WA NP MORA 11(1), Fryingpan Creek Bridge
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 69056726B000001
- Agency
-
Federal Highway Administration
Department of Transportation
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Washington, United States
- Points of contact
-
- Contracts G. Office wfl.contracts@dot.gov (360) 619-7520
Notice details come from SAM.gov. Updated .
About this opportunity
The Federal Highway Administration is soliciting sealed bids for construction of the Fryingpan Creek Bridge (WA NP MORA 11(1)) in Mount Rainier National Park, Pierce County, Washington, with bids due July 1, 2026, and bid opening completed on that date. This is an Invitation for Bids (IFB 69056726B000001) for a firm fixed-price contract with economic price adjustment for steel, and no set-aside applies.
Place of performance is Mount Rainier National Park, Washington. The project involves replacement of an existing bridge with a new permanent structure, demolition of the existing bridge, mechanically stabilized earth (MSE) walls with hot-dipped galvanized steel mesh reinforcement (geosynthetics not accepted), drilled shaft foundations (48-inch diameter concrete with permanent casing), temporary work bridges, and stream diversion systems. Construction follows a three-season sequence: Season 1 (abutments and riprap), Season 2 (girder erection and deck), and Season 3 (existing bridge demolition and final riprap). The NAICS code is 237310, Highway, Street, and Bridge Construction; PSC code is Y1LB, Construction of Highways, Roads, Streets, Bridges, and Railways.
Critical constraints include an in-water work window of June 15 to August 15 annually; maximum 16 temporary piles below ordinary high water mark; road closures limited to 6 hours per calendar day during daytime only with no night work or consecutive closures permitted; raw rock harvesting from Stevens Canyon Road avalanche chutes only (above roadway) before Memorial Day, with priority given to salvaging stones from the existing bridge structure first; and compliance with a 4.92-acre wetland impact cap and 0.5-acre temporary mat allowance. Temporary work bridges are permitted for years 2027, 2028, and 2029. Stream diversions must be removed at the end of each construction season. Vehicles exceeding 80,000 pounds gross vehicle weight may be approved through oversized/overweight permit processes.
Bids were received July 1, 2026, with seven responsive contractors. Stellar J Corporation submitted the lowest bid at $16,912,211.00 for Schedule A and $17,445,161.00 for Schedule B. Engineer's Estimate was $20,525,390.00 for Schedule A and $21,292,140.00 for Schedule B. Award will be made to the responsible bidder whose conforming bid is most advantageous to the Government considering only price and price-related factors. A HUBZone price evaluation preference of 10% per FAR 52.219-4 applies. The successful contractor must commence work within 10 calendar days of notice to proceed (anticipated August 25, 2026) and complete all work by September 28, 2029. Prevailing wage requirements apply under the Davis-Bacon Act. Large business bidders must submit subcontracting plans with small business utilization goals. Performance and payment bonds equal to 100 percent of contract price are required. Five amendments were issued addressing bid schedule extensions, prevailing wage updates, plan sheet revisions, and specification clarifications through June 26, 2026.
Notice text
20 versions
Update #20 · Latest ·
Project: WA NP MORA 11(1), Fryingpan Creek Bridge
See attachments for full requirements.
QA_05-26-2026 Posted 05/26/2026
Amendment A001 Posted 05/27/2026
QA_05-29-2026 Posted 05/29/2026
Amendment A002 Posted 06/01/2026
QA_06-03-2026 Posted 06/03/2026
QA_06-08-2026 Posted 06/08/2026
Amendment A003 Posted 06/09/2026
Physical Data updated and uploaded 06/09/2026
QA_06-11-2026 Posted 06/11/2026
QA2_06-11-2026 Posted 06/11/2026
QA_06-12-2026 Posted 06/12/2026
QA_06-16-2026 Posted 06/16/2026
QA_06-18-2026 Posted 06/18/2026
QA_06-22-2026 Posted 06/22/2026
Amendment A004 Posted 06/22/2026
QA_06-24-2026 Posted 06/25/2026
Bid Opening Link Updated 06/25/2026
QA_06-25-2026 Posted 06/25/2026
Amendment A005 Posted 06/26/2026
Bid Summary Posted 07/01/2026
Bid Tabulation Posted 07/02/2026
Updated Bid Tabulation Posted 07/14/2026
Update #19 ·
Project: WA NP MORA 11(1), Fryingpan Creek Bridge
See attachments for full requirements.
QA_05-26-2026 Posted 05/26/2026
Amendment A001 Posted 05/27/2026
QA_05-29-2026 Posted 05/29/2026
Amendment A002 Posted 06/01/2026
QA_06-03-2026 Posted 06/03/2026
QA_06-08-2026 Posted 06/08/2026
Amendment A003 Posted 06/09/2026
Physical Data updated and uploaded 06/09/2026
QA_06-11-2026 Posted 06/11/2026
QA2_06-11-2026 Posted 06/11/2026
QA_06-12-2026 Posted 06/12/2026
QA_06-16-2026 Posted 06/16/2026
QA_06-18-2026 Posted 06/18/2026
QA_06-22-2026 Posted 06/22/2026
Amendment A004 Posted 06/22/2026
QA_06-24-2026 Posted 06/25/2026
Bid Opening Link Updated 06/25/2026
QA_06-25-2026 Posted 06/25/2026
Amendment A005 Posted 06/26/2026
Bid Summary Posted 07/01/2026
Bid Tabulation Posted 07/02/2026
Update #18 ·
Project: WA NP MORA 11(1), Fryingpan Creek Bridge
See attachments for full requirements.
QA_05-26-2026 Posted 05/26/2026
Amendment A001 Posted 05/27/2026
QA_05-29-2026 Posted 05/29/2026
Amendment A002 Posted 06/01/2026
QA_06-03-2026 Posted 06/03/2026
QA_06-08-2026 Posted 06/08/2026
Amendment A003 Posted 06/09/2026
Physical Data updated and uploaded 06/09/2026
QA_06-11-2026 Posted 06/11/2026
QA2_06-11-2026 Posted 06/11/2026
QA_06-12-2026 Posted 06/12/2026
QA_06-16-2026 Posted 06/16/2026
QA_06-18-2026 Posted 06/18/2026
QA_06-22-2026 Posted 06/22/2026
Amendment A004 Posted 06/22/2026
QA_06-24-2026 Posted 06/25/2026
Bid Opening Link Updated 06/25/2026
QA_06-25-2026 Posted 06/25/2026
Amendment A005 Posted 06/26/2026
Bid Summary Posted 07/01/2026
Update #17 ·
Project: WA NP MORA 11(1), Fryingpan Creek Bridge
See attachments for full requirements.
QA_05-26-2026 Posted 05/26/2026
Amendment A001 Posted 05/27/2026
QA_05-29-2026 Posted 05/29/2026
Amendment A002 Posted 06/01/2026
QA_06-03-2026 Posted 06/03/2026
QA_06-08-2026 Posted 06/08/2026
Amendment A003 Posted 06/09/2026
Physical Data updated and uploaded 06/09/2026
QA_06-11-2026 Posted 06/11/2026
QA2_06-11-2026 Posted 06/11/2026
QA_06-12-2026 Posted 06/12/2026
QA_06-16-2026 Posted 06/16/2026
QA_06-18-2026 Posted 06/18/2026
QA_06-22-2026 Posted 06/22/2026
Amendment A004 Posted 06/22/2026
QA_06-24-2026 Posted 06/25/2026
Bid Opening Link Updated 06/25/2026
QA_06-25-2026 Posted 06/25/2026
Amendment A005 Posted 06/26/2026
Update #16 ·
Project: WA NP MORA 11(1), Fryingpan Creek Bridge
See attachments for full requirements.
QA_05-26-2026 Posted 05/26/2026
Amendment A001 Posted 05/27/2026
QA_05-29-2026 Posted 05/29/2026
Amendment A002 Posted 06/01/2026
QA_06-03-2026 Posted 06/03/2026
QA_06-08-2026 Posted 06/08/2026
Amendment A003 Posted 06/09/2026
Physical Data updated and uploaded 06/09/2026
QA_06-11-2026 Posted 06/11/2026
QA2_06-11-2026 Posted 06/11/2026
QA_06-12-2026 Posted 06/12/2026
QA_06-16-2026 Posted 06/16/2026
QA_06-18-2026 Posted 06/18/2026
QA_06-22-2026 Posted 06/22/2026
Amendment A004 Posted 06/22/2026
QA_06-24-2026 Posted 06/25/2026
Bid Opening Link Updated 06/25/2026
QA_06-25-2026 Posted 06/25/2026
Update #15 ·
Project: WA NP MORA 11(1), Fryingpan Creek Bridge
See attachments for full requirements.
QA_05-26-2026 Posted 05/26/2026
Amendment A001 Posted 05/27/2026
QA_05-29-2026 Posted 05/29/2026
Amendment A002 Posted 06/01/2026
QA_06-03-2026 Posted 06/03/2026
QA_06-08-2026 Posted 06/08/2026
Amendment A003 Posted 06/09/2026
Physical Data updated and uploaded 06/09/2026
QA_06-11-2026 Posted 06/11/2026
QA2_06-11-2026 Posted 06/11/2026
QA_06-12-2026 Posted 06/12/2026
QA_06-16-2026 Posted 06/16/2026
QA_06-18-2026 Posted 06/18/2026
QA_06-22-2026 Posted 06/22/2026
Amendment A004 Posted 06/22/2026
QA_06-24-2026 Posted 06/25/2026
Bid Opening Link Updated 06/25/2026
Update #14 ·
Project: WA NP MORA 11(1), Fryingpan Creek Bridge
See attachments for full requirements.
QA_05-26-2026 Posted 05/26/2026
Amendment A001 Posted 05/27/2026
QA_05-29-2026 Posted 05/29/2026
Amendment A002 Posted 06/01/2026
QA_06-03-2026 Posted 06/03/2026
QA_06-08-2026 Posted 06/08/2026
Amendment A003 Posted 06/09/2026
Physical Data updated and uploaded 06/09/2026
QA_06-11-2026 Posted 06/11/2026
QA2_06-11-2026 Posted 06/11/2026
QA_06-12-2026 Posted 06/12/2026
QA_06-16-2026 Posted 06/16/2026
QA_06-18-2026 Posted 06/18/2026
QA_06-22-2026 Posted 06/22/2026
Amendment A004 Posted 06/22/2026
Update #13 ·
Project: WA NP MORA 11(1), Fryingpan Creek Bridge
See attachments for full requirements.
QA_05-26-2026 Posted 05/26/2026
Amendment A001 Posted 05/27/2026
QA_05-29-2026 Posted 05/29/2026
Amendment A002 Posted 06/01/2026
QA_06-03-2026 Posted 06/03/2026
QA_06-08-2026 Posted 06/08/2026
Amendment A003 Posted 06/09/2026
Physical Data updated and uploaded 06/09/2026
QA_06-11-2026 Posted 06/11/2026
QA2_06-11-2026 Posted 06/11/2026
QA_06-12-2026 Posted 06/12/2026
QA_06-16-2026 Posted 06/16/2026
QA_06-18-2026 Posted 06/18/2026
Update #12 ·
Project: WA NP MORA 11(1), Fryingpan Creek Bridge
See attachments for full requirements.
QA_05-26-2026 Posted 05/26/2026
Amendment A001 Posted 05/27/2026
QA_05-29-2026 Posted 05/29/2026
Amendment A002 Posted 06/01/2026
QA_06-03-2026 Posted 06/03/2026
QA_06-08-2026 Posted 06/08/2026
Amendment A003 Posted 06/09/2026
Physical Data updated and uploaded 06/09/2026
QA_06-11-2026 Posted 06/11/2026
QA2_06-11-2026 Posted 06/11/2026
QA_06-12-2026 Posted 06/12/2026
QA_06-16-2026 Posted 06/16/2026
Update #11 ·
Project: WA NP MORA 11(1), Fryingpan Creek Bridge
See attachments for full requirements.
QA_05-26-2026 Posted 05/26/2026
Amendment A001 Posted 05/27/2026
QA_05-29-2026 Posted 05/29/2026
Amendment A002 Posted 06/01/2026
QA_06-03-2026 Posted 06/03/2026
QA_06-08-2026 Posted 06/08/2026
Amendment A003 Posted 06/09/2026
Physical Data updated and uploaded 06/09/2026
QA_06-11-2026 Posted 06/11/2026
QA2_06-11-2026 Posted 06/11/2026
QA_06-12-2026 Posted 06/12/2026
Update #10 ·
Project: WA NP MORA 11(1), Fryingpan Creek Bridge
See attachments for full requirements.
QA_05-26-2026 Posted 05/26/2026
Amendment A001 Posted 05/27/2026
QA_05-29-2026 Posted 05/29/2026
Amendment A002 Posted 06/01/2026
QA_06-03-2026 Posted 06/03/2026
QA_06-08-2026 Posted 06/08/2026
Amendment A003 Posted 06/09/2026
Physical Data updated and uploaded 06/09/2026
QA_06-11-2026 Posted 06/11/2026
QA2_06-11-2026 Posted 06/11/2026
Update #9 ·
Project: WA NP MORA 11(1), Fryingpan Creek Bridge
See attachments for full requirements.
QA_05-26-2026 Posted 05/26/2026
Amendment A001 Posted 05/27/2026
QA_05-29-2026 Posted 05/29/2026
Amendment A002 Posted 06/01/2026
QA_06-03-2026 Posted 06/03/2026
QA_06-08-2026 Posted 06/08/2026
Amendment A003 Posted 06/09/2026
Physical Data updated and uploaded 06/09/2026
QA_06-11-2026 Posted 06/11/2026
Update #8 ·
Project: WA NP MORA 11(1), Fryingpan Creek Bridge
See attachments for full requirements.
QA_05-26-2026 Posted 05/26/2026
Amendment A001 Posted 05/27/2026
QA_05-29-2026 Posted 05/29/2026
Amendment A002 Posted 06/01/2026
QA_06-03-2026 Posted 06/03/2026
QA_06-08-2026 Posted 06/08/2026
Amendment A003 Posted 06/09/2026
Physical Data updated and uploaded 06/09/2026
Update #7 ·
Project: WA NP MORA 11(1), Fryingpan Creek Bridge
See attachments for full requirements.
QA_05-26-2026 Posted 05/26/2026
Amendment A001 Posted 05/27/2026
QA_05-29-2026 Posted 05/29/2026
Amendment A002 Posted 06/01/2026
QA_06-03-2026 Posted 06/03/2026
QA_06-08-2026 Posted 06/08/2026
Update #6 ·
Project: WA NP MORA 11(1), Fryingpan Creek Bridge
See attachments for full requirements.
QA_05-26-2026 Posted 05/26/2026
Amendment A001 Posted 05/27/2026
QA_05-29-2026 Posted 05/29/2026
Amendment A002 Posted 06/01/2026
QA_06-03-2026 Posted 06/03/2026
Update #5 ·
Project: WA NP MORA 11(1), Fryingpan Creek Bridge
See attachments for full requirements.
QA_05-26-2026 Posted 05/26/2026
Amendment A001 Posted 05/27/2026
QA_05-29-2026 Posted 05/29/2026
Amendment A002 Posted 06/01/2026
Update #4 ·
Project: WA NP MORA 11(1), Fryingpan Creek Bridge
See attachments for full requirements.
QA_05-26-2026 Posted 05/26/2026
Amendment A001 Posted 05/27/2026
QA_05-29-2026 Posted 05/29/2026
Update #3 ·
Project: WA NP MORA 11(1), Fryingpan Creek Bridge
See attachments for full requirements.
QA_05-26-2026 Posted 05/26/2026
Amendment A001 Posted 05/27/2026
Update #2 ·
Project: WA NP MORA 11(1), Fryingpan Creek Bridge
See attachments for full requirements.
QA_05-26-2026 Posted 05/26/2026
Update #1 ·
Project: WA NP MORA 11(1), Fryingpan Creek Bridge
See attachments for full requirements.
Files
| File | Type | Posted |
|---|---|---|
| BidTab_WA NP MORA 11(1) Fryingpan Creek Bridge_Update.pdf | ||
| BidTab_WA NP MORA 11(1) Fryingpan Creek Bridge.pdf | ||
| BidSum_WA NP MORA 11.pdf | ||
| Amendment A005.pdf | ||
| QA_06-25-2026.pdf | ||
| QA_06-24-2026.pdf | ||
| QA_06-22-2026.pdf | ||
| Amendment A004.pdf | ||
| QA_06-18-2026.pdf | ||
| QA_06-16-2026.pdf | ||
| QA_06-12-2026.pdf | ||
| QA2_06-11-2026.pdf | ||
| QA_06-11-2026.pdf | ||
| Amendment A003.pdf | ||
| Physical Data WA NP MORA 11(1) A003.zip | ZIP file | |
| QA_06-08-2026.pdf | ||
| QA_06-03-2026.pdf | ||
| Amendment A002.pdf | ||
| QA_05-29-2026.pdf | ||
| Amendment A001.pdf | ||
| QA_05-26-2026.pdf | ||
| Physical Data WA NP MORA 11(1).zip | ZIP file | |
| mora11-1_plans.pdf | ||
| IFB 69056726B000001.pdf |
Show all 24
Notice history
| Notice | Type | Posted |
|---|---|---|
| WA NP MORA 11(1), Fryingpan Creek Bridge | Award Notice | |
| This notice | Solicitation | |
| WA NP MORA 11(1), Fryingpan Creek Bridge | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| WA ERFO NPS OLYM 2022-1(3), OLYMPIC NPS ERFO REPAIRS 2022 Road 107 MP 0.3 TO 0.5 & MP 0.8 | Federal Highway Administration | No set-aside | |
| WA NP OLYM 12(8), Hurricane Ridge Rockfall Mitigation MP 9.4 | Federal Highway Administration | Total Small Business | |
| UT NP ARCH 100(2) Bridges on Delicate Arch Road | Federal Highway Administration | No set-aside | |
| Acadia National Park | Federal Highway Administration | Total Small Business | |
| YELL 338223 - Bridge Preservation | — | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity