Amendment1 SF30 1282AK20R0003.pdf

PDF 86 KB Posted

Attached to
Rio Grande Supervisor's Office Construction Federal contract opportunity
Solicitation number
1282AK20R0003
Issued by
Department of Agriculture Forest Service R2-Rocky Mountain Region

About this file

This amendment modifies a solicitation for construction services. The project involves renovating a former high school building in Del Norte, Colorado to serve as office space for the Rio Grande National Forest Supervisor's Office. The project is estimated to cost between $5-10 million and will demolish approximately 60% of the existing building along with associated site work. The remaining 14,400 square feet will be renovated to meet building codes, federal space requirements, and sustainability standards. Utilities, site work, and construction/renovation are included. The estimated completion time is 18 months. The amendment provides a virtual site tour for offerors and removes asbestos certification requirements from the solicitation. The solicitation is scheduled for release by July 27, 2020 and is set aside for 8(a) small businesses in Colorado with a bona fide office in the state. The Department of Agriculture Forest Service Rocky Mountain Region is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to Rio Grande Supervisor's Office Construction, newest first.
File Type Posted
Am4 Attach1 QA Post Preproposal Meeting.xlsx XLSX spreadsheet
Am4 Attach 2 11 30 13 BSD-Residential Appliances.pdf PDF
Amendment4 SF30 1282AK20R0003.pdf PDF
Am4 Attach 3 Rio Grande_Schedule_of_Items-revised-08192020.pdf PDF
Am4 Attach 4 010250_Definition_of_Contract_Items_and_Measurement_and_Payment-Revision-08192020.pdf PDF
Amendment3 SF30 1282AK20R0003.pdf PDF
Amendment2 Attachment 1 Questions and Answers.xlsx XLSX spreadsheet
SF30 Sol_1282AK20R0003_Amd_0002.pdf PDF
Former High School Walk Through - Inside Part2.mp4 MP4 file
Former High School Walk Through - Inside Part1.mp4 MP4 file
Former High School Walk Through - Outside 07222020.mp4 MP4 file
SF1442 RG SO Construction Sol Award Form.pdf PDF
SF1442 Solicitation Award Form.pdf PDF
Attach3 RGS0-100-3-Project Manual Vol I.pdf PDF
Solicitation Phase 2 FINAL.pdf PDF
Attach5 RGS0-100-5-Project Manual Vol III.pdf PDF
Attach2 RGS0-100-1-Drawings-Stamped.pdf PDF
Attach09 RFP Question Submission Form.xlsx XLSX spreadsheet
Attach6 Appendix A-Geotech Report.pdf PDF
Attach07 Wage Rates.docx DOCX document
Attach4 RGS0-100-4-Project Manual Vol II.pdf PDF
Attach1 Rio Grande_Schedule_of_Items FINAL.pdf PDF
Attach08 Technical Proposal Submission Aid.docx DOCX document
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

1282AK20R0003

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

82AT

FORT COLLINS CO 80526-8119

2150 CENTRE AVENUE BUILDING E

ARAPAHOE-ROOSEVELT NF PAWNEE NG

USDA FOREST SERVICE

07/17/20200001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/17/2020

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Rio Grande Supervisors Office Construction

USFS Region Two

Rio Grande National Forest

Amendment One (01) updates the following:

1. The contract documents are being amended to include a video walk through of the building for anyone interested in viewing the site but that may not be able to attend the site visit in person. The original purpose of these files were to provide a virtual walkthrough for Phase One, Hazardous Materials Abatement, of this project. Therefore they are not targeted specifically for these project specifications, but will provide offerors

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

CHRISTINA A. SCHOFIELD

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

1282AK20R0003/0001

with an alternative to a face-to-face site visit due to the current COVID-19 pandemic. Three files are attached to this amendment for the virtual site visit.

2. All references to the requirement of state certification for asbestos removal are hereby removed from this solicitation as referenced in

Sections L and Sections M. Specifically Section

L, Volume 1 Technical Approach and Capability, D

State Certification for Asbestos Abatement and

Attachment 08, Technical Proposal Submission

Form, Technical Approach and Capability, D State

Certification for Asbestos Abatement.

All other terms and conditions remain unchanged.

Period of Performance: 10/05/2020 to 10/05/2022

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .