This is an Amendment of Solicitation/Modification of Contract for federal highway construction work, specifically Amendment A001 dated May 27, 2026, issued by the Department of Transportation Federal Highway Administration for the WA NP MORA 11(1) Fryingpan Creek Bridge project in Washington State (Solicitation No. 69056726B000001, originally dated May 12, 2026). The amendment updates the Davis-Bacon General Wage Decision Number WA20260001 to reflect current prevailing wage rates effective May 18, 2026, covering all 39 Washington State counties for highway construction work. The revised wage decision includes detailed classification rates for multiple trades including carpenters (various specialties including divers and bridge carpenters ranging from $44.21 to $110.48 per hour plus fringes), electricians, equipment operators, ironworkers, laborers, painters, and truck drivers, with rates varying by county and job classification. Additionally, the amendment modifies Section 620.03 (General) of the Special Contract Requirements to add language requiring contractors to conserve and use stones from existing project site structures, source additional stones from the Stevens Canyon Road avalanche chutes as needed, conduct pre-work meetings per Subsection 153.04 coordinated with Section 613, construct stone masonry matching the character of existing historic masonry in terms of finish and color, and construct underdrain systems according to Section 605. Contractor acknowledgment of this amendment is required prior to offer submission.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidTab_WA NP MORA 11(1) Fryingpan Creek Bridge_Update.pdf | ||
| BidTab_WA NP MORA 11(1) Fryingpan Creek Bridge.pdf | ||
| BidSum_WA NP MORA 11.pdf | ||
| Amendment A005.pdf | ||
| QA_06-25-2026.pdf | ||
| QA_06-24-2026.pdf | ||
| QA_06-22-2026.pdf | ||
| Amendment A004.pdf | ||
| QA_06-18-2026.pdf | ||
| QA_06-16-2026.pdf | ||
| QA_06-12-2026.pdf | ||
| QA2_06-11-2026.pdf | ||
| QA_06-11-2026.pdf | ||
| Amendment A003.pdf | ||
| Physical Data WA NP MORA 11(1) A003.zip | ZIP file | |
| QA_06-08-2026.pdf | ||
| QA_06-03-2026.pdf | ||
| Amendment A002.pdf | ||
| QA_05-29-2026.pdf | ||
| QA_05-26-2026.pdf | ||
| mora11-1_plans.pdf | ||
| IFB 69056726B000001.pdf | ||
| Physical Data WA NP MORA 11(1).zip | ZIP file |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A001 05/27/2026 N/A See Blk 14
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X
69056726B000001
9B. DATED (SEE ITEM 11)
05/12/2026
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A
N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
(__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D OTHER (Specify type of modification and authority)
N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
WA NP MORA 11(1), Fryingpan Creek Bridge
See page 2
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment No. A001, dated 05/27/2026 WA NP MORA 11(1), Solicitation No. 69056726B000001 Fryingpan Creek Bridge
REVISIONS ARE AS FOLLOWS:
MINIMUM WAGE SCHEDULE
Page D-1 through D-56. Updates Davis-Bacon General Wage Decision Number
WA20260001 to current effective date of 05/18/2026.
SPECIAL CONTRACT REQUIREMENTS
Page F-64, Subsection 620.03, General. Adds languge.
ENCLOSURES
Pages:
D-1 through D-66
F-64
D - 1
General Wage Decision Revised by Amendment A001
Project: WA NP MORA 11(1), Fryingpan Creek Bridge
General Wage Decision
Revised by Amendment A001
General Decision Number: WA20260001 05/18/2026
State: Washington
Construction Types: Highway
Counties: Washington Counties of Adams, Asotin, Benton, Chelan, Clallam, Clark, Columbia, Cowlitz, Douglas, Ferry, Franklin, Garfield, Grant, Grays Harbor, Island, Jefferson, King, Kitsap, Kittitas, Klickitat, Lewis, Lincoln, Mason, Okanogan, Pacific, Pend Oreille, Pierce, San Juan, Skagit, Skamania, Snohomish, Spokane, Stevens, Thurston, Wahkiakum, Walla Walla, Whatcom, Whitman and Yakima
Excludes D.O.E. Hanford Site in Benton and Franklin Counties
Modification Number Publication Date
1 01/23/2026
2 05/18/2026
CARP0059-021 06/01/2025
Rates Fringes
CARPENTER: PILEDRIVER: INCLUDES DRIVING, PULLING,
CUTTING, PLACING COLLARS, SETTING, WELDING, OR
CREOSOTE TREATED MATERIAL, ON ALL PILING (ADAMS,
ASOTIN, BENTON, CHELAN, COLUMBIA, DOUGLAS, FERRY,
FRANKLIN, GARFIELD, GRANT, KITTITAS, LINCOLN,
OKANOGAN, PEND OREILLE, SPOKANE, STEVENS, WALLA
WALLA, WHITMAN, AND YAKIMA COUNTIES) EMPLOYEES MAY
BE REQUIRED TO PERFORM ANY COMBINATION OF WORK
WITHIN THE DIVING TEAM/CREW, (EXCEPT FOR DIVE
SUPERVISOR) PROVIDED THEY ARE PAID AT THE HIGHEST
RATE OF PAY THAT THEY RECEIVED DURING THEIR SHIFT...$ 49.76 17.28
CARPENTER: DIVER TENDER, MANIFOLD OPERATOR,
ROV OPERATOR(ADAMS, ASOTIN, BENTON, CHELAN,
COLUMBIA, DOUGLAS, FERRY, FRANKLIN, GARFIELD,
GRANT, KITTITAS, LINCOLN, OKANOGAN, PEND OREILLE,
SPOKANE, STEVENS, WALLA WALLA, WHITMAN, AND YAKIMA
COUNTIES) EMPLOYEES MAY BE REQUIRED TO PERFORM ANY
COMBINATION OF WORK WITHIN THE DIVING TEAM/CREW,
(EXCEPT FOR DIVE SUPERVISOR) PROVIDED THEY ARE PAID
AT THE HIGHEST RATE OF PAY THAT THEY RECEIVED
DURING THEIR SHIFT..................................$ 54.24 17.28
CARPENTER: MANIFOLD OPERATOR-MIXED GAS(ADAMS,
ASOTIN, BENTON, CHELAN, COLUMBIA, DOUGLAS, FERRY,
FRANKLIN, GARFIELD, GRANT, KITTITAS, LINCOLN,
OKANOGAN, PEND OREILLE, SPOKANE, STEVENS, WALLA
WALLA, WHITMAN, AND YAKIMA COUNTIES) EMPLOYEES MAY
BE REQUIRED TO PERFORM ANY COMBINATION OF WORK
WITHIN THE DIVING TEAM/CREW, (EXCEPT FOR DIVE
SUPERVISOR) PROVIDED THEY ARE PAID AT THE HIGHEST
RATE OF PAY THAT THEY RECEIVED DURING THEIR SHIFT...$ 58.24 17.28
CARPENTER: CARPENTER (ADAMS, ASOTIN, BENTON,
D - 2
CHELAN, COLUMBIA, DOUGLAS, FERRY, FRANKLIN,
GARFIELD, GRANT, KITTITAS, LINCOLN, OKANOGAN, PEND
OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN,
AND YAKIMA COUNTIES) EMPLOYEES MAY BE REQUIRED TO
PERFORM ANY COMBINATION OF WORK WITHIN THE DIVING
TEAM/CREW, (EXCEPT FOR DIVE SUPERVISOR) PROVIDED
THEY ARE PAID AT THE HIGHEST RATE OF PAY THAT THEY
RECEIVED DURING THEIR SHIFT.........................$ 44.21 17.28
CARPENTER: ASSISTANT DIVER TENDER, ROV
TENDER/TECHNICIAN (ADAMS, ASOTIN, BENTON, CHELAN,
COLUMBIA, DOUGLAS, FERRY, FRANKLIN, GARFIELD,
GRANT, KITTITAS, LINCOLN, OKANOGAN, PEND OREILLE,
SPOKANE, STEVENS, WALLA WALLA, WHITMAN, AND YAKIMA
COUNTIES) EMPLOYEES MAY BE REQUIRED TO PERFORM ANY
COMBINATION OF WORK WITHIN THE DIVING TEAM/CREW,
(EXCEPT FOR DIVE SUPERVISOR) PROVIDED THEY ARE PAID
AT THE HIGHEST RATE OF PAY THAT THEY RECEIVED
DURING THEIR SHIFT..................................$ 50.76 17.28
CARPENTER:BRIDGE, DOCK, AND WHARF CARPENTER
(ADAMS, ASOTIN, BENTON, CHELAN, COLUMBIA, DOUGLAS,
FERRY, FRANKLIN, GARFIELD, GRANT, KITTITAS,
LINCOLN, OKANOGAN, PEND OREILLE, SPOKANE, STEVENS,
WALLA WALLA, WHITMAN, AND YAKIMA COUNTIES)
EMPLOYEES MAY BE REQUIRED TO PERFORM ANY
COMBINATION OF WORK WITHIN THE DIVING TEAM/CREW,
(EXCEPT FOR DIVE SUPERVISOR) PROVIDED THEY ARE PAID
AT THE HIGHEST RATE OF PAY THAT THEY RECEIVED
DURING THEIR SHIFT..................................$ 48.21 17.28
CARPENTER: DIVER STANDBY (ADAMS, ASOTIN, BENTON,
CHELAN, COLUMBIA, DOUGLAS, FERRY, FRANKLIN,
GARFIELD, GRANT, KITTITAS, LINCOLN, OKANOGAN, PEND
OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN,
AND YAKIMA COUNTIES) EMPLOYEES MAY BE REQUIRED TO
PERFORM ANY COMBINATION OF WORK WITHIN THE DIVING
TEAM/CREW, (EXCEPT FOR DIVE SUPERVISOR) PROVIDED
THEY ARE PAID AT THE HIGHEST RATE OF PAY THAT THEY
RECEIVED DURING THEIR SHIFT.........................$ 55.24 17.28
CARPENTER: DIVER WET (ADAMS, ASOTIN, BENTON,
CHELAN, COLUMBIA, DOUGLAS, FERRY, FRANKLIN,
GARFIELD, GRANT, KITTITAS, LINCOLN, OKANOGAN, PEND
OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN,
AND YAKIMA COUNTIES) EMPLOYEES MAY BE REQUIRED TO
PERFORM ANY COMBINATION OF WORK WITHIN THE DIVING
TEAM/CREW, (EXCEPT FOR DIVE SUPERVISOR) PROVIDED
THEY ARE PAID AT THE HIGHEST RATE OF PAY THAT THEY
RECEIVED DURING THEIR SHIFT.........................$ 110.48 17.28
CARP0096-002 06/01/2025
MILLWRIGHT: CLALLAM, GRAYS HARBOR, ISLAND,
JEFFERSON, KING, KITSAP, LEWIS,MASON, PACIFIC
(NORTH OF A STRAIGHT LINE MADE BY EXTENDING
THENORTH BOUNDARY LINE OF WAHKIAKUM COUNTY WEST TO
D - 3
THE PACIFICOCEAN), PIERCE, SAN JUAN, SKAGIT,
SNOHOMISH, THURSTON AND WHATCOM COUNTIES............$ 55.39 22.38
CARP0096-007 06/01/2025
MILLWRIGHT: SOUTHWEST WASHINGTON: CLARK, COWLITZ,
LEWIS (PILEDRIVER ONLY), PACIFIC (SOUTH OF A
STRAIGHT LINE MADE BY EXTENDING THE NORTH BOUNDARY
LINE OF WAHKIAKUM COUNTY WEST TO WILLAPA BAY TO THE
PACIFIC OCEAN), SKAMANIA, AND WAHKIAKUM COUNTIES....$ 59.35 22.38
CARP0196-004 06/01/2025
PILEDRIVER (CLARK, COWLITZ, *PACIFIC, SKAMANIA, AND
WAHKIAKUM COUNTIES *PORTION OF PACIFIC COUNTY
SOUTH OF A STRAIGHT LINE MADE BY EXTENDING THE
NORTH BOUNDARY LINE OF WAHKIAKUM COUNTY WEST TO
WILLAPA BAY TO THE PACIFIC OCEAN, AND THENCE NORTH
THROUGH THE NATURAL WATERWAY TO THE PACIFIC OCEAN
(THIS INCLUDES THE ENTIRE PENINSULA WEST OF WILLAPA
BAY))...............................................$ 56.06 16.81
CARP0196-006 06/01/2025
PILEDRIVER (CLALLAM, GRAYS HARBOR, ISLAND,
JEFFERSON, KING, KITSAP, LEWIS, MASON, *PACIFIC,
PIERCE, SAN JUAN, SKAGIT, SNOHOMISH, THURSTON AND
WHATCOM COUNTIES * PORTION OF PACIFIC COUNTY NORTH
OF A STRAIGHT LINE MADE BY EXTENDING THE NORTH
BOUNDARY LINE OF WAHKIAKUM COUNTY WEST TO THE
PACIFIC OCEAN COUNTIES OR PARTS OF COUNTIES EAST OF
THE 120TH MERIDIAN).................................$ 65.53 19.13
CARP0206-009 06/01/2025
CARPENTER: BRIDGE CARPENTER (KING AND KITSAP
COUNTIES)...........................................$ 65.58 19.13
CARPENTER: CARPENTER (KING AND KITSAP COUNTIES).....$ 63.98 19.13
CARPENTER: DIVER (KING AND KITSAP COUNTIES).........$ 125.44 19.13
CARPENTER: DIVER TENDER (KING AND KITSAP COUNTIES)..$ 71.77 19.13
CARP0360-006 09/15/2025
BRIDGE CARPENTER....................................$ 65.58 19.13
CARP0360-007 06/01/2025
CARPENTERS:: CARPENTERS (PACIFIC COUNTY PORTION OF
D - 4
PACIFIC COUNTY SOUTH OF A STRAIGHT LINE MADE BY
EXTENDING THE NORTH BOUNDARY LINE OF WAHKIAKUM
COUNTY WEST TO WILLAPA BAY TO THE PACIFIC OCEAN,
AND THENCE NORTH THROUGH THE NATURAL WATERWAY TO
THE PACIFIC OCEAN (THIS INCLUDES THE ENTIRE
PENINSULA WEST OF WILLAPA BAY)).....................$ 54.69 16.81
CARPENTERS:: DIVERS (PACIFIC COUNTY PORTION OF
PACIFIC COUNTY SOUTH OF A STRAIGHT LINE MADE BY
EXTENDING THE NORTH BOUNDARY LINE OF WAHKIAKUM
COUNTY WEST TO WILLAPA BAY TO THE PACIFIC OCEAN,
AND THENCE NORTH THROUGH THE NATURAL WATERWAY TO
THE PACIFIC OCEAN (THIS INCLUDES THE ENTIRE
PENINSULA WEST OF WILLAPA BAY)).....................$ 108.33 16.81
CARPENTERS:: DIVERS TENDERS (PACIFIC COUNTY
PORTION OF PACIFIC COUNTY SOUTH OF A STRAIGHT LINE
MADE BY EXTENDING THE NORTH BOUNDARY LINE OF
WAHKIAKUM COUNTY WEST TO WILLAPA BAY TO THE PACIFIC
OCEAN, AND THENCE NORTH THROUGH THE NATURAL
WATERWAY TO THE PACIFIC OCEAN (THIS INCLUDES THE
ENTIRE PENINSULA WEST OF WILLAPA BAY))..............$ 64.32 16.81
CARPENTERS:: DRYWALL (PACIFIC COUNTY PORTION OF
PACIFIC COUNTY SOUTH OF A STRAIGHT LINE MADE BY
EXTENDING THE NORTH BOUNDARY LINE OF WAHKIAKUM
COUNTY WEST TO WILLAPA BAY TO THE PACIFIC OCEAN,
AND THENCE NORTH THROUGH THE NATURAL WATERWAY TO
THE PACIFIC OCEAN (THIS INCLUDES THE ENTIRE
PENINSULA WEST OF WILLAPA BAY)).....................$ 54.59 16.81
CARP0360-013 06/01/2025
CARPENTER (GRAYS HARBOR, LEWIS, MASON, PIERCE, AND
THURSTON COUNTIES)..................................$ 63.98 19.13
CARPENTER: BRIDGE CARPENTER (GRAYS HARBOR, LEWIS,
MASON, PIERCE, AND THURSTON COUNTIES)...............$ 65.58 19.13
CARPENTER: DIVER (GRAYS HARBOR, LEWIS, MASON,
PIERCE, AND THURSTON COUNTIES) EMPLOYEES MAY BE
REQUIRED TO PERFORM ANY COMBINATION OF WORK WITHIN
THE DIVING TEAM/CREW, (EXCEPT FOR DIVE SUPERVISOR)
PROVIDED THEY ARE PAID AT THE HIGHEST RATE OF PAY
THAT THEY RECEIVED DURING THEIR SHIFT...............$ 125.44 19.13
CARPENTER: DIVER TENDER (GRAYS HARBOR, LEWIS,
MASON, PIERCE, AND THURSTON COUNTIES) EMPLOYEES
MAY BE REQUIRED TO PERFORM ANY COMBINATION OF WORK
WITHIN THE DIVING TEAM/CREW, (EXCEPT FOR DIVE
SUPERVISOR) PROVIDED THEY ARE PAID AT THE HIGHEST
RATE OF PAY THAT THEY RECEIVED DURING THEIR SHIFT...$ 71.77 19.13
CARP0425-006 09/15/2025
CARPENTER: BRIDGE CARPENTER (CLALLAM, ISLAND,
JEFFERSON, SAN JUAN, SKAGIT, SNOHOMISH, AND WHATCOM
COUNTIES)...........................................$ 65.58 19.13
D - 5
CARPENTER: DIVER TENDER (CLALLAM, ISLAND,
JEFFERSON, SAN JUAN, SKAGIT, SNOHOMISH, AND WHATCOM
COUNTIES) EMPLOYEES MAY BE REQUIRED TO PERFORM ANY
COMBINATION OF WORK WITHIN THE DIVING TEAM/CREW,
(EXCEPT FOR DIVE SUPERVISOR) PROVIDED THEY ARE PAID
AT THE HIGHEST RATE OF PAY THAT THEY RECEIVED
DURING THEIR SHIFT..................................$ 71.77 19.13
CARP0503-021 06/01/2025
CARPENTERS (CLARK, COWLITZ, SKAMANIA, AND WAHKIAKUM
COUNTIES)...........................................$ 54.69 16.81
CARPENTERS: DIVERS (CLARK, COWLITZ, SKAMANIA, AND
WAHKIAKUM COUNTIES).................................$ 108.33 16.81
CARPENTERS: DIVERS TENDERS (CLARK, COWLITZ,
SKAMANIA, AND WAHKIAKUM COUNTIES) EMPLOYEES MAY BE
REQUIRED TO PERFORM ANY COMBINATION OF WORK WITHIN
THE DIVING TEAM/CREW, (EXCEPT FOR DIVE SUPERVISOR)
PROVIDED THEY ARE PAID AT THE HIGHEST RATE OF PAY
THAT THEY RECEIVED DURING THEIR SHIFT...............$ 64.32 16.81
CARPENTERS: DRYWALL (CLARK, COWLITZ, SKAMANIA, AND
WAHKIAKUM COUNTIES).................................$ 54.59 16.81
CARP1607-010 06/01/2025
CEMENT MASON: CEMENT MASONS ON SUSPENDED, SWINGING
AND/OR HANGING SCAFFOLD (CLARK, KLICKITAT AND
SKAMANIA COUNTIES ZONE 1:) ZONE DIFFERENTIAL
(ADD TO ZONE 1 RATES): ZONE 2 - $0.65 ZONE 3 -
1.15 ZONE 4 - 1.70 ZONE 5 - 3.00 BASE
POINTS: BEND, CORVALLIS, EUGENE, MEDFORD,
PORTLAND, SALEM, THE DALLES, VANCOUVER ZONE 1:
PROJECTS WITHIN 30 MILES OF THE RESPECTIVE CITY
HALL ZONE 2: MORE THAN 30 MILES BUT LESS THAN 40
MILES FROM THE RESPECTIVE CITY HALL. ZONE 3:
MORE THAN 40 MILES BUT LESS THAN 50 MILES FROM THE
RESPECTIVE CITY HALL. ZONE 4: MORE THAN 50 MILES
BUT LESS THAN 80 MILES FROM THE RESPECTIVE CITY
HALL. ZONE 5: MORE THAN 80 MILES FROM THE
RESPECTIVE CITY HALL................................$ 61.62 20.43
ELEC0046-001 08/04/2025
CABLE SPLICER (CALLAM, JEFFERSON, KING AND KITSAP
COUNTIES)...........................................$ 83.56 33.71
ELECTRICIAN (CALLAM, JEFFERSON, KING AND KITSAP
COUNTIES)...........................................$ 75.96 33.48
ELEC0048-003 01/01/2020
CABLE SPLICER (CLARK, KLICKITAT AND SKAMANIA
D - 6
COUNTIES). HOURLY ZONE PAY: HOURLY ZONE PAY
SHALL BE PAID ON JOBS LOCATED OUTSIDE OF THE FREE
ZONE COMPUTED FROM THE CITY CENTER OF THE FOLLOWING
LISTED CITIES: PORTLAND, THE DALLES, HOOD RIVER,
TILLAMOOK, SEASIDE AND ASTORIA
ZONE PAY: ZONE 1: 31-50 MILES $1.50/HOUR ZONE
2: 51-70 MILES $3.50/HOUR ZONE 3: 71-90 MILES
$5.50/HOUR ZONE 4: BEYOND 90 MILES $9.00/HOUR
*THESE ARE NOT MILES DRIVEN. ZONES ARE BASED ON
DELORRNE STREET ATLAS USA 2006 PLUS.................$ 44.22 21.50
ELECTRICIAN (CLARK, KLICKITAT AND SKAMANIA
COUNTIES)...........................................$ 63.50 29.73
ELEC0048-003 01/01/2025
CABLE SPLICER (CLARK, KLICKITAT AND SKAMANIA
COUNTIES). HOURLY ZONE PAY: HOURLY ZONE PAY
SHALL BE PAID ON JOBS LOCATED OUTSIDE OF THE FREE
ZONE COMPUTED FROM THE CITY CENTER OF THE FOLLOWING
LISTED CITIES: PORTLAND, THE DALLES, HOOD RIVER,
TILLAMOOK, SEASIDE AND ASTORIA
ZONE PAY: ZONE 1: 31-50 MILES $1.50/HOUR ZONE
2: 51-70 MILES $3.50/HOUR ZONE 3: 71-90 MILES
$5.50/HOUR ZONE 4: BEYOND 90 MILES $9.00/HOUR
*THESE ARE NOT MILES DRIVEN. ZONES ARE BASED ON
DELORRNE STREET ATLAS USA 2006 PLUS.................$ 44.22 21.50
ELECTRICIAN (CLARK, KLICKITAT AND SKAMANIA
COUNTIES)...........................................$ 63.50 29.73
ELEC0048-029 01/01/2020
CABLE SPLICER (COWLITZ AND WAHKIAKUM COUNTY)........$ 44.22 21.50
ELECTRICIAN (COWLITZ AND WAHKIAKUM COUNTY)..........$ 63.50 29.73
ELEC0048-029 01/01/2025
CABLE SPLICER (COWLITZ AND WAHKIAKUM COUNTY)........$ 44.22 21.50
ELECTRICIAN (COWLITZ AND WAHKIAKUM COUNTY)..........$ 63.50 29.73
ELEC0073-001 07/01/2015
CABLE SPLICER (ADAMS, FERRY, LINCOLN, PEND OREILLE,
SPOKANE, STEVENS, WHITMAN COUNTIES).................$ 34.10 16.68
ELECTRICIAN (ADAMS, FERRY, LINCOLN, PEND OREILLE,
SPOKANE, STEVENS, WHITMAN COUNTIES).................$ 49.55 19.09
ELEC0073-001 07/01/2025
CABLE SPLICER (ADAMS, FERRY, LINCOLN, PEND OREILLE,
D - 7
SPOKANE, STEVENS, WHITMAN COUNTIES).................$ 34.10 16.68
ELECTRICIAN (ADAMS, FERRY, LINCOLN, PEND OREILLE,
SPOKANE, STEVENS, WHITMAN COUNTIES).................$ 49.55 19.09
ELEC0076-002 08/31/2025
CABLE SPLICER (GRAYS HARBOR, LEWIS, MASON, PACIFIC,
PIERCE, AND THURSTON COUNTIES)......................$ 71.65 26.76
ELECTRICIAN (GRAYS HARBOR, LEWIS, MASON, PACIFIC,
PIERCE, AND THURSTON COUNTIES)......................$ 65.14 26.56
ELEC0112-005 06/01/2025
CABLE SPLICER (ASOTIN, BENTON, COLUMBIA, FRANKLIN,
GARFIELD, KITTITAS, WALLA WALLA, YAKIMA COUNTIES)...$ 63.00 27.87
ELECTRICIAN (ASOTIN, BENTON, COLUMBIA, FRANKLIN,
GARFIELD, KITTITAS, WALLA WALLA, YAKIMA COUNTIES)...$ 60.00 27.78
ELEC0191-003 06/01/2014
CABLE SPLICER (ISLAND, SAN JUAN, SNOHOMISH, SKAGIT
AND WHATCOM COUNTIES)...............................$ 44.23 17.73
ELECTRICIAN (ISLAND, SAN JUAN, SNOHOMISH, SKAGIT
AND WHATCOM COUNTIES)...............................$ 53.20 27.51
ELEC0191-003 06/01/2022
CABLE SPLICER (ISLAND, SAN JUAN, SNOHOMISH, SKAGIT
AND WHATCOM COUNTIES)...............................$ 44.23 17.73
ELECTRICIAN (ISLAND, SAN JUAN, SNOHOMISH, SKAGIT
AND WHATCOM COUNTIES)...............................$ 53.20 27.51
ELEC0191-004 06/01/2014
CABLE SPLICER (CHELAN, DOUGLAS, GRANT AND OKANOGAN
COUNTIES)...........................................$ 40.82 17.63
ELECTRICIAN (CHELAN, DOUGLAS, GRANT AND OKANOGAN
COUNTIES)...........................................$ 42.45 21.34
ELEC0191-004 06/01/2018
CABLE SPLICER (CHELAN, DOUGLAS, GRANT AND OKANOGAN
COUNTIES)...........................................$ 40.82 17.63
ELECTRICIAN (CHELAN, DOUGLAS, GRANT AND OKANOGAN
COUNTIES)...........................................$ 42.45 21.34
ENGI0302-092 06/01/2025
D - 8
Rates Fringes
POWER EQUIPMENT OPERATOR: GROUP 1 ASPHALT PLANT
OPERATORS; CABLEWAYS; CONCRETE PUMP: TRUCK MOUNT
WITH BOOM ATTACHMENT OVER 42M; CRANES: 45 TONS
THROUGH 99 TONS, UNDER 150’ OF BOOM (INCLUDING JIB
WITH ATTACHMENTS); OVERHEAD, BRIDGE TYPE: 45 TONS
THROUGH 99 TONS; DERRICKS: ON BUILDING WORK; HARD
TAIL END DUMP: ARTICULATING OFF-ROAD EQUIPMENT 45
YARDS & OVER; LOADER: OVERHEAD 6 YARDS BUT NOT
INCLUDING 8 YARDS; MOTOR PATROL GRADERS; MUCKING
MACHINE, MOLE, TUNNEL DRILL, BORING, ROAD HEADER
AND/OR SHIELD; QUAD 9, HD 41, D10 AND OVER; REMOTE
CONTROL OPERATOR ON RUBBER TIRED EARTH MOVING
EQUIPMENT; ROLLAGON; SCRAPERS, SELF-PROPELLED: 45
YARDS AND OVER; SPREADER: TOPSIDER & SCREEDMAN;
SHOVEL, EXCAVATOR, BACKHOE: OVER 30 METRIC TONS AND
UP TO 50 METRIC TONS; SLIPFORM PAVERS;
TRANSPORTERS: ALL TRACK OR TRUCK TYPE; WELDER.
KING AND SNOHOMISH COUNTIES.........................$ 61.93 27.57
POWER EQUIPMENT OPERATOR: GROUP 1A CRANES: 100
TONS THROUGH 199 TONS, OR 150’ OF BOOM (INCLUDING
JIB WITH ATTACHMENTS); DRILLING MACHINE; OVERHEAD,
BRIDGE TYPE: 100 TONS AND OVER; TOWER CRANE: UP TO
175’ IN HEIGHT BASE TO BOOM; LOADER: OVERHEAD 8
YARDS & OVER; SHOVEL, EXCAVATOR, BACKHOES: OVER 50
METRIC TONS AND UP TO 90 METRIC TONS; MECHANICS.
KING AND SNOHOMISH COUNTIES.........................$ 62.85 27.57
POWER EQUIPMENT OPERATOR: GROUP 1AA CRANES: 200
TONS- 299 TONS, OR 250’ OF BOOM INCLUDING JIB WITH
ATTACHMENTS; CRANES: FRICTION CRANES THROUGH 199
TONS; LEVERMAN; SHOVEL, EXCAVATOR, BACKHOES: OVER
90 METRIC TONS; TOWER CRANE: OVER 175’ THROUGH 250’
IN HEIGHT, BASE TO BOOM KING AND SNOHOMISH
COUNTIES............................................$ 63.75 27.57
POWER EQUIPMENT OPERATOR: GROUP 1AAA CRANES: 300
TONS AND OVER OR 300’ OF BOOM INCLUDING JIB WITH
ATTACHMENTS; CRANES FRICTION: 200 TONS AND OVER;
TOWER CRANES: OVER 250’ IN HEIGHT FROM BASE TO
BOOM. KING AND SNOHOMISH COUNTIES................$ 64.66 27.57
POWER EQUIPMENT OPERATOR: GROUP 2 BATCH PLANT
OPERATOR: CONCRETE; BARRIER MACHINE: (ZIPPER); BUMP
CUTTER; CRANES: 20 TONS THROUGH 44 TONS WITH
ATTACHMENTS; OVERHEAD, BRIDGE TYPE CRANE: 20 TONS
THROUGH 44 TONS; CHIPPER; CONCRETE PUMP: TRUCK
MOUNT WITH BOOM ATTACHMENT UP TO 42M; CRUSHER; DECK
ENGINEER/DECK WINCHES (POWER); GRADE ENGINEER:
USING BLUE PRINTS, CUT SHEETS, ETC.; -FINISHING
MACHINE: BIDWELL AND GAMACO & SIMILAR EQUIPMENT;
GUARDRAIL PUNCH; HARD TAIL END DUMP: ARTICULATING
OFF-ROAD EQUIPMENT UNDER 45 YARDS;
HORIZONTAL/DIRECTIONAL DRILL OPERATOR; LOADERS:
OVERHEAD UNDER 6 YARDS; LOADERS: PLANT FEED;
LOCOMOTIVES: ALL; MATERIAL TRANSFER DEVICE;
PILEDRIVER: (OTHER THAN CRANE MOUNT); QUICK TOWER:
D - 9
NO CAB, UNDER 100 FEET IN HEIGHT BASE TO BOOM;
ROTO-MILL, ROTO-GRINDER; SHOVEL, EXCAVATOR,
BACKHOE, TRACTOR: 15 TO 30 METRIC TONS; SUBGRADER
TRIMMER; SCRAPER: SELF PROPELLED UNDER 45 YARDS;
TRUCK CRANE OILER/DRIVER: 100 TONS AND OVER; TRUCK
MOUNT PORTABLE CONVEYOR; -VAC TRUCK (VACTOR
GUZZLER, HYDRO EXCAVATOR); YO YO PAY DOZER. KING
AND SNOHOMISH COUNTIES..............................$ 61.14 27.57
POWER EQUIPMENT OPERATOR: GROUP 3 CRANES: THROUGH
19 TONS WITH ATTACHMENTS, A-FRAME OVER 10 TONS;
CONCRETE PUMP: MOUNTED OR TRAILER HIGH PRESSURE
LINE PUMP, PUMP HIGH PRESSURE; CONVEYORS; DOZERS:
D-9 & UNDER; DRILL OILERS: AUGER TYPE, TRUCK OR
CRANE MOUNT; FORKLIFT: 3000 LBS AND OVER WITH
ATTACHMENTS; HORIZONTAL/DIRECTIONAL DRILL LOCATOR;
OUTSIDE HOISTS (ELEVATORS AND MANLIFTS), AIR
TUGGERS, STRATO; TOWER BUCKET ELEVATORS;
HYDRALIFTS/BOOM TRUCKS: OVER 10 TONS; LOADERS:
ELEVATING TYPE BELT; PLANT OILER: ASPHALT, CRUSHER;
RIGGER/SIGNAL PERSON, BELLMAN (CERTIFIED); ROLLER:
PLANT MIX OR MULTI-LIFT MATERIALS; SAWS: CONCRETE;
SCRAPERS: CONCRETE & CARRY ALL SERVICE ENGINEERS:
EQUIPMENT; TRENCHING MACHINES; TRUCK CRANE
OILER/DRIVER: UNDER 100 TONS; SHOVEL, EXCAVATOR,
BACKHOE, TRACTORS: UNDER 15 METRIC TONS. KING
AND SNOHOMISH COUNTIES..............................$ 60.46 27.57
POWER EQUIPMENT OPERATOR: GROUP 4 ASSISTANT
ENGINEER; BOBCAT; BROOMS; COMPRESSOR; CONCRETE
FINISH MACHINE: LASER SCREED; CRANES, A-FRAME: 10
TONS AND UNDER; ELEVATOR AND MAN-LIFT: PERMANENT
AND SHAFT TYPE; FORKLIFTS: UNDER 3000 LBS. WITH
ATTACHMENTS; GRADECHECKER/STAKEMAN; HYDRALIFTS/BOOM
TRUCKS: 10 TONS AND UNDER; OIL DISTRIBUTORS, BLOWER
DISTRIBUTION & MULCH SEEDING OPERATOR; PAVEMENT
BREAKER; POSTHOLE DIGGER: MECHANICAL; POWER PLANT;
PUMPS: WATER; -RIGGER AND BELLMAN; ROLLER: OTHER
THAN PLANT MIX; WHEEL TRACTORS: FARM ALL TYPE;
SHOTCRETE/GUNITE EQUIPMENT; BROKK: REMOTE
DEMOLITION EQUIPMENT KING AND SNOHOMISH COUNTIES.$ 56.63 27.57
ENGI0302-093 06/01/2025
POWER EQUIPMENT OPERATOR GROUP 2 BATCH PLANT
OPERATOR: CONCRETE; BARRIER MACHINE: (ZIPPER); BUMP
CUTTER; CRANES: 20 TONS THROUGH 44 TONS WITH
ATTACHMENTS; OVERHEAD, BRIDGE TYPE CRANE: 20 TONS
THROUGH 44 TONS; CHIPPER; CONCRETE PUMP: TRUCK
MOUNT WITH BOOM ATTACHMENT UP TO 42M; CRUSHER; DECK
ENGINEER/DECK WINCHES (POWER); GRADE ENGINEER:
USING BLUE PRINTS, CUT SHEETS, ETC.; -FINISHING
MACHINE: BIDWELL AND GAMACO & SIMILAR EQUIPMENT;
GUARDRAIL PUNCH; HARD TAIL END DUMP: ARTICULATING
OFF-ROAD EQUIPMENT UNDER 45 YARDS;
D - 10
HORIZONTAL/DIRECTIONAL DRILL OPERATOR; LOADERS:
OVERHEAD UNDER 6 YARDS; LOADERS: PLANT FEED;
LOCOMOTIVES: ALL; MATERIAL TRANSFER DEVICE;
PILEDRIVER: (OTHER THAN CRANE MOUNT); QUICK TOWER:
NO CAB, UNDER 100 FEET IN HEIGHT BASE TO BOOM;
ROTO-MILL, ROTO-GRINDER; SHOVEL, EXCAVATOR,
BACKHOE, TRACTOR: 15 TO 30 METRIC TONS; SUBGRADER
TRIMMER; SCRAPER: SELF PROPELLED UNDER 45 YARDS;
TRUCK CRANE OILER/DRIVER: 100 TONS AND OVER; TRUCK
MOUNT PORTABLE CONVEYOR; -VAC TRUCK (VACTOR
GUZZLER, HYDRO EXCAVATOR); YO YO PAY DOZER.
SKAGIT AND WHATCOM COUNTIES.........................$ 60.69 27.57
POWER EQUIPMENT OPERATOR GROUP 4 ASSISTANT
ENGINEER; BOBCAT; BROOMS; COMPRESSOR; CONCRETE
FINISH MACHINE: LASER SCREED; CRANES, A-FRAME: 10
TONS AND UNDER; ELEVATOR AND MAN-LIFT: PERMANENT
AND SHAFT TYPE; FORKLIFTS: UNDER 3000 LBS. WITH
ATTACHMENTS; GRADECHECKER/STAKEMAN; HYDRALIFTS/BOOM
TRUCKS: 10 TONS AND UNDER; OIL DISTRIBUTORS, BLOWER
DISTRIBUTION & MULCH SEEDING OPERATOR; PAVEMENT
BREAKER; POSTHOLE DIGGER: MECHANICAL; POWER PLANT;
PUMPS: WATER; -RIGGER AND BELLMAN; ROLLER: OTHER
THAN PLANT MIX; WHEEL TRACTORS: FARM ALL TYPE;
SHOTCRETE/GUNITE EQUIPMENT; BROKK: REMOTE
DEMOLITION EQUIPMENT SKAGIT AND WHATCOM COUNTIES.$ 56.19 27.57
POWER EQUIPMENT OPERATOR: GROUP 1 ASPHALT PLANT
OPERATORS; CABLEWAYS; CONCRETE PUMP: TRUCK MOUNT
WITH BOOM ATTACHMENT OVER 42M; CRANES: 45 TONS
THROUGH 99 TONS, UNDER 150’ OF BOOM (INCLUDING JIB
WITH ATTACHMENTS); OVERHEAD, BRIDGE TYPE: 45 TONS
THROUGH 99 TONS; DERRICKS: ON BUILDING WORK; HARD
TAIL END DUMP: ARTICULATING OFF-ROAD EQUIPMENT 45
YARDS & OVER; LOADER: OVERHEAD 6 YARDS BUT NOT
INCLUDING 8 YARDS; MOTOR PATROL GRADERS; MUCKING
MACHINE, MOLE, TUNNEL DRILL, BORING, ROAD HEADER
AND/OR SHIELD; QUAD 9, HD 41, D10 AND OVER; REMOTE
CONTROL OPERATOR ON RUBBER TIRED EARTH MOVING
EQUIPMENT; ROLLAGON; SCRAPERS, SELF-PROPELLED: 45
YARDS AND OVER; SPREADER: TOPSIDER & SCREEDMAN;
SHOVEL, EXCAVATOR, BACKHOE: OVER 30 METRIC TONS AND
UP TO 50 METRIC TONS; SLIPFORM PAVERS;
TRANSPORTERS: ALL TRACK OR TRUCK TYPE; WELDER.
SKAGIT AND WHATCOM COUNTIES.........................$ 61.47 27.57
POWER EQUIPMENT OPERATOR: GROUP 1A CRANES: 100
TONS THROUGH 199 TONS, OR 150’ OF BOOM (INCLUDING
JIB WITH ATTACHMENTS); DRILLING MACHINE; OVERHEAD,
BRIDGE TYPE: 100 TONS AND OVER; TOWER CRANE: UP TO
175’ IN HEIGHT BASE TO BOOM; LOADER: OVERHEAD 8
YARDS & OVER; SHOVEL, EXCAVATOR, BACKHOES: OVER 50
METRIC TONS AND UP TO 90 METRIC TONS; MECHANICS.
SKAGIT AND WHATCOM COUNTIES........................$ 62.39 27.57
POWER EQUIPMENT OPERATOR: GROUP 1AA CRANES: 200
TONS- 299 TONS, OR 250’ OF BOOM INCLUDING JIB WITH
ATTACHMENTS; CRANES: FRICTION CRANES THROUGH 199
D - 11
TONS; LEVERMAN; SHOVEL, EXCAVATOR, BACKHOES: OVER
90 METRIC TONS; TOWER CRANE: OVER 175’ THROUGH 250’
IN HEIGHT, BASE TO BOOM SKAGIT AND WHATCOM
COUNTIES............................................$ 63.29 27.57
POWER EQUIPMENT OPERATOR: GROUP 1AAA CRANES: 300
TONS AND OVER OR 300’ OF BOOM INCLUDING JIB WITH
ATTACHMENTS; CRANES FRICTION: 200 TONS AND OVER;
TOWER CRANES: OVER 250’ IN HEIGHT FROM BASE TO
BOOM. SKAGIT AND WHATCOM COUNTIES................$ 64.19 27.57
POWER EQUIPMENT OPERATOR: GROUP 3 CRANES: THROUGH
19 TONS WITH ATTACHMENTS, A-FRAME OVER 10 TONS;
CONCRETE PUMP: MOUNTED OR TRAILER HIGH PRESSURE
LINE PUMP, PUMP HIGH PRESSURE; CONVEYORS; DOZERS:
D-9 & UNDER; DRILL OILERS: AUGER TYPE, TRUCK OR
CRANE MOUNT; FORKLIFT: 3000 LBS AND OVER WITH
ATTACHMENTS; HORIZONTAL/DIRECTIONAL DRILL LOCATOR;
OUTSIDE HOISTS (ELEVATORS AND MANLIFTS), AIR
TUGGERS, STRATO; TOWER BUCKET ELEVATORS;
HYDRALIFTS/BOOM TRUCKS: OVER 10 TONS; LOADERS:
ELEVATING TYPE BELT; PLANT OILER: ASPHALT, CRUSHER;
RIGGER/SIGNAL PERSON, BELLMAN (CERTIFIED); ROLLER:
PLANT MIX OR MULTI-LIFT MATERIALS; SAWS: CONCRETE;
SCRAPERS: CONCRETE & CARRY ALL SERVICE ENGINEERS:
EQUIPMENT; TRENCHING MACHINES; TRUCK CRANE
OILER/DRIVER: UNDER 100 TONS; SHOVEL, EXCAVATOR,
BACKHOE, TRACTORS: UNDER 15 METRIC TONS SKAGIT
AND WHATCOM COUNTIES................................$ 60.02 27.57
ENGI0302-094 06/01/2025
POWER EQUIPMENT OPERATOR: GROUP 1 ASPHALT PLANT
OPERATORS; CABLEWAYS; CONCRETE PUMP: TRUCK MOUNT
WITH BOOM ATTACHMENT OVER 42M; CRANES: 45 TONS
THROUGH 99 TONS, UNDER 150’ OF BOOM (INCLUDING JIB
WITH ATTACHMENTS); OVERHEAD, BRIDGE TYPE: 45 TONS
THROUGH 99 TONS; DERRICKS: ON BUILDING WORK; HARD
TAIL END DUMP: ARTICULATING OFF-ROAD EQUIPMENT 45
YARDS & OVER; LOADER: OVERHEAD 6 YARDS BUT NOT
INCLUDING 8 YARDS; MOTOR PATROL GRADERS; MUCKING
MACHINE, MOLE, TUNNEL DRILL, BORING, ROAD HEADER
AND/OR SHIELD; QUAD 9, HD 41, D10 AND OVER; REMOTE
CONTROL OPERATOR ON RUBBER TIRED EARTH MOVING
EQUIPMENT; ROLLAGON; SCRAPERS, SELF-PROPELLED: 45
YARDS AND OVER; SPREADER: TOPSIDER & SCREEDMAN;
SHOVEL, EXCAVATOR, BACKHOE: OVER 30 METRIC TONS AND
UP TO 50 METRIC TONS; SLIPFORM PAVERS;
TRANSPORTERS: ALL TRACK OR TRUCK TYPE; WELDER.
KITSAP COUNTY.......................................$ 60.93 27.57
POWER EQUIPMENT OPERATOR: GROUP 1A CRANES: 100
TONS THROUGH 199 TONS, OR 150’ OF BOOM (INCLUDING
JIB WITH ATTACHMENTS); DRILLING MACHINE; OVERHEAD,
BRIDGE TYPE: 100 TONS AND OVER; TOWER CRANE: UP TO
175’ IN HEIGHT BASE TO BOOM; LOADER: OVERHEAD 8
D - 12
YARDS & OVER; SHOVEL, EXCAVATOR, BACKHOES: OVER 50
METRIC TONS AND UP TO 90 METRIC TONS; MECHANICS.
KITSAP COUNTY.......................................$ 61.83 27.57
POWER EQUIPMENT OPERATOR: GROUP 1AA CRANES: 200
TONS- 299 TONS, OR 250’ OF BOOM INCLUDING JIB WITH
ATTACHMENTS; CRANES: FRICTION CRANES THROUGH 199
TONS; LEVERMAN; SHOVEL, EXCAVATOR, BACKHOES: OVER
90 METRIC TONS; TOWER CRANE: OVER 175’ THROUGH 250’
IN HEIGHT, BASE TO BOOM KITSAP COUNTY............$ 62.73 27.57
POWER EQUIPMENT OPERATOR: GROUP 1AAA CRANES: 300
TONS AND OVER OR 300’ OF BOOM INCLUDING JIB WITH
ATTACHMENTS; CRANES FRICTION: 200 TONS AND OVER;
TOWER CRANES: OVER 250’ IN HEIGHT FROM BASE TO
BOOM. KITSAP COUNTY..............................$ 63.62 27.57
POWER EQUIPMENT OPERATOR: GROUP 2 BATCH PLANT
OPERATOR: CONCRETE; BARRIER MACHINE: (ZIPPER); BUMP
CUTTER; CRANES: 20 TONS THROUGH 44 TONS WITH
ATTACHMENTS; OVERHEAD, BRIDGE TYPE CRANE: 20 TONS
THROUGH 44 TONS; CHIPPER; CONCRETE PUMP: TRUCK
MOUNT WITH BOOM ATTACHMENT UP TO 42M; CRUSHER; DECK
ENGINEER/DECK WINCHES (POWER); GRADE ENGINEER:
USING BLUE PRINTS, CUT SHEETS, ETC.; -FINISHING
MACHINE: BIDWELL AND GAMACO & SIMILAR EQUIPMENT;
GUARDRAIL PUNCH; HARD TAIL END DUMP: ARTICULATING
OFF-ROAD EQUIPMENT UNDER 45 YARDS;
HORIZONTAL/DIRECTIONAL DRILL OPERATOR; LOADERS:
OVERHEAD UNDER 6 YARDS; LOADERS: PLANT FEED;
LOCOMOTIVES: ALL; MATERIAL TRANSFER DEVICE;
PILEDRIVER: (OTHER THAN CRANE MOUNT); QUICK TOWER:
NO CAB, UNDER 100 FEET IN HEIGHT BASE TO BOOM;
ROTO-MILL, ROTO-GRINDER; SHOVEL, EXCAVATOR,
BACKHOE, TRACTOR: 15 TO 30 METRIC TONS; SUBGRADER
TRIMMER; SCRAPER: SELF PROPELLED UNDER 45 YARDS;
TRUCK CRANE OILER/DRIVER: 100 TONS AND OVER; TRUCK
MOUNT PORTABLE CONVEYOR; -VAC TRUCK (VACTOR
GUZZLER, HYDRO EXCAVATOR); YO YO PAY DOZER.
KITSAP COUNTY.......................................$ 60.14 27.57
POWER EQUIPMENT OPERATOR: GROUP 3 CRANES: THROUGH
19 TONS WITH ATTACHMENTS, A-FRAME OVER 10 TONS;
CONCRETE PUMP: MOUNTED OR TRAILER HIGH PRESSURE
LINE PUMP, PUMP HIGH PRESSURE; CONVEYORS; DOZERS:
D-9 & UNDER; DRILL OILERS: AUGER TYPE, TRUCK OR
CRANE MOUNT; FORKLIFT: 3000 LBS AND OVER WITH
ATTACHMENTS; HORIZONTAL/DIRECTIONAL DRILL LOCATOR;
OUTSIDE HOISTS (ELEVATORS AND MANLIFTS), AIR
TUGGERS, STRATO; TOWER BUCKET ELEVATORS;
HYDRALIFTS/BOOM TRUCKS: OVER 10 TONS; LOADERS:
ELEVATING TYPE BELT; PLANT OILER: ASPHALT, CRUSHER;
RIGGER/SIGNAL PERSON, BELLMAN (CERTIFIED); ROLLER:
PLANT MIX OR MULTI-LIFT MATERIALS; SAWS: CONCRETE;
SCRAPERS: CONCRETE & CARRY ALL SERVICE ENGINEERS:
EQUIPMENT; TRENCHING MACHINES; TRUCK CRANE
OILER/DRIVER: UNDER 100 TONS; SHOVEL, EXCAVATOR,
BACKHOE, TRACTORS: UNDER 15 METRIC TONS. KITSAP
D - 13
COUNTY..............................................$ 59.49 27.57
POWER EQUIPMENT OPERATOR: GROUP 4 ASSISTANT
ENGINEER; BOBCAT; BROOMS; COMPRESSOR; CONCRETE
FINISH MACHINE: LASER SCREED; CRANES, A-FRAME: 10
TONS AND UNDER; ELEVATOR AND MAN-LIFT: PERMANENT
AND SHAFT TYPE; FORKLIFTS: UNDER 3000 LBS. WITH
ATTACHMENTS; GRADECHECKER/STAKEMAN; HYDRALIFTS/BOOM
TRUCKS: 10 TONS AND UNDER; OIL DISTRIBUTORS, BLOWER
DISTRIBUTION & MULCH SEEDING OPERATOR; PAVEMENT
BREAKER; POSTHOLE DIGGER: MECHANICAL; POWER PLANT;
PUMPS: WATER; -RIGGER AND BELLMAN; ROLLER: OTHER
THAN PLANT MIX; WHEEL TRACTORS: FARM ALL TYPE;
SHOTCRETE/GUNITE EQUIPMENT; BROKK: REMOTE
DEMOLITION EQUIPMENT KITSAP COUNTY...............$ 55.68 27.57
ENGI0302-095 06/01/2025
POWER EQUIPMENT OPERATOR GROUP 1AA: CRANES: 200
TONS- 299 TONS, OR 250 OF BOOM INCLUDING JIB WITH
ATTACHMENTS; CRANES: FRICTION CRANES THROUGH 199
TONS; LEVERMAN; SHOVEL, EXCAVATOR, BACKHOES: OVER
90 METRIC TONS; TOWER CRANE: OVER 175 THROUGH 250
IN HEIGHT, BASE TO BOOM. CHELAN(WEST OF THE
120TH MERIDIAN), CLALLAM, DOUGLAS(WEST OF THE 120TH
MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON,
KITTITAS(WEST OF THE 120TH MERIDIAN), MASON,
OKANOGAN(WEST OF THE 120TH MERIDIAN), SAN JUNA, AND
YAKIMA(WEST OF THE 120TH MERIDIAN) COUNTIES.........$ 62.47 27.57
POWER EQUIPMENT OPERATOR GROUP 1AAA: CRANES: 300
TONS AND OVER OR 300’ OF BOOM INCLUDING JIB WITH
ATTACHMENTS; CRANES FRICTION: 200 TONS AND OVER;
TOWER CRANES: OVER 250’ IN HEIGHT FROM BASE TO
BOOM. CHELAN(WEST OF THE 120TH MERIDIAN),
CLALLAM, DOUGLAS(WEST OF THE 120TH MERIDIAN), GRAYS
HARBOR, ISLAND, JEFFERSON, KITTITAS(WEST OF THE
120TH MERIDIAN), MASON, OKANOGAN(WEST OF THE 120TH
MERIDIAN), SAN JUNA, AND YAKIMA(WEST OF THE 120TH
MERIDIAN) COUNTIES..................................$ 63.35 27.57
POWER EQUIPMENT OPERATOR: GROUP 1: ASPHALT PLANT
OPERATORS; CABLEWAYS; CONCRETE PUMP: TRUCK MOUNT
WITH BOOM ATTACHMENT OVER 42M; CRANES: 45 TONS
THROUGH 99 TONS, UNDER 150’ OF BOOM (INCLUDING JIB
WITH ATTACHMENTS); OVERHEAD, BRIDGE TYPE: 45 TONS
THROUGH 99 TONS; DERRICKS: ON BUILDING WORK; HARD
TAIL END DUMP: ARTICULATING OFF-ROAD EQUIPMENT 45
YARDS & OVER; LOADER: OVERHEAD 6 YARDS BUT NOT
INCLUDING 8 YARDS; MOTOR PATROL GRADERS; MUCKING
MACHINE, MOLE, TUNNEL DRILL, BORING, ROAD HEADER
AND/OR SHIELD; QUAD 9, HD 41, D10 AND OVER; REMOTE
CONTROL OPERATOR ON RUBBER TIRED EARTH MOVING
EQUIPMENT; ROLLAGON; SCRAPERS, SELF-PROPELLED: 45
YARDS AND OVER; SPREADER: TOPSIDER & SCREEDMAN;
SHOVEL, EXCAVATOR, BACKHOE: OVER 30 METRIC TONS AND
D - 14
UP TO 50 METRIC TONS; SLIPFORM PAVERS;
TRANSPORTERS: ALL TRACK OR TRUCK TYPE; WELDER.
CHELAN(WEST OF THE 120TH MERIDIAN), CLALLAM,
DOUGLAS(WEST OF THE 120TH MERIDIAN), GRAYS HARBOR,
ISLAND, JEFFERSON, KITTITAS(WEST OF THE 120TH
MERIDIAN), MASON, OKANOGAN(WEST OF THE 120TH
MERIDIAN), SAN JUNA, AND YAKIMA(WEST OF THE 120TH
MERIDIAN) COUNTIES..................................$ 60.67 27.57
POWER EQUIPMENT OPERATOR: GROUP 1A: CRANES: 100
TONS THROUGH 199 TONS, OR 150’ OF BOOM (INCLUDING
JIB WITH ATTACHMENTS); DRILLING MACHINE; OVERHEAD,
BRIDGE TYPE: 100 TONS AND OVER; TOWER CRANE: UP TO
175’ IN HEIGHT BASE TO BOOM; LOADER: OVERHEAD 8
YARDS & OVER; SHOVEL, EXCAVATOR, BACKHOES: OVER 50
METRIC TONS AND UP TO 90 METRIC TONS; MECHANICS.
CHELAN(WEST OF THE 120TH MERIDIAN), CLALLAM,
DOUGLAS(WEST OF THE 120TH MERIDIAN), GRAYS HARBOR,
ISLAND, JEFFERSON, KITTITAS(WEST OF THE 120TH
MERIDIAN), MASON, OKANOGAN(WEST OF THE 120TH
MERIDIAN), SAN JUNA, AND YAKIMA(WEST OF THE 120TH
MERIDIAN) COUNTIES..................................$ 61.56 27.57
POWER EQUIPMENT OPERATOR: GROUP 2: BATCH PLANT
OPERATOR: CONCRETE; BARRIER MACHINE: (ZIPPER); BUMP
CUTTER; CRANES: 20 TONS THROUGH 44 TONS WITH
ATTACHMENTS; OVERHEAD, BRIDGE TYPE CRANE: 20 TONS
THROUGH 44 TONS; CHIPPER; CONCRETE PUMP: TRUCK
MOUNT WITH BOOM ATTACHMENT UP TO 42M; CRUSHER; DECK
ENGINEER/DECK WINCHES (POWER); GRADE ENGINEER:
USING BLUE PRINTS, CUT SHEETS, ETC.; -FINISHING
MACHINE: BIDWELL AND GAMACO & SIMILAR EQUIPMENT;
GUARDRAIL PUNCH; HARD TAIL END DUMP: ARTICULATING
OFF-ROAD EQUIPMENT UNDER 45 YARDS;
HORIZONTAL/DIRECTIONAL DRILL OPERATOR; LOADERS:
OVERHEAD UNDER 6 YARDS; LOADERS: PLANT FEED;
LOCOMOTIVES: ALL; MATERIAL TRANSFER DEVICE;
PILEDRIVER: (OTHER THAN CRANE MOUNT); QUICK TOWER:
NO CAB, UNDER 100 FEET IN HEIGHT BASE TO BOOM;
ROTO-MILL, ROTO-GRINDER; SHOVEL, EXCAVATOR,
BACKHOE, TRACTOR: 15 TO 30 METRIC TONS; SUBGRADER
TRIMMER; SCRAPER: SELF PROPELLED UNDER 45 YARDS;
TRUCK CRANE OILER/DRIVER: 100 TONS AND OVER; TRUCK
MOUNT PORTABLE CONVEYOR; -VAC TRUCK (VACTOR
GUZZLER, HYDRO EXCAVATOR); YO YO PAY DOZER.
CHELAN(WEST OF THE 120TH MERIDIAN), CLALLAM,
DOUGLAS(WEST OF THE 120TH MERIDIAN), GRAYS HARBOR,
ISLAND, JEFFERSON, KITTITAS(WEST OF THE 120TH
MERIDIAN), MASON, OKANOGAN(WEST OF THE 120TH
MERIDIAN), SAN JUNA, AND YAKIMA(WEST OF THE 120TH
MERIDIAN) COUNTIES..................................$ 59.88 27.57
POWER EQUIPMENT OPERATOR: GROUP 3: CRANES:
THROUGH 19 TONS WITH ATTACHMENTS, A-FRAME OVER 10
TONS; CONCRETE PUMP: MOUNTED OR TRAILER HIGH
PRESSURE LINE PUMP, PUMP HIGH PRESSURE; CONVEYORS;
DOZERS: D-9 & UNDER; DRILL OILERS: AUGER TYPE,
D - 15
TRUCK OR CRANE MOUNT; FORKLIFT: 3000 LBS AND OVER
WITH ATTACHMENTS; HORIZONTAL/DIRECTIONAL DRILL
LOCATOR; OUTSIDE HOISTS (ELEVATORS AND MANLIFTS),
AIR TUGGERS, STRATO; TOWER BUCKET ELEVATORS;
HYDRALIFTS/BOOM TRUCKS: OVER 10 TONS; LOADERS:
ELEVATING TYPE BELT; PLANT OILER: ASPHALT, CRUSHER;
RIGGER/SIGNAL PERSON, BELLMAN (CERTIFIED); ROLLER:
PLANT MIX OR MULTI-LIFT MATERIALS; SAWS: CONCRETE;
SCRAPERS: CONCRETE & CARRY ALL SERVICE ENGINEERS:
EQUIPMENT; TRENCHING MACHINES; TRUCK CRANE
OILER/DRIVER: UNDER 100 TONS; SHOVEL, EXCAVATOR,
BACKHOE, TRACTORS: UNDER 15 METRIC TONS.
CHELAN(WEST OF THE 120TH MERIDIAN), CLALLAM,
DOUGLAS(WEST OF THE 120TH MERIDIAN), GRAYS HARBOR,
ISLAND, JEFFERSON, KITTITAS(WEST OF THE 120TH
MERIDIAN), MASON, OKANOGAN(WEST OF THE 120TH
MERIDIAN), SAN JUNA, AND YAKIMA(WEST OF THE 120TH
MERIDIAN) COUNTIES..................................$ 59.23 27.57
POWER EQUIPMENT OPERATOR: GROUP 4: ASSISTANT
ENGINEER; BOBCAT; BROOMS; COMPRESSOR; CONCRETE
FINISH MACHINE: LASER SCREED; CRANES, A-FRAME: 10
TONS AND UNDER; ELEVATOR AND MAN-LIFT: PERMANENT
AND SHAFT TYPE; FORKLIFTS: UNDER 3000 LBS. WITH
ATTACHMENTS; GRADECHECKER/STAKEMAN; HYDRALIFTS/BOOM
TRUCKS: 10 TONS AND UNDER; OIL DISTRIBUTORS, BLOWER
DISTRIBUTION & MULCH SEEDING OPERATOR; PAVEMENT
BREAKER; POSTHOLE DIGGER: MECHANICAL; POWER PLANT;
PUMPS: WATER; -RIGGER AND BELLMAN; ROLLER: OTHER
THAN PLANT MIX; WHEEL TRACTORS: FARM ALL TYPE;
SHOTCRETE/GUNITE EQUIPMENT; BROKK: REMOTE
DEMOLITION EQUIPMENT CHELAN(WEST OF THE 120TH
MERIDIAN), CLALLAM, DOUGLAS(WEST OF THE 120TH
MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON,
KITTITAS(WEST OF THE 120TH MERIDIAN), MASON,
OKANOGAN(WEST OF THE 120TH MERIDIAN), SAN JUNA, AND
YAKIMA(WEST OF THE 120TH MERIDIAN) COUNTIES.........$ 55.43 27.57
ENGI0302-124 06/01/2025
POWER EQUIPMENT OPERATOR: GROUP 1 BIT GRINDERS;
BOLT THREADING MACHINE; COMPRESSORS (UNDER 2000
CFM, GAS, DIESEL, OR ELECTRIC POWER); DECK HAND;
FIREMAN & HEATER TENDER; HYDRO-SEEDER, MULCHER,
NOZZLEMAN; OILER DRIVER, & CABLE TENDER, MUCKING
MACHINE; PUMPMAN; ROLLERS, ALL TYPES ON SUBGRADE,
INCLUDING SEAL AND CHIP COATINGS (FARM TYPE, CASE,
JOHN DEERE & SIMILAR, OR COMPACTING VIBRATOR),
EXCEPT WHEN PULLED BY DOZER WITH OPERABLE BLADE;
WELDING MACHINE; CRANE OILER-DRIVER (CLD REQUIRED)
& CABLE TENDER, MUCKING MACHINE
(ASOTIN, BENTON, FRANKLIN, GARFIELD,
D - 16
LINCOLN, SPOKANE, STEVENS, WALLA WALLA, AND
WHITMAN)............................................$ 38.17 23.40
POWER EQUIPMENT OPERATOR: GROUP 2 A-FRAME TRUCK
(SINGLE DRUM); ASSISTANT REFRIGERATION PLANT (UNDER
1000 TON); ASSISTANT PLANT OPERATOR, FIREMAN OR
PUGMIXER (ASPHALT); BAGLEY OR STATIONARY SCRAPER;
BELT FINISHING MACHINE; BLOWER OPERATOR (CEMENT);
CEMENT HOG; COMPRESSOR (2000 CFM OR OVER, 2 OR
MORE, GAS DIESEL OR ELECTRIC POWER); CONCRETE SAW
(MULTIPLE CUT); DISTRIBUTOR LEVERMAN; DITCH WITCH
OR SIMILAR; ELEVATOR HOISTING MATERIALS; DOPE POTS
(POWER AGITATED); FORK LIFT OR LUMBER STACKER,
HYDRA-LIFT & SIMILAR; GIN TRUCKS (PIPELINE); HOIST,
SINGLE DRUM; LOADERS (BUCKET ELEVATORS AND
CONVEYORS); LONGITUDINAL FLOAT; MIXER
(PORTABLE-CONCRETE); PAVEMENT BREAKER, HYDRA-HAMMER
& SIMILAR; POWER BROOM; RAILROAD BALLAST REGULATION
OPERATOR (SELF-PROPELLED); RAILROAD POWER TAMPER
OPERATOR (SELF-PROPELLED); RAILROAD TAMPER JACK
OPERATOR (SELF-PROPELLED; SPRAY CURING MACHINE
(CONCRETE); SPREADER BOX (SELF-PROPELLED); STRADDLE
BUGGY (ROSS & SIMILAR ON CONSTRUCTION JOB ONLY);
TRACTOR (FARM TYPE R/T WITH ATTACHMENT, EXCEPT
BACKHOE); TUGGER OPERATOR
(ASOTIN, BENTON, FRANKLIN, GARFIELD, LINCOLN, SPOKANE,
STEVENS, WALLA WALLA, AND WHITMAN)..................$ 38.56 23.40
POWER EQUIPMENT OPERATOR: GROUP 3 A-FRAME TRUCK (2
OR MORE DRUMS); ASSISTANT REFRIGERATION PLANT &
CHILLER OPERATOR (OVER 1000 TON); BACKFILLERS
(CLEVELAND & SIMILAR); BATCH PLANT & WET MIX
OPERATOR, SINGLE UNIT (CONCRETE); BELT-CRETE
CONVEYORS WITH POWER PACK OR SIMILAR; BELT LOADER
(KOCAL OR SIMILAR); BENDING MACHINE; BOB CAT (SKID
STEER); BORING MACHINE (EARTH); BORING MACHINE
(ROCK UNDER 8 INCH BIT) (QUARRY MASTER, JOY OR
SIMILAR); BUMP CUTTER (WAYNE, SAGINAU OR SIMILAR);
CANAL LINING MACHINE (CONCRETE); CHIPPER (WITHOUT
CRANE); CLEANING & DOPING MACHINE (PIPELINE); DECK
ENGINEER; ELEVATING BELT-TYPE LOADER (EUCLID,
BARBER GREEN & SIMILAR); ELEVATING GRADER-TYPE
LOADER (DUMOR, ADAMS OR SIMILAR); GENERATOR PLANT
ENGINEERS (DIESEL OR ELECTRIC); GUNNITE COMBINATION
MIXER & COMPRESSOR; LOCOMOTIVE ENGINEER;
MIXERMOBILE; MUCKING MACHINE; POSTHOLE AUGER OR
PUNCH; PUMP (GROUT OR JET); SOIL STABILIZER (P & H
OR SIMILAR); SPREADER MACHINE; DOZER/TRACTOR (UP TO
D-6 OR EQUIVALENT) AND TRAXCAVATOR; TRAVERSE FINISH
MACHINE; TURNHEAD OPERATOR
(ASOTIN, BENTON, FRANKLIN, GARFIELD, LINCOLN, SPOKANE,
D - 17
STEVENS, WALLA WALLA, AND WHITMAN)..................$ 39.31 23.40
POWER EQUIPMENT OPERATOR: GROUP 4 CONCRETE PUMPS
(SQUEEZE-CRETE, FLOW-CRETE, PUMP- CRETE, WHITMAN &
SIMILAR); CURB EXTRUDER (ASPHALT OR CONCRETE);
DRILLS (CHURN, CORE, CALYX OR DIAMOND); EQUIPMENT
SERVICEMAN; GREASER & OILER; HOIST (2 OR MORE DRUMS
OR TOWER HOIST); LOADERS (OVERHEAD & FRONT-END,
UNDER 4 YDS. R/T); REFRIGERATION PLANT ENGINEER
(UNDER 1000 TON); RUBBER-TIRED SKIDDERS (R/T WITH
OR WITHOUT ATTACHMENTS); SURFACE HEATER & PLANT
MACHINE; TRENCHING MACHINES (UNDER 7 FT. DEPTH
CAPACITY); TURNHEAD (WITH RE-SCREENING); VACUUM
DRILL (REVERSE CIRCULATION DRILL UNDER 8 INCH BIT)
(ASOTIN, BENTON, FRANKLIN, GARFIELD, LINCOLN,
SPOKANE, STEVENS, WALLA WALLA, AND WHITMAN).........$ 39.51 23.40
POWER EQUIPMENT OPERATOR: GROUP 5 BACKHOE (UNDER
45,000 GW); BACKHOE & HOE RAM (UNDER 3/4 YD.);
CARRYDECK & BOOM TRUCK (UNDER 25 TONS); CRANES (25
TONS & UNDER), ALL ATTACHMENTS INCLUDING CLAMSHELL,
DRAGLINE; DERRICKS & STIFFLEGS (UNDER 65 TONS);
DRILLING EQUIPMENT(8 INCH BIT & OVER) (ROBBINS,
REVERSE CIRCULATION & SIMILAR); HOE RAM;
PILEDRIVING ENGINEERS; PAVING (DUAL DRUM); RAILROAD
TRACK LINER OPERAOTR (SELF-PROPELLED);
REFRIGERATION PLANT ENGINEER (1000 TONS & OVER);
SIGNALMAN (WHIRLEYS, HIGHLINE HAMMERHEADS OR
SIMILAR); GRADE CHECKER
(ASOTIN, BENTON, FRANKLIN, GARFIELD,
LINCOLN, SPOKANE, STEVENS, WALLA WALLA, AND
WHITMAN)............................................$ 39.71 23.40
POWER EQUIPMENT OPERATOR: GROUP 6 ASPHALT PLANT
OPERATOR; AUTOMATIC SUBGRADER (DITCHES &
TRIMMERS)(AUTOGRADE, ABC, R.A. HANSEN & SIMILAR ON
GRADE WIRE); BACKHOE (45,000 GW AND OVER TO 110,000
GW); BACKHOES & HOE RAM (3/4 YD. TO 3 YD.); BATCH
PLANT (OVER 4 UNITS); BATCH & WET MIX OPERATOR
(MULTIPLE UNITS, 2 & INCL. 4); BLADE OPERATOR
(MOTOR PATROL & ATTACHMENTS); CABLE CONTROLLER
(DISPATCHER); COMPACTOR (SELF-PROPELLED WITH
BLADE); CONCRETE PUMP BOOM TRUCK; CONCRETE SLIP
FORM PAVER; CRANES (OVER 25 TONS, TO AND INCLUDING
45 TONS), ALL ATTACHMENTS INCLUDING CLAMSHELL,
DRAGLINE; CRUSHER, GRIZZLE & SCREENING PLANT
OPERATOR; DOZER, 834 R/T & SIMILAR; DRILL DOCTOR;
LOADER OPERATOR (FRONT-END & OVERHEAD, 4 YDS. INCL.
8 YDS.); MULTIPLE DOZER UNITS WITH SINGLE BLADE;
PAVING MACHINE (ASPHALT AND CONCRETE); QUAD-TRACK
OR SIMILAR EQUIPMENT; ROLLERMAN (FINISHING ASPHALT
PAVEMENT); ROTO MILL (PAVEMENT GRINDER); SCRAPERS,
D - 18
ALL, RUBBER-TIRED; SCREED OPERATOR; SHOVEL(UNDER 3
YDS.); TRENCHING MACHINES (7 FT. DEPTH & OVER); TUG
BOAT OPERATOR VACTOR GUZZLER, SUPER SUCKER; LIME
BATCH TANK OPERATOR (RECYCLE TRAIN); LIME BRAIN
OPERATOR (RECYCLE TRAIN); MOBILE CRUSHER OPERATOR
(RECYCLE TRAIN)
(ASOTIN, BENTON,
FRANKLIN, GARFIELD, LINCOLN, SPOKANE, STEVENS,
WALLA WALLA, AND WHITMAN)...........................$ 40.00 23.40
POWER EQUIPMENT OPERATOR: GROUP 7 BACKHOE (OVER
110,000 GW); BACKHOES & HOE RAM (3 YDS & OVER);
BLADE (FINISH & BLUETOP) AUTOMATIC, CMI, ABC,
FINISH ATHEY & HUBER & SIMILAR WHEN USED AS
AUTOMATIC; CABLEWAY OPERATORS; CONCRETE
CLEANING/DECONTAMINATION MACHINE OPERATOR; CRANES
(OVER 45 TONS TO BUT NOT INCLUDING 85 TONS), ALL
ATTACHMENTS INCLUDING CLAMSHELL AND DRAGINE;
DERRICKS & STIFFLEYS (65 TONS & OVER); ELEVATING
BELT (HOLLAND TYPE); HEAVY EQUIPMENT ROBOTICS
OPERATOR; LOADER (360 DEGREES REVOLVING KOEHRING
SCOOPER OR SIMILAR); LOADERS (OVERHEAD & FRONT-END,
OVER 8 YDS. TO 10 YDS.); RUBBER-TIRED SCRAPERS
(MULTIPLE ENGINE WITH THREE OR MORE SCRAPERS);
SHOVELS (3 YDS. & OVER); WHIRLEYS & HAMMERHEADS,
ALL; H.D. MECHANIC; H.D. WELDER; HYDRAULIC PLATFORM
TRAILERS (GOLDHOFER, SHAURERLY ANDSIMILAR); ULTRA
HIGH PRESSURE WATERIET CUTTING TOOL SYSTEM OPERATOR
(30,000 PSI); VACUUM BLASTING MACHINE OPERATOR
(ASOTIN, BENTON, FRANKLIN, GARFIELD, LINCOLN,
SPOKANE, STEVENS, WALLA WALLA, AND WHITMAN).........$ 40.39 23.40
POWER EQUIPMENT OPERATOR: GROUP 8 CRANES (85 TONS
AND OVER, AND ALL CLIMBING, OVERHEAD,RAIL AND
TOWER), ALL ATTACHMENTS INCLUDING CLAMSHELL,
DRAGLINE; LOADERS (OVERHEAD AND FRONT-END, 10 YARDS
AND OVER); HELICOPTER PILOT
(ASOTIN, BENTON, FRANKLIN,
GARFIELD, LINCOLN, SPOKANE, STEVENS, WALLA WALLA,
AND WHITMAN)........................................$ 42.36 23.40
ENGI0302-125 06/01/2025
POWER EQUIPMENT OPERATOR: GROUP 1 BIT GRINDERS;
BOLT THREADING MACHINE; COMPRESSORS (UNDER 2000
CFM, GAS, DIESEL, OR ELECTRIC POWER); DECK HAND;
FIREMAN & HEATER TENDER; HYDRO-SEEDER, MULCHER,
NOZZLEMAN; OILER DRIVER, & CABLE TENDER, MUCKING
MACHINE; PUMPMAN; ROLLERS, ALL TYPES ON SUBGRADE,
INCLUDING SEAL AND CHIP COATINGS (FARM TYPE, CASE,
D - 19
JOHN DEERE & SIMILAR, OR COMPACTING VIBRATOR),
EXCEPT WHEN PULLED BY DOZER WITH OPERABLE BLADE;
WELDING MACHINE; CRANE OILER-DRIVER (CLD REQUIRED)
& CABLE TENDER, MUCKING MACHINE
(ADAMS,
CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA,
DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, GRANT,
OKANOGAN (EAST OF THE 120TH MERIDIAN), PEND
OREILLE, STEVENS, AND YAKIMA (EAST OF THE 120TH
MERIDIAN) COUNTIES).................................$ 41.17 23.40
POWER EQUIPMENT OPERATOR: GROUP 2 A-FRAME TRUCK
(SINGLE DRUM); ASSISTANT REFRIGERATION PLANT (UNDER
1000 TON); ASSISTANT PLANT OPERATOR, FIREMAN OR
PUGMIXER (ASPHALT); BAGLEY OR STATIONARY SCRAPER;
BELT FINISHING MACHINE; BLOWER OPERATOR (CEMENT);
CEMENT HOG; COMPRESSOR (2000 CFM OR OVER, 2 OR
MORE, GAS DIESEL OR ELECTRIC POWER); CONCRETE SAW
(MULTIPLE CUT); DISTRIBUTOR LEVERMAN; DITCH WITCH
OR SIMILAR; ELEVATOR HOISTING MATERIALS; DOPE POTS
(POWER AGITATED); FORK LIFT OR LUMBER STACKER,
HYDRA-LIFT & SIMILAR; GIN TRUCKS (PIPELINE); HOIST,
SINGLE DRUM; LOADERS (BUCKET ELEVATORS AND
CONVEYORS); LONGITUDINAL FLOAT; MIXER
(PORTABLE-CONCRETE); PAVEMENT BREAKER, HYDRA-HAMMER
& SIMILAR; POWER BROOM; RAILROAD BALLAST REGULATION
OPERATOR (SELF-PROPELLED); RAILROAD POWER TAMPER
OPERATOR (SELF-PROPELLED); RAILROAD TAMPER JACK
OPERATOR (SELF-PROPELLED; SPRAY CURING MACHINE
(CONCRETE); SPREADER BOX (SELF-PROPELLED); STRADDLE
BUGGY (ROSS & SIMILAR ON CONSTRUCTION JOB ONLY);
TRACTOR (FARM TYPE R/T WITH ATTACHMENT, EXCEPT
BACKHOE); TUGGER OPERATOR
(ADAMS, CHELAN (EAST OF
THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE
120TH MERIDIAN), FERRY, GRANT, OKANOGAN (EAST OF
THE 120TH MERIDIAN), PEND OREILLE, STEVENS, AND
YAKIMA (EAST OF THE 120TH MERIDIAN) COUNTIES).......$ 41.56 23.40
POWER EQUIPMENT OPERATOR: GROUP 3 A-FRAME TRUCK (2
OR MORE DRUMS); ASSISTANT REFRIGERATION PLANT &
CHILLER OPERATOR (OVER 1000 TON); BACKFILLERS
(CLEVELAND & SIMILAR); BATCH PLANT & WET MIX
OPERATOR, SINGLE UNIT (CONCRETE); BELT-CRETE
CONVEYORS WITH POWER PACK OR SIMILAR; BELT LOADER
(KOCAL OR SIMILAR); BENDING MACHINE; BOB CAT (SKID
STEER); BORING MACHINE (EARTH); BORING MACHINE
(ROCK UNDER 8 INCH BIT) (QUARRY MASTER, JOY OR
SIMILAR); BUMP CUTTER (WAYNE, SAGINAU OR SIMILAR);
CANAL LINING MACHINE (CONCRETE); CHIPPER (WITHOUT
CRANE); CLEANING & DOPING MACHINE (PIPELINE); DECK
D - 20
ENGINEER; ELEVATING BELT-TYPE LOADER (EUCLID,
BARBER GREEN & SIMILAR); ELEVATING GRADER-TYPE
LOADER (DUMOR, ADAMS OR SIMILAR); GENERATOR PLANT
ENGINEERS (DIESEL OR ELECTRIC); GUNNITE COMBINATION
MIXER & COMPRESSOR; LOCOMOTIVE ENGINEER;
MIXERMOBILE; MUCKING MACHINE; POSTHOLE AUGER OR
PUNCH; PUMP (GROUT OR JET); SOIL STABILIZER (P & H
OR SIMILAR); SPREADER MACHINE; DOZER/TRACTOR (UP TO
D-6 OR EQUIVALENT) AND TRAXCAVATOR; TRAVERSE FINISH
MACHINE; TURNHEAD OPERATOR
(ADAMS, CHELAN (EAST OF
THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE
120TH MERIDIAN), FERRY, GRANT, OKANOGAN (EAST OF
THE 120TH MERIDIAN), PEND OREILLE, STEVENS, AND
YAKIMA (EAST OF THE 120TH MERIDIAN) COUNTIES).......$ 42.31 23.40
POWER EQUIPMENT OPERATOR: GROUP 4 CONCRETE PUMPS
(SQUEEZE-CRETE, FLOW-CRETE, PUMP- CRETE, WHITMAN &
SIMILAR); CURB EXTRUDER (ASPHALT OR CONCRETE);
DRILLS (CHURN, CORE, CALYX OR DIAMOND); EQUIPMENT
SERVICEMAN; GREASER & OILER; HOIST (2 OR MORE DRUMS
OR TOWER HOIST); LOADERS (OVERHEAD & FRONT-END,
UNDER 4 YDS. R/T); REFRIGERATION PLANT ENGINEER
(UNDER 1000 TON); RUBBER-TIRED SKIDDERS (R/T WITH
OR WITHOUT ATTACHMENTS); SURFACE HEATER & PLANT
MACHINE; TRENCHING MACHINES (UNDER 7 FT. DEPTH
CAPACITY); TURNHEAD (WITH RE-SCREENING); VACUUM
DRILL (REVERSE CIRCULATION DRILL UNDER 8 INCH BIT)
(ADAMS, CHELAN (EAST OF THE 120TH MERIDIAN),
COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN),
FERRY, GRANT, OKANOGAN (EAST OF THE 120TH
MERIDIAN), PEND OREILLE, STEVENS, AND YAKIMA (EAST
OF THE 120TH MERIDIAN) COUNTIES)....................$ 42.51 23.40
POWER EQUIPMENT OPERATOR: GROUP 5 BACKHOE (UNDER
45,000 GW); BACKHOE & HOE RAM (UNDER 3/4 YD.);
CARRYDECK & BOOM TRUCK (UNDER 25 TONS); CRANES (25
TONS & UNDER), ALL ATTACHMENTS INCLUDING CLAMSHELL,
DRAGLINE; DERRICKS & STIFFLEGS (UNDER 65 TONS);
DRILLING EQUIPMENT(8 INCH BIT & OVER) (ROBBINS,
REVERSE CIRCULATION & SIMILAR); HOE RAM;
PILEDRIVING ENGINEERS; PAVING (DUAL DRUM); RAILROAD
TRACK LINER OPERAOTR (SELF-PROPELLED);
REFRIGERATION PLANT ENGINEER (1000 TONS & OVER);
SIGNALMAN (WHIRLEYS, HIGHLINE HAMMERHEADS OR
SIMILAR); GRADE CHECKER
(ADAMS, CHELAN
(EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS
(EAST OF THE 120TH MERIDIAN), FERRY, GRANT,
D - 21
OKANOGAN (EAST OF THE 120TH MERIDIAN), PEND
OREILLE, STEVENS, AND YAKIMA (EAST OF THE 120TH
MERIDIAN) COUNTIES).................................$ 42.71 23.40
POWER EQUIPMENT OPERATOR: GROUP 6 ASPHALT PLANT
OPERATOR; AUTOMATIC SUBGRADER (DITCHES &
TRIMMERS)(AUTOGRADE, ABC, R.A. HANSEN & SIMILAR ON
GRADE WIRE); BACKHOE (45,000 GW AND OVER TO 110,000
GW); BACKHOES & HOE RAM (3/4 YD. TO 3 YD.); BATCH
PLANT (OVER 4 UNITS); BATCH & WET MIX OPERATOR
(MULTIPLE UNITS, 2 &…