Amendment A005.pdf
PDF 247 KB Posted
- Attached to
- WA NP MORA 11(1), Fryingpan Creek Bridge
- Solicitation number
- 69056726B000001
About this file
This is an Amendment of Solicitation (Amendment A005) issued by the Department of Transportation Federal Highway Administration for the WA NP MORA 11(1) Fryingpan Creek Bridge project. The amendment is effective June 26, 2026, and modifies solicitation 69056726B000001 originally dated May 12, 2026.
Amendment A005 revises Special Contract Requirements on Page F-69, specifically Subsection 623.04 (Measurement) under Section 623 (General Labor). The amendment removes language from the measurement section that previously specified how Special Labor (Fish Biologist) should be measured. The section originally stated measurement should be by the hour and include time to install and remove block nets, time to remove fish and aquatic life, and any time actively spent on maintenance of block nets and monitoring for stranded aquatic organisms. Offerors must acknowledge receipt of this amendment prior to the solicitation deadline through one of three methods: completing and returning one copy of the amendment, acknowledging receipt on each offer copy, or submitting a separate letter or telegram referencing the solicitation and amendment numbers. Failure to acknowledge receipt may result in offer rejection.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidTab_WA NP MORA 11(1) Fryingpan Creek Bridge_Update.pdf | ||
| BidTab_WA NP MORA 11(1) Fryingpan Creek Bridge.pdf | ||
| BidSum_WA NP MORA 11.pdf | ||
| QA_06-25-2026.pdf | ||
| QA_06-24-2026.pdf | ||
| QA_06-22-2026.pdf | ||
| Amendment A004.pdf | ||
| QA_06-18-2026.pdf | ||
| QA_06-16-2026.pdf | ||
| QA_06-12-2026.pdf | ||
| QA2_06-11-2026.pdf | ||
| QA_06-11-2026.pdf | ||
| Amendment A003.pdf | ||
| Physical Data WA NP MORA 11(1) A003.zip | ZIP file | |
| QA_06-08-2026.pdf | ||
| QA_06-03-2026.pdf | ||
| Amendment A002.pdf | ||
| QA_05-29-2026.pdf | ||
| Amendment A001.pdf | ||
| QA_05-26-2026.pdf | ||
| mora11-1_plans.pdf | ||
| IFB 69056726B000001.pdf | ||
| Physical Data WA NP MORA 11(1).zip | ZIP file |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A005 06/26/2026 N/A See Blk 14
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X
69056726B000001
9B. DATED (SEE ITEM 11)
05/12/2026
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A
N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
(__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D OTHER (Specify type of modification and authority)
N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
WA NP MORA 11(1), Fryingpan Creek Bridge
Amendment A005 is issued to revise the following:
SPECIAL CONTRACT REQUIREMENTS: Page F-69. Subsection, 623.04 Measurement Removes language.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
F-69 DIVISION 600
Section 623. GENERAL LABOR
08/01/14 FP14
Description
623.01 Delete this Subsection and substitute the following:
This work consists of furnishing workers and hand tools for the work listed in Subsection 622.01 and as directed by the CO.
This work also consists of furnishing a fish biologist to conduct and supervise fish capture and release operations according to Subsection 157.10 when directed.
Construction Requirements
623.03 Workers and Equipment. Add the following:
Provide a fish biologist that is similar projects.
Measurement
623.04 Add the following:
Measure Special Labor (Fish Biologist) by the hour. Measurement includes time to install and remove block nets, time to remove fish and aquatic life, and any time actively spent on maintenance of block nets and monitoring for stranded aquatic organisms.
Special Contract Requirements Revised by Amendment A005 Project: WA NP MORA 11(1), Fryingpan Creek Bridge marino.chea Cross-Out
File details come from the government source that posted it. Updated .