Attachment 5 Project Price Breakdown.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Y1DA--FY23: NRM-Tier 1 (PROJ: 548-23-122) D/B Install Additional Pump on OR Chilled Water Loop
Solicitation number
36C24823R0051_1
Issued by

About this file

This document contains a federal contract solicitation and related project price breakdown template. The solicitation seeks bids for a project to install an additional pump on an existing OR chilled water loop at a Veterans Affairs medical center. The scope of work includes supplying and installing a new pump, VFD, and DDC controls to integrate the new equipment into the existing BAS. The project is a 100% SDVOSB set-aside with a 120 day period of performance from notice to proceed. The price breakdown template requires bidders to itemize labor, material, overhead, profit, and bond costs by construction division for the project.

View the file

Other files

File Type Posted
Award Announcement 36C24823C0052_1.pdf PDF
548-23-122 QAs.pdf PDF
16-104 18-5-18 RECORD PDF PACKAGE CH1-2.pdf PDF
Doors - Windows.Wood Doors.Ash.jpg JPG image
03 30 53.pdf PDF
Brooks controls - approved by Moses lr.pdf PDF
h-max-installation-manual-mn04008005e.pdf PDF
IOM1206 - Daikin Trailblazer (AGZ).pdf PDF
36C24823R0051 0003.pdf PDF
19010 Electrical - SandS.pdf PDF
WPB-VA_S-SHEETS.txt TXT text file
h-max-application-manual-mn04008006e.pdf PDF
A100 - SS.pdf PDF
19010 Mechical - SandS.pdf PDF
Grundfosliterature-5104627.pdf PDF
h-max-quick-start-guide-mn04008004e.pdf PDF
Structural.pdf PDF
A210 - SS.pdf PDF
36C24823R0051 0002.pdf PDF
S06 36C24823R0051 0001.pdf PDF
Attachment 3 548-23-122 01321615 Spec.docx DOCX document
Attachment 1 548-23-122 010000 Spec.docx DOCX document
Attachment 14 Site Plan.pdf PDF
Attachment 11 548-23-122 AE Instructions DB.docx DOCX document
Attachment 4 548-23-122 013323 Spec.docx DOCX document
Attachment 13 Location Plan.pdf PDF
Attachment 9 Combatting COVID 19.pdf PDF
Attachment 6 Experience Information Sheet.pdf PDF
Attachment 2 548-23-122 014219 Spec.docx DOCX document
Attachment 12 Design Manual Index.pdf PDF
Attachment 10 548-23-122 001121 SpecSOW.docx DOCX document
Attachment 8 WD FL20220220 09.30.2022.pdf PDF
S02 36C24823R0051 for SAM.docx DOCX document
Attachment 7 VA Info and Info System Security.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer

Project Price Breakdown

Project Number:

Edward L Roy: VA assigned project #

Date:
Project Title
Edward L Roy: VA assigned Project TitleProject Location
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements$ - 0$ - 0$ - 0
Division 2Existing Conditions- 0- 0- 0
Division 3Concrete- 0- 0- 0
Division 4Masonry- 0- 0- 0
Division 5Metals- 0- 0- 0
Division 6Wood and Plastic- 0- 0- 0
Division 7Thermal & Moisture Protect- 0- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %0.00%
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %0.00%

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0

File details come from the government source that posted it. Updated .