Am4 Attach 3 Rio Grande_Schedule_of_Items-revised-08192020.pdf

PDF 67 KB Posted

Attached to
Rio Grande Supervisor's Office Construction
Solicitation number
1282AK20R0003
Issued by

About this file

This document includes a schedule of items and federal contract opportunity related to the Rio Grande Supervisor's Office Construction project. The project involves renovating the former Del Norte High School in Del Norte, Colorado into the Rio Grande National Forest Supervisor's Office. The schedule of items outlines the base items and optional items for the construction project, which is estimated to cost between $5-10 million and will take 18 months to complete. The federal contract opportunity provides additional details on the pre-solicitation for the project, including that it is being set aside as an 8(a) competitive opportunity for small businesses in Colorado with an SBA-approved office in the state. Interested offerors must respond by July 27, 2020. The Department of Agriculture Forest Service Rocky Mountain Region is the contracting agency.

View the file

Other files

File Type Posted
Am4 Attach 4 010250_Definition_of_Contract_Items_and_Measurement_and_Payment-Revision-08192020.pdf PDF
Am4 Attach1 QA Post Preproposal Meeting.xlsx XLSX spreadsheet
Am4 Attach 2 11 30 13 BSD-Residential Appliances.pdf PDF
Amendment4 SF30 1282AK20R0003.pdf PDF
Amendment3 SF30 1282AK20R0003.pdf PDF
Amendment2 Attachment 1 Questions and Answers.xlsx XLSX spreadsheet
SF30 Sol_1282AK20R0003_Amd_0002.pdf PDF
Former High School Walk Through - Outside 07222020.mp4 MP4 file
Amendment1 SF30 1282AK20R0003.pdf PDF
Former High School Walk Through - Inside Part2.mp4 MP4 file
Former High School Walk Through - Inside Part1.mp4 MP4 file
SF1442 RG SO Construction Sol Award Form.pdf PDF
SF1442 Solicitation Award Form.pdf PDF
Attach08 Technical Proposal Submission Aid.docx DOCX document
Attach09 RFP Question Submission Form.xlsx XLSX spreadsheet
Attach2 RGS0-100-1-Drawings-Stamped.pdf PDF
Solicitation Phase 2 FINAL.pdf PDF
Attach5 RGS0-100-5-Project Manual Vol III.pdf PDF
Attach3 RGS0-100-3-Project Manual Vol I.pdf PDF
Attach6 Appendix A-Geotech Report.pdf PDF
Attach4 RGS0-100-4-Project Manual Vol II.pdf PDF
Attach1 Rio Grande_Schedule_of_Items FINAL.pdf PDF
Attach07 Wage Rates.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NUMBER PROJECT TITLE DATE

Supervisor's Office

ESTIMATORS Rio Grande National Forest

Type Item

(Base Item) #

BI 1 Mobilization L.S.Q Lump Sum Job

BI 2 Site Preparation L.S.Q Lump Sum Job

BI 3 Site Improvement L.S.Q Lump Sum Job

BI 4 Site Civil Utilities L.S.Q Lump Sum Job

BI 5 Site Electrical Utiities L.S.Q Lump Sum Job

BI 6 Building Demolition L.S.Q Lump Sum Job

BI 7 Foundation L.S.Q Lump Sum Job

BI 8 Superstructure L.S.Q Lump Sum Job

BI 9 Enclosure L.S.Q Lump Sum Job

BI 10 Roofing L.S.Q Lump Sum Job

BI 11 Interior Construction L.S.Q Lump Sum Job

BI 12 Interior Finishes L.S.Q Lump Sum Job

BI 13 Building Plumbing Systems L.S.Q Lump Sum Job

BI 14 Building Mechanical Systems L.S.Q Lump Sum Job

BI 15

Building Electrical and Communication Systems

L.S.Q Lump Sum Job

BI 16 Equipment L.S.Q Lump Sum Job

Schedule of Items

Description Method of Measure

Unit Quantity Unit Price TOTAL

RIO GRANDE SUPERVISOR'S OFFICE 1 SCHEDULE OF ITEMS

BI 17 Furnishings L.S.Q Lump Sum Job

Type

(Optional Items)

OI 1 Fleet Parking L.S.Q Lump Sum Job

OI 2 Covered Storage Building L.S.Q Lump Sum Job

OI 3 Administration Sign L.S.Q Lump Sum Job

OI 4 Chain Link Fencing and Gates L.S.Q Lump Sum Job

OI 5 Asphalt Employee Parking A L.S.Q Lump Sum Job

OI 6 Asphalt Employee Parking B L.S.Q Lump Sum Job

OI 7 Vehicle Charging Stations L.SQ Lump Sum Job

OI 8 Brick Tuckpointing AQ SF 100

OI 9 Lockers AQ Each 60

OI 10 Casework L.S.Q Lump Sum Job

OI 11 Window Coverings AQ SF 1816

OI 12 Floor Polish L.SQ Lump Sum Job

OI 13 Metal Roof L.SQ Lump Sum Job

OI 14 Heat Trace System L.S.Q Lump Sum Job

OI 15 Building Intrusion Monitoring System L.S.Q Lump Sum Job

Description Method of Measure

Unit Quantity Unit Price TOTAL

TOTAL BASE ITEMS

RIO GRANDE SUPERVISOR'S OFFICE 2 SCHEDULE OF ITEMS

OI 16 Hazardous Material Storage Building L.S.Q Lump Sum Job

OI 17 Trash Enclosure L.S.Q Lump Sum Job

OI 18 Site Furnishings L.S.Q Lump Sum Job

OI 19 Planting L.S.Q Lump Sum Job

OI 20 Shower Room L.S.Q Lump Sum Job

OI 21 Blasting AQ Each

OI 22 Rock Hammer AQ Lineal Feet

OI 23 Export Rock Spoils AQ Cubic Yard

TOTAL BASE PLUS

OPTIONAL ITEMS

TOTAL OPTIONAL ITEMS

RIO GRANDE SUPERVISOR'S OFFICE 3 SCHEDULE OF ITEMS