About this opportunity

The U.S. Air Force seeks repair and repainting of Water Tower B738 at Goodfellow Air Force Base, San Angelo, Texas, with proposals due September 15, 2026. The procurement is a total small business set-aside, restricting competition to firms meeting the $45 million annual receipts size standard under NAICS 237110.

Work comprises interior repair, coating removal, and application of new protective coatings to the interior of a 400,000-gallon multi-column elevated water storage tank built in 1950. Metal fabrication includes replacement of the overflow stub pipe, installation of a new riser access manway, replacement of the internal riser access ladder with OSHA-compliant safety devices, and installation of new steel bar safety grating to meet current NFPA and OSHA requirements. All interior dry areas require abrasive blast surface preparation (SSPC-SP6) and full coating system application; the 4-foot-wide vertical riser (wet area) requires current AWWA-approved epoxy systems. The project involves extensive lead-based paint removal on exterior surfaces per Section 02 83 33. Performance period is 120 calendar days from Notice to Proceed, with work conducted Monday–Friday, 7:30 a.m. to 4:30 p.m. The estimated contract magnitude is between $500,000 and $1,000,000.

Sealed bid Invitation for Bid FA303026Q0013 (latest amendment FA303026Q00130007, issued September 10) specifies two CLINs: CLIN 0001 (Interior Tank Repairs, mandatory) and CLIN 0002 (Riser Manway and Internal Access Ladder, bid option). CLIN 0003 (pump removal and piping work) was deleted in Amendment 0002. Performance and payment bonds equal to 100 percent of contract price are required within 10 calendar days of award. Bid guarantee of 20 percent of bid price or $3,000,000, whichever is less, is required. Award will use Lowest Priced Technically Acceptable (LPTA) evaluation, weighing specification compliance, work schedule adherence, environmental and submittal compliance, contractor qualifications (including 10 years' construction experience and OSHA-30 certification for the superintendent), safety programs, and past performance on $300,000–$1,000,000 projects since Fiscal Year 2021. The contractor must obtain AF Form 103 work clearance at least 14 days before construction and provide a Site-Specific Safety Plan, Baseline Construction Schedule within 10 days of award, and detailed submittals including shop drawings, product data, test reports, and as-built drawings with GIS mapping. Prevailing wage rates apply per Department of Labor determination for Irion and Tom Green counties, Texas. Liquidated damages are $985 for the first day of delay and $340 per day thereafter. Questions were due August 20; amendments have addressed scope clarifications including waiver of certain specification sections and confirmation that no historical tank inspection reports or coating assessments are available—bidders must assume full interior coating removal and commercial blast cleaning.

Notice text

7 versions

Update #7 · Latest ·

Amendment 0007 (10 September 2026):

The purpose of this amendment is to:

1. Update the date offers are due to 15 September 2026
2. Attach Repair Water Tower B738 - Question & Answers Rev. 002
3. Attach 26-7001 - Repair Water Tower Specs Sheet and SOW - Addendum 002
4. Attach the updated solicitation document FA303026Q00130007

Amendment 0006 (02 September 2026):

The purpose of this amendment is to:

1. Attach the updated solicitation document FA303026Q00130006, reflecting the appropriate date offers are due.

Amendment 0005 (02 September 2026):

The purpose of this amendment is to:

1. Modify the date offers are due to 11 September 2026 to allow for another Q&A period.

2. Attach updated solicitation document FA303026Q00130005


Amendment 0004 (28 August 2026):

The purpose of this amendment is to update the solictiation document to include the following amendments:

Incorporate Provision FAR 52.228-1 Bid Guarantee & add the amended solicitiation document "Solicitation Amendment - FA303026Q00130004"

Bid Guarantee (Sept 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds-

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000.00, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of clause)

Amendment 0003 (20 August 2026):

The purpose of this amendment is to attach:

1. Repair Water Tower B738 - Question & Answers Rev. 001

2. Revised 1442 Solicitation document

Amendment 0002 (14 August 2026):

The purpose of this amendment is to attach:

1. Repair Water Tower B738 - Questions and Answers

2. 26-7001 - Repair Water Tower Specs Sheet and SOW - Amended

3. JGCU 26-7001 Updated Drawings

4. Pricing Schedule, which replaces the previous "Bid Schedule"

5. 26-7001 Elevated Water Storage Tank Photos B738

6. Updated Solicitation document FA303026Q00130002

This solicitation is being extended until 02 September 2026 at 2:00PM(CST).

The second pre-quote site visit will take place on Wednesday, 19 August 2026 at 9:00AM (CST).

Questions are due to SSgt Michael McCoy at Michael.McCoy.52@us.af.mil and TSgt Christian Bertram at Christian.Bertram@us.af.mil by Thursday, 20 August 2026 at 9:00AM (CST).

Amendment 0001 (24 July 2026):

The purpose of this amendment is to:

a. Attach the Base Access Letter (BAL) Template

“Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.”

Project Title: Repair Water Tower B738

Project Location: Goodfellow Air Force Base, San Angelo, Texas

NAICS: 237110

Size Standard: $45M

PSC: Z2NE

Period of Performance: 120 Days after NTP

Solicitation number FA303026Q0013 is being issued as a Request for Quotation (RFQ).

This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with part 12. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov.

This project involves repairing and repainting the interior of a 400,000‑gallon multi‑column elevated water storage tank, including the main center column and stem. Work includes complete surface preparation, removal of existing coatings, and application of new interior protective coatings to restore structural integrity and ensure compliance with potable‑water standards. Metal fabrication repairs are required to replace the overflow stub pipe, install a new riser access manway, replace the internal riser access ladder, and install new steel bar safety grating. These upgrades are necessary to meet current NFPA and OSHA requirements and to ensure safe access, proper overflow function, and long‑term operational reliability of the elevated water storage tank. The contractor shall complete all work IAW the attached Specifications.

The magnitude for this requirement is between $500,000 and $1,000,000.

Base Access Letters (BAL’s):

Please utilize the template attached below to submit a BAL to SSgt Michael McCoy at Michael.McCoy.52@us.af.mil. by Monday, 27 July 2026 NLT 4:00PM (CST).

Site Visit:

The pre-quote site visit will take place onThursday, 30 July 2026 at 9:00AM (CST). See page 1 of the attachment titled "Drawings" for directions.

Questions:

Due to SSgt Michael McCoy at Michael.McCoy.52@us.af.mil and TSgt Christian Bertram at Christian.Bertram@us.af.mil by Thursday, 06 August 2026 at 9:00AM (CST).

Inspection/Acceptance:

Conducted on-site (Water Tower B738) upon completion of the project IAW the terms and conditions of the contract

Inspection POC: Robert Terrazas (325) 654-5134

Acceptance POC: TSgt Christian Bertram (325) 654-5805

Alternate POC: SSgt Michael McCoy (325) 654-442

Provisions and Clauses:

See attached "Solicitation - FA303026Q0013" document.

Instructions, Conditions, and Notices to Offerors or Quoters:

To ensure timely and equitable evaluation of quotes, offerors must follow the instructions herein. The quote must be complete, self-sufficient, and respond directly to the requirements of this solicitation. Offerors shall submit a written quote in response to this Request for Quote (RFQ) before the due date and time for consideration. Quotes are due no later than Wednesday, 02 September 2026, NLT 2PM (CST).. Quotes shall be emailed to SSgt Michael McCoy at Michael.McCoy.52@us.af.mil and TSgt Christian Bertram at christian.bertram@us.af.mil.

Quotes shall include the following:

     A) Price Quotation:

        (i) Insert proposed pricing utilzing the format of the attached Pricing Schedule.

     B) Technical Requirements:

        (i) The offeror shall include a cover letter that provides:

          Company legal name

          RFQ number

          Small Business status/categories as appropriate

          Company point of contact with email and phone number

          Company CAGE code

        (ii) The offeror shall provide with his/her quote sufficient documentation (using no more than twenty (20) pages, all subsequent pages will not be considered) specifically addressing the technical requirements as stated in FAR Clause 52.212-2, EVALUATION-COMMERCIAL ITEMS AND COMMERCIAL SERVICES.

Failure to comply with any of the requested requirements in this Instruction to Offerors or any other provisions may constitute sufficient cause to justify rejection of a quote.

Evaluation Factors for Award:

Please refer to Section M of the attached "Solicitation - FA303026Q0013" document below.

Definitization of Equitable Adjustments for Change Orders –

The 17th Contracting Squadron anticipates this combo will result in award to a Small Business concern. In accordance with RFO Part 5.101(c)(4)(v) and RFO Part 36.101-4(a), the Government expects change orders to be definitized in an expeditious manner. In the event that a change order cannot be definitized before the work is completed, the Government may issue an undefinitized change order. For any such undefinitized actions, the Government and the contractor will negotiate a final price and terms as soon as practicable, with a target of within 60 days from the date the undefinitized action is issued. The allowable costs will be determined in accordance with RFO Part 31. In accordance with RFO Par 36.101-4(b), for the prior three fiscal years, the 17th Contracting Squadron has not had any construction contract change orders that required the subsequent definitization of an equitable adjustment. Therefore, there is no historical data to report in the format prescribed by the FAR.

Update #6 ·

Amendment 0006 (02 September 2026):

The purpose of this amendment is to:

1. Attach the updated solicitation document FA303026Q00130006, reflecting the appropriate date offers are due.

Amendment 0005 (02 September 2026):

The purpose of this amendment is to:

1. Modify the date offers are due to 11 September 2026 to allow for another Q&A period.

2. Attach updated solicitation document FA303026Q00130005


Amendment 0004 (28 August 2026):

The purpose of this amendment is to update the solictiation document to include the following amendments:

Incorporate Provision FAR 52.228-1 Bid Guarantee & add the amended solicitiation document "Solicitation Amendment - FA303026Q00130004"

Bid Guarantee (Sept 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds-

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000.00, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of clause)

Amendment 0003 (20 August 2026):

The purpose of this amendment is to attach:

1. Repair Water Tower B738 - Question & Answers Rev. 001

2. Revised 1442 Solicitation document

Amendment 0002 (14 August 2026):

The purpose of this amendment is to attach:

1. Repair Water Tower B738 - Questions and Answers

2. 26-7001 - Repair Water Tower Specs Sheet and SOW - Amended

3. JGCU 26-7001 Updated Drawings

4. Pricing Schedule, which replaces the previous "Bid Schedule"

5. 26-7001 Elevated Water Storage Tank Photos B738

6. Updated Solicitation document FA303026Q00130002

This solicitation is being extended until 02 September 2026 at 2:00PM(CST).

The second pre-quote site visit will take place on Wednesday, 19 August 2026 at 9:00AM (CST).

Questions are due to SSgt Michael McCoy at Michael.McCoy.52@us.af.mil and TSgt Christian Bertram at Christian.Bertram@us.af.mil by Thursday, 20 August 2026 at 9:00AM (CST).

Amendment 0001 (24 July 2026):

The purpose of this amendment is to:

a. Attach the Base Access Letter (BAL) Template

“Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.”

Project Title: Repair Water Tower B738

Project Location: Goodfellow Air Force Base, San Angelo, Texas

NAICS: 237110

Size Standard: $45M

PSC: Z2NE

Period of Performance: 120 Days after NTP

Solicitation number FA303026Q0013 is being issued as a Request for Quotation (RFQ).

This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with part 12. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov.

This project involves repairing and repainting the interior of a 400,000‑gallon multi‑column elevated water storage tank, including the main center column and stem. Work includes complete surface preparation, removal of existing coatings, and application of new interior protective coatings to restore structural integrity and ensure compliance with potable‑water standards. Metal fabrication repairs are required to replace the overflow stub pipe, install a new riser access manway, replace the internal riser access ladder, and install new steel bar safety grating. These upgrades are necessary to meet current NFPA and OSHA requirements and to ensure safe access, proper overflow function, and long‑term operational reliability of the elevated water storage tank. The contractor shall complete all work IAW the attached Specifications.

The magnitude for this requirement is between $500,000 and $1,000,000.

Base Access Letters (BAL’s):

Please utilize the template attached below to submit a BAL to SSgt Michael McCoy at Michael.McCoy.52@us.af.mil. by Monday, 27 July 2026 NLT 4:00PM (CST).

Site Visit:

The pre-quote site visit will take place onThursday, 30 July 2026 at 9:00AM (CST). See page 1 of the attachment titled "Drawings" for directions.

Questions:

Due to SSgt Michael McCoy at Michael.McCoy.52@us.af.mil and TSgt Christian Bertram at Christian.Bertram@us.af.mil by Thursday, 06 August 2026 at 9:00AM (CST).

Inspection/Acceptance:

Conducted on-site (Water Tower B738) upon completion of the project IAW the terms and conditions of the contract

Inspection POC: Robert Terrazas (325) 654-5134

Acceptance POC: TSgt Christian Bertram (325) 654-5805

Alternate POC: SSgt Michael McCoy (325) 654-442

Provisions and Clauses:

See attached "Solicitation - FA303026Q0013" document.

Instructions, Conditions, and Notices to Offerors or Quoters:

To ensure timely and equitable evaluation of quotes, offerors must follow the instructions herein. The quote must be complete, self-sufficient, and respond directly to the requirements of this solicitation. Offerors shall submit a written quote in response to this Request for Quote (RFQ) before the due date and time for consideration. Quotes are due no later than Wednesday, 02 September 2026, NLT 2PM (CST).. Quotes shall be emailed to SSgt Michael McCoy at Michael.McCoy.52@us.af.mil and TSgt Christian Bertram at christian.bertram@us.af.mil.

Quotes shall include the following:

     A) Price Quotation:

        (i) Insert proposed pricing utilzing the format of the attached Pricing Schedule.

     B) Technical Requirements:

        (i) The offeror shall include a cover letter that provides:

          Company legal name

          RFQ number

          Small Business status/categories as appropriate

          Company point of contact with email and phone number

          Company CAGE code

        (ii) The offeror shall provide with his/her quote sufficient documentation (using no more than twenty (20) pages, all subsequent pages will not be considered) specifically addressing the technical requirements as stated in FAR Clause 52.212-2, EVALUATION-COMMERCIAL ITEMS AND COMMERCIAL SERVICES.

Failure to comply with any of the requested requirements in this Instruction to Offerors or any other provisions may constitute sufficient cause to justify rejection of a quote.

Evaluation Factors for Award:

Please refer to Section M of the attached "Solicitation - FA303026Q0013" document below.

Definitization of Equitable Adjustments for Change Orders –

The 17th Contracting Squadron anticipates this combo will result in award to a Small Business concern. In accordance with RFO Part 5.101(c)(4)(v) and RFO Part 36.101-4(a), the Government expects change orders to be definitized in an expeditious manner. In the event that a change order cannot be definitized before the work is completed, the Government may issue an undefinitized change order. For any such undefinitized actions, the Government and the contractor will negotiate a final price and terms as soon as practicable, with a target of within 60 days from the date the undefinitized action is issued. The allowable costs will be determined in accordance with RFO Part 31. In accordance with RFO Par 36.101-4(b), for the prior three fiscal years, the 17th Contracting Squadron has not had any construction contract change orders that required the subsequent definitization of an equitable adjustment. Therefore, there is no historical data to report in the format prescribed by the FAR.

Update #5 ·

Amendment 0004 (28 August 2026):

The purpose of this amendment is to update the solictiation document to include the following amendments:

Incorporate Provision FAR 52.228-1 Bid Guarantee & add the amended solicitiation document "Solicitation Amendment - FA303026Q00130004"

Bid Guarantee (Sept 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds-

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000.00, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of clause)

Amendment 0003 (20 August 2026):

The purpose of this amendment is to attach:

1. Repair Water Tower B738 - Question & Answers Rev. 001

2. Revised 1442 Solicitation document

Amendment 0002 (14 August 2026):

The purpose of this amendment is to attach:

1. Repair Water Tower B738 - Questions and Answers

2. 26-7001 - Repair Water Tower Specs Sheet and SOW - Amended

3. JGCU 26-7001 Updated Drawings

4. Pricing Schedule, which replaces the previous "Bid Schedule"

5. 26-7001 Elevated Water Storage Tank Photos B738

6. Updated Solicitation document FA303026Q00130002

This solicitation is being extended until 02 September 2026 at 2:00PM(CST).

The second pre-quote site visit will take place on Wednesday, 19 August 2026 at 9:00AM (CST).

Questions are due to SSgt Michael McCoy at Michael.McCoy.52@us.af.mil and TSgt Christian Bertram at Christian.Bertram@us.af.mil by Thursday, 20 August 2026 at 9:00AM (CST).

Amendment 0001 (24 July 2026):

The purpose of this amendment is to:

a. Attach the Base Access Letter (BAL) Template

“Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.”

Project Title: Repair Water Tower B738

Project Location: Goodfellow Air Force Base, San Angelo, Texas

NAICS: 237110

Size Standard: $45M

PSC: Z2NE

Period of Performance: 120 Days after NTP

Solicitation number FA303026Q0013 is being issued as a Request for Quotation (RFQ).

This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with part 12. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov.

This project involves repairing and repainting the interior of a 400,000‑gallon multi‑column elevated water storage tank, including the main center column and stem. Work includes complete surface preparation, removal of existing coatings, and application of new interior protective coatings to restore structural integrity and ensure compliance with potable‑water standards. Metal fabrication repairs are required to replace the overflow stub pipe, install a new riser access manway, replace the internal riser access ladder, and install new steel bar safety grating. These upgrades are necessary to meet current NFPA and OSHA requirements and to ensure safe access, proper overflow function, and long‑term operational reliability of the elevated water storage tank. The contractor shall complete all work IAW the attached Specifications.

The magnitude for this requirement is between $500,000 and $1,000,000.

Base Access Letters (BAL’s):

Please utilize the template attached below to submit a BAL to SSgt Michael McCoy at Michael.McCoy.52@us.af.mil. by Monday, 27 July 2026 NLT 4:00PM (CST).

Site Visit:

The pre-quote site visit will take place onThursday, 30 July 2026 at 9:00AM (CST). See page 1 of the attachment titled "Drawings" for directions.

Questions:

Due to SSgt Michael McCoy at Michael.McCoy.52@us.af.mil and TSgt Christian Bertram at Christian.Bertram@us.af.mil by Thursday, 06 August 2026 at 9:00AM (CST).

Inspection/Acceptance:

Conducted on-site (Water Tower B738) upon completion of the project IAW the terms and conditions of the contract

Inspection POC: Robert Terrazas (325) 654-5134

Acceptance POC: TSgt Christian Bertram (325) 654-5805

Alternate POC: SSgt Michael McCoy (325) 654-442

Provisions and Clauses:

See attached "Solicitation - FA303026Q0013" document.

Instructions, Conditions, and Notices to Offerors or Quoters:

To ensure timely and equitable evaluation of quotes, offerors must follow the instructions herein. The quote must be complete, self-sufficient, and respond directly to the requirements of this solicitation. Offerors shall submit a written quote in response to this Request for Quote (RFQ) before the due date and time for consideration. Quotes are due no later than Wednesday, 02 September 2026, NLT 2PM (CST).. Quotes shall be emailed to SSgt Michael McCoy at Michael.McCoy.52@us.af.mil and TSgt Christian Bertram at christian.bertram@us.af.mil.

Quotes shall include the following:

     A) Price Quotation:

        (i) Insert proposed pricing utilzing the format of the attached Pricing Schedule.

     B) Technical Requirements:

        (i) The offeror shall include a cover letter that provides:

          Company legal name

          RFQ number

          Small Business status/categories as appropriate

          Company point of contact with email and phone number

          Company CAGE code

        (ii) The offeror shall provide with his/her quote sufficient documentation (using no more than twenty (20) pages, all subsequent pages will not be considered) specifically addressing the technical requirements as stated in FAR Clause 52.212-2, EVALUATION-COMMERCIAL ITEMS AND COMMERCIAL SERVICES.

Failure to comply with any of the requested requirements in this Instruction to Offerors or any other provisions may constitute sufficient cause to justify rejection of a quote.

Evaluation Factors for Award:

Please refer to Section M of the attached "Solicitation - FA303026Q0013" document below.

Definitization of Equitable Adjustments for Change Orders –

The 17th Contracting Squadron anticipates this combo will result in award to a Small Business concern. In accordance with RFO Part 5.101(c)(4)(v) and RFO Part 36.101-4(a), the Government expects change orders to be definitized in an expeditious manner. In the event that a change order cannot be definitized before the work is completed, the Government may issue an undefinitized change order. For any such undefinitized actions, the Government and the contractor will negotiate a final price and terms as soon as practicable, with a target of within 60 days from the date the undefinitized action is issued. The allowable costs will be determined in accordance with RFO Part 31. In accordance with RFO Par 36.101-4(b), for the prior three fiscal years, the 17th Contracting Squadron has not had any construction contract change orders that required the subsequent definitization of an equitable adjustment. Therefore, there is no historical data to report in the format prescribed by the FAR.

Update #4 ·

Amendment 0003 (20 August 2026):

The purpose of this amendment is to attach:

1. Repair Water Tower B738 - Question & Answers Rev. 001

2. Revised 1442 Solicitation document

Amendment 0002 (14 August 2026):

The purpose of this amendment is to attach:

1. Repair Water Tower B738 - Questions and Answers

2. 26-7001 - Repair Water Tower Specs Sheet and SOW - Amended

3. JGCU 26-7001 Updated Drawings

4. Pricing Schedule, which replaces the previous "Bid Schedule"

5. 26-7001 Elevated Water Storage Tank Photos B738

6. Updated Solicitation document FA303026Q00130002

This solicitation is being extended until 02 September 2026 at 2:00PM(CST).

The second pre-quote site visit will take place on Wednesday, 19 August 2026 at 9:00AM (CST).

Questions are due to SSgt Michael McCoy at Michael.McCoy.52@us.af.mil and TSgt Christian Bertram at Christian.Bertram@us.af.mil by Thursday, 20 August 2026 at 9:00AM (CST).

Amendment 0001 (24 July 2026):

The purpose of this amendment is to:

a. Attach the Base Access Letter (BAL) Template

“Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.”

Project Title: Repair Water Tower B738

Project Location: Goodfellow Air Force Base, San Angelo, Texas

NAICS: 237110

Size Standard: $45M

PSC: Z2NE

Period of Performance: 120 Days after NTP

Solicitation number FA303026Q0013 is being issued as a Request for Quotation (RFQ).

This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with part 12. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov.

This project involves repairing and repainting the interior of a 400,000‑gallon multi‑column elevated water storage tank, including the main center column and stem. Work includes complete surface preparation, removal of existing coatings, and application of new interior protective coatings to restore structural integrity and ensure compliance with potable‑water standards. Metal fabrication repairs are required to replace the overflow stub pipe, install a new riser access manway, replace the internal riser access ladder, and install new steel bar safety grating. These upgrades are necessary to meet current NFPA and OSHA requirements and to ensure safe access, proper overflow function, and long‑term operational reliability of the elevated water storage tank. The contractor shall complete all work IAW the attached Specifications.

The magnitude for this requirement is between $500,000 and $1,000,000.

Base Access Letters (BAL’s):

Please utilize the template attached below to submit a BAL to SSgt Michael McCoy at Michael.McCoy.52@us.af.mil. by Monday, 27 July 2026 NLT 4:00PM (CST).

Site Visit:

The pre-quote site visit will take place onThursday, 30 July 2026 at 9:00AM (CST). See page 1 of the attachment titled "Drawings" for directions.

Questions:

Due to SSgt Michael McCoy at Michael.McCoy.52@us.af.mil and TSgt Christian Bertram at Christian.Bertram@us.af.mil by Thursday, 06 August 2026 at 9:00AM (CST).

Inspection/Acceptance:

Conducted on-site (Water Tower B738) upon completion of the project IAW the terms and conditions of the contract

Inspection POC: Robert Terrazas (325) 654-5134

Acceptance POC: TSgt Christian Bertram (325) 654-5805

Alternate POC: SSgt Michael McCoy (325) 654-442

Provisions and Clauses:

See attached "Solicitation - FA303026Q0013" document.

Instructions, Conditions, and Notices to Offerors or Quoters:

To ensure timely and equitable evaluation of quotes, offerors must follow the instructions herein. The quote must be complete, self-sufficient, and respond directly to the requirements of this solicitation. Offerors shall submit a written quote in response to this Request for Quote (RFQ) before the due date and time for consideration. Quotes are due no later than Wednesday, 02 September 2026, NLT 2PM (CST).. Quotes shall be emailed to SSgt Michael McCoy at Michael.McCoy.52@us.af.mil and TSgt Christian Bertram at christian.bertram@us.af.mil.

Quotes shall include the following:

     A) Price Quotation:

        (i) Insert proposed pricing utilzing the format of the attached Pricing Schedule.

     B) Technical Requirements:

        (i) The offeror shall include a cover letter that provides:

          Company legal name

          RFQ number

          Small Business status/categories as appropriate

          Company point of contact with email and phone number

          Company CAGE code

        (ii) The offeror shall provide with his/her quote sufficient documentation (using no more than twenty (20) pages, all subsequent pages will not be considered) specifically addressing the technical requirements as stated in FAR Clause 52.212-2, EVALUATION-COMMERCIAL ITEMS AND COMMERCIAL SERVICES.

Failure to comply with any of the requested requirements in this Instruction to Offerors or any other provisions may constitute sufficient cause to justify rejection of a quote.

Evaluation Factors for Award:

Please refer to Section M of the attached "Solicitation - FA303026Q0013" document below.

Definitization of Equitable Adjustments for Change Orders –

The 17th Contracting Squadron anticipates this combo will result in award to a Small Business concern. In accordance with RFO Part 5.101(c)(4)(v) and RFO Part 36.101-4(a), the Government expects change orders to be definitized in an expeditious manner. In the event that a change order cannot be definitized before the work is completed, the Government may issue an undefinitized change order. For any such undefinitized actions, the Government and the contractor will negotiate a final price and terms as soon as practicable, with a target of within 60 days from the date the undefinitized action is issued. The allowable costs will be determined in accordance with RFO Part 31. In accordance with RFO Par 36.101-4(b), for the prior three fiscal years, the 17th Contracting Squadron has not had any construction contract change orders that required the subsequent definitization of an equitable adjustment. Therefore, there is no historical data to report in the format prescribed by the FAR.

Update #3 ·

Amendment 002 (14 August 2026):

The purpose of this amendment is to attach:

1. Repair Water Tower B738 - Questions and Answers

2. 26-7001 - Repair Water Tower Specs Sheet and SOW - Amended

3. JGCU 26-7001 Updated Drawings

4. Pricing Schedule, which replaces the previous "Bid Schedule"

5. 26-7001 Elevated Water Storage Tank Photos B738

6. Updated Solicitation document FA303026Q00130002

This solicitation is being extended until 02 September 2026 at 2:00PM(CST).

The second pre-quote site visit will take place on Wednesday, 19 August 2026 at 9:00AM (CST).

Questions are due to SSgt Michael McCoy at Michael.McCoy.52@us.af.mil and TSgt Christian Bertram at Christian.Bertram@us.af.mil by Thursday, 20 August 2026 at 9:00AM (CST).

Amendment 0001 (24 July 2026):

The purpose of this amendment is to:

a. Attach the Base Access Letter (BAL) Template

“Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.”

Project Title: Repair Water Tower B738

Project Location: Goodfellow Air Force Base, San Angelo, Texas

NAICS: 237110

Size Standard: $45M

PSC: Z2NE

Period of Performance: 120 Days after NTP

Solicitation number FA303026Q0013 is being issued as a Request for Quotation (RFQ).

This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with part 12. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov.

This project involves repairing and repainting the interior of a 400,000‑gallon multi‑column elevated water storage tank, including the main center column and stem. Work includes complete surface preparation, removal of existing coatings, and application of new interior protective coatings to restore structural integrity and ensure compliance with potable‑water standards. Metal fabrication repairs are required to replace the overflow stub pipe, install a new riser access manway, replace the internal riser access ladder, and install new steel bar safety grating. These upgrades are necessary to meet current NFPA and OSHA requirements and to ensure safe access, proper overflow function, and long‑term operational reliability of the elevated water storage tank. The contractor shall complete all work IAW the attached Specifications.

The magnitude for this requirement is between $500,000 and $1,000,000.

Base Access Letters (BAL’s):

Please utilize the template attached below to submit a BAL to SSgt Michael McCoy at Michael.McCoy.52@us.af.mil. by Monday, 27 July 2026 NLT 4:00PM (CST).

Site Visit:

The pre-quote site visit will take place onThursday, 30 July 2026 at 9:00AM (CST). See page 1 of the attachment titled "Drawings" for directions.

Questions:

Due to SSgt Michael McCoy at Michael.McCoy.52@us.af.mil and TSgt Christian Bertram at Christian.Bertram@us.af.mil by Thursday, 06 August 2026 at 9:00AM (CST).

Inspection/Acceptance:

Conducted on-site (Water Tower B738) upon completion of the project IAW the terms and conditions of the contract

Inspection POC: Robert Terrazas (325) 654-5134

Acceptance POC: TSgt Christian Bertram (325) 654-5805

Alternate POC: SSgt Michael McCoy (325) 654-442

Provisions and Clauses:

See attached "Solicitation - FA303026Q0013" document.

Instructions, Conditions, and Notices to Offerors or Quoters:

To ensure timely and equitable evaluation of quotes, offerors must follow the instructions herein. The quote must be complete, self-sufficient, and respond directly to the requirements of this solicitation. Offerors shall submit a written quote in response to this Request for Quote (RFQ) before the due date and time for consideration. Quotes are due no later than Wednesday, 02 September 2026, NLT 2PM (CST).. Quotes shall be emailed to SSgt Michael McCoy at Michael.McCoy.52@us.af.mil and TSgt Christian Bertram at christian.bertram@us.af.mil.

Quotes shall include the following:

     A) Price Quotation:

        (i) Insert proposed pricing utilzing the format of the attached Pricing Schedule.

     B) Technical Requirements:

        (i) The offeror shall include a cover letter that provides:

          Company legal name

          RFQ number

          Small Business status/categories as appropriate

          Company point of contact with email and phone number

          Company CAGE code

        (ii) The offeror shall provide with his/her quote sufficient documentation (using no more than twenty (20) pages, all subsequent pages will not be considered) specifically addressing the technical requirements as stated in FAR Clause 52.212-2, EVALUATION-COMMERCIAL ITEMS AND COMMERCIAL SERVICES.

Failure to comply with any of the requested requirements in this Instruction to Offerors or any other provisions may constitute sufficient cause to justify rejection of a quote.

Evaluation Factors for Award:

Please refer to Section M of the attached "Solicitation - FA303026Q0013" document below.

Definitization of Equitable Adjustments for Change Orders –

The 17th Contracting Squadron anticipates this combo will result in award to a Small Business concern. In accordance with RFO Part 5.101(c)(4)(v) and RFO Part 36.101-4(a), the Government expects change orders to be definitized in an expeditious manner. In the event that a change order cannot be definitized before the work is completed, the Government may issue an undefinitized change order. For any such undefinitized actions, the Government and the contractor will negotiate a final price and terms as soon as practicable, with a target of within 60 days from the date the undefinitized action is issued. The allowable costs will be determined in accordance with RFO Part 31. In accordance with RFO Par 36.101-4(b), for the prior three fiscal years, the 17th Contracting Squadron has not had any construction contract change orders that required the subsequent definitization of an equitable adjustment. Therefore, there is no historical data to report in the format prescribed by the FAR.

Update #2 ·

Amendment 0001 (24 July 2026):

The purpose of this amendment is to:

a. Attach the Base Access Letter (BAL) Template

“Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.”

Project Title: Repair Water Tower B738

Project Location: Goodfellow Air Force Base, San Angelo, Texas

NAICS: 237110

Size Standard: $45M

PSC: Z2NE

Period of Performance: 120 Days after NTP

Solicitation number FA303026Q0013 is being issued as a Request for Quotation (RFQ).

This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with part 12. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov.

This project involves repairing and repainting the interior of a 400,000‑gallon multi‑column elevated water storage tank, including the main center column and stem. Work includes complete surface preparation, removal of existing coatings, and application of new interior protective coatings to restore structural integrity and ensure compliance with potable‑water standards. Metal fabrication repairs are required to replace the overflow stub pipe, install a new riser access manway, replace the internal riser access ladder, and install new steel bar safety grating. These upgrades are necessary to meet current NFPA and OSHA requirements and to ensure safe access, proper overflow function, and long‑term operational reliability of the elevated water storage tank. The contractor shall complete all work IAW the attached Specifications.

The magnitude for this requirement is between $500,000 and $1,000,000.

Base Access Letters (BAL’s):

Please utilize the template attached below to submit a BAL to SSgt Michael McCoy at Michael.McCoy.52@us.af.mil. by Monday, 27 July 2026 NLT 4:00PM (CST).

Site Visit:

The pre-quote site visit will take place onThursday, 30 July 2026 at 9:00AM (CST). See page 1 of the attachment titled "Drawings" for directions.

Questions:

Due to SSgt Michael McCoy at Michael.McCoy.52@us.af.mil and TSgt Christian Bertram at Christian.Bertram@us.af.mil by Thursday, 06 August 2026 at 9:00AM (CST).

Inspection/Acceptance:

Conducted on-site (Water Tower B738) upon completion of the project IAW the terms and conditions of the contract

Inspection POC: Robert Terrazas (325) 654-5134

Acceptance POC: TSgt Christian Bertram (325) 654-5805

Alternate POC: SSgt Michael McCoy (325) 654-442

Provisions and Clauses:

See attached "Solicitation - FA303026Q0013" document.

Instructions, Conditions, and Notices to Offerors or Quoters:

To ensure timely and equitable evaluation of quotes, offerors must follow the instructions herein. The quote must be complete, self-sufficient, and respond directly to the requirements of this solicitation. Offerors shall submit a written quote in response to this Request for Quote (RFQ) before the due date and time for consideration. Quotes are due no later than Thursday, 24 August 2026 NLT 2PM (CST).. Quotes shall be emailed to SSgt Michael McCoy at Michael.McCoy.52@us.af.mil and TSgt Christian Bertram at christian.bertram@us.af.mil.

Quotes shall include the following:

     A) Price Quotation:

        (i) Insert proposed pricing utilzing the format of the attached Pricing Schedule.

     B) Technical Requirements:

        (i) The offeror shall include a cover letter that provides:

          Company legal name

          RFQ number

          Small Business status/categories as appropriate

          Company point of contact with email and phone number

          Company CAGE code

        (ii) The offeror shall provide with his/her quote sufficient documentation (using no more than twenty (20) pages, all subsequent pages will not be considered) specifically addressing the technical requirements as stated in FAR Clause 52.212-2, EVALUATION-COMMERCIAL ITEMS AND COMMERCIAL SERVICES.

Failure to comply with any of the requested requirements in this Instruction to Offerors or any other provisions may constitute sufficient cause to justify rejection of a quote.

Evaluation Factors for Award:

Please refer to Section M of the attached "Solicitation - FA303026Q0013" document below.

Definitization of Equitable Adjustments for Change Orders –

The 17th Contracting Squadron anticipates this combo will result in award to a Small Business concern. In accordance with RFO Part 5.101(c)(4)(v) and RFO Part 36.101-4(a), the Government expects change orders to be definitized in an expeditious manner. In the event that a change order cannot be definitized before the work is completed, the Government may issue an undefinitized change order. For any such undefinitized actions, the Government and the contractor will negotiate a final price and terms as soon as practicable, with a target of within 60 days from the date the undefinitized action is issued. The allowable costs will be determined in accordance with RFO Part 31. In accordance with RFO Par 36.101-4(b), for the prior three fiscal years, the 17th Contracting Squadron has not had any construction contract change orders that required the subsequent definitization of an equitable adjustment. Therefore, there is no historical data to report in the format prescribed by the FAR.

Update #1 ·

“Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.”

Project Title: Repair Water Tower B738

Project Location: Goodfellow Air Force Base, San Angelo, Texas

NAICS: 237110

Size Standard: $45M

PSC: Z2NE

Period of Performance: 120 Days after NTP

Solicitation number FA303026Q0013 is being issued as a Request for Quotation (RFQ).

This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with part 12. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov.

This project involves repairing and repainting the interior of a 400,000‑gallon multi‑column elevated water storage tank, including the main center column and stem. Work includes complete surface preparation, removal of existing coatings, and application of new interior protective coatings to restore structural integrity and ensure compliance with potable‑water standards. Metal fabrication repairs are required to replace the overflow stub pipe, install a new riser access manway, replace the internal riser access ladder, and install new steel bar safety grating. These upgrades are necessary to meet current NFPA and OSHA requirements and to ensure safe access, proper overflow function, and long‑term operational reliability of the elevated water storage tank. The contractor shall complete all work IAW the attached Specifications.

The magnitude for this requirement is between $500,000 and $1,000,000.

Base Access Letters (BAL’s):

Please utilize the template attached below to submit a BAL to SSgt Michael McCoy at Michael.McCoy.52@us.af.mil. by Monday, 27 July 2026 NLT 4:00PM (CST).

Site Visit:

The pre-quote site visit will take place onThursday, 30 July 2026 at 9:00AM (CST). See page 1 of the attachment titled "Drawings" for directions.

Questions:

Due to SSgt Michael McCoy at Michael.McCoy.52@us.af.mil and TSgt Christian Bertram at Christian.Bertram@us.af.mil by Thursday, 06 August 2026 at 9:00AM (CST).

Inspection/Acceptance:

Conducted on-site (Water Tower B738) upon completion of the project IAW the terms and conditions of the contract

Inspection POC: Robert Terrazas (325) 654-5134

Acceptance POC: TSgt Christian Bertram (325) 654-5805

Alternate POC: SSgt Michael McCoy (325) 654-442

Provisions and Clauses:

See attached "Solicitation - FA303026Q0013" document.

Instructions, Conditions, and Notices to Offerors or Quoters:

To ensure timely and equitable evaluation of quotes, offerors must follow the instructions herein. The quote must be complete, self-sufficient, and respond directly to the requirements of this solicitation. Offerors shall submit a written quote in response to this Request for Quote (RFQ) before the due date and time for consideration. Quotes are due no later than Thursday, 24 August 2026 NLT 2PM (CST).. Quotes shall be emailed to SSgt Michael McCoy at Michael.McCoy.52@us.af.mil and TSgt Christian Bertram at christian.bertram@us.af.mil.

Quotes shall include the following:

     A) Price Quotation:

        (i) Insert proposed pricing utilzing the format of the attached Pricing Schedule.

     B) Technical Requirements:

        (i) The offeror shall include a cover letter that provides:

          Company legal name

          RFQ number

          Small Business status/categories as appropriate

          Company point of contact with email and phone number

          Company CAGE code

        (ii) The offeror shall provide with his/her quote sufficient documentation (using no more than twenty (20) pages, all subsequent pages will not be considered) specifically addressing the technical requirements as stated in FAR Clause 52.212-2, EVALUATION-COMMERCIAL ITEMS AND COMMERCIAL SERVICES.

Failure to comply with any of the requested requirements in this Instruction to Offerors or any other provisions may constitute sufficient cause to justify rejection of a quote.

Evaluation Factors for Award:

Please refer to Section M of the attached "Solicitation - FA303026Q0013" document below.

Definitization of Equitable Adjustments for Change Orders –

The 17th Contracting Squadron anticipates this combo will result in award to a Small Business concern. In accordance with RFO Part 5.101(c)(4)(v) and RFO Part 36.101-4(a), the Government expects change orders to be definitized in an expeditious manner. In the event that a change order cannot be definitized before the work is completed, the Government may issue an undefinitized change order. For any such undefinitized actions, the Government and the contractor will negotiate a final price and terms as soon as practicable, with a target of within 60 days from the date the undefinitized action is issued. The allowable costs will be determined in accordance with RFO Part 31. In accordance with RFO Par 36.101-4(b), for the prior three fiscal years, the 17th Contracting Squadron has not had any construction contract change orders that required the subsequent definitization of an equitable adjustment. Therefore, there is no historical data to report in the format prescribed by the FAR.

Files

Show all 21

Notice history

Notice Type Posted
Repair Water Tower B738 Award Award Notice
This notice Latest solicitation Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Hill AFB Painting ID/IQ Sources Sought Hill Air Force Base, Utah 84056, United States · NAICS 238990 Air Force Sustainment Center Competitive 8(a)
2-STEP SEALED BID - TINKER AFB WWYK250019 Remove and Replace Fire Sprinkler in Plasma Booth Dust Collectors and Replace the Building F/A System, B3221 Tinker AFB, Oklahoma 73145, United States · NAICS 236220 Air Force Sustainment Center Total Small Business
Airfield Blast Shield Dyess AFB, Texas 79607, United States · NAICS 238120 Global Strike Command Total Small Business
WWYK260004 - repair structural integrity, B1134, post 34 & north wall Tinker AFB, Oklahoma 73145, United States · NAICS 238190 Air Force Sustainment Center Total Small Business
Protective Coating Maintenance IDIQ Sheppard AFB, TX 76311 · NAICS 238320 Air Education and Training Command Economically Disadvantaged Woman-Owned Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity