Attachment A - Itemized Schedule of Values Cost Breakdown (1).pdf
PDF 66 KB Posted
- Attached to
- Y1DA--FY24: NRM (PROJ: 673-23-104) DB Install Fall Protection Anchorage and Guardrails for Bldg 1 and 2
- Solicitation number
- 36C24824R0016
About this file
This document contains an itemized schedule of values cost breakdown for a federal construction project. The schedule breaks down the total estimated base offer cost into 31 construction divisions including masonry, metals, wood and plastics, concrete, equipment, finishes, plumbing, HVAC and electrical. It further divides the estimated costs into labor costs and material costs for each division. In addition to the base estimated costs, it includes separate line items for overhead, profit and bond.
The related federal contract opportunity is a solicitation from the Department of Veterans Affairs Veterans Health Administration to install fall protection anchorage and guardrails for two buildings. The solicitation number and additional identifying details are provided.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number: Date:
Project Title
Project Location
Offeror Name
Offeror Street
Offeror City State Zip
Item Labor Cost Material Cost Total Cost
Division 1 $ - $ - $ -
Division 2 - - -
Division 3 - - -
Division 4 - - -
Division 5 - - -
Division 6 - - -
Division 7 - - -
Division 8 - - -
Division 9 - - -
Division 10 - - -
Division 11 - - -
Division 12 - - -
Division 13 - - -
Division 14 - - -
Division 21 - - -
Division 22 - - -
Division 23 - - -
Division 26 - - -
Division 27 - - -
Division 28 - - -
Division 31 - - -
Division 32 - - -
Division 33 - - -
Division 34 - - -
Overhead % -
Profit % -
Bond % -
Description
Base Offer Cost Breakdown
Masonry
Metals
Wood and Plastic
General Requirements
Existing Conditions
Concrete
Specialties
Equipment
Furnishings
Thermal & Moisture Protect
Doors and Windows
Finishes
Plumbing
HVAC
Electrical
Special Construction
Conveying Equipment
Fire Suppression
Exterior Improvements
Utilities
Transportation Subtotal
Communications
Electronic Safety & Security
Earthwork
Total Base Offer Cost
Overhead/Profit Subtotals :
Division Subtotals :
0.00%
0.00%
0.00%
File details come from the government source that posted it. Updated .