This is a Pricing Schedule for a federal construction contract to repair Water Tower B738 (West) at Goodfellow AFB, Texas, under contract number JCGU 26-7001. The project delivery team must provide all tools, equipment, materials, labor, and supervision necessary to complete the work within a performance period of 120 calendar days, which includes time for Government transitions and phasing.
The contract utilizes a tiered CLIN structure with one basic line item and two optional bid items. CLIN 0001 (Basic: Interior Tank Repairs) is mandatory and encompasses all demolition, repair, equipment replacement, and interior finishes including temporary partition construction/deconstruction, floor demolition and preparation, new flooring application, site cleanup, and demobilization. CLIN 0002 (Bid Option: Riser Manway & Internal Access Ladder) covers manufacture, assembly, and installation of manway access and internal ladder with Government-approved coatings. CLIN 0003 (Bid Option: Remove, Maintenance, and Re-install Pump and Replace Piping and Fittings) includes removal, maintenance, and reinstallation of the motorized pump assembly along with installation of new valves, fittings, and piping in the pump house. The total contract value is the sum of CLIN 0001 plus CLIN 0002 plus CLIN 0003, with pricing to be provided by the contractor on a per-project basis for each line item.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JCGU 26-7001Repair Water Tower B738 (West) Goodfellow AFB, TX
Pricing Schedule
PART 1 GENERAL
1.1 SUMMARY
This section lists the pricing schedule and schedule of contract line-item numbers (CLINs) defined in the technical provisions of the contract.
1.2 CONTRACT LINE-ITEM NUMBER (CLIN)SCHEDULE
The project delivery team shall provide all tools, equipment, material, labor, and supervision necessary to perform all work subject to the terms and conditions required by contract.
The total project performance period shall be ONE HUNDRED AND TWENTY (120) CALENDAR DAYS. The total performance period includes time prescribed for
Government transitions and phasing as described in the project documents.
CLIN DESCRIPTION QTY UNIT PRICE AMOUNT
0001 (Basic: Interior Tank Repairs): All costs associated with the demolition, repair, equipment replacement, and interior finishes of the tank. This includes all time and costs associated with constructing/ deconstructing temporary partitions, floor demolition and preparation, application of new flooring, site cleanup, and demobilization. This CLIN does not include any of the following CLINs within it.
1 Project **** ____$
UNIT TOTAL
0002 (Bid Option: Riser Manway & Internal Access Ladder): All costs associated with manufacture, assembly, and installation of both the manway access and internal ladder. This includes costs of applied Government approved coatings.
1 Project **** ___ $
UNIT TOTAL
TOTAL CLIN (ALL): CLIN 0001 + CLIN 0002 + CLIN 0003
TOTAL
-- End of Document –
0003 (Bid Option: Remove, Maintenance, and Re-install Pump and Replace Piping and Fittings): All costs associated with removal, maintenance, and re-installation motorized pump assembly, and installation of new valves, fittings, and piping within the pump house.
TOTAL
1 Project