About this file

This document contains construction drawings for framing a second floor as well as details for a related federal contract opportunity. The drawings show framing plans for a second floor addition and include specifications for studs, anchors, and guardrails. The federal contract opportunity is a solicitation from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8 to install fall protection anchorage and guardrails for Buildings 1 and 2. The solicitation includes the number 36C24824R0016 and is for project 673-23-104. Responses are due by the date listed on the solicitation. The drawings and contract opportunity provide information for upgrading fall protection systems on two buildings for the VA.

View the file

Other files

File Type Posted
36C24824R0016 0004.pdf PDF
VA JH - BLDG 2 - ROOF - AEC - 95 Percent.pdf PDF
ED roof details.pdf PDF
RFI_ Answers 02.docx DOCX document
36C24824R0016 0003.docx DOCX document
VA JH - BLDG 1 - ROOF.pdf PDF
01 - Penthouse Framing Drawings.pdf PDF
ED roof plans and section.pdf PDF
01 - Dimension Plan Drawings.pdf PDF
01 - Exterior Elevations Drawings.pdf PDF
Architectural - Bldg 1 penthouse.pdf PDF
36C24824R0016 0002.docx DOCX document
Bldg 2 parapet.pdf PDF
01 - Floor Plan Penthouse Drawings.pdf PDF
Roof Warranty.pdf PDF
01 - Elevations 2 Drawings.pdf PDF
James A. Haley VA Hospital OR Lab Addition (ARCH) detail.pdf PDF
Specialty clinics addition detail.pdf PDF
AHERA Survey.pdf PDF
36C24824R0016 0001.docx DOCX document
36C24824R0016_1.pdf PDF
4 SOW 673-23-104 Install Fall Protection Anchorage.pdf PDF
4 Structual Drawings 1-S20.pdf PDF
9 VA 099100 PAINTING 673-23-104.docx DOCX document
attachment C-Pre-Award Contractor Safety and Environmental Record Form (EMR).pdf PDF
4 Structual Drawings 1-S29 7th floor roof framing plan b.pdf PDF
673-23-104 Site map.pdf PDF
4 Structual Drawings 1-S22.pdf PDF
Attachment B - Experience Information Sheet.pdf PDF
5 - 013526 Safety Requirements - 673-23-104.docx DOCX document
9 VA 055000 Metal Fabrications 673-23-104.docx DOCX document
6 014219 Reference Standards 673-23-104.docx DOCX document
4 Structual Drawings 1-S23.pdf PDF
WD_FL20220208_09292023.pdf PDF
8 VA 01 33 23 - SHOP DRAWINGS 673-23-104.docx DOCX document
9 VA 051200 STRUCTURAL STEEL FRAMING 673-23-104.docx DOCX document
7 VA 01 32 16 17 Project Schedules 673-23-104.docx DOCX document
Attachment A - Itemized Schedule of Values Cost Breakdown (1).pdf PDF
5 VA 01 00 00 General Requirements 673-23-104.docx DOCX document
4 Structual Drawings 1-S21.pdf PDF
VA NOTICE OF LIMITATIONS ON SUBCONTRACTING(2).pdf PDF
4 Structual Drawings 1-S28 7th floor roof framing plan A.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RJ

RJ

RH.1

RH.1

R1R1

R1.6

R1.9

RH

RH

R2R2

RG

RGRF

RF

RE

RE

RD

RD

RC

RCRB

RB

RA.9

RA.9

RA

RA

R2.5R2.5

R4R4

R3.2

R3R3

R3.4

R3.3

R2.4

R1.7

RJ.1

RJ.1

A301

A302

05.1905.19

11' - 9" 9" 23' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 23' - 0" 9" 11' - 9" 4" 167' - 4"

4"

3"

0"

2"

3"

7'

- 1

1" 2'

- 4

0" 2"

0" 2'

- 1 1"

7'

- 4

NORTH 3/16" = 1'-0"1 PENTHOUSE ROOF

05.19 PL 5/8" X 10 X 6" EMBED WITH (4) 3/4 HEADED ANCHORS STUDS

12/01/20202.15.2021

File details come from the government source that posted it. Updated .