Am4 Attach 2 11 30 13 BSD-Residential Appliances.pdf

PDF 61 KB Posted

Attached to
Rio Grande Supervisor's Office Construction
Solicitation number
1282AK20R0003
Issued by

About this file

This document outlines requirements for a federal construction contract opportunity for the Rio Grande Supervisor's Office project. The project involves renovating the former Del Norte High School in Del Norte, Colorado into office space for the Rio Grande National Forest Supervisor's Office. Work includes demolishing approximately 60% of the existing 14,400 square foot building and renovating the remaining space to comply with building codes, federal space requirements, and sustainability standards. The project also includes site work and utilities. The estimated contract value is between $5-10 million and the estimated completion time is 18 months. The solicitation will be set aside for 8(a) small businesses with a Colorado office and is anticipated for release by July 27, 2020. Kitchen appliances required for the project include an undercounter stainless steel dishwasher by GE Appliances or an approved equal manufacturer.

View the file

Other files

File Type Posted
Am4 Attach 4 010250_Definition_of_Contract_Items_and_Measurement_and_Payment-Revision-08192020.pdf PDF
Am4 Attach 3 Rio Grande_Schedule_of_Items-revised-08192020.pdf PDF
Am4 Attach1 QA Post Preproposal Meeting.xlsx XLSX spreadsheet
Amendment4 SF30 1282AK20R0003.pdf PDF
Amendment3 SF30 1282AK20R0003.pdf PDF
Amendment2 Attachment 1 Questions and Answers.xlsx XLSX spreadsheet
SF30 Sol_1282AK20R0003_Amd_0002.pdf PDF
Former High School Walk Through - Outside 07222020.mp4 MP4 file
Amendment1 SF30 1282AK20R0003.pdf PDF
Former High School Walk Through - Inside Part2.mp4 MP4 file
Former High School Walk Through - Inside Part1.mp4 MP4 file
SF1442 RG SO Construction Sol Award Form.pdf PDF
SF1442 Solicitation Award Form.pdf PDF
Attach08 Technical Proposal Submission Aid.docx DOCX document
Attach09 RFP Question Submission Form.xlsx XLSX spreadsheet
Attach2 RGS0-100-1-Drawings-Stamped.pdf PDF
Solicitation Phase 2 FINAL.pdf PDF
Attach5 RGS0-100-5-Project Manual Vol III.pdf PDF
Attach3 RGS0-100-3-Project Manual Vol I.pdf PDF
Attach6 Appendix A-Geotech Report.pdf PDF
Attach4 RGS0-100-4-Project Manual Vol II.pdf PDF
Attach1 Rio Grande_Schedule_of_Items FINAL.pdf PDF
Attach07 Wage Rates.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2019.041 / Rio Grande Supervisor's Office

11 30 13 - 1 RESIDENTIAL APPLIANCES

SECTION 11 30 13

RESIDENTIAL APPLIANCES

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Kitchen appliances.

1.02 REFERENCE STANDARDS

A. UL (DIR) - Online Certifications Directory; Current Edition.

1.03 SUBMITTALS

A. Product Data: Manufacturer's data indicating dimensions, capacity, and operating features of each piece of residential equipment specified.

B. Copies of Warranties: Submit manufacturer warranty and ensure that forms have been completed in Owner's name and registered with manufacturer.

1.04 QUALITY ASSURANCE

A. Electric Appliances: Listed and labeled by UL (DIR) and complying with NEMA Standards (National Electrical Manufacturers Association).

B. Gas Appliances: Bearing design certification seal of American Gas Association (AGA).

C. Basis of Design: Specifications are based on appliance models and types by the specified basis of design manufacturer. Appliances manufactured by other acceptable manufacturers are permitted, subject to compliance with all specified requirements and equal to the product parameters and features of the basis of design product; and provided that deviations in dimensions, sizes, style, function, and finish are minor, and do not detract subtantially fromt he indicated design intent.

PART 2 PRODUCTS

2.01 KITCHEN APPLIANCES

A. Dishwasher: Undercounter.

1. Finish: Stainless steel.

2. Basis of Design Manufacturer:

a. GE Appliances; model # GLDT6969JSS

3. Other Acceptable Manufacturers:

a. Frigidaire Home Products

b. Whirlpool Corp

PART 3 EXECUTION

3.01 EXAMINATION

A. Verify utility rough-ins are provided and correctly located.

3.02 INSTALLATION

A. Install in accordance with manufacturer's instructions.

B. Provide appliances with all standard accessories supplied by the manufacturer and/or required for complete and function installation of each appliance unit.

3.03 ADJUSTING

A. Adjust equipment to provide efficient operation.

2019.041 / Rio Grande Supervisor's Office

11 30 13 - 2 RESIDENTIAL APPLIANCES

3.04 CLEANING

A. Remove packing materials from equipment and properly discard.

B. Wash and clean equipment.

END OF SECTION 11 30 13

File details come from the government source that posted it. Updated .