Y1DA--FY24: NRM (PROJ: 673-23-104) DB Install Fall Protection Anchorage and Guardrails for Bldg 1 and 2
Closed Solicitation Posted
- Solicitation number
- 36C24824R0016
- Agency
-
Veterans Integrated Service Network 8
Veterans Health Administration, Department of Veterans Affairs
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Tampa, Florida 33612, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks design-build construction services to install fall protection anchorage and guardrails on Buildings 1 and 2 of the James A. Haley VA Medical Center in Tampa, Florida. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8 will evaluate proposals to engineer and install systems complying with safety standards within a 365-day period of performance from notice to proceed. A pre-bid site visit is scheduled for November 15, 2023 and questions are due by November 22, 2023, with responses provided in amendments and proposals due by December 8, 2023.
This requirement is set aside for Service-Disabled Veteran-Owned Small Businesses. The NAICS code is 236220 for Commercial and Institutional Building Construction with a size standard of $45 million. The estimated value is between $2-5 million to be performed at the James A. Haley VA Medical Center in Tampa, Florida. The wage determination FL20230208 applies.
Notice text
4 versions
Update #4 · Latest ·
Please review the responses below:
1. Will the VA clarify if a counterweight system can be used in lieu of a through mounted
system? A counterweight system would eliminate the need for additional work in the
areas below the SOW(welding/abatement/etc.)
RFI Answer: This counterweight system will not satisfy the requirement as the through mounted
system and the VA will not accept the counterweight system.
2. Will a horizontal lifeline system be required in addition to a guard rail were indicated in
the SOW? The horizontal lifeline system is designed separately from the swing stage tie
backs. The last rounds of RFIs requested that we install (3) separate systems; a horizontal
lifeline, swing stage tie backs and railings. There appears to be some redundancies and
overlaps in this request.
RFI Answer: There is no horizontal lifeline system needed. The guard rails are for fall
protection. There is no need to have another system performing this requirement.
Adding FAR 52.232-18 “Availability Of Funds”. (Apr 1984) Clause to the RFP.
Funds are not presently available for this contract. The Government’s obligation under this
contract is contingent upon the availability of appropriated funds from which payment for
contract purposes can be made. No legal liability on the part of the Government for any payment
may arise until funds are made available to the Contracting Officer for this contract and until the
Contractor receives notice of such availability, to be confirmed in writing by the Contracting
Officer.
(End of clause)
Update #3 ·
Request for Information (RFI)
DB - Install Fall Protection Anchorage and Guardrails for Bldg. 1 and 2
PROJECT # 673-23-104/ 36C24824R0016
Attachment 2 RFI Tracking Log
RFI NBR
Question/
Response
Company Submitted By
Dated Received
1.
First to define the Fall Protection world differences:
Fall Prevention System: Prevents people from reaching the fall hazard by creating a barrier between the person and the fall hazard, such as passive guardrails.
Fall Restraint System: Prevents people from reaching a fall hazard through a tie off system such a horizontal lifeline (e.g., a cable traveler system)
Fall Arrest System: Stops a fall that is in progress through a tie off system.
Suspended Access System: Also considered rope access anchors, window cleaning anchors, facade maintenance anchors, or tie-backs. This is an anchor system that allows for suspending a worker to conduct facade maintenance work such as window cleaning.
A suspended access system can double as a fall restraint or fall prevention system. So typically, you would not need to add fall prevention guardrails where suspended access anchors are newly installed.
Please confirm which of the above is desired for the following locations: Bldg. 1 Penthouse roof, Bldg. 1 3rd floor roof, Â bldg. 2 roof and bldg. 2 penthouse roof.
Midwestern
11/22/23
VA Response: :
Bldg. 1 Penthouse roof: Guardrails
Bldg. 1 3rd floor roof: Guardrails and anchors
Bldg. 2 roof: Guardrails and anchors
Bldg. 2 penthouse roof: Guardrails
Please review the last pages and the pictures attached for further clarification of areas lower than 3rd floor roof
2.
For Building 1, there are some areas of the roof that do not have existing fall prevention guardrails. In these areas, will the installation of suspended access anchors suffice or are you wanting to add guardrails anyway?
Midwestern
11/22/23
VA Response: The guardrails that are existing should remain. The new guardrails will fill in the areas that are not currently covered. The project is providing safety measures for 2 sets of people. The safety of untrained persons and trained persons. Untrained persons may not know how to use fall protection and the guard rails will be installed for their safety. The suspended access anchors will be used by contractors and equipment for maintaining the buildings.
3.
For Building 1, the upper large roof has guardrails already installed. In these areas, will the installation of suspended access anchors be the only thing required?
Midwestern
11/22/23
VA Response: Correct
4.
For Building 1, do you want suspended access anchors to reach every facade face of the building, even if there are no windows?
Midwestern
11/22/23
VA Response: Correct, the anchors can be used for other maintenance activities.
5
For Building 2, there appears to be no fall protection of any sort. Do you want suspended access anchors to reach every facade face of the building, even if there are no windows?
Midwestern
11/22/23
VA Response: Correct. The east façade side would not need to have them. It doesn t look like a suspended scaffold could be used there.
6
For Building 2, if a suspended access system is installed and can double as fall restraint or fall prevention, do you want to install guardrails?
Midwestern
11/22/23
VA Response: Yes
7
Please clarify if a superintendent can be a dual hat to cover the requirements of SSHO?
Blue Cord
11/22/23
VA Response: No
8
If no to the question above, will the SSHO need to be full-time for this project?
Blue Cord
11/22/23
VA Response: Yes, due to the type of project this is, the SSHO will have to be onsite and active in the installation process.
9
Please clarify if a superintendent can be a dual hat to cover the requirement of QA/QC?
Blue Cord
11/22/23
VA Response: Yes
10
If no to the question above, will the QA/QC need to be full time for this project
Blue Cord
11/22/23
VA Response: N/A
11
Can a superintendent be a triple hat to cover the requirements of SSHO and QA/QC?
Blue Cord
11/22/23
VA Response: No
12
Please provide architectural drawings for all roofs that are included in this project.
Blue Cord
11/22/23
VA Response: Attached
13
Please provide structural drawings for Building 2.
Blue Cord
11/22/23
VA Response: Attached
14
Please confirm that that any existing railing is to remain in place and worked around
Blue Cord
11/22/23
VA Response: Confirmed
15
Please confirm if there are any warranties requirements for the roofs as part of this project
Blue Cord
11/22/23
VA Response: There are no specific warranty requirements (that apply to the existing roof system) identified. The contractor should be prepared to research the roof material and review warranty with any manufacturer s requirements. This should be a part of the design phase.
16
If the answer to the above question is yes, please provide the warranty requirements for these roof systems.
Blue Cord
11/22/23
VA Response: Attached
17
Please confirm that the roof above the new Emergency Department is not included in this project.
Blue Cord
11/22/23
VA Response: It has been decided that it is included, please review pictures at the end of this document
18
Please confirm that interventional radiology suite is not included in this project.
Blue Cord
11/22/23
VA Response: It has been decided it is included, please review pictures at the end of this document
19
Please confirm that the upper penthouse roof of Building 1 is only receiving guard rail.
Blue Cord
11/22/23
VA Response: Confirmed
20
Please confirm that the south sub roof of Building 1 is included in this project.
Blue Cord
11/22/23
VA Response: It has been decided that it is included, please review pictures at the end of this document
21
Please provide the existing master label for the campus lightning protection system
Blue Cord
11/22/23
VA Response: Unable to locate this label
22
If one does not exist, will the contractor need to provide a new master label lightning protection system for the entire campus or will the contractor only need to provide certification for the new work associated with this project
Blue Cord
11/22/23
VA Response: New work associated only
23
Are we required to fix any issues with the existing lighting protection, railing and roofing systems as part of this project?
Blue Cord
11/22/23
VA Response: No
24
Please provide a hazardous material survey for all areas of this project
Blue Cord
11/22/23
VA Response: We will provide AHERA for review, but a NESHAP is required prior to beginning work in all areas the contractor expects to work in
25
Past Performance: If we have a PPQ that is less than 12 months old, can we use it within our proposal? Or will a new PPQ need to be requested?
Blue Cord
11/22/23
VA Response: That will be acceptable
27
Please confirm it is the VA s intent to use a horizontal lifeline system and not individual fall protection anchors
Blue Cord
11/22/23
VA Response: That is correct
28
Does the VA have a preferred basis of design for the horizontal lifeline system?
Blue Cord
11/22/23
VA Response: The safety anchor system design shall comply with current OSHA, ANSI, and local regulations pertaining to window cleaning and fall protection.
29
Please confirm which rooftop locations received fall protection and guardrails. Some areas were observed at the site walk with existing railing or fall protection systems.
Blue Cord
11/22/23
VA Response:
Bldg. 1 Penthouse roof: Guardrails
Bldg. 1 3rd floor roof: Guardrails and anchors
Bldg. 2 roof: Guardrails and anchors
Bldg. 2 penthouse roof: Guardrails
Please review pictures at the end of this document
30
During the site walk several existing railing systems were observed. Is it the intent of the VA for these to be removed, the roof patched, and a new railing installed?
Blue Cord
11/22/23
VA Response: The intent is to leave the existing and install new to fill in the spaces that are not protected with guardrail
31
During the site walk several temporary roof patches and sandbags were observed. Please confirm that the repair of existing roof leaks is excluded from the scope of this project.
Blue Cord
11/22/23
VA Response: This project is not responsible for any roof repair outside of the area affected by the new work installed
32
Please confirm the VA s intended finish for the new railings (I.e. Aluminum, galvanized, painted)
Blue Cord
11/22/23
VA Response: Aluminum would be preferred. There is an aesthetic piece to this project and the product should match the majority of existing.
33
Please provide a section view of the existing roof and parapet structure.
Blue Cord
11/22/23
VA Response: Attached
34
Does the VA have a preferred basis of design for the suspended scaffolding anchors?
Blue Cord
11/22/23
VA Response: No
35
Does the VA have a preferred basis of design for the tie back anchors?
Blue Cord
11/22/23
VA Response: It should follow the rest of the existing campus design
36
Does the VA have a preference on the spacing of suspended scaffolding anchors?
Blue Cord
11/22/23
VA Response: No
37
Is the contractor required to provide the entire suspended scaffolding system, or just the anchors?
Blue Cord
11/22/23
VA Response: Only the anchors
38
Some walls may be impossible to cover with suspended scaffolding due to obstructions on the roof. Is it the intent of the VA to have every wall set up to use suspended scaffolding and tie back anchors?
Blue Cord
11/22/23
VA Response: Yes, every façade that can benefit from tuck pointing and window cleaning etc.
39
If no to the question above, which walls are required to be covered by suspended scaffolding?
Blue Cord
11/22/23
VA Response: NA
40
Has the VA investigated whether the existing structure can support suspended scaffolding anchors, or if structural reinforcements will need to be made?
Blue Cord
11/22/23
VA Response: No structural survey has been completed.
41
If the VA requires swing stage scaffolding, this may require the roof structure to be reinforced from underneath. How much of the 2nd Floor of Building 1, 7th Floor of Building 1 and 2nd Floor of Building 2 be made available to the contractor at one time
Blue Cord
11/22/23
VA Response: There are many variables affecting a definite answer for this RFI question. The COR will work with the affected departments to accommodate any underside work. Please understand that these areas include medical and surgical patient areas. Depending on the contractor solution for the anchors, the underside work may require Infection Control measures as well. This installation will have to incorporate a plan to complete sections for this coordination.
42
Please provide a hazardous material survey for each area underneath all roofs affected by this project.
Blue Cord
11/22/23
VA Response: The AHERA will be provided. All areas affected will require a NESHAP from the contractor to identify hazmat.
43
Please advise if in Factor II, part 4a if the year is intended to say 1999 or if another year should be referenced?
KMK Construction, Inc.
11/22/23
VA Response: 2024
44
If selected for Phase II, will there be a second site visit and round of RFIs?
KMK Construction, Inc.
11/22/23
VA Response: Yes
Emergency West-South Side
Emergency South side
Emergency West-South Side
South Sub Station
MRI West side looking North
MRI west side looking east
Warehouse roof southeast
SHADED AREAS SHOW THE 2 LEVELS THE ANCHOR POINTS WILL BE INSTALLED
Update #2 ·
Description
Update #1 ·
Project title: DB Install Fall Protection Anchorage and Guardrails for Bldg. 1 and 2 Project Number: 673-23-104 Project Location: JAMES A. HALEY VAMC BLDG 1and 2, 13000 Bruce B. Downs, Tampa, Florida 33612 Contract Specialist: David Hernandez Magnitude of Construction: $2M and $5M. NAICS code of 236220 Commercial and Institutional Building Construction with a size standard of $45M. Service Code: Y1DA Construction of Hospital and Infirmaries. The Design /Build contractor shall install a fall protection guard rail system for Building 1 and Building 2 as well as to provide a safe and compliant engineered solution for anyone needing to work on or from the roof that utilizes roof anchor points at the James A. Haley VA Hospital, located at 13000 Bruce B. Downs Boulevard, Tampa, Florida as required by the drawings and specifications included in this acquisition package. (See Attached SOW and documents). A site Visit is schedule for:11/15/2023 at 09:00 AM, any questions please email Engineering Tech Paul Guerra at paul.guerra@va.gov location James A. Haley building 42 courtyard. RFI due on 11/22/2023 at 2:00PM email to david.hernandez1@va.gov All VA Medical Facilities are smoke free. Smoking is not permitted anywhere on the JAHVH Campus. Contractors must wear Personal Protective Equipment at all times while at the JAHVH AT THE TIME OF PROPOSAL SUBMISSION, interested contractors MUST be actively registered in the following database System for Award Management: SAM.gov | Home Veteran Small Business Certification (VetCert): Veteran Small Business Certification (sba.gov) WAGE DETERMINATION: General Decision Number: FL20230208 09/29/2023 applies to this project. Please complete attachment 852.219-75 VA Notice of Limitations on Subcontracting - Certificate of Compliance THIS REQUIREMENT IS SET ASIDE FOR SERVICE DISABLE VETERANS OWNED SMALL BUSINESS(SDVOSB)
Files
Show all 43
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Y1DA--FY24: NRM (PROJ: 673-23-104) DB Install Fall Protection Anchorage and Guardrails for Bldg 1 and 2 | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| N063--FY 27 Building 111 Project Lighthouse C-CURE Installation | Veterans Integrated Service Network 8 | Service-Disabled Veteran-Owned Small Business | |
| Z1DA--Design Build | NRM 654-27-130 | Eliminate Trip Hazards Facility Wide VASNHCS | Veterans Integrated Service Network 21 | No set-aside | |
| Z1DA--528A8-22-814 Consolidate Primary Care Reception | Veterans Integrated Service Network 2 | No set-aside | |
| Y1DA--FY27 NRM | 619-24-103 | Replace Flooring & Repair Walls in Building 1 (VA-27-00012190) | Veterans Integrated Service Network 7 | Service-Disabled Veteran-Owned Small Business | |
| Y1DA--replace roofs and repair facades building 6 and 7 at the northport VA medical center project number: 632-23-112 | Veterans Integrated Service Network 2 | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity