01 - Penthouse Framing Drawings.pdf
PDF 681 KB Posted
- Attached to
- Y1DA--FY24: NRM (PROJ: 673-23-104) DB Install Fall Protection Anchorage and Guardrails for Bldg 1 and 2
- Solicitation number
- 36C24824R0016
About this file
This document contains construction drawings and specifications for a federal contract opportunity to install fall protection anchorage and guardrails at two buildings. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8 to provide guardrails and fall protection anchorage at Building 1 and Building 2. The drawings show the layout of the penthouse floor and include dimensions, notes and a legend. Contractors should reference the mechanical drawings for air handling unit locations. The response deadline is not stated, but the drawings are dated December 1, 2020 and revised January 15, 2021, indicating the opportunity is currently available.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RJ
RJ
RH.1
RH.1
R1R1
R1.6
R1.9
RH
RH
R2R2
RG
RGRF
RF
RE
RE
RD
RD
RC
RCRB
RB
RA.9
RA.9
RA
RA
R2.5R2.5
R4R4
R3.2
R3R3
R3.4
R3.3
R2.4
R1.7
RJ.1
RJ.1
A301
A302
11' - 9" 9" 23' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 23' - 0" 9" 11' - 9" 4"
167' - 4"
4"
3"
0"
2"
3"
7'
- 1
1" 2'
- 4
0" 2"
0" 2'
- 1 1"
7'
- 4
8'- 3"
'-0
" SEE MEP DRAWINGS FOR
AHU LOCATION
NORTH 3/16" = 1'-0"1 PENTHOUSE FLOOR
12/01/20202.15.2021
File details come from the government source that posted it. Updated .