Attachment A - Itemized Schedule of Values Cost Breakdown (1).pdf

PDF 66 KB Posted

Attached to
Y1DA--FY24: NRM (PROJ: 673-23-104) DB Install Fall Protection Anchorage and Guardrails for Bldg 1 and 2
Solicitation number
36C24824R0016
Issued by

About this file

This document contains an itemized schedule of values cost breakdown for a federal construction project. The schedule breaks down the total estimated base offer cost into 31 construction divisions including masonry, metals, wood and plastics, concrete, equipment, finishes, plumbing, HVAC and electrical. It further divides the estimated costs into labor costs and material costs for each division. In addition to the base estimated costs, it includes separate line items for overhead, profit and bond.

The related federal contract opportunity is a solicitation from the Department of Veterans Affairs Veterans Health Administration to install fall protection anchorage and guardrails for two buildings. The solicitation number and additional identifying details are provided.

View the file

Other files

File Type Posted
36C24824R0016 0004.pdf PDF
VA JH - BLDG 2 - ROOF - AEC - 95 Percent.pdf PDF
ED roof details.pdf PDF
RFI_ Answers 02.docx DOCX document
36C24824R0016 0003.docx DOCX document
VA JH - BLDG 1 - ROOF.pdf PDF
01 - Penthouse Framing Drawings.pdf PDF
ED roof plans and section.pdf PDF
01 - Dimension Plan Drawings.pdf PDF
01 -2nd floor framing Drawings.pdf PDF
01 - Exterior Elevations Drawings.pdf PDF
Architectural - Bldg 1 penthouse.pdf PDF
36C24824R0016 0002.docx DOCX document
Bldg 2 parapet.pdf PDF
01 - Floor Plan Penthouse Drawings.pdf PDF
Roof Warranty.pdf PDF
01 - Elevations 2 Drawings.pdf PDF
James A. Haley VA Hospital OR Lab Addition (ARCH) detail.pdf PDF
Specialty clinics addition detail.pdf PDF
AHERA Survey.pdf PDF
36C24824R0016 0001.docx DOCX document
36C24824R0016_1.pdf PDF
4 SOW 673-23-104 Install Fall Protection Anchorage.pdf PDF
4 Structual Drawings 1-S20.pdf PDF
9 VA 099100 PAINTING 673-23-104.docx DOCX document
attachment C-Pre-Award Contractor Safety and Environmental Record Form (EMR).pdf PDF
4 Structual Drawings 1-S29 7th floor roof framing plan b.pdf PDF
673-23-104 Site map.pdf PDF
4 Structual Drawings 1-S22.pdf PDF
Attachment B - Experience Information Sheet.pdf PDF
5 - 013526 Safety Requirements - 673-23-104.docx DOCX document
9 VA 055000 Metal Fabrications 673-23-104.docx DOCX document
6 014219 Reference Standards 673-23-104.docx DOCX document
4 Structual Drawings 1-S23.pdf PDF
WD_FL20220208_09292023.pdf PDF
8 VA 01 33 23 - SHOP DRAWINGS 673-23-104.docx DOCX document
9 VA 051200 STRUCTURAL STEEL FRAMING 673-23-104.docx DOCX document
7 VA 01 32 16 17 Project Schedules 673-23-104.docx DOCX document
5 VA 01 00 00 General Requirements 673-23-104.docx DOCX document
4 Structual Drawings 1-S21.pdf PDF
VA NOTICE OF LIMITATIONS ON SUBCONTRACTING(2).pdf PDF
4 Structual Drawings 1-S28 7th floor roof framing plan A.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number: Date:

Project Title

Project Location

Offeror Name

Offeror Street

Offeror City State Zip

Item Labor Cost Material Cost Total Cost

Division 1 $ - $ - $ -

Division 2 - - -

Division 3 - - -

Division 4 - - -

Division 5 - - -

Division 6 - - -

Division 7 - - -

Division 8 - - -

Division 9 - - -

Division 10 - - -

Division 11 - - -

Division 12 - - -

Division 13 - - -

Division 14 - - -

Division 21 - - -

Division 22 - - -

Division 23 - - -

Division 26 - - -

Division 27 - - -

Division 28 - - -

Division 31 - - -

Division 32 - - -

Division 33 - - -

Division 34 - - -

Overhead % -

Profit % -

Bond % -

Description

Base Offer Cost Breakdown

Masonry

Metals

Wood and Plastic

General Requirements

Existing Conditions

Concrete

Specialties

Equipment

Furnishings

Thermal & Moisture Protect

Doors and Windows

Finishes

Plumbing

HVAC

Electrical

Special Construction

Conveying Equipment

Fire Suppression

Exterior Improvements

Utilities

Transportation Subtotal

Communications

Electronic Safety & Security

Earthwork

Total Base Offer Cost

Overhead/Profit Subtotals :

Division Subtotals :

0.00%

0.00%

0.00%

File details come from the government source that posted it. Updated .