Attach1 Rio Grande_Schedule_of_Items FINAL.pdf
PDF 73 KB Posted
- Attached to
- Rio Grande Supervisor's Office Construction Federal contract opportunity
- Solicitation number
- 1282AK20R0003
About this file
This document includes a schedule of items and federal contract opportunity for the Rio Grande Supervisor's Office Construction project. The project involves remodeling a former high school in Del Norte, Colorado into an office for the Rio Grande National Forest Supervisor's Office. The schedule of items outlines the base items and optional items for the project, which includes site work, demolition, building construction and renovation, utilities, and furnishings. The total estimated cost range for the base items and all optional items is $5 million to $10 million. The federal contract opportunity notes this will be an 8(a) competitive set-aside solicited by the Department of Agriculture Forest Service Rocky Mountain Region. The hazardous material removal contract is anticipated to be completed in December 2020, with an estimated 18 month time frame for the full construction project. The solicitation is planned for release on or before July 27, 2020 for Colorado contractors with an SBA-approved bona fide office in the state.
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NUMBER PROJECT TITLE DATE
Supervisor's Office
ESTIMATORS Rio Grande National Forest
Type Item
(Base Item) #
BI 1 Mobilization L.S.Q Lump Sum Job
BI 2 Site Preparation L.S.Q Lump Sum Job
BI 3 Site Improvement L.S.Q Lump Sum Job
BI 4 Site Civil Utilities L.S.Q Lump Sum Job
BI 5 Site Electrical Utiities L.S.Q Lump Sum Job
BI 6 Building Demolition L.S.Q Lump Sum Job
BI 7 Foundation L.S.Q Lump Sum Job
BI 8 Superstructure L.S.Q Lump Sum Job
BI 9 Enclosure L.S.Q Lump Sum Job
BI 10 Roofing L.S.Q Lump Sum Job
BI 11 Interior Construction L.S.Q Lump Sum Job
BI 12 Interior Finishes L.S.Q Lump Sum Job
BI 13 Building Plumbing Systems L.S.Q Lump Sum Job
BI 14 Building Mechanical Systems L.S.Q Lump Sum Job
BI 15
Building Electrical and Communication Systems
L.S.Q Lump Sum Job
BI 16 Equipment L.S.Q Lump Sum Job
Schedule of Items
Description Method of Measure
Unit Quantity Unit Price TOTAL
RIO GRANDE SUPERVISOR'S OFFICE 1 SCHEDULE OF ITEMS
BI 17 Furnishings L.S.Q Lump Sum Job
Type
(Optional Items)
OI 1 Fleet Parking L.S.Q Lump Sum Job
OI 2 Covered Storage Building L.S.Q Lump Sum Job
OI 3 Administration Sign L.S.Q Lump Sum Job
OI 4 Chain Link Fencing and Gates L.S.Q Lump Sum Job
OI 5 Asphalt Employee Parking A L.S.Q Lump Sum Job
OI 6 Asphalt Employee Parking B L.S.Q Lump Sum Job
OI 7 Vehicle Charging Stations L.SQ Lump Sum Job
OI 8 Brick Tuckpointing L.S.Q Lump Sum Job
OI 9 Lockers AQ Each 60
OI 10 Casework L.S.Q Lump Sum Job
OI 11 Window Coverings AQ SF 1816
OI 12 Floor Polish L.SQ Lump Sum Job
OI 13 Metal Roof L.SQ Lump Sum Job
OI 14 Heat Trace System L.S.Q Lump Sum Job
OI 15 Building Intrusion Monitoring System L.S.Q Lump Sum Job
TOTAL
TOTAL BASE ITEMS
Description Method of Measure
Unit Quantity Unit Price
RIO GRANDE SUPERVISOR'S OFFICE 2 SCHEDULE OF ITEMS
OI 16 Hazardous Material Storage Building L.S.Q Lump Sum Job
OI 17 Trash Enclosure L.S.Q Lump Sum Job
OI 18 Site Furnishings L.S.Q Lump Sum Job
OI 19 Planting L.S.Q Lump Sum Job
OI 20 Shower Room L.S.Q Lump Sum Job
OI 21 Blasting AQ Each
OI 22 Rock Hammer AQ Lineal Feet
OI 23 Export Rock Spoils AQ Cubic Yard
TOTAL OPTIONAL ITEMS
TOTAL BASE PLUS
OPTIONAL ITEMS