Attachment 6 Experience Information Sheet.pdf
PDF 161 KB Posted
- Attached to
- Y1DA--FY23: NRM-Tier 1 (PROJ: 548-23-122) D/B Install Additional Pump on OR Chilled Water Loop
- Solicitation number
- 36C24823R0051_1
About this file
This document contains an experience information sheet template and details of a related federal contract opportunity for installation services. The opportunity is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses to install an additional pump on an existing OR chilled water loop at a Veterans Affairs medical center within 120 days of award. The contractor will match existing pumps and valves, install a new parallel pump and Eaton VFD, rewire existing power feeds, and integrate new DDC controls and devices into the BAS system. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8 is the awarding agency.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXPERIENCE INFORMATION SHEET
36C24822R0002
PROJECT NO. [ ] Page 1 Must have a total of four (4) projects, more than 4 will not be evaluated; less than 4 may result in a lower rating.
a. Contractor Information of Awarded Contract (Firm Name, Address, DUNS Number, Phone number, POC Name, POC e‐mail, Company e‐mail)
b. Contract and/or Task Order Number and Award Date (mm/dd/yyyy)
c. Project Title/Name and Location
d. Work Performed as: Prime Contractor or Subcontractor
e. Percent (%) of project work performed by your company.
f. If you work as subcontractor, who was the prime?
(Firm Name, Address, DUNS Number and Cage Code, Phone number, POC Name, POC email, Company email)
g. Government Agency/Company which awarded contract to offeror, and Contact Information, such Contracting Officer/Procurement Official/Point of Contract (Name, Title, Email, Phone Number).
PROJECT NO. [ ] Page 2
h. Description of project’s scope of work and the offeror’s specific roles and responsibilities in the project:
Describe work performed in sufficient detail to permit evaluation of project relevancy to this procurement. Detail how work performed is relevant to the effort required by the solicitation? Use continuation page for additional information, if necessary.
PROJECT NO. [ ] Page 3
i. Describe any difficulties and/or obstacles encountered during project performance; steps taken toward resolution
j. Describe differing site condition(s) occurrence(s) and how each were resolved.
k. Performance Period, including contract start date (mm/dd/yyyy), and original completion date, if not completed, projected date (mm/dd/yyyy)
Contract start date (mm/dd/yyyy): Original completion date (mm/dd/yyyy):
l. Actual Completion Date (mm/dd/yyyy), and if not completed, why?
Actual Completion Date:
m. Attesting the example project is 100% complete? YES [ ]
n. The Offerors shall indicate if any of the example project provided was terminated and the type and reasons for the termination.
o. Original Contract Price (Award Amount), Final Contract Price (to include all modifications, if applicable), Explain Differences.
Original Contract Price: Final Contract Price:
Explain Differences:
PROJECT NO. [ ] Page 4
CONTINUATION PAGE:
File details come from the government source that posted it. Updated .