36C24824R0016 0002.docx
DOCX document 8 MB Posted
- Attached to
- Y1DA--FY24: NRM (PROJ: 673-23-104) DB Install Fall Protection Anchorage and Guardrails for Bldg 1 and 2
- Solicitation number
- 36C24824R0016
About this file
This document contains a request for information (RFI) for the installation of fall protection anchorage and guardrails for two buildings at a Department of Veterans Affairs medical center. The RFI provides responses to contractor questions to clarify project requirements and scope. Key details include that fall protection will be installed on rooftops and facades of Building 1 and Building 2 and will include guardrails, suspended access anchors for maintenance, and a horizontal lifeline system. Structural drawings are attached for Building 2. Hazardous materials surveys will be required prior to beginning work. The safety supervisor must be onsite full-time during installation. Proposals are due by January 10, 2024. The RFI responses clarify areas of work, preferred materials, warranty requirements, and responsibilities for existing conditions.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Information (RFI)
DB - Install Fall Protection Anchorage and Guardrails for Bldg. 1 and 2
PROJECT # 673-23-104/ 36C24824R0016
5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE
OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERE
D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 673-23-104 36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8) Tampa FL 33637 36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8) Tampa FL 33637 To all Offerors/Bidders
36C24824R0016 11-03-2023
X X
X Project Title: DB Install Fall Protection Anchorage and Guardrails for Bldg 1 and 2 Project # 673-23-104
The purpose of this amendment is to provide answers to RFIs and additional drawings.
Phase 1 Proposal Due Date to January 10, 2024, at 2:00 PM. EST. remains the same.
All other terms and conditions remain the same.
POC: David Hernande
z. Email: david.hernandez1@va.gov
Contracting Specialist.
David Hernandez
| RFI NBR |
| Question/ |
Response
| Company Submitted By |
| Dated Received |
| 1. |
| First to define the Fall Protection world differences: |
· Fall Prevention System: Prevents people from reaching the fall hazard by creating a barrier between the person and the fall hazard, such as passive guardrails.
· Fall Restraint System: Prevents people from reaching a fall hazard through a tie off system such a horizontal lifeline (e.g., a cable traveler system)
· Fall Arrest System: Stops a fall that is in progress through a tie off system.
· Suspended Access System: Also considered rope access anchors, window cleaning anchors, facade maintenance anchors, or tie-backs. This is an anchor system that allows for suspending a worker to conduct facade maintenance work such as window cleaning.
A suspended access system can double as a fall restraint or fall prevention system. So typically, you would not need to add fall prevention guardrails where suspended access anchors are newly installed.
Please confirm which of the above is desired for the following locations: Bldg. 1 Penthouse roof, Bldg. 1 3rd floor roof, bldg. 2 roof and bldg. 2 penthouse roof.
| Midwestern |
| 11/22/23 |
VA Response: :
Bldg. 1 Penthouse roof: Guardrails Bldg. 1 3rd floor roof: Guardrails and anchors Bldg. 2 roof: Guardrails and anchors Bldg. 2 penthouse roof: Guardrails Please review the last pages and the pictures attached for further clarification of areas lower than 3rd floor roof
| 2. |
| For Building 1, there are some areas of the roof that do not have existing fall prevention guardrails. In these areas, will the installation of suspended access anchors suffice or are you wanting to add guardrails anyway? |
| Midwestern |
| 11/22/23 |
VA Response: The guardrails that are existing should remain. The new guardrails will fill in the areas that are not currently covered. The project is providing safety measures for 2 sets of people. The safety of untrained persons and trained persons. Untrained persons may not know how to use fall protection and the guard rails will be installed for their safety. The suspended access anchors will be used by contractors and equipment for maintaining the buildings.
| 3. |
| For Building 1, the upper large roof has guardrails already installed. In these areas, will the installation of suspended access anchors be the only thing required? |
| Midwestern |
| 11/22/23 |
VA Response: Correct
| 4. |
| For Building 1, do you want suspended access anchors to reach every facade face of the building, even if there are no windows? |
| Midwestern |
| 11/22/23 |
VA Response: Correct, the anchors can be used for other maintenance activities.
| 5 |
| For Building 2, there appears to be no fall protection of any sort. Do you want suspended access anchors to reach every facade face of the building, even if there are no windows? |
| Midwestern |
| 11/22/23 |
VA Response: Correct. The east façade side would not need to have them. It doesn’t look like a suspended scaffold could be used there.
| 6 |
| For Building 2, if a suspended access system is installed and can double as fall restraint or fall prevention, do you want to install guardrails? |
| Midwestern |
| 11/22/23 |
VA Response: Yes
| 7 |
| Please clarify if a superintendent can be a dual hat to cover the requirements of SSHO? |
| Blue Cord |
| 11/22/23 |
VA Response: No
| 8 |
| If no to the question above, will the SSHO need to be full-time for this project? |
| Blue Cord |
| 11/22/23 |
VA Response: Yes, due to the type of project this is, the SSHO will have to be onsite and active in the installation process.
| 9 |
| Please clarify if a superintendent can be a dual hat to cover the requirement of QA/QC? |
| Blue Cord |
| 11/22/23 |
VA Response: Yes
| 10 |
| If no to the question above, will the QA/QC need to be full time for this project |
| Blue Cord |
| 11/22/23 |
VA Response: N/A
| 11 |
| Can a superintendent be a triple hat to cover the requirements of SSHO and QA/QC? |
| Blue Cord |
| 11/22/23 |
VA Response: No
| 12 |
| Please provide architectural drawings for all roofs that are included in this project. |
| Blue Cord |
| 11/22/23 |
VA Response: Attached
| 13 |
| Please provide structural drawings for Building 2. |
| Blue Cord |
| 11/22/23 |
VA Response: Attached
| 14 |
| Please confirm that that any existing railing is to remain in place and worked around |
| Blue Cord |
| 11/22/23 |
VA Response: Confirmed
| 15 |
| Please confirm if there are any warranties requirements for the roofs as part of this project |
| Blue Cord |
| 11/22/23 |
VA Response: There are no specific warranty requirements (that apply to the existing roof system) identified. The contractor should be prepared to research the roof material and review warranty with any manufacturer’s requirements. This should be a part of the design phase.
| 16 |
| If the answer to the above question is yes, please provide the warranty requirements for these roof systems. |
| Blue Cord |
| 11/22/23 |
VA Response: Attached
| 17 |
| Please confirm that the roof above the new Emergency Department is not included in this project. |
| Blue Cord |
| 11/22/23 |
VA Response: It has been decided that it is included, please review pictures at the end of this document
| 18 |
| Please confirm that interventional radiology suite is not included in this project. |
| Blue Cord |
| 11/22/23 |
VA Response: It has been decided it is included, please review pictures at the end of this document
| 19 |
| Please confirm that the upper penthouse roof of Building 1 is only receiving guard rail. |
| Blue Cord |
| 11/22/23 |
VA Response: Confirmed
| 20 |
| Please confirm that the south sub roof of Building 1 is included in this project. |
| Blue Cord |
| 11/22/23 |
VA Response: It has been decided that it is included, please review pictures at the end of this document
| 21 |
| Please provide the existing master label for the campus lightning protection system |
| Blue Cord |
| 11/22/23 |
VA Response: Unable to locate this label
| 22 |
| If one does not exist, will the contractor need to provide a new master label lightning protection system for the entire campus or will the contractor only need to provide certification for the new work associated with this project |
| Blue Cord |
| 11/22/23 |
VA Response: New work associated only
| 23 |
| Are we required to fix any issues with the existing lighting protection, railing and roofing systems as part of this project? |
| Blue Cord |
| 11/22/23 |
VA Response: No
| 24 |
| Please provide a hazardous material survey for all areas of this project |
| Blue Cord |
| 11/22/23 |
VA Response: We will provide AHERA for review, but a NESHAP is required prior to beginning work in all areas the contractor expects to work in
| 25 |
| Past Performance: If we have a PPQ that is less than 12 months old, can we use it within our proposal? Or will a new PPQ need to be requested? |
| Blue Cord |
| 11/22/23 |
VA Response: That will be acceptable
| 27 |
| Please confirm it is the VA’s intent to use a horizontal lifeline system and not individual fall protection anchors |
| Blue Cord |
| 11/22/23 |
VA Response: That is correct
| 28 |
| Does the VA have a preferred basis of design for the horizontal lifeline system? |
| Blue Cord |
| 11/22/23 |
VA Response: The safety anchor system design shall comply with current OSHA, ANSI, and local regulations pertaining to window cleaning and fall protection.
| 29 |
| Please confirm which rooftop locations received fall protection and guardrails. Some areas were observed at the site walk with existing railing or fall protection systems. |
| Blue Cord |
| 11/22/23 |
VA Response:
Bldg. 1 Penthouse roof: Guardrails Bldg. 1 3rd floor roof: Guardrails and anchors Bldg. 2 roof: Guardrails and anchors Bldg. 2 penthouse roof: Guardrails Please review pictures at the end of this document
| 30 |
| During the site walk several existing railing systems were observed. Is it the intent of the VA for these to be removed, the roof patched, and a new railing installed? |
| Blue Cord |
| 11/22/23 |
VA Response: The intent is to leave the existing and install new to fill in the spaces that are not protected with guardrail
| 31 |
| During the site walk several temporary roof patches and sandbags were observed. Please confirm that the repair of existing roof leaks is excluded from the scope of this project. |
| Blue Cord |
| 11/22/23 |
VA Response: This project is not responsible for any roof repair outside of the area affected by the new work installed
| 32 |
| Please confirm the VA’s intended finish for the new railings (I.e. Aluminum, galvanized, painted) |
| Blue Cord |
| 11/22/23 |
VA Response: Aluminum would be preferred. There is an aesthetic piece to this project and the product should match the majority of existing.
| 33 |
| Please provide a section view of the existing roof and parapet structure. |
| Blue Cord |
| 11/22/23 |
VA Response: Attached
| 34 |
| Does the VA have a preferred basis of design for the suspended scaffolding anchors? |
| Blue Cord |
| 11/22/23 |
VA Response: No
| 35 |
| Does the VA have a preferred basis of design for the tie back anchors? |
| Blue Cord |
| 11/22/23 |
VA Response: It should follow the rest of the existing campus design
| 36 |
| Does the VA have a preference on the spacing of suspended scaffolding anchors? |
| Blue Cord |
| 11/22/23 |
VA Response: No
| 37 |
| Is the contractor required to provide the entire suspended scaffolding system, or just the anchors? |
| Blue Cord |
| 11/22/23 |
VA Response: Only the anchors
| 38 |
| Some walls may be impossible to cover with suspended scaffolding due to obstructions on the roof. Is it the intent of the VA to have every wall set up to use suspended scaffolding and tie back anchors? |
| Blue Cord |
| 11/22/23 |
VA Response: Yes, every façade that can benefit from tuck pointing and window cleaning etc.
| 39 |
| If no to the question above, which walls are required to be covered by suspended scaffolding? |
| Blue Cord |
| 11/22/23 |
VA Response: NA
| 40 |
| Has the VA investigated whether the existing structure can support suspended scaffolding anchors, or if structural reinforcements will need to be made? |
| Blue Cord |
| 11/22/23 |
VA Response: No structural survey has been completed.
| 41 |
| If the VA requires swing stage scaffolding, this may require the roof structure to be reinforced from underneath. How much of the 2nd Floor of Building 1, 7th Floor of Building 1 and 2nd Floor of Building 2 be made available to the contractor at one time |
| Blue Cord |
| 11/22/23 |
VA Response: There are many variables affecting a definite answer for this RFI question. The COR will work with the affected departments to accommodate any underside work. Please understand that these areas include medical and surgical patient areas. Depending on the contractor solution for the anchors, the underside work may require Infection Control measures as well. This installation will have to incorporate a plan to complete sections for this coordination.
| 42 |
| Please provide a hazardous material survey for each area underneath all roofs affected by this project. |
| Blue Cord |
| 11/22/23 |
VA Response: The AHERA will be provided. All areas affected will require a NESHAP from the contractor to identify hazmat.
| 43 |
| Please advise if in Factor II, part 4a if the year is intended to say “1999” or if another year should be referenced? |
| KMK Construction, Inc. |
| 11/22/23 |
VA Response: 2024
| 44 |
| If selected for Phase II, will there be a second site visit and round of RFIs? |
| KMK Construction, Inc. |
| 11/22/23 |
VA Response: Yes
Emergency West- S outh Side
Emergency South side Emergency West-South Side South Sub Station MRI West side looking N orth MRI west side looking east Warehouse roof southeast
SHADED AREAS SHOW THE 2 LEVELS THE ANCHOR POINTS WILL BE INSTALLED
See attached document: Roof Warranty.
See attached document: ED roof plans and section.
See attached document: Architectural - Bldg 1 penthouse.
See attached document: 01 -2nd floor framing Drawings.
See attached document: 01 - Floor Plan Penthouse Drawings.
See attached document: 01 - Elevations 2 Drawings.
See attached document: Specialty clinics addition detail.
See attached document: James A. Haley VA Hospital OR Lab Addition (ARCH) detail.
See attached document: Bldg 2 parapet.
See attached document: AHERA Survey.
See attached document: 01 - Penthouse Framing Drawings.
See attached document: 01 - Exterior Elevations Drawings.
See attached document: 01 - Dimension Plan Drawings.
Attachment 2 RFI Tracking Log image4.jpeg image5.jpeg image6.jpeg image7.jpeg image8.png image9.png image1.jpeg image2.jpeg image3.jpeg