This document contains an Experience Information Sheet template to be completed by offerors responding to solicitation number 36C24824R0016 from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8. The solicitation seeks offers to install fall protection anchorage and guardrails for Buildings 1 and 2 at Project 673-23-104. Offerors must use the sheet to provide details of relevant past performance including contract information, scope of work performed, completion dates, difficulties encountered, and pricing details. Items such as subcontracting roles, percentage of work performed, and contract terminations must also be addressed.

View the file

Other files

File Type Posted
36C24824R0016 0004.pdf PDF
VA JH - BLDG 2 - ROOF - AEC - 95 Percent.pdf PDF
ED roof details.pdf PDF
RFI_ Answers 02.docx DOCX document
36C24824R0016 0003.docx DOCX document
VA JH - BLDG 1 - ROOF.pdf PDF
01 - Penthouse Framing Drawings.pdf PDF
ED roof plans and section.pdf PDF
01 - Dimension Plan Drawings.pdf PDF
01 -2nd floor framing Drawings.pdf PDF
01 - Exterior Elevations Drawings.pdf PDF
Architectural - Bldg 1 penthouse.pdf PDF
36C24824R0016 0002.docx DOCX document
Bldg 2 parapet.pdf PDF
01 - Floor Plan Penthouse Drawings.pdf PDF
Roof Warranty.pdf PDF
01 - Elevations 2 Drawings.pdf PDF
James A. Haley VA Hospital OR Lab Addition (ARCH) detail.pdf PDF
Specialty clinics addition detail.pdf PDF
AHERA Survey.pdf PDF
36C24824R0016 0001.docx DOCX document
36C24824R0016_1.pdf PDF
4 SOW 673-23-104 Install Fall Protection Anchorage.pdf PDF
4 Structual Drawings 1-S20.pdf PDF
9 VA 099100 PAINTING 673-23-104.docx DOCX document
attachment C-Pre-Award Contractor Safety and Environmental Record Form (EMR).pdf PDF
4 Structual Drawings 1-S29 7th floor roof framing plan b.pdf PDF
673-23-104 Site map.pdf PDF
4 Structual Drawings 1-S22.pdf PDF
5 - 013526 Safety Requirements - 673-23-104.docx DOCX document
9 VA 055000 Metal Fabrications 673-23-104.docx DOCX document
6 014219 Reference Standards 673-23-104.docx DOCX document
4 Structual Drawings 1-S23.pdf PDF
WD_FL20220208_09292023.pdf PDF
8 VA 01 33 23 - SHOP DRAWINGS 673-23-104.docx DOCX document
9 VA 051200 STRUCTURAL STEEL FRAMING 673-23-104.docx DOCX document
7 VA 01 32 16 17 Project Schedules 673-23-104.docx DOCX document
Attachment A - Itemized Schedule of Values Cost Breakdown (1).pdf PDF
5 VA 01 00 00 General Requirements 673-23-104.docx DOCX document
4 Structual Drawings 1-S21.pdf PDF
VA NOTICE OF LIMITATIONS ON SUBCONTRACTING(2).pdf PDF
4 Structual Drawings 1-S28 7th floor roof framing plan A.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXPERIENCE INFORMATION SHEET 36C24823R0186

EXPERIENCE INFORMATION SHEET - See Factor 2 Subfactor C PROJECT NO. [673-14-104] Page 1

a. Contractor Information of awarded contract (Firm Name, Address, DUNS Number and Cage Code, Phone number, POC Name, POC email, Company email)

b. Contract and/or Task Order Number and Award Date (mm/dd/yyyy)

c. Project Title/Name and Location

d. Work Performed as: Prime Contractor, Subcontractor, Joint Venture, Other (explain)

e. Percent (%) of project work performed by your company

f. If you work as subcontractor, who was the prime?

(Firm Name, Address, DUNS Number and Cage Code, Phone number, POC Name, POC email, Company email)

g. Government Agency/Company which awarded contract to offeror, and Contact Information, such Contracting Officer/Procurement Official/Point of Contract (Name, Title, Email, Phone Number).

EXPERIENCE INFORMATION SHEET

PROJECT NO. [673-14-104] Page 2

h. Description of project’s scope of work and the offeror’s specific roles and responsibilities in the project:

Describe work performed in sufficient detail to permit evaluation of project relevancy to this procurement. Detail how work performed is relevant to the effort required by the solicitation? Use continuation sheet for additional information, if necessary

EXPERIENCE INFORMATION SHEET

PROJECT NO. [673-14-104] Page 3

i. Describe any difficulties and/or obstacles encountered during performance; steps taken toward resolution

j. Describe unforeseen conditions and how each were resolved

k. Performance Period, including contract start date (mm/dd/yyyy), and original completion date, if not completed, projected date (mm/dd/yyyy) contract start date: original completion date, if not completed, projected completion date (mm/dd/yyyy)

l. Actual Completion Date (mm/dd/yyyy), and if not completed, why?

Actual Completion Date:

If not completed, Why?

m. Project is 50% or more complete? YES [ ] No [ ]. If “No” explain percentage of completion, if not 50% completed for any reason, rating may be lower.

n. The Offerors shall indicate if any of the contracts listed were terminated and the type and reasons for the termination.

o. Original Contract Price (Award Amount), Final Contract Price (to include all modifications, if applicable), Explain Differences.

Original Contract Price: Final Contract Price:

Explain Differences: