Rio Grande Supervisor's Office Construction

Closed Pre-Solicitation Posted

Solicitation number
1282AK20R0003
Agency
Region 2 - Rocky Mountain Region Forest Service, Department of Agriculture
Responses due
Set-aside
Competitive 8(a)

Opportunity facts

NAICS code
236220 Commercial and Institutional Building Construction
PSC
Y1AZ Construction Of Other Administrative Facilities And Service Buildings
Place of performance
Del Norte CO 81132 USA

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation is seeking construction services to renovate the former Del Norte High School building located in Del Norte, Colorado into office space for the Rio Grande National Forest Supervisor's Office. The project involves demolishing approximately 60% of the existing 14,400 square foot building and renovating the remaining space to comply with building codes, federal space requirements, and sustainability guidelines. The Department of Agriculture Forest Service Rocky Mountain Region will evaluate proposals based on technical approach, past performance, and price. Questions must be submitted by August 14, 2020 and proposals are due by the amended date of August 26, 2020.

This opportunity is designated as an 8(a) small business set-aside restricted to contractors with a principal office located in Colorado. The NAICS code is 236220 and the PSC code is S206. The estimated value for all base work and options ranges from $5-10 million. The project is anticipated to take 18 months to complete and includes demolition of portions of the existing structure, site utilities and infrastructure work, and building construction and renovation services.

Notice text

5 versions

Update #5 · Latest ·

The project involves remodeling the Del Norte High School into the Rio Grande National Forest’s Supervisor Office.  The project site is located at 9th and Hermosa, Del Norte, Colorado, 81132.  The original building was built in 1968 with a band room addition constructed at a later date.  In 2018, the Del Norte School District approached the Rio Grande National Forest with an offer to give the high school and land to the Forest Service.  That year the Forest Service began preparing construction documents to renovate the high school into an office building.  The Forest Service is currently soliciting a Hazardous Material Removal contract to remove hazardous material throughout the building.  It is anticipated that hazardous removal will be completed December 2020.  This project includes demolishing approximately 60% of the current building and associated site components.  The remaining 14,400 square foot building will be renovated to comply with current building codes, federal space requirements, and other federal requirements such as Guiding Principles for sustainability.  The project includes utilities, site work, and building construction and renovation.  The estimated project time for this project is 18 months.  The government estimated range to include the base and all option items is $5,000,000 to $10,000,000.  This project is being advertised as a 8(a) Competitive Set Aside project in accordance with Section 8(a) of the Small Business Administration Act [15 USC 637(a)(1)], FAR Part 19.804-2(a)(9), and the executed Partnership Agreement between the Small Business Administration and the United States Department of Agriculture with the special restriction of a geographic limitation to Colorado with a verified SBA approved bona fide office within the state of Colorado.  The estimated date for issuance of solicitations for this project is on or before July 27, 2020.

Amendment One- Posted 07/23/2020- Provides a video walkthrough of project site and removes references to need for State Asbestos Removal Certification

Amendment Two- Posted 08/06/2020- Provides the questions and answers submitted prior to the July 31, 2020 cut off date.

Amendment Three- Posted 08/12/2020- Extends the due date for question submission to August 14, 2020, 16:00 MT and extends the due date for offers to August 26, 2020, 16:00 MT.

Amendment Four- Posted 08/19/2020- Provides Questions and Answers for questions submitted prior to August 14, 2020 cut off; provides specification for dishwasher; provides a replacement Schedule of Items and Division 010250 specification to replace the existing in full.

