Amendment A002.pdf

PDF 912 KB Posted

Attached to
WA NP MORA 11(1), Fryingpan Creek Bridge
Solicitation number
69056726B000001
Issued by

About this file

This is Amendment A002 to Solicitation No. 69056726B000001 issued by the Federal Highway Administration (FHWA) Western Federal Lands Division for the Fryingpan Creek Bridge project in Washington (WA NP MORA 11(1)). The amendment was issued on June 1, 2026, with an effective date of June 1, 2026, and extends the bid opening date.

The amendment revises three key elements of the original solicitation: (1) the bid opening date has been extended from June 18, 2026, to July 1, 2026, at 2:00 p.m. local time; (2) the notice to proceed date has been revised from August 4, 2026, to August 25, 2026; and (3) Plan Sheet S.19 has been updated to add weld details to Detail B. The construction completion date remains September 28, 2029, for both Schedule A and B, though this will be extended by the number of calendar days after August 25, 2026, that the contractor receives the notice to proceed. Contractors must acknowledge receipt of this amendment prior to the revised bid opening date by completing and returning the amendment, acknowledging receipt on each offer copy, or submitting a separate letter or telegram referencing the solicitation and amendment numbers. Sealed offers in original and zero copies are due at the specified address, and performance and payment bonds are required. The project is subject to Federal Acquisition Regulation (FAR), Transportation Acquisition Regulations (TAR), General Wage Decision requirements, and the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14.

View the file

Other files

File Type Posted
BidTab_WA NP MORA 11(1) Fryingpan Creek Bridge_Update.pdf PDF
BidTab_WA NP MORA 11(1) Fryingpan Creek Bridge.pdf PDF
BidSum_WA NP MORA 11.pdf PDF
Amendment A005.pdf PDF
QA_06-25-2026.pdf PDF
QA_06-24-2026.pdf PDF
QA_06-22-2026.pdf PDF
Amendment A004.pdf PDF
QA_06-18-2026.pdf PDF
QA_06-16-2026.pdf PDF
QA_06-12-2026.pdf PDF
QA2_06-11-2026.pdf PDF
QA_06-11-2026.pdf PDF
Amendment A003.pdf PDF
Physical Data WA NP MORA 11(1) A003.zip ZIP file
QA_06-08-2026.pdf PDF
QA_06-03-2026.pdf PDF
QA_05-29-2026.pdf PDF
Amendment A001.pdf PDF
QA_05-26-2026.pdf PDF
mora11-1_plans.pdf PDF
IFB 69056726B000001.pdf PDF
Physical Data WA NP MORA 11(1).zip ZIP file
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A002 06/01/2026 N/A See Blk 14

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X

69056726B000001

9B. DATED (SEE ITEM 11)

05/12/2026

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A

N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

(_X ) is extended, ( ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D OTHER (Specify type of modification and authority)

N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

WA NP MORA 11(1), Fryingpan Creek Bridge

See page 2

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment No. A002, dated 06/01/2026 WA NP MORA 11(1), Solicitation No. 69056726B000001 Fryingpan Creek Bridge

REVISIONS ARE AS FOLLOWS:

SF 1442, SOLICITATION, OFFER, AND AWARD

Page A-3, Block 13A. Revises bid opening date from 06/18/2026 to 07/01/2026.

Page A-5, Continuation SF 1442, Block 11. Revises notice to proceed date from

08/04/2026 to 08/25/2026.

PLANS

Plan sheet S.19. Adds weld details to Detail B.

ENCLOSURES

Pages:

A-3

A-5

Plan Sheets:

S.19

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

Federal Highway Administration

FHWA WESTERN FED LANDS DIVISION

610 E FIFTH STREET

Vancouver WA 98661

690567

Federal Highway Administration

FHWA WESTERN FED LANDS DIVISION

610 E FIFTH STREET

Vancouver WA 98661

See Page A-5

b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

360-619-7520

See Blk 10 x

05/12/2026

69056726B000001

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

This solicitation is designed WA NP MORA 11(1), Fryingpan Creek Bridge

IN STRICT ACCORDANCE WITH:

Federal Acquisition Regulation (FAR) and Transportation Acquisition Regulations (TAR)

General Wage Decision

Special Contract Requirements

Standard Specifications for Construction of Roads and Bridges on Federal Highway

Projects, FP-14

11. The Contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 calendar days and complete it within ________________ ________________ calendar days after receiving

Page A-6

06/18/2026

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 8/2014)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

A-3

07/01/2026

Revised by Amendment A002

Rebekah Webb Cross-Out

A-5

Continuation SF 1442

Project: WA NP MORA 11(1), Fryingpan Creek Bridge

Block 9 FOR GENERAL INFORMATION, call 360.619.7520 from the hours of 8:00 a.m. to

4:00 p.m. local time or e-mail us at wfl.contracts@dot.gov.

FOR TECHNICAL INFORMATION (plan and specification questions only), requests for technical information about this project will only be accepted in writing.

Submit questions via e-mail at wfl.plans-spec@dot.gov.

QUESTIONS/ANSWERS POSTED ONLINE. You can view questions and answers on the Contract Opportunities Website SAM.gov.

• Insert the solicitation number in search box.

• Scroll to the project.

• Make sure you are on the most recent view and look in the right section of the page for the most recent Q&A document.

FOR DAVIS-BACON WAGE RATE INFORMATION go to the U.S. Department of

Labor, Branch of Construction Wage Determinations Website:

https://www.dol.gov/agencies/whd/government-contracts/construction.

FOR PHYSICAL DATA, See Subsection 102.02A in the Special Contract

Requirements for listing of available data. Physical Data will be posted with the solicitation on the SAM.gov website.

Block 11 COMPLETION DATE: The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 09/28/2029 for Schedule A and B, subject to such extensions as may be authorized. The time stated for completion shall include final cleanup of the premises.

The completion date is based on the assumption that the successful offeror will receive the notice to proceed by 08/04/2026 08/25/2026 for Schedule A and B. The completion date will be extended by the number of calendar days after the above date that the

Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.

Work shall be completed on or before the date specified above, subject to such extensions as may be authorized by the terms of the contract and the specifications made a part thereof.

Block 12A PERFORMANCE & PAYMENT BONDS: See FAR Clause, 52.228-15, Performance and Payment Bonds - Construction (clauses begin on page C-1) and Subsection 102.06 of the Standard Specifications for Construction of Roads and Bridges on Federal Highway

Projects, FP-14, U.S. Customary Units.

Block 13A BID OPENING: Video call link: https://meet.google.com/xgh-hthy-edi Or dial: (US) +1

6237-405-304 PIN: 983 639 621#

Revised by Amendment A002 mailto:wfl.contracts@dot.gov mailto:wfl.plans-spec@dot.gov https://sam.gov/content/home https://www.dol.gov/agencies/whd/government-contracts/construction https://sam.gov/content/home https://meet.google.com/xgh-hthy-edi

File details come from the government source that posted it. Updated .