WA NP MORA 11(1), Fryingpan Creek Bridge
Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 69056726B000001
- Agency
-
Federal Highway Administration
Department of Transportation
- Responses due
- Not on record
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Washington, United States
- Points of contact
-
- Contracts G. Office wfl.contracts@dot.gov (360) 619-7520
Notice details come from SAM.gov. Updated .
About this opportunity
The Federal Highway Administration is procuring bridge replacement and roadway construction services for the Fryingpan Creek Bridge project located 31 miles north of Packwood, Washington, within Mount Rainier National Park. The project scope includes construction of a new 218.5-foot long single-span steel plate girder bridge with cast-in-place concrete deck, roadway realignment, parking lot construction, minor pipe culvert replacement, stone masonry work, and demolition of the existing steel arch girder bridge. The solicitation is offered as a full and open competition with no set-aside designations, and prospective bidders are encouraged to register on SAM.gov and follow the opportunity page to receive notification when solicitation documents are posted. The formal Invitation for Bids with specifications and plans will be released in Spring 2026 (April or May 2026), as the project was rescheduled from the originally planned December 2025 advertisement date. Interested vendors should direct technical questions to wfl.plansspec@dot.gov and general inquiries to wfl.contracts@dot.gov or 360-619-7520, and may view the project site during fall months due to seasonal road closures between October and May.
This procurement carries an estimated price range of $10 million to $20 million with a tentative fixed completion date in Summer 2029. The project encompasses substantial work including 21,500 cubic yards of roadway excavation, 234 cubic yards of structural concrete, 37,390 pounds of reinforcing steel, 298,000 pounds of structural steel, 950 linear feet of stone curb, and 5,350 square yards of erosion control products across a 0.27-mile project length. No incumbent contractors or potential awardees are identified in the pre-solicitation materials. The contract will require comprehensive construction survey, quality control, soil erosion control, traffic management, and environmental mitigation measures appropriate to the National Park setting. Bidders should monitor SAM.gov for the release of formal solicitation documents and plan accordingly, as this represents a major federal infrastructure project with significant technical and logistical complexity.
Notice text
2 versions
Update #2 · Latest ·
Update 2/23/2026: QA_2-20-2026.pdf posted to attachments.
PROJECT: WA NP MORA 11(1), Fryingpan Creek Bridge
The work consists of bridge replacement, roadway realignment, parking lot, minor pipe culvert replacement, stone masonry
Bridge Information: The project includes construction of a single span, 218.5-foot long steel plate girder bridge with cast-in-place concrete deck. Abutments are founded on deep foundation (drilled shafts). The work includes demolition of the existing steel arch girder bridge upon completion of the new structure.
Project Length: 0.27 miles
Tentative Fixed Completion Date: Summer 2029
(Once solicitation is issued, see SF-1442 continuation, Block 11 for exact date.)
Tentative Solicitation Date: Winter 2026
Estimated Price Range: $10 million to $20 million
Location: 31 miles North of Packwood, Washington.
INTERESTED VENDORS LIST: To view the Interested Vendors List, you must register as a SAM user, be logged in, and linked to an entity. If you are signed into SAM.gov with your registered entity and you cannot see the Interested Vendors List, you will need to be assigned the Contract Opportunities Administrator role for your entity in SAM.gov. If you need assistance, call the Federal Service Desk at 866-606-8220.
THIS SOLICITATION IS OFFERED AS A FULL AND OPEN.
To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the “follow” button at the top of the opportunity page. When solicitation documents are issued, the INVITATION FOR BIDS (specifications and plans) will be posted at this link.
See attachments for additional information.
Update #1 ·
PROJECT: WA NP MORA 11(1), Fryingpan Creek Bridge
The work consists of bridge replacement, roadway realignment, parking lot, minor pipe culvert replacement, stone masonry
Bridge Information: The project includes construction of a single span, 218.5-foot long steel plate girder bridge with cast-in-place concrete deck. Abutments are founded on deep foundation (drilled shafts). The work includes demolition of the existing steel arch girder bridge upon completion of the new structure.
Project Length: 0.27 miles
Tentative Fixed Completion Date: Summer 2029
(Once solicitation is issued, see SF-1442 continuation, Block 11 for exact date.)
Tentative Solicitation Date: Winter 2026
Estimated Price Range: $10 million to $20 million
Location: 31 miles North of Packwood, Washington.
INTERESTED VENDORS LIST: To view the Interested Vendors List, you must register as a SAM user, be logged in, and linked to an entity. If you are signed into SAM.gov with your registered entity and you cannot see the Interested Vendors List, you will need to be assigned the Contract Opportunities Administrator role for your entity in SAM.gov. If you need assistance, call the Federal Service Desk at 866-606-8220.
THIS SOLICITATION IS OFFERED AS A FULL AND OPEN.
To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the “follow” button at the top of the opportunity page. When solicitation documents are issued, the INVITATION FOR BIDS (specifications and plans) will be posted at this link.
See attachments for additional information.
Files
| File | Type | Posted |
|---|---|---|
| QA_2-20-2026.pdf | ||
| PROJECT DESCRIPTION_WA NP MORA 11(1).pdf | ||
| Fryingpan Prelim Letter.pdf | ||
| mora11-1_Plans_Pre-Ad.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| WA NP MORA 11(1), Fryingpan Creek Bridge | Award Notice | |
| WA NP MORA 11(1), Fryingpan Creek Bridge | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| WA ERFO NPS OLYM 2022-1(3), OLYMPIC NPS ERFO REPAIRS 2022 Road 107 MP 0.3 TO 0.5 & MP 0.8 | Federal Highway Administration | No set-aside | |
| UT NP ARCH 100(2) Bridges on Delicate Arch Road | Federal Highway Administration | No set-aside | |
| ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1 | Federal Highway Administration | No set-aside | |
| WA NP OLYM 12(8), Hurricane Ridge Rockfall Mitigation MP 9.4 | Federal Highway Administration | Total Small Business | |
| Humbolt pacific crest trail bridge replacement | Forest Service | No set-aside |