Y1DA--FY23: NRM-Tier 1 (PROJ: 548-23-122) D/B Install Additional Pump on OR Chilled Water Loop
Closed Solicitation Posted
- Solicitation number
- 36C24823R0051_1
- Agency
-
Veterans Integrated Service Network 8
Veterans Health Administration, Department of Veterans Affairs
- Responses due
- Set-aside
- Service-Disabled Veteran-Owned Small Business
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Florida 33410, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks a contractor to install an additional pump on the existing operating room chilled water loop at a Department of Veterans Affairs medical center located in Riviera Beach, Florida. The contractor shall provide all labor, materials, tools, equipment, engineering and technical assistance required to install a new pump matching the capacity of two existing pumps. The contractor must also install a new variable frequency drive and integrate direct digital controls and devices into the facility's existing BACnet compatible building automation system. Technical proposals are due by December 13, 2022 at 12:00 PM EST. Evaluation criteria include relevant experience, past performance, and technical approach. The period of performance is 120 days from notice to proceed.
This is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses. The NAICS code is 238220 - Plumbing, Heating, and Air-Conditioning Contractors and the PSC code is R499 - Other Facility Related Services. The anticipated cost is between $100,000 to $250,000. The place of performance is the Department of Veterans Affairs medical center located at Riviera Beach, Florida 33410. Questions were due by December 2nd and the previous technical proposal due date was amended from December 20th to December 13, 2022 at 12:00 PM EST in amendment 0002.
Notice text
5 versions
Update #5 · Latest ·
Award Announcement Attached, 36C24823C0052
This solicitation is 100% Set-Aside for Service Disabled Veteran Owned Small Businesses (SDVOSB). POP is 120 Days from NTP.
AMENDMENT 3 - RFI Responses & Attachments provided; Proposal Due Date extended to Dec 20, 2022 at 2:00 PM EST.
AMENDMENT 2 - P1 Due Date extended to Dec 13, 2022 at 12:00 PM EST; P1 Site Visit Sign In Sheet Provided.
AMENDMENT 1 - Change to Site Visit and RFI dates. See attachment titled "S06 36C24823R0051 0001".
The contractor shall provide all labor, tools, and materials necessary for the following work: Install new pump on existing OR chilled water loop. The pump will match existing and will be installed in parallel with the two (2) existing pumps. Pumping capacity will be designed to carry full load. Control configuration will allow either of the three (3) pumps to act as the primary. Install new Eaton VFD for the new pump. The new VFD will match existing and will be located adjacent to the (2) existing pump VFDs. New VFD to have manual disconnect. The power feed to the two (2) existing pumps will be rewired by the contractor so that the pumps are not on the same electrical panel. New DDC controls with BACNET communication. Contractor shall use our installed BACnet compatible building automation system (BAS) for this project. Contractor shall provide all engineering and technical assistance required for integration into BAS. All devices installed shall be BACnet tested and approved and work seamlessly with existing BAS.
Update #4 ·
This solicitation is 100% Set-Aside for Service Disabled Veteran Owned Small Businesses (SDVOSB). POP is 120 Days from NTP.
AMENDMENT 3 - RFI Responses & Attachments provided; Proposal Due Date extended to Dec 20, 2022 at 2:00 PM EST.
AMENDMENT 2 - P1 Due Date extended to Dec 13, 2022 at 12:00 PM EST; P1 Site Visit Sign In Sheet Provided.
AMENDMENT 1 - Change to Site Visit and RFI dates. See attachment titled "S06 36C24823R0051 0001".
The contractor shall provide all labor, tools, and materials necessary for the following work: Install new pump on existing OR chilled water loop. The pump will match existing and will be installed in parallel with the two (2) existing pumps. Pumping capacity will be designed to carry full load. Control configuration will allow either of the three (3) pumps to act as the primary. Install new Eaton VFD for the new pump. The new VFD will match existing and will be located adjacent to the (2) existing pump VFDs. New VFD to have manual disconnect. The power feed to the two (2) existing pumps will be rewired by the contractor so that the pumps are not on the same electrical panel. New DDC controls with BACNET communication. Contractor shall use our installed BACnet compatible building automation system (BAS) for this project. Contractor shall provide all engineering and technical assistance required for integration into BAS. All devices installed shall be BACnet tested and approved and work seamlessly with existing BAS.
Update #3 ·
This solicitation is 100% Set-Aside for Service Disabled Veteran Owned Small Businesses (SDVOSB). POP is 120 Days from NTP.
AMENDMENT 2 - P1 Due Date extended to Dec 13, 2022 at 12:00 PM EST; P1 Site Visit Sign In Sheet Provided.
AMENDMENT 1 - Change to Site Visit and RFI dates. See attachment titled "S06 36C24823R0051 0001".
The contractor shall provide all labor, tools, and materials necessary for the following work: Install new pump on existing OR chilled water loop. The pump will match existing and will be installed in parallel with the two (2) existing pumps. Pumping capacity will be designed to carry full load. Control configuration will allow either of the three (3) pumps to act as the primary. Install new Eaton VFD for the new pump. The new VFD will match existing and will be located adjacent to the (2) existing pump VFDs. New VFD to have manual disconnect. The power feed to the two (2) existing pumps will be rewired by the contractor so that the pumps are not on the same electrical panel. New DDC controls with BACNET communication. Contractor shall use our installed BACnet compatible building automation system (BAS) for this project. Contractor shall provide all engineering and technical assistance required for integration into BAS. All devices installed shall be BACnet tested and approved and work seamlessly with existing BAS.
Update #2 ·
This solicitation is 100% Set-Aside for Service Disabled Veteran Owned Small Businesses (SDVOSB). POP is 120 Days from NTP.
AMENDMENT 1 - Change to Site Visit and RFI dates. See attachment titled "S06 36C24823R0051 0001".
The contractor shall provide all labor, tools, and materials necessary for the following work: Install new pump on existing OR chilled water loop. The pump will match existing and will be installed in parallel with the two (2) existing pumps. Pumping capacity will be designed to carry full load. Control configuration will allow either of the three (3) pumps to act as the primary. Install new Eaton VFD for the new pump. The new VFD will match existing and will be located adjacent to the (2) existing pump VFDs. New VFD to have manual disconnect. The power feed to the two (2) existing pumps will be rewired by the contractor so that the pumps are not on the same electrical panel. New DDC controls with BACNET communication. Contractor shall use our installed BACnet compatible building automation system (BAS) for this project. Contractor shall provide all engineering and technical assistance required for integration into BAS. All devices installed shall be BACnet tested and approved and work seamlessly with existing BAS.
Update #1 ·
This solicitation is 100% Set-Aside for Service Disabled Veteran Owned Small Businesses (SDVOSB). POP is 120 Days from NTP.
The contractor shall provide all labor, tools, and materials necessary for the following work: Install new pump on existing OR chilled water loop. The pump will match existing and will be installed in parallel with the two (2) existing pumps. Pumping capacity will be designed to carry full load. Control configuration will allow either of the three (3) pumps to act as the primary. Install new Eaton VFD for the new pump. The new VFD will match existing and will be located adjacent to the (2) existing pump VFDs. New VFD to have manual disconnect. The power feed to the two (2) existing pumps will be rewired by the contractor so that the pumps are not on the same electrical panel. New DDC controls with BACNET communication. Contractor shall use our installed BACnet compatible building automation system (BAS) for this project. Contractor shall provide all engineering and technical assistance required for integration into BAS. All devices installed shall be BACnet tested and approved and work seamlessly with existing BAS.
Files
Show all 35
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Y1DA--FY23: NRM-Tier 1 (PROJ: 548-23-122) D/B Install Additional Pump on OR Chilled Water Loop | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Y1DZ--replace chilled water pump at the boiler plant | Veterans Integrated Service Network 2 | Service-Disabled Veteran-Owned Small Business | |
| Y1DA--CON NRM 531-25-102 | Expand Emergency Room | Veterans Integrated Service Network 20 | Service-Disabled Veteran-Owned Small Business | |
| CON | Z2DA | replace chiller 1 B104 | 580-24-111 | solicitation | Veterans Integrated Service Network 16 | Service-Disabled Veteran-Owned Small Business | |
| CON | Z1DA | replace or chillers | 580-23-105 | solicitation | Veterans Integrated Service Network 16 | Service-Disabled Veteran-Owned Small Business | |
| Z1DA--Local | 460-26- 4-5074-0108 | 460-26-999 | Condenser Water Piping Modification | (VA-26-00077929) | Veterans Integrated Service Network 4 | Service-Disabled Veteran-Owned Small Business |