Update #4 ·

The project involves remodeling the Del Norte High School into the Rio Grande National Forest’s Supervisor Office.  The project site is located at 9th and Hermosa, Del Norte, Colorado, 81132.  The original building was built in 1968 with a band room addition constructed at a later date.  In 2018, the Del Norte School District approached the Rio Grande National Forest with an offer to give the high school and land to the Forest Service.  That year the Forest Service began preparing construction documents to renovate the high school into an office building.  The Forest Service is currently soliciting a Hazardous Material Removal contract to remove hazardous material throughout the building.  It is anticipated that hazardous removal will be completed December 2020.  This project includes demolishing approximately 60% of the current building and associated site components.  The remaining 14,400 square foot building will be renovated to comply with current building codes, federal space requirements, and other federal requirements such as Guiding Principles for sustainability.  The project includes utilities, site work, and building construction and renovation.  The estimated project time for this project is 18 months.  The government estimated range to include the base and all option items is $5,000,000 to $10,000,000.  This project is being advertised as a 8(a) Competitive Set Aside project in accordance with Section 8(a) of the Small Business Administration Act [15 USC 637(a)(1)], FAR Part 19.804-2(a)(9), and the executed Partnership Agreement between the Small Business Administration and the United States Department of Agriculture with the special restriction of a geographic limitation to Colorado with a verified SBA approved bona fide office within the state of Colorado.  The estimated date for issuance of solicitations for this project is on or before July 27, 2020.

Amendment One- Posted 07/23/2020- Provides a video walkthrough of project site and removes references to need for State Asbestos Removal Certification

Amendment Two- Posted 08/06/2020- Provides the questions and answers submitted prior to the July 31, 2020 cut off date.

Amendment Three- Posted 08/12/2020- Extends the due date for question submission to August 14, 2020, 16:00 MT and extends the due date for offers to August 26, 2020, 16:00 MT.

Update #3 ·

The project involves remodeling the Del Norte High School into the Rio Grande National Forest’s Supervisor Office.  The project site is located at 9th and Hermosa, Del Norte, Colorado, 81132.  The original building was built in 1968 with a band room addition constructed at a later date.  In 2018, the Del Norte School District approached the Rio Grande National Forest with an offer to give the high school and land to the Forest Service.  That year the Forest Service began preparing construction documents to renovate the high school into an office building.  The Forest Service is currently soliciting a Hazardous Material Removal contract to remove hazardous material throughout the building.  It is anticipated that hazardous removal will be completed December 2020.  This project includes demolishing approximately 60% of the current building and associated site components.  The remaining 14,400 square foot building will be renovated to comply with current building codes, federal space requirements, and other federal requirements such as Guiding Principles for sustainability.  The project includes utilities, site work, and building construction and renovation.  The estimated project time for this project is 18 months.  The government estimated range to include the base and all option items is $5,000,000 to $10,000,000.  This project is being advertised as a 8(a) Competitive Set Aside project in accordance with Section 8(a) of the Small Business Administration Act [15 USC 637(a)(1)], FAR Part 19.804-2(a)(9), and the executed Partnership Agreement between the Small Business Administration and the United States Department of Agriculture with the special restriction of a geographic limitation to Colorado with a verified SBA approved bona fide office within the state of Colorado.  The estimated date for issuance of solicitations for this project is on or before July 27, 2020.

Amendment One- Posted 07/23/2020- Provides a video walkthrough of project site and removes references to need for State Asbestos Removal Certification

Amendment Two- Posted 08/06/2020- Provides the questions and answers submitted prior to the July 31, 2020 cut off date.

Update #2 ·

The project involves remodeling the Del Norte High School into the Rio Grande National Forest’s Supervisor Office.  The project site is located at 9th and Hermosa, Del Norte, Colorado, 81132.  The original building was built in 1968 with a band room addition constructed at a later date.  In 2018, the Del Norte School District approached the Rio Grande National Forest with an offer to give the high school and land to the Forest Service.  That year the Forest Service began preparing construction documents to renovate the high school into an office building.  The Forest Service is currently soliciting a Hazardous Material Removal contract to remove hazardous material throughout the building.  It is anticipated that hazardous removal will be completed December 2020.  This project includes demolishing approximately 60% of the current building and associated site components.  The remaining 14,400 square foot building will be renovated to comply with current building codes, federal space requirements, and other federal requirements such as Guiding Principles for sustainability.  The project includes utilities, site work, and building construction and renovation.  The estimated project time for this project is 18 months.  The government estimated range to include the base and all option items is $5,000,000 to $10,000,000.  This project is being advertised as a 8(a) Competitive Set Aside project in accordance with Section 8(a) of the Small Business Administration Act [15 USC 637(a)(1)], FAR Part 19.804-2(a)(9), and the executed Partnership Agreement between the Small Business Administration and the United States Department of Agriculture with the special restriction of a geographic limitation to Colorado with a verified SBA approved bona fide office within the state of Colorado.  The estimated date for issuance of solicitations for this project is on or before July 27, 2020.

Amendment One- Posted 07/23/2020- Provides a video walkthrough of project site and removes references to need for State Asbestos Removal Certification

Update #1 ·

The project involves remodeling the Del Norte High School into the Rio Grande National Forest’s Supervisor Office.  The project site is located at 9th and Hermosa, Del Norte, Colorado, 81132.  The original building was built in 1968 with a band room addition constructed at a later date.  In 2018, the Del Norte School District approached the Rio Grande National Forest with an offer to give the high school and land to the Forest Service.  That year the Forest Service began preparing construction documents to renovate the high school into an office building.  The Forest Service is currently soliciting a Hazardous Material Removal contract to remove hazardous material throughout the building.  It is anticipated that hazardous removal will be completed December 2020.  This project includes demolishing approximately 60% of the current building and associated site components.  The remaining 14,400 square foot building will be renovated to comply with current building codes, federal space requirements, and other federal requirements such as Guiding Principles for sustainability.  The project includes utilities, site work, and building construction and renovation.  The estimated project time for this project is 18 months.  The government estimated range to include the base and all option items is $5,000,000 to $10,000,000.  This project is being advertised as a 8(a) Competitive Set Aside project in accordance with Section 8(a) of the Small Business Administration Act [15 USC 637(a)(1)], FAR Part 19.804-2(a)(9), and the executed Partnership Agreement between the Small Business Administration and the United States Department of Agriculture with the special restriction of a geographic limitation to Colorado with a verified SBA approved bona fide office within the state of Colorado.  The estimated date for issuance of solicitations for this project is on or before July 27, 2020.

Attachments

Files attached to this notice, newest first
File Type Posted
Am4 Attach1 QA Post Preproposal Meeting.xlsx XLSX spreadsheet
Am4 Attach 3 Rio Grande_Schedule_of_Items-revised-08192020.pdf PDF
Am4 Attach 4 010250_Definition_of_Contract_Items_and_Measurement_and_Payment-Revision-08192020.pdf PDF
Am4 Attach 2 11 30 13 BSD-Residential Appliances.pdf PDF
Amendment4 SF30 1282AK20R0003.pdf PDF
Amendment3 SF30 1282AK20R0003.pdf PDF
Amendment2 Attachment 1 Questions and Answers.xlsx XLSX spreadsheet
SF30 Sol_1282AK20R0003_Amd_0002.pdf PDF
Amendment1 SF30 1282AK20R0003.pdf PDF
Former High School Walk Through - Outside 07222020.mp4 MP4 file
Former High School Walk Through - Inside Part1.mp4 MP4 file
Former High School Walk Through - Inside Part2.mp4 MP4 file
SF1442 RG SO Construction Sol Award Form.pdf PDF
SF1442 Solicitation Award Form.pdf PDF
Attach3 RGS0-100-3-Project Manual Vol I.pdf PDF
Solicitation Phase 2 FINAL.pdf PDF
Attach08 Technical Proposal Submission Aid.docx DOCX document
Attach6 Appendix A-Geotech Report.pdf PDF
Attach07 Wage Rates.docx DOCX document
Attach4 RGS0-100-4-Project Manual Vol II.pdf PDF
Attach1 Rio Grande_Schedule_of_Items FINAL.pdf PDF
Attach5 RGS0-100-5-Project Manual Vol III.pdf PDF
Attach2 RGS0-100-1-Drawings-Stamped.pdf PDF
Attach09 RFP Question Submission Form.xlsx XLSX spreadsheet
Show all 24

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity