About this file

This document contains floor plan drawings for penthouse renovations and the related federal contract opportunity for fall protection installations. The floor plan drawings depict the layout and construction details for renovating the penthouse area, including new wall installations, door locations, roof drainage features, and mechanical equipment placements. The related federal contract opportunity is seeking offers to install fall protection anchorage and guardrails for Buildings 1 and 2 of a Veterans Affairs medical facility. Offerors should respond by the listed solicitation number and date. The work will be completed for the Veterans Health Administration under Contract Number 36C24824R0016.

View the file

Other files

File Type Posted
36C24824R0016 0004.pdf PDF
VA JH - BLDG 2 - ROOF - AEC - 95 Percent.pdf PDF
ED roof details.pdf PDF
RFI_ Answers 02.docx DOCX document
36C24824R0016 0003.docx DOCX document
VA JH - BLDG 1 - ROOF.pdf PDF
01 - Penthouse Framing Drawings.pdf PDF
ED roof plans and section.pdf PDF
01 - Dimension Plan Drawings.pdf PDF
01 -2nd floor framing Drawings.pdf PDF
01 - Exterior Elevations Drawings.pdf PDF
Architectural - Bldg 1 penthouse.pdf PDF
36C24824R0016 0002.docx DOCX document
Bldg 2 parapet.pdf PDF
Roof Warranty.pdf PDF
01 - Elevations 2 Drawings.pdf PDF
James A. Haley VA Hospital OR Lab Addition (ARCH) detail.pdf PDF
Specialty clinics addition detail.pdf PDF
AHERA Survey.pdf PDF
36C24824R0016 0001.docx DOCX document
36C24824R0016_1.pdf PDF
4 SOW 673-23-104 Install Fall Protection Anchorage.pdf PDF
4 Structual Drawings 1-S20.pdf PDF
9 VA 099100 PAINTING 673-23-104.docx DOCX document
attachment C-Pre-Award Contractor Safety and Environmental Record Form (EMR).pdf PDF
4 Structual Drawings 1-S29 7th floor roof framing plan b.pdf PDF
673-23-104 Site map.pdf PDF
4 Structual Drawings 1-S22.pdf PDF
Attachment B - Experience Information Sheet.pdf PDF
5 - 013526 Safety Requirements - 673-23-104.docx DOCX document
9 VA 055000 Metal Fabrications 673-23-104.docx DOCX document
6 014219 Reference Standards 673-23-104.docx DOCX document
4 Structual Drawings 1-S23.pdf PDF
WD_FL20220208_09292023.pdf PDF
8 VA 01 33 23 - SHOP DRAWINGS 673-23-104.docx DOCX document
9 VA 051200 STRUCTURAL STEEL FRAMING 673-23-104.docx DOCX document
7 VA 01 32 16 17 Project Schedules 673-23-104.docx DOCX document
Attachment A - Itemized Schedule of Values Cost Breakdown (1).pdf PDF
5 VA 01 00 00 General Requirements 673-23-104.docx DOCX document
4 Structual Drawings 1-S21.pdf PDF
VA NOTICE OF LIMITATIONS ON SUBCONTRACTING(2).pdf PDF
4 Structual Drawings 1-S28 7th floor roof framing plan A.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RJ

RJ

RH.1

RH.1

R1R1

R1.6

R1.9

RH

RH

R2R2

RG

RGRF

RF

RE

RE

RD

RD

RC

RCRB

RB

RA.9

RA.9

RA

RA

R2.5R2.5

R4R4

R3.2

R3R3

R3.4

MECH CHASE

ELEV. EQUIP.

PE02

EQUIPMENT

PA01

STAIRS

S1P

CHASE

PCH02

PLENUM

PA03

R3.3

R2.4

R1.7

RJ.1

RJ.1

11' - 9" 9"

23' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 23' - 0" 9"

11' - 9" 4"

7'

- 1

1" 2'

- 4

0"

2"

0" 2'

- 1 1"

7'

- 4

3"

0"

2"

3"

EX

S

1P 3'

-0

EX PA03

3' - 0"

EX

P

A0 1B

2' -8

EX

P

A0 1A

3' -0

EX PE02

3' - 0"

A301

A302

04.04

DN

EXISTING

ELEVATOR

EL31

02.37

02.37 02.37

02.37

02.37 02.37

07.29

1/4

SL

OP

E

07.3207.33

07.34

07.35

02.94

07.54

07.56 04.09

04.04

04.0804.08

PA01C

7' - 0"

04.10

18' - 10"

01.20

05.4205.42

1. ALL DIMENSIONS ARE TO FACE OF STUD IN NEW CONSTRUCTION, FACE OF FINISH IN EXISTING.

2. ALL FLOOR FINISH CHANGES OCCUR AT CENTERLINE OF DOOR IN CLOSED POSITION, UNLESS NOTED OTHERWISE.

3. COORDINATE LOCATIONS OF ALL FLOOR AND ROOF DRAINS WITH PLUMBING PLANS.

4. PATCH INTERIOR HOLES IN NON-RATED MASONRY WALLS BY FILLING VOIDS WITH CLOSED CELL SPRAY INSULATION.

PATCH INTERIOR HOLES IN RATED MASONRY WALLS BY REPAIRING CELL WALLS WITH DRY PACK MORTAR. MASONRY WALL PATCHES ARE TO BE FINISHED FLUSH WITH EXISTING BLOCK PRIOR TO APPLYING WATER BARRIER OR FINISH.

NORTH 3/16" = 1'-0"1 FLOOR PLAN - PENTHOUSE FLOOR

04.10 PATCH AND INFILL WALL AROUND NEW DOOR WITH CONCRETE MASONRY BLOCKS

AND BRICK VENEER TO MATCH THE EXISTING ADJACENT PERIMETER WALLS, SEE

STRUCTURAL NOTES FOR REINFORCING

05.42 ROOFTOP EDGE PROTECTION IN COMPLIANCE WITH IBC 1015.6

07.29 OUTSIDE AIR INTAKE TUNNEL PLENUM

07.32 EPDM OVER TAPERED RIGID INSULATION OVER METAL DECKING

07.33 PARAPET CAP, SEE DETAIL ON A501

07.34 REPAIR DAMAGED ROOFING

07.35 REMOVE LOUVER AND INFILL WALL TO MATCH EXISTING

07.54 NEW THROUGH WALL ROOF SCUPPER

07.56 SEE MECHANICAL DRAWINGS FOR LOUVER REPLACEMENT

01.20 10 FOOT PERIMETER LINE AROUND DOOR ACCESS AREA

02.37 EXISTING ROOF DRAIN TO REMAIN

02.94 REMOVE EXISTING 4" CONCRETE CURB AND LEVEL FLOOR

04.04 NEW WALL INFILL TO MATCH EXISTING WALL, SEE STRUCTURAL NOTES FOR

REINFORCING

04.08 REMOVE EXISTING METAL WALL AND INFILL OPENING WITH CONCRETE MASONRY

UNITS AND BRICK VENEER TO MATCH THE EXISTING PENTHOUSE PERIMETER. FILL

UNGROUTED MASONRY CELLS WITH EXPANDED PERLITE CONSTRUCTION FILLER,

SEE STRUCTURAL NOTES FOR REINFORCING

04.09 PATCH AND INFILL WALL AROUND NEW LOUVER WITH CONCRETE MASONRY BLOCKS

AND BRICK VENEER TO MATCH THE EXISTING ADJACENT PERIMETER WALLS, SEE

STRUCTURAL NOTES FOR REINFORCING

RAND M.

EARDLEY

128806

ST

OF

AT

E UTAH

ARED CH

IT

EC

T

NS

CE

LI 04 DEC 2020

File details come from the government source that posted it. Updated .