTORE HVAC SYSTEM
WHERE WORK WAS PERFORMED.
• RETURN PERMIT TO THE COR.
CLASS 4:
DURING CONSTRUCTION WORK:
• OBTAIN PERMIT FROM THE COR.
• ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS
BEING DONE TO PREVENT CONTAMINATION OF
DUCT SYSTEM.
• COMPLETE ALL CRITICAL BARRIERS TO SEAL AREA
FROM NON-WORK AREA OR IMPLEMENT CONTROL
CUBE METHOD (CART WITH PLASTIC COVERING AND
SEALED CONNECTION TO WORK SITE WITH HEPA
VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE
CONSTRUCTION BEGINS. INSTALL CONSTRUCTION
BARRIERS AND CEILING PROTECTION CAREFULLY,
OUTSIDE OF NORMAL WORK HOURS.
• MAINTAIN NEGATIVE AIR PRESSURE, 0.01 INCHES OF
WATER GAUGE, WITHIN WORK SITE UTILIZING HEPA
EQUIPPED AIR FILTRATION UNITS AND
CONTINUOUSLY MONITORED WITH A DIGITAL
DISPLAY, RECORDING AND ALARM INSTRUMENT,
WHICH MUST BE CALIBRATED ON INSTALLATION,
MAINTAINED WITH PERIODIC CALIBRATION AND
MONITORED BY THE CONTRACTOR.
• SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES.
• CONSTRUCT ANTEROOM AND REQUIRE ALL
PERSONNEL TO PASS THROUGH THIS ROOM SO
THEY CAN BE VACUUMED USING A HEPA VACUUM
CLEANER BEFORE LEAVING WORK SITE OR THEY
CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE
REMOVED EACH TIME THEY LEAVE WORK SITE.
• ALL PERSONNEL ENTERING WORK SITE ARE
REQUIRED TO WEAR SHOE COVERS. SHOE COVERS
MUST BE CHANGED EACH TIME THE WORKER EXITS
THE WORK AREA.
UPON COMPLETION:
• DO NOT REMOVE BARRIERS FROM WORK AREA
UNTIL COMPLETED PROJECT THOROUGHLY
CLEANED, AND IS INSPECTED BY THE CONTRACTING
OFFICER REPRESENTATIVE AND BY THE VA
ENVIRONMENTAL SERVICES DEPARTMENT.
• REMOVE CONSTRUCTION BARRIERS AND CEILING
PROTECTION CAREFULLY TO MINIMIZE SPREADING
OF DIRT AND DEBRIS ASSOCIATED WITH
CONSTRUCTION, OUTSIDE OF NORMAL WORK
HOURS.
• CONTAIN CONSTRUCTION WASTE BEFORE
TRANSPORT IN TIGHTLY COVERED CONTAINERS.
• COVER TRANSPORT RECEPTACLES OR CARTS.
TAPE COVERING UNLESS SOLID LID.
• VACUUM WORK AREA WITH HEPA FILTERED
VACUUMS.
• WET MOP AREA WITH CLEANER/DISINFECTANT.
• UPON COMPLETION, RESTORE HVAC SYSTEM
WHERE WORK WAS PERFORMED.
• RETURN PERMIT TO THE COR.
TEMPORARY ICRA/DUST/LIFE SAFETY BARRIER
EXISTING
STRUCTURAL DECK
ABOVE
EXISTING CEILING
MODULAR PANELS
SEE PLAN
TEMPORARY ICRA/DUST BARRIER AND LIFE SAFETY
BARRIER.
ACCEPTABLE PRODUCTS:
EDGE-GUARD PANELS
STARC REALWALL.
TEMPORARY CONTAINMENT WALL SYSTEM: ICRA/DUST
BARRIER PLASTIC SHEETS, CONTINUOUS FROM FLOOR TO
CEILING, WITH SEALED JOINTS AT PERIMETER.
BASIS OF DESIGN: ZIPWALL DUST BARRIER SYSTEM.
TEMPORARY ICRA/DUST/BARRIER - PLASTIC SHEET
EXISTING
STRUCTURAL DECK
ABOVE
EXISTING CEILING
PLASTIC SHEET
BARRIER
SEE PLAN
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
REMODEL STERILE
PROCESSING SERVICE
/1
/2
:1
:5
P
M
G-102-3
ICRA DETAILS
4 5MVK
JESSE BROWN VA MEDICAL CENTER
820 S. DAMEN AVE, CHICAGO IL 60612
06/13/2024
ISSUED FOR CONSTRUCTION
537-17-11518-327
RMC
Scale: 1/2" = 1'-0"
ICRA TYPICAL CONSTRUCTION PLAN LAYOUT_3
Scale: 1/2" = 1'-0"
CROSS SECTION A_3
Scale: 12" = 1'-0"
ILSM TEMPORARY BARRIER TAG_3
Scale: 6" = 1'-0"
ILSM SIGNAGE_3
Scale: 3/4" = 1'-0"
TEMP DUST AND INFECTION CONTROL BARRIER TYPES_3
E
13.1
C.5
12.111.1 14.1 16
B
C
C1
D
A
F
G
D
C
B
A.5
A
D.9
X
E.5
DN
UP
U P
UP
46.597°
T O
G R
ID
D
EXIST
ROOM
EXIST
ROOM
EXIST
ROOM
EXIST
ROOM
EXIST
ROOM
EXIST
ROOM EXIST
ROOM
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
WP 1
WP 2
WP 4
WP 3
WP 5
1R-121
1R-122 1R-123
1R-124 1R-125
1R-126 1R-127
1R-112
1R-111
1R-101
1R-102
1 _ 4
'-4
'-4
'-8
'-4
'-0
116' -6"
30'-6"
28'-8"
28'-8"
28'-8"
26'-5 3_ 8 "
26'-5 3_ 8 "
26'-5 3_
1 _ 4
'-3
R96'-6 3__
R138'-2 7__
21.344°
'-6
'-0
T O
G R
ID
D
.0
18.1°
9'-0"29'-6 5__
28'-8" 28'-7
3__
" 28'-7 3__
" 30'-11
1_
" 29'-6 5__
4.0°
28'-8"
28'-8"
28'-8"
28'-8"
31'-0"
L
L
L
L
L
L
L
L
S
S S
S
S
S
S
S
S
S
S
S
S S
S S
S
L
L
L
L
L
L
L
L
L
L
L
L
L
L
S
S
S
FRS
FRS
S
L
CONNECTING
CORRIDOR
INFORMATION
DESK
TRANSPORT
WAITING
SEATING
GAS
CYLINDER
STORAGE
HAC
FIRE
COMMAND
CENTER
CART
WASH
CONNECTOR
REGIST.
SURG. RECEPT.
CLEAN
SUPPLY
HAC
HAC
HAC
ELECT.
ROOM
ELECT.
ROOM
ELECT.
ROOM
ELEVATOR
MACHINE
ROOM
SOILED
RECEIVING/
DECONTAM
STAFF
TOILET
STAFF
LOCKERS
STAFF
LOUNGE
STAFF
TOILET
STAFF
LOCKERS
PREPARATION
CART
STAGING
AREA
STERILE
SUPPLY
STOR.&DIST.
STAFF
LOUNGE
STAFF
TOILET
STAFF
TOILET
CLEAN
RECEIVING
BREAK-OUT
STAFF
LOCKERS
STAFF
LOCKERS
SPD
CHIEF
OFFICE
SPD
STAFF
OFFICE
BLESSED
SACRAMENT
SACRISTY
CHAPEL
VESTIBULE
ESCORT
WAITING
ROOM
CHAPLAIN
CONF.
ROOM
CHAPLAIN
OFFICE
CORRIDOR
PUBLIC
TOILETS
PUBLIC
TOILETS
PATIENT
CLOTHING
ROOM
DRESSING
VESTIBULE
LINEN
CHUTE
ROOM
COMM.
ROOM
SHOWER
TOILETS
SHOWER
TOILETS
VESTIBULEVESTIBULE
STAFF
LOCKERS
STAFF
LOCKERS
INTERVIEW
CONSULTATION
ROOM
CONSULTATION
ROOM
SURGERY
FAMILY
WAITING
ELEV.
MACHINE
ROOM
MINOR
PROCEDURES
VESTIBULE
CLEAN
SUPPLY
OFFICE
NOURISHMENT
STATION
PAT
TOILET
CONF
ROOM
SOILED
UTILITY
NURSE
STATION
STAFF
TOILET
STAFF
LOUNGE
LOBBY
VESTIBULE
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
ELEV
LOBBY
CORRIDOR
CORRIDOR
ELEV
LOBBY
ELEV
LOBBY
CORRIDOR
ELEV
ELEV
ELEV
ELEVELEV
ELEVELEVELEV
ELEV
ELEV
ETO
ROOM
HAC
PAT
CLOTHING
CLOSET
TELEPHONE
ALCOVE
CLEAN
LINEN
SECURED
ITEMS
VENDING
MACHINES
HOLDING
ROOM
HOLDING
ROOM
HOLDING
ROOM
HOLDING
ROOM
HOLDING
ROOM
HOLDING
ROOM
HOLDING
ROOM
HOLDING
ROOM
HOLDING
ROOM
HOLDING
ROOM
HOLDING
ROOM
HOLDING
ROOM
HOLDING
ROOM
HOLDING
ROOM
MINOR
PROCEDURE
EQUIPMENT
STORAGE
STORAGE
CLOSET
WARD
EQUIPMENT
STORAGE
EXISTING
ROOM
EXISTING
ROOM
EXISTING
ROOM
EXISTING
ROOM
EXISTING
ROOM
EXISTING
ROOM
CORRIDOR
ALCOVE
MANUAL
EQUIPMENT
WASH
PAT
TOILET
PAT
TOILET
RECYCLING
EMS
FIRE
PUMP
ROOM
MECH
PUMP
ROOM
MED
ROOM
VEST
VEST
VEST
WHEELCHAIR
WASH
EQUIPMENT
STORAGE
STAIR 8
STAIR 10
STAIR 9
EGRESS
VEST.
ETO
SERVICE
C1-010
C1-014A
C1-015A
C1-016A
1B-105
1B-106A
1D-108A
1C-107C
C1-014
1A-139
1A-123
1A-100
1C-104C
1C-107B
1A-112A
1B-108
1C-108A 1C-108
1C-107A 1C-106A
1C-106
1C-105B
1C-105A
1C-105
1C-104B
1C-104A
1C-104
1C-101B
1C-102A
1C-101A
1C-103 1C-102
1C-101
1C-100A1C-100
1D-109D
1D-109C
1D-109B
1D-109
1D-108
1D-106
1D-105
C1-018
1D-102
1D-101
1B-104
1B-103A
1B-103 1B-101
1B-100
1A-103C
1A-103B
1A-102C
1A-102B
1A-102A1A-103A
1A-103
1A-102
1A-140
1A-137
1A-136
1A-135
1A-134
1A-130
1A-128
1A-127
1A-126
1A-122
1A-120
1A-118
1A-112
1A-107
1A-101A
1A-101
C1-016
C1-015
C1-013
C1-012
C1-011
C1-009
C1-008
C1-007
C1-006
C1-004
C1-003
C1-001
C1-002
S-7
S-6
P-3 P-2P-1
S-3S-2S-1
S-5
S-4
1C-104D
1D-100A
C1-006A
1D-100
1A-132
1C-104E
1D-104
1A-105
1A-106
1A-108
1A-109
1A-113
1A-111
1A-115
1A-117
1A-119
1A-121
1A-124
1A-116
1A-114
1A-110
1A-129
1A-133
C1-006B
1R-105
1R-103 1R-104
1R-106
1R-107
1R-108
1R-109
1R-110
C1-006C
1C-107D
1A-131 1A-104
1B-102
1B-106
1D-110
1D-111
1A-125
1A-138
1A-103D
1A-102D
1D-107
1D-109A
ST-8
ST-10
ST-9
C1-005
1C-101C
UP
UP
S S
S S
S S
S SS
BUILDING 40
BUILDING 1
2 HOUR FIRE
BARRIER
BETWEEN
BUILDINGS
2 HOUR FIRE SEPARATION
1 HOUR FIRE SEPARATION
SMOKE RATED
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
REMODEL STERILE
PROCESSING SERVICE
/1
/2
:1
:5
P
M
LS-100-3
FIRST FLOOR LIFE SAFETY PLAN -
PHASE 3
5 5MVK
JESSE BROWN VA MEDICAL CENTER
820 S. DAMEN AVE, CHICAGO IL 60612
06/13/2024
ISSUED FOR CONSTRUCTION
537-17-11518-327
RMC
N
KEY PLAN
SCALE: NO SCALE
Scale: 1" = 20'-0"
FIRST FLOOR LIFE SAFETY PLAN 0 4 8 16
NORTH
PLAN
WALL RATING LEGEND
A. SEE SHEET A-001-3 FOR GENERAL NOTES.
EXISTING BUILDING 40:
NFPA 101 OCCUPANCY CLASSIFICATION:
AMBULATORY HEALTH CARE
EXISTING BUILDING 1:
NFPA 101 OCCUPANCY CLASSIFICATION:
AMBULATORY HEALTH CARE
CODE OVERVIEW
AFF ABOVE FINISHED FLOOR
ACT ACOUSTIC(AL) TILE
ALT ALTERNATE
AL ALUMINUM
APPROX APPROXIMATE(LY)
CLR CLEAR
CPT CARPET
DIM DIMENSION
EL ELEVATION
ELEV ELEVATOR
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FFE FINISH FLOOR ELEVATION
FEC FIRE EXTINGUISHER CABINET
FIN FINISH
FLR FLOOR
FRMG FRAMING
FT FOOT/FEET
GC GENERAL CONTRACTOR
GA GAUGE
GALV GALVANIZED
GEN GENERAL
GYP GYPSUM
HAC HOUSEKEEPING CLOSET
HM HOLLOW METAL
HDWR HARDWARE
HOR HORIZONTAL
HT HEIGHT
IN INCH
INT INTERIOR
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTD MOUNTED
MTL METAL
N NORTH
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NOM NOMINAL
OFCI OWNER FURNISHED, CONTRACTOR INSTALLED
O TO O OUT TO OUT
OPNG OPENING
OPP OPPOSITE
OVHD OVERHEAD
PNT PAINT
PTD PAINTED
SF SQUARE FEET
SS STAINLESS STEEL
SIM SIMILAR
SPEC SPECIFICATIONS
STL STEEL
T/O TOP OF
TYP TYPICAL
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
WALL TYPE
DOOR NUMBER TYPICAL KEYNOTE
CEILING/ SOFFIT
HEIGHT
MATL
1'-0"
-1
GENERAL NOTES
1. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF THE DESIGNER AS TO THE LIMITATIONS OF THE WORK AREA IN AN OCCUPIED AREA. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY AGREEMENT BETWEEN THE COR AND
CONTRACTOR BEFORE THE START OF THE WORK.
2. DRAWINGS ARE PREPARED USING DIMENSIONS AND PRODUCT DETAILS FOR SPECIFIC PRODUCTS, WHICH MAY CHANGE BEFORE THEY ARE ACTUALLY INCORPORATED INTO THE WORK, AND PRODUCTS BY OTHER MANUFACTURERS ARE ALSO ACCEPTABLE. THEREFORE, ACTUAL INSTALLATION DETAILS AND DIMENSIONS MAY DIFFER FROM THOSE SHOWN. CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE INCORPORATED IN THE WORK (INCLUDING THICKNESS FOR RECESSED OR SEMI-RECESSED
PRODUCTS) AND IS RESPONSIBLE FOR ACCOMMODATING AND COORDINATING CHANGES TO OTHER
MATERIALS OR PRODUCTS THAT ARE NECESSARY BECAUSE OF THESE DIFFERENCES.
3. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS USED ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS, OR OF THE DRAWINGS AND SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO BE CONSTRUCTED AS A COMPLETE, INTEGRATED AND UNIFIED WHOLE.
4. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE COR PRIOR TO BIDDING. WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR INTENT CANNOT BE REASONABLY INFERRED, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR GREATER
QUANTITY OF WORK.
5. USE OF THE WORD "VERIFY" POINTS OUT A SITUATION WHICH MUST BE CONFIRMED PRIOR TO PROCEEDING WITH THE WORK, FABRICATION OF EQUIPMENT, OR ORDERING MATERIAL. NOTIFY THE COR OF ANY
DISCREPANCY DISCOVERED.
6. THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY SHOULD DISCREPANCIES BE FOUND IN THE
DRAWINGS AND SPECIFICATIONS.
7. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS AND DIMENSIONS AS THEY RELATE TO THIS PROJECT. SHOULD DISCREPANCIES EXIST BETWEEN THE WORK INDICATED AND ACTUAL FIELD
CONDITIONS NOTIFY THE COR PRIOR TO PROCEEDING WITH THE WORK.
8. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL OR DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL
GOVERN.
9. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION.
10. THE CONTRACTOR AND SUBCONTRACTORS INVOLVED IN THIS PROJECT SHALL BE RESPONSIBLE FOR DESIGNING AND INSTALLING THEIR RESPECTIVE WORK AND SYSTEMS TO MEET ALL APPLICABLE FEDERAL, STATE, AND LOCAL CODES, LAWS, SAFETY REGULATIONS, HAZARDOUS WASTE LAWS, ETC. THE CONTRACTOR
SHALL FURNISH ALL NECESSARY PERMITS.
11. THE CONTRACTOR SHALL REVIEW THE DRAWINGS AND UNDERSTAND THE SCOPE OF THE DRAWINGS TO BE THE FOLLOWING: THESE CONSTRUCTION DOCUMENTS (DRAWINGS, SPECIFICATIONS, ADDENDA, ETC.)
INDICATE THE GENERAL SCOPE OF THE PROJECT IN TERMS OF ARCHITECTURAL DESIGN CONCEPTS, THE DIMENSIONS OF THE BUILDING, THE MAJOR ARCHITECTURAL ELEMENTS, AND THE MAJOR STRUCTURAL, MECHANICAL, ELECTRICAL, AND DATA SYSTEMS. THE DOCUMENTS DO NOT AND ARE NOT INTENDED TO INDICATE OR DESCRIBE IN DETAIL ALL THE NECESSARY WORK REQUIRED FOR FULL PERFORMANCE OF, AND COMPLETION OF THE REQUIREMENTS OF THE CONTRACT. ON THE BASIS OF THE GENERAL SCOPE INDICATED IN THESE DOCUMENTS, THE TRADE CONTRACTORS SHALL FURNISH ALL ITEMS REQUIRED FOR THE PROPER EXECUTION AND COMPLETION OF THEIR WORK. ALL WORK SHALL BE COMPLETE IN EVERY DETAIL AND THE CONTRACTORS SHALL PROVIDE A ONE YEAR WARRANTY FOR THEIR WORK UNLESS A LONGER WARRANTY IS
INDICATED IN THE SPECIFICATIONS.
12. CONTRACTORS SHALL FOLLOW AND OBEY ALL FEDERAL, STATE AND LOCAL CODES, LAWS, SAFETY
REGULATIONS AND HAZARDOUS WASTE LAWS, ETC.
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
REMODEL STERILE
PROCESSING SERVICE
/1
/2
:2
:0
P
M
A-001-3
ARCHITECTURAL SYMBOLS,
ABBREVIATIONS AND NOTES
1 7MVK
JESSE BROWN VA MEDICAL CENTER
820 S. DAMEN AVE, CHICAGO IL 60612
06/13/2024
ISSUED FOR CONSTRUCTION
537-17-11518-327
RMC
ABBREVIATIONS 003
ARCHITECTURAL SYMBOL LEGEND 003
UP
S SS
SCOPE
REPROCESSING/HLD
1578A
ANTE ROOM
344 SF
SCOPE
DECONTAM
SCOPE
STAGING
ROOM
SOILED
RECEIVING
DECONTAM
STAFF
LOUNGE
ETO
ROOM
1639A
ETO
SERVICE
STAFF
TOILET
1645A
CLEAN
RECEIVING
BREAK-OUT
STAFF
LOCKERS
STAFF
LOCKERS
STAFF
TOILET
1643A
STERILE
SUPPLY
STOR. &
DIST.
CART
STAGING
AREA
ELECT.
ROOM
16E3
ELEV
P25
STAIR 11
CORRIDOR
STAFF
TOILET
STAFF
LOCKERS
- MALE
STAFF
LOCKERS
- FEMALE
STAFF
TOILET
1627A
ANTE
ROOM
16H5
SPS
PREPARATION
CHIEF
OFFICE
ELEVATOR
MACHINE
ROOM
STAFF
PPE
EXISTING
ROOM
HAC
16H1
A-102-3
A
A
A
A
A
HAC
1628A 1628A
ALIGN
ALIGN
ALIGN
13'-0"
B1
B1
B
C
C.5
D
D.9
E
E.5
F
G
18X13X12X11X10 X14
A
6'-10"
1 1
ELEV
LOBBY
STAFF
OFFICE
OFFICE
1642A
EXISTING DOOR
NEW DOOR
NO WORK THIS AREA
WORK IN THIS AREA CONSISTS OF
MINOR RENOVATION:
REPLACEMENT OF LIGHT
FIXTURES. SEE ELECTRICAL.
2 HOUR FIRE SEPARATION
1 HOUR FIRE SEPARATION
SMOKE RATED
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
REMODEL STERILE
PROCESSING SERVICE
/1
/2
:2
:0
P
M
A-101-3
FIRST FLOOR PLAN
2 7MVK
JESSE BROWN VA MEDICAL CENTER
820 S. DAMEN AVE, CHICAGO IL 60612
06/13/2024
ISSUED FOR CONSTRUCTION
537-17-11518-327
RMC
Scale: 3/16" = 1'-0"
FIRST FLOOR PLAN 0 42 8
NORTH
PLAN
N
KEY PLAN
SCALE: NO SCALE
A. SEE SHEET A-001-3 FOR GENERAL
CONSTRUCTION NOTES.
B. SEE SHEET A-601-3 FOR PARTITION TYPES.
C. FIRE-SEAL ALL PENETRATIONS THROUGH
WALLS AND FLOORS WITH UL LISTED FIRE-
RATED MATERIALS AND SYSTEMS TO ACHIEVE
A RATED ASSEMBLY EQUIVALENT OR BETTER
THAN THAT REQUIRED.
D. CONTRACTOR RESPONSIBLE TO PROVIDE
SHEET METAL BACKING FOR ATTACHMENT OF
ALL WALL MOUNTED ITEMS. USE AS BASIS OF
DESIGN: STEELTEC EXTRA STRENGTH
BACKING, 600 ESB 050 16-54-10 G, OR
APPROVED COLD-FORMED EQUAL.
E. DEMOLITION FOR THIS AREA IS IN THE PHASE 2
DOCUMENT PACKAGE.
LEGEND
WALL RATING LEGEND
01 STAINLESS STEEL CORNER GUARDS,
4'-0" HIGH
02 PATCH AND WALL IN THIS AREA AS
REQUIRED TO MATCH EXISTING ADJACENT
CONDITIONS. PAINT ENTIRE WALL P-2.
03 PROVIDE NEW HANDRAIL TO MATCH
EXISTING ADJACENT HANDRAIL.
04 ADD BUMBER RAIL BR-2 TO ALL NEW
WALLS TO MATCH EXISITING STYLE,
HIGHT, MOUNTING LOCATION AND COLOR
1578A
SCOPE
REPROCESSING/HLD
ANTE
ROOM
SCOPE
DECONTAM
SOILED
RECEIVING
DECONTAM
S0555 S0555 S0555
S0555
A A
F0535
A1195-3
A
A
A
B
S2635
S2636
S0556
S0556
S0556
17 SF
HAC
1628A
95 SF
ANTE
ROOM
16H5
A-401-3 1
A-401-3 11
A-401-3 9
A-401-3
1628A
M3161 M3161
S0940
M1803
A
A1195-3
K1910
A5020A
A5020A
CW100
M1803
M1803
B
B
/2
2'-4"
B
A B
B
B
B
2'-4"
CHIEF OFFICE
W1
W2
B
A1195-3
A-401-3
A-401-3
A-401-38
A1195-3
C.5
D
D.9
E
E.5
F
G
18X13 X14
STAFF PPE
S1905
B
7'-0" 1'-3"
M
M
A A
S0941
S0555
SCOPE
STAGING
ROOM
M3161
M3161
9'-5"
4'-6" 4'-6" 4'-6" 4'-6"
6'-0"
B1
B1
B1
B
B1
F0535 F0535
A1195-2
A -1
A
A
B1
B1 B1
B1
B1
3'-10"
A
6'-2"
C
1. REFER TO MECHANICAL, ELECTRICAL, PLUMBING, TEL-COM AND LOW VOLTAGE DRAWINGS FOR ADDITIONAL
REQUIRED UTILITY CONNECTIONS AND LOCATIONS.
2. FURNITURE, FIXTURES AND EQUIPMENT SHOWN ON PLANS AND SCHEDULES ARE FOR
COORDINATION AND SPACIAL PURPOSES ONLY, NOT TO BE USED FOR ACTIVATION PURCHASING
3. ITEM TAGS INCLUDE ACQUISITION AND INSTALLATION RESPONSIBILITIES (ACQ.), DENOTED AS FOLLOWS:
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
REMODEL STERILE
PROCESSING SERVICE
/1
/2
:2
:0
P
M
A-102-3
FIRST FLOOR ENLARGED PLAN
3 7MVK
JESSE BROWN VA MEDICAL CENTER
820 S. DAMEN AVE, CHICAGO IL 60612
06/13/2024
ISSUED FOR CONSTRUCTION
537-17-11518-327
RMC
Scale: 1/4" = 1'-0"
FIRST FLOOR ENLARGED PLAN 0 4 8 16
NORTH
PLAN
N
KEY PLAN
SCALE: NO SCALE
A. SEE SHEET A-001-3 FOR GENERAL
CONSTRUCTION NOTES.
B. SEE SHEET A-601-3 FOR PARTITION TYPES.
C. PROVIDE SHEET METAL BACKING IN WALL
BEHIND ALL WALL-MOUNTED ITEMS.
D. FIRE-SEAL ALL PENETRATIONS THROUGH
WALLS AND FLOORS WITH UL LISTED FIRE-
RATED MATERIALS AND SYSTEMS TO
ACHIEVE A RATED ASSEMBLY EQUIVALENT
OR BETTER THAN THAT REQUIRED.
E. CONTRACTOR RESPONSIBLE TO PROVIDE
BLOCKING FOR ATTACHMENT OF ALL WALL
MOUNTED ITEMS. BLOCKING NOT SHOWN
ON INTERIOR ELEVATIONS. AT ALL
LOCATIONS WHERE BLOCKING IS REQUIRED
TO SECURE ITEMS, USE AS BASIS OF
DESIGN: STEELTEC EXTRA STRENGTH
BACKING, 600 ESB 050 16-54-10 G, OR
APPROVED COLD-FORMED EQUAL. INSTALL
BLOCKING AT 16" O.C.
F. PATCH ALL OPENINGS/HOLES IN FLOOR
SLAB RESULTING FROM PLUMBING
DEMOLITION.
Specialty Equipment Schedule
Type Mark Description Manufacturer Model Comments
A1195-1 STAINLESS STEEL 1 SINK CLEANUP COUNTER CONTINENTAL METAL
PRODUCTS
WS1-60
A1195-2 STAINLESS STEEL 2 SINK CLEANUP COUNTER STERIS FURNISHED BY OWNER, INSTALLED BY CONTRACTOR
A1195-3 STAINLESS STEEL 3 SINK CLEANUP COUNTER STERIS FURNISHED BY OWNER, INSTALLED BY CONTRACTOR
A502…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